1j. Flamingo Dr and Basswood Cir: Award of Contract4 0
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
7901 Park Place
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
www.ci.chanhassen.mn.us
MEMORANDUM
TO: Paul Oehme, Director of Public Works /City Engineer
FROM: Terrance Jeffery, Water Resources Coordinator (R
DATE: June 27, 2011 k -KU1
SUBJ: Flamingo Drive and Basswood Circle Drainage Improvement Project
SWMP19 11 -01 -1 & 11- 01 -02: Award of Contract
PROPOSED MOTION
"The City Council approves a construction contract in the amount of $54,970.50
to Kusske Construction Company for work to be performed on Flamingo Drive
and Basswood Circle."
City Council approval requires a simple majority vote of the City Council present.
BACKGROUND
Because of safety issues and degradation of existing infrastructure, staff proposed and
Council approved a drainage improvement project for Flamingo Road and Basswood
Circle. On May 23, 2011, with staff's recommendation, Council awarded the contract
to Olson Construction Company. The project was to be substantially completed by
June 17, 2011. As of this date, the contractor had not provided the City with signed
contracts, proof of insurance or a performance /payment bonds. Further, no effort had
been made to provide the City with an amended schedule of activities.
Based upon the lack of responsiveness by the contractor and their inability to perform
the solicited activities by the completion date, staff is recommending that the contract
is awarded to the second contractor from the original quote submittal. The second
apparent low bidder is Kusske Construction Company.
BIDS
Requests for Proposals were submitted to four contractors on May 3, 2011. Minger
Construction elected not to submit a quote to the City. The bids received are as
follows:
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
Paul Oehme
Flamingo Dr. & Basswood Cir. Drainage Improvement Project
June 27, 2011
Page 2
Kusske Construction has done work for the City of Chanhassen. Most recently they were involved in
the 2011 road and trail improvement project. Their work performance has been good. Scheduling
for this project is contingent upon the current state budget discussion as that will have a direct
bearing on the contractor's schedule. Subsequent to award of first quote, Kusske has additional
projects that are scheduled during the summer months and will work this project into his existing
schedule at the earliest practical time. Regardless, the contractor is confident that they will be able to
schedule a continuous block of time to complete the work before the Labor Day Holiday weekend.
The contractor and staff will establish a schedule and communicate it to the residents on July 5.
Funding for the project is proposed from the 720 - 000 -4300 fund of the Surface Water Management
Fund. This fund will also be used for ongoing maintenance of the existing storm sewer
infrastructure, including pond cleanouts and emergency repairs such as the outlet for Brenden Pond
and the pond southwest of the intersection of Powers Boulevard and Lake Lucy Road. Also included
in this funding is storm water improvements associated with the T.H. 101 and Pleasant View Road
project including consulting fees and sediment testing. Other items funded from this include the
Citizen Assisted Monitoring Program (C.A.M.P.) and our erosion control inspections program.
Attachment: 1. SWMP Budget 720 - 000 -4300
2. Project Location Map
3. Construction Plans
c: Jason Kusske, Kusske Construction Company
g: \eng\swmp projects\swmp 19 11 -01 flamingo drainage \award construction_062711.doc
The engineer's opinion of total project cost was $54,476.00.
CITY OF CHANHASSEN
2011 BUDGET
ENTERPRISE FUNDS
7zo Surface Water Management Fund
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC1 DEC
i
a
82
4010
Salaries & Wages -Reg
123,527
126,200
129,200
2.4%
°
4020
Salaries & Wages -Temp
-
10,000
- 8,000
(20.0 %)
4030
Contributions- Retirement
16,968
18,200
18,200
0.0%
4040
Contributions - Insurance
18,166
19,000
21,000
10.5%
4050
Workers Compensation
326
900
500
(44.4 %)
TOTAL PERSONAL SERVICES
158,986
174,300
176,900
1.5%
4120
Supplies- Equipment
939
5,000
2,000
(60.0 %)
4130
Supplies Program
5,857
5,000
7,500
50.0%
4150
Maintenance Materials
13,481
25,000
10,000
(60.0 %)
4210
Books and Periodicals
-
100
100
0.0%
4240
Uniforms & Clothing
-
100
100
0.0%
TOTAL MATERIALS & SUPPLIES
20,277
35,200
19,700
(44.0 %)
(P- :►4300
4301
Fees, Services
Auditing .
99,379
8,000
175,000
8,000
175,000
8,000
0.0%
4310
Telephone and Communications
491
600
600
0.0%
0.0%
4340
Printing & Publishing
25
1,000
100
(90.0 %)
4360
Subscriptions & Memberships
1,060
1,800
1,200-
(33.3 %)
4370
Travel & Training
1,427
4,500
2,000
(55.6 %)
4380
Mileage
-
300
300
0.0%
4410
Rental- Equipment
-
4,000
-
(100.0 %)
4483
Insurance - General Liability
1,500
1,500
1,500
0.0%
4933
Safes Tax
117
-
-
TOTAL CONTRACTUAL SERVICES
111,998
196,700
188,700
(4.1%)
**
TOTAL EXPENDITURES
291,262
406,200
385,300
a
82
�
l�
t -
I
�W
S, E
, cg\j
LrT
lb
�t
Fl amingo Drive
I 11:1���
DIIOTACIR�
0 LU
,w��I ��=Z�
0
Lake Susan
O
Q
N
+ W E
S
0 0 -
0 CU
U) c:
U) 0)
U) E 0
- > m
c: 0 0
0
CB Q —i
M n
U-
MOF
CHMSER
Lake
k e
FRONT Lotus Lake
IG LAND D R
ur
Basswoo)�d Curve
C
Ui
>
LrT
lb
�t
Fl amingo Drive
I 11:1���
DIIOTACIR�
0 LU
,w��I ��=Z�
0
Lake Susan
O
Q
N
+ W E
S
0 0 -
0 CU
U) c:
U) 0)
U) E 0
- > m
c: 0 0
0
CB Q —i
M n
U-
MOF
CHMSER
MALLARD
G
( 1 0
N
'0
O,
Utility location based upon information provided from Qwest and Centerpoint Energy
and are approximate and for general use only. Gasline located 17 feet from ceterline
14 0 i / of Flamingo Drive Contractor will be responsible to call for field locations.
/ 8521
8
1 50
l i
41 14
1421
8528
856
8570
Ci
8571
8612
15
1470
1480
\ 15201
8787
6 tiF�c
T
8631 8 1
LEGEND
TO, ® swlnlct
86
639 - -` ~i
Storm Pipe
1364 C-Wm ,ntG -1— \
8647 8771
8652
865p,
N
W // AA B�,
+E
FFF
1 inch equals 100 feet
Draintile Installation Project SWMP 19:11 -01
Flamingo Dr Neighborhood
cror
CN6NI O
Utility location based upon information provided from Qwest and Centerpoint Energy
and are approximate and for general use only. Gasline located 19 feet from ceterline
of Basswood and on a 49 foot radius from center of cul de sac. Qwest location shown
as approximate back of curb. Contractor will be responsible to call for field locations.
N
WEE
30 /
S
co,
U) 13
O.
p.
N
l
O
1
r
r
20 \
O
�
C 0
O
Basswood Circle
l
^
W Z
• O
W
(1. U
L_
0 U
0
— o
7330 `_
0
rn U)
rn
M
M
31 LEGEND
- - - Drain Tile N swlnlet
gwest -r
Storm Pipe
aff or
7340 Centerpoint Gasline��(
Tw a M
1 inch equals 40 feet 7361 °aE° I II °w "E ._ °a PaO_T, ° ° ° "°4R —. " °" °