6. Preliminary plat to Subdivide Golden Glow acres, 6660 Powers Blvd.CITY OF PC DATE: 1/4/95 (p
CC DATE:8 /28!95 and
� 9/25/95
.J.� CASE #: 94 -22 SUB
' By: Al -Jaff / Hempel:v
�Z
Q
'J
�Q
STAFF REPORT
PROPOSAL: Preliminary Plat to Subdivide 2.22 Acres into 4 single family lots, Golden
Glow Acres
LOCATION: West of Powers Boulevard and approximately 500 feet south of the
intersection of Lake Lucy Road and Powers Boulevard
APPLICANT: James G. Ravis
6660 Powers Boulevard
Chanhassen, MN 55317
1
1
1�
W
IN
1
1
PRESENT ZONING: RSF, Residential Single Family District OM Nj cM AdmMkIt►ator
Fadmed
ACREAGE: 2.22 acres Dwred
DENSITY: 1.8 Units per Acre 1.87 Units per Acre -Net Submitted to Commisskfll
DW ADJACENT ZONING AND Fete submitted to Bound
LAND USE: N - RSF, Residential Single Family 9-
S - RSF, Residential Single Family 9 — a5' -qs
E - RSF, Residential Single Family, Powers Boulevard
W - RSF, Residential Single Family
WATER AND SEWER: Available to the site.
PHYSICAL CHARACTER. The site contains a single family home and a garage. A
wetland occupies the southwesterly edge of the site.
Mature trees of different species occupy the northerly and
easterly portion of the site.
2000 LAND USE PLAN: Residential -Low Density et Density 1.2 - 4.0 units per acre)
f
:49
0% r. A
RD
PA
4R
K Nw Ifl
-am
mi
,
W
?mW
' tvm Ai
P-M
Imp
FA
a 00
v
Mq
a 4r
Nil
MCA 0
. Ifni
', gy ros + ��® � � � � � �r •, —�-
wrr
4
U TTW I'l
T 7 7.
71
Ilk L
., gpp
Golden Glow Acres
September 25, 1995
Page 2
PROPOSAL /SUMMARY
The applicant is proposing to subdivide 2.22 acres into 4 single family lots. The property is
zoned RSF, Residential Single Family.
The average lot size is 23,304 square feet with a resulting net density of 1.87 units per acre. The
site is located west of Powers Boulevard and approximately 500 feet south of the intersection of
Lake Lucy Road and Powers Boulevard. Access to the subdivision is proposed to be provided
via a private street which will serve all four lots. There is a single family home on the existing
parcel.
All of the proposed lots meet the minimum area, width, and depth requirements of the Zoning
Ordinance.
The site has a dense concentration of mature trees along its northerly portion. The applicant has
submitted a landscaping /reforestation plan. A preservation easement over the wooded areas
along the north property line as well as the common lot line separating Lots 2 and 3, will be
required. This easement will prevent any construction from taking place and subsequently
preserving the trees.
One of the main issues of concern is access to the site. Back in September of 1991, in
conjunction with Lundgren's WillowRidge subdivision which lies directly to the west of this site,
access and utility service to this site were explored. Utilities were extended to the west line of
this site in conjunction with WillowRidge's development proposal. Access into the Ravis parcel
from WillowRidge was another matter, however. The Ravis parcel does have frontage along
Powers Boulevard (County Road 17) which allowed other alternatives to provide access to the
Ravis property rather than WillowRidge. Staff concluded at that time a cul -de -sac from
WillowRidge was not feasible. A cul -de -sac from Lundgren's WillowRidge would have
involved losing a lot of trees and by the time the cul -de -sac was extended through to the Ravis
property, there was very little property left to be developed. Staff has recently explored some
other alternative development possibilities on the Ravis property and adjoining parcels. Attached
is a memo that was sent to the residents lying south of Lake Lucy Road and west of Powers
Boulevard (Attachment 1). This memo explores five alternatives to subdividing the
neighborhood. Staff met with the residents regarding the alternative development proposals back
on March 9, 1995. At that meeting, there were numerous discussions pertaining to private
driveway access points along Powers Boulevard as well as all of the options listed within the
memo. The general consensus was that no one alternative could be completely agreed upon by
all affected parcels. Staff did propose Option E as a viable option in developing the
neighborhood, including the Ravis parcel. This alternative also provided the most flexibility for
the other adjacent parcels to subdivide as well. The private driveway proposal, as submitted,
limits access to only the Ravis parcel and no future access to the adjoining parcels. Staff feels
Golden Glow Acres
September 25, 1995
Page 3
that this area can and should be developed under a different alternative which includes a public
street. Therefore, at this time staff recommends that the subdivision as proposed be denied due
to premature street access to development. If a private driveway was allowed to be constructed,
the remaining parcels (Kohman and Infanger) will have limited subdivision potential, if any.
