1d-1. TH 101 Imp from Lyman Blvd to Pioneer Trl: Accept EA-EAW and Call PH0$
CITY OF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
7901 Park Place
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
www.ci.chanhassen.mn.us
MEMORANDUM
TO: Todd Gerhardt, City Manager 0.
FROM: Paul Oehme, Dir. of Public Works /City Engineer
DATE: July 11, 2011
SUBJ: Accept EA /EAW and Call Public Hearing
TH 101 Improvements, Lyman Boulevard to Pioneer Trail
City Project PW671
�r
PROPOSED MOTION
"The City Council approves resolution accepting EA/EAW; Call Public
Hearing for August 8, 2011"
BACKGROUND
Over the past nine months, Chanhassen staff has been working with
representatives of Mn/DOT and Carver County to identify a preferred design for
the reconstruction of TH 101 between Lyman Boulevard (CSAH 18) and Pioneer
Trail (CSAH 14). The intent is to have all preliminary design and environmental
reviews and approvals for the project completed by December 2011 to allow final
design to proceed in late 2011 or 2012. Project construction is currently planned
for 2013.
The project construction is proposed to be financed primarily through Federal
Transportation Funding secured through the 2009 regional solicitation process.
As a result of the scope of the proposed improvements and the Federal funding,
the preparation of an Environmental Assessment /Environmental Assessment
Worksheet (EA/EAW) is required to review the potential environmental impacts
of the project. The EA/EAW document has been completed and is available for
review in the City's Engineering Department or on the City's website.
The EA/EAW notice was published in the EQB (Environmental Quality Board)
Monitor on June 27, 2011 and the public comment period is proposed to be
extended from July 11, 2011 through August 22, 2011. A public hearing for the
EA/EAW is proposed to be held at the City Council meeting on August 8, 2011.
DISCUSSION
TH 101 is currently a two -lane undivided roadway with a number of safety
deficiencies including steep grades, sharp curves, and inadequate sight distances
resulting in blind intersections. TH 101 is proposed to be reconstructed to a
Chanhassen is a Community for Life - Providing for Todayand Planning for Tomorrow
Todd Gerhardt
July 11, 2011
Page 2
four -lane divided design with pedestrian/bicycle trails along both sides of the roadway. The
primary goals of the project are as follows:
Improve safety for people along the existing TH 101 corridor
✓ Reduce crashes to the extent possible
✓ Add turn lanes to provide safe turning movements at intersections
✓ Improve sight distance by reducing sharp curves and steep grades near intersections
Improve capacity and connectivity along the TH 101 corridor
✓ Accommodate regional and local transportation needs of anticipated population and
employment growth in the TH 101 corridor by increasing traffic capacity
Provide transportation solutions that minimize environmental impacts
• Avoid /minimize /mitigate impacts on environmental, social, and cultural resources
• Minimize need for new right of way takings from park, business and residential properties
Public involvement activities have been initiated for the project including the following:
• Distribution of newsletter #1 to inform area residents about the project in November 2010
• Public open house meeting #1 was held on December 2, 2010
• Distribution of newsletter #2 to update residents on the project in June 2011
• Public open house meeting #2 was held on June 22, 2011
Attachments: 1. Resolution
2. Location Map
Bill Weckman, Carver County
Kristen Zschomler, Mn/DOT
Jon Horn, Kimley -Horn & Associates
gAeng \public \pw67f4a ea th 101 lyman to pioneer \071111 bkgd th 101 call public hearing.doc
CITY OF CHANHASSEN
CARVER COUNTY, MINNESOTA
DATE: July 11, 2011 RESOLUTION NO: 2011-
MOTION BY:
SECONDED BY:
APPROVE RESOLUTION ACCEPTING EA/EAW FOR THE TH 101
IMPROVEMENTS; CALL PUBLIC HEARING FOR AUGUST 8, 2011
CITY PROJECT PW67F4A
WHEREAS, Chanhassen staff has been working with representatives of Mn/DOT and
Carver County to identify a preferred design for the reconstruction of TH 101 between Lyman
Boulevard (CSAH 18) and Pioneer Trail (CSAH 14).
WHEREAS, TH 101 is currently a two -lane undivided roadway with a number of safety
deficiencies including steep grades, sharp curves, and inadequate sight distances resulting in
blind intersections.
WHEREAS, TH 101 is proposed to be reconstructed to a four -lane divided design with
pedestrian/bicycle trails along both sides of the roadway.
WHEREAS, the reconstruction of TH 101 is proposed to be financed primarily through
Federal Transportation Funding secured through the 2009 regional solicitation process.
WHEREAS, as a result of the scope of the proposed improvements and the Federal
funding, an Environmental Assessment/Environmental Assessment Worksheet (EA/EAW) has
been completed to review the potential environmental impacts of the project.
WHEREAS, the EA/EAW notice was published in the EQB Monitor on June 27, 2011
and the public comment period is proposed to extend from July 11, 2011 through August 22,
2011.
NOW THERE BE IT RESOLVED that the City of Chanhassen accepts the EA/EAW for
the TH 101 Improvements, City Project PW67F4a, and calls a public hearing for August 8, 2011.
ATTEST:
Todd Gerhardt, City Manager
Thomas A. Furlong, Mayor
YES NO ABSENT
zoo o zoo 400
eGal9 100 feat
LEGEND
CITY OF CHANHASSEN
c � i Proposed Roadways Existing Wetland Boundary
- Proposed ROW
Proposed Shoulder
_ - - - -- Existing ROW
Proposed Raised Median. Curb Existing Permanent Easement
Proposed Trails Parcel Boundary
Section Line
Proposed Ponds
Proposed Signal
Proposed Mill & Overlay ® "
8 Existing Signal
Proposed Retaining Wall -
' -
,
z
r ,
,
t.
�w
Ili
} r r,ffi
� co
a Proposed
Pedestrian
Tunnel
1
T■ ■ .-- I
Ike
` � f�� it • �' �.
r
r
I ,
_
I P0 i
~•��.-- •m_,... fit ,, j / �s� �,, ., �� w `. m .: , . glaw
r
a f
V
s ,
R .
I
t
_
----- -- --- - ------------
\\
f�
m❑
HIGHWAY 101 Improvements
- Pioneer Trail to Lyman Boulevard
Preferred
Alternative
L l'
I —
Kimley -Horn
and Associates, Inc.
Apri 2011