In summary, staff believes that the proposed subdivision is premature. We are recommending
that it be denied for reasons discussed in the staff report.
PRELIMINARY PLAT
The applicant is proposing to subdivide 2.22 acres into 4 single family lots. The property is
zoned RSF, Residential Single Family. The density of the proposed subdivision is 1.87 units per
acre net.
All the lots meet or exceed the minimum 15,000 square feet of area with an average lot size of
23,304 square feet. A single - family residence currently occupies proposed Lot 1. This structure
meets all zoning ordinance setback requirements. The site is located west of Powers Boulevard
and approximately 500 feet south of the intersection of Lake Lucy Road and Powers Boulevard.
Access to the subdivision is proposed to be provided via a private street
which will serve all four lots.
Staff notes that the proposal is consistent with the Comprehensive Plan.
WETLANDS
The edge of a large ag -urban wetland touches the Ravis property and has been staked by a trained
wetland delineator. A 0 to 20 foot wide buffer with an average 10 foot wide buffer will be
maintained as required in the City's Wetland Ordinance. Staff requires a letter documenting that
there will be no alterations to the wetland as a result of the project.
Wetland buffer areas shall be surveyed and staked in accordance with the City's wetland
ordinance. The City will install wetland buffer edge signs before building construction begins
and will charge the applicant $20 per sign.
DRAINAGE
Surface Water Management Plan (SWMP)
The city has adopted a Surface Water Management Plan (SWMP) that serves as a tool to protect,
preserve and enhance water resources. The plan identifies, from a regional perspective, the storm
water quantity and quality improvements necessary to allow future development to take place
' Golden Glow Acres
September 25, 1995
' Page 4
and minimize its impact to downstream water bodies. In general, the water quantity portion of
the plan uses a 100 -year design storm interval for ponding and a 10 -year design storm interval
for storm sewer piping. The water quality portion of the plan uses William Walker, Jr.'s Pondnet
model for predicting phosphorus concentrations in shallow water bodies. An ultimate conditions
' model has been developed at each drainage area based on the projected future land use, and
therefore, different sets of improvements under full development were analyzed to determine the
optimum phosphorus reduction in priority water bodies.
Storm Water Quality Fees
' The SWMP has established a water quality connection charge for each new subdivision based on
land use. Dedication shall be equal to the cost of land and pond volume needed for treatment of
the phosphorus load leaving the site. The requirement for cash in lieu of land and pond
' construction shall be based upon a schedule in accordance with the prescribed land use zoning.
Values are calculated using market values of land in the city of Chanhassen plus a value of $2.50
' per cubic yard for excavation of the pond. Since there is no downstream water quality basin for
this site these fees will be charged according to the volume of ponding needed for the site. A
credit for the one existing house /lot has been applied. The proposed SWMP quality charge has
' been calculated at $800 /acre for single - family residential developments. This proposed
development of 2.14 acres (less the existing home site on Lot 1 = .72 acres) would then be
responsible for a water quality connection charge of 1.42 acres which equates to $1,136.00. This
' fee will be waived if the applicant constructs an appropriate sediment basin to pretreat the
stormwater runoff from the site.
' The site drains to the southwest into the ag /urban wetland. Since this wetland is shown to
receive all stormwater discharge including hard surface areas, staff recommends that a sediment
trap should be provided in accordance with the City's SWMP to pretreat the stormwater before it
' is discharged into the wetland. Staff recommends the applicant develop a storm water drainage
plan to convey runoff from the driveways down to a stormwater treatment pond. Detailed storm
drainage calculations will be required for review and approval by the City prior to final plat.
Storm Water Quantity Fees
The SWMP has established a connection charge for the different land uses based on an average
city -wide rate for the installation of water quantity systems. This cost includes land acquisition,
' proposed SWMP culverts, open channels and storm water ponding areas for runoff storage.
Since the SWMP does not propose any improvements on this site, the applicant should be
required to pay the City the stormwater quantity charge. Single family residential developments
' have a connection charge of $1,980 per developable acre. This proposed single - family residential
development of 1.42 acres would then be responsible for a water quantity connection charge of
$2,811.60.
Golden Glow Acres
September 25, 1995
Page 5
GRADING
The grading and utility plan proposes to grade a private street from Powers Boulevard (County
Road 17) to service the proposed four lots. As a result of the grading most of the significant
spruce trees along the southerly property line will be lost. The existing driveway access point is
proposed to be relocated to tie into the proposed private street from Powers Boulevard. The
Carver County Highway Department will need to issue an access permit for the proposed private
street. Between 6 to 8 feet of fill is needed to build up the house pads for Lots 3 and 4. Staff is
wondering if there is additional material on site to be utilized for the development of these house
pads or will material be imported to the site? If material is to be imported or exported, approved
haul routes will need to be submitted to the City for review and approval.
EROSION CONTROL
All disturbed areas, as a result of construction, shall be seeded and mulched or sodded
immediately after grading to minimize erosion. Erosion control fence is proposed adjacent to the
wetlands within the buffer zone. Staff recommends erosion control be placed at the construction
limits and not encroaching upon the buffer zone.
UTILITIES
Sanitary sewer service is available to the site from the west; however, sanitary sewer is not deep
enough to service Lot 4 without an ejector pump in the lower level. According to the plans, the
applicant is proposing the use of a 3 -inch forcemain which is not desirable nor necessary in this
situation. There are alternative measures to be employed such as an ejector pump from the lower
level. Staff recommends that Lot 4 be required to make use of an ejector system for the lower
level so that the main level and above will be on a gravity sewer system. This option requires
less maintenance for the homeowner and, from a reliability standpoint, a superior alternative.
Water service is available from Powers Boulevard. The applicant is proposing to extend a 6 -inch
water service line down for water service to the new lots as well as fire protection. As denoted in
the alternative development proposals, this site can also be served by public utilities and streets
from the north through a public improvement project. If this application is approved, staff
recommends that the sewer and water construction be in accordance with the City's Standard
Specifications and Detail Plates. Upon completion of the utility improvements, the utilities
should be turned over to the City for ownership and maintenance. The applicant will need to
enter into a development contract with the City and provide the necessary security to guarantee
installation of the public improvements.
Golden Glow Acres
September 25, 1995
Page 6
STREETS
' Back in September of 1991 in conjunction with Lundgren's WillowRidge subdivision which lies
directly to the west of this site, access and utility service to this site were explored. Utilities were
' extended to the west line of this site in conjunction with WillowRidge's development proposal.
Access into the Ravis parcel from WillowRidge was another matter, however. The Ravis parcel
does have frontage along Powers Boulevard (County Road 17) which allowed other alternatives
' to provide access to the Ravis property rather than WillowRidge. Staff concluded at that time a
cul -de -sac from WillowRidge was not feasible. A cul -de -sac from Lundgren's WillowRidge
would have involved losing a lot of trees and by the time the cul -de -sac was extended through to
' the Ravis property, there was very little property left to be developed. Staff has recently
explored some other alternative development possibilities on the Ravis property and adjoining
' parcels. Attached is a memo that was sent to the residents lying south of Lake Lucy Road and
west of Powers Boulevard (Attachment 1). This memo explores five alternatives to subdividing
the neighborhood. Staff met with the residents regarding the alternative development proposals
back on March 9, 1995. At that meeting there were numerous discussions pertaining to private
driveway access points along Powers Boulevard as well as all of the options listed within the
memo. The general consensus was that no one alternative could be completely agreed upon by
' all affected parcels. Staff did propose Option E as a viable option in developing the
neighborhood, including the Ravis parcel. This alternative also provided the most flexibility for
the other adjacent parcels to subdivide as well. The private driveway proposal, as submitted,
limits access to only the Ravis parcel and no future access to the adjoining parcels. Staff feels
that this area can and should be developed under a different alternative which includes a public
street. Therefore, at this time staff recommends that the subdivision as proposed be denied due
' to premature street access to development. If a private driveway was allowed to be constructed,
the remaining parcels (Kohman and Infanger) will have limited subdivision potential, if any.
' PRIVATE STREETS - FINDINGS
The applicant is proposing the use of a private street to provide access to four proposed lots in
this development. City Code, Section 18 -57 (o) permits up to four (4) lots to be served by a
private street if the city finds the following to exist:
' (1) The prevailing development pattern makes it infeasible or inappropriate to
construct a public street. In making this determination, the city may consider the
' location of existing property lines and homes, local or geographic conditions, and
the existence of wetlands.
' FINDING: The prevailing development does not make it infeasible for the construction
of a public street. Should the applicant be permitted to construct the private street as
proposed, two parcels will be limited in subdividing and/or possibly prohibited from
Golden Glow Acres
September 25, 1995
Page 7
further subdividing. Staff believes that option E of the alternative development proposals
is the best of the 5 alternatives for serving the neighboring properties.
(2) After reviewing the surrounding area it is concluded that an extension of the
public street system is not required to serve other parcels in the area, improve
access, or to provide a street system consistent with the comprehensive plan.
FINDING: The extension of a public street as described in option E is required to
service the surrounding parcels.
(3) The use of a private street will permit enhanced protection of wetlands and mature
trees.
FINDING: The proposed private street will result in the removal of a large number of
trees located south of Lot 1. By using a public street, all those trees will be preserve_ d. If
the public street was relocated to the north of the site where staff has proposed, tree loss
would be minimal. Most of the trees can be transplanted due to their size.
Staff is recommending that the private streets as proposed by the applicant be denied for reasons
outlined above.
PARK DEDICATION
Full park and trail fees will be collected per city ordinance in lieu of land acquisition and/or trail
construction.
COMPLIANCE WITH ORDINANCE - RSF DISTRICT
Lot
Lot
Lot
Home
Area
Width
Depth
Setback
Ordinance
15,000
100'
125'
30' front/rear
10' sides
BLOCK 1
Lot 1
31,437
125'
252'
30730'
10'
Lot 2
18,750
125'
150'
30730'
20'
Lot 3
20,456
140'
150
30750'
20'
Golden Glow Acres
September 25, 1995
' Page 8
Lot 4 22,575 169' 150' 30750'
20'
' TREE PRESERVATION/LANDSCAPING
The applicant has submitted a tree inventory and canopy coverage calculation. Also noted on the
plan are required replacement plantings to be done. All trees, excluding those in the front yard of
the existing home, are along the property lines of the site. Since the new road will be following
the southern and lower eastern lines, a number of trees are scheduled to be removed. The
' diameters range from four to 16 inches, not including a 48 inch willow that appears to be on the
neighbor's property.
Five trees ( 35, 36, 37, 38, and 45) have been included on the survey, but do not appear to be on
the property being developed. Trees 35 through 38 have questionable survival chances. There
' will be a three to four foot cut for the roadway and the four trees are 2 to 10 feet from the edge of
the cut. Since they appear to be on the neighbor's property, their removal cannot be readily
assumed.
' The applicant's canopy coverage calculations are in order and they will be required to plant 13
replacement trees as shown on the tree inventory. During construction, trees 51 through 58 must
be protected at all times by tree protection fencing. The same preservation principles shall be
applied to trees near the existing house and along the proposed roadway.
' Whether or not trees 35 through 38 and 45 will be included in the development plans must be
resolved by the applicant considering they are not on the development property. Their removal or
preservation may also make a slight difference in canopy coverage calculations.
FINDINGS
1. The proposed subdivision is consistent with the zoning ordinance;
Finding: The subdivision meets all the requirements of the RSF, Residential
' Single Family District.
' 2. The proposed subdivision is consistent with all applicable city, county and regional plans
including but not limited to the city's comprehensive plan;
'
Finding: The proposed subdivision is consistent with all applicable plans with the
exception of the private street ordinance as discussed in the private street findings
section.
D
Golden Glow Acres
September 25, 1995
Page 9
3. The physical characteristics of the site, including but not limited to topography, soils,
vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm
water drainage are suitable for the proposed development;
Finding: The proposed site is suitable for development subject to the conditions
specified in this report.
4. The proposed subdivision makes adequate provision for water supply, storm drainage,
sewage disposal, streets, erosion control and all other improvements required by this
chapter;
Finding: The proposed subdivision is served by adequate urban infrastructure with
the exception of public streets.
5. The proposed subdivision will not cause environmental damage;
Finding: The proposed subdivision will not cause environmental damage subject
to conditions of approval. The'proposed subdivision contains adequate open areas
to accommodate house pads. Tree removal can be minimized if the applicant
implemented option E of street layout proposal prepared by the city.
6. The proposed subdivision will not conflict with easements of record.
Finding The proposed subdivision will not conflict with existing easements, but
rather will expand and provide all necessary easements.
7. The proposed subdivision is not premature. A subdivision is premature if any of the
following exists:
a. Lack of adequate storm water drainage.
b. Lack of adequate roads.
C. Lack of adequate sanitary sewer systems.
d. Lack of adequate off -site public improvements or support systems.
Finding The proposed subdivision is provided with adequate urban infrastructure
with the exception of adequate streets.
PLANNING COMMISSION UPDATE
On April 19, 1995, the Planning Commission reviewed and unanimously recommended denial of
this application. They concluded that their role was to ensure that areas develop in an orderly
' Golden Glow Acres
September 25, 1995
Page 10
fashion. Allowing the subject site to develop as proposed could hinder the development of the
' surrounding properties. Hence, the Planning Commission concurred with the findings presented
in the staff report and recommended denial of the application.
Staff met with the applicant and his attorney on June 6, 1995 and August 2, 1995 to discuss
compromises to the conditions of approval for preliminary plat of Golden Glow Acres.
' One of the alternatives was granting an easement for the cul -de -sac over proposed Lots 1 and 2.
With this proposal we had concerns for upgrading the cul -de -sac in the future. Staff s initial
reaction was to require it to be paved in conjunction with the overall development or at least
' require a financial security to guarantee construction in the future which was not acceptable to Mr.
Ravis. Staff agreed to consider it as an alternative.
' It appears the Ravis' are interested in striking a compromise with regards to granting a cul -de -sac
easement to the City contingent upon certain conditions. The conditions involve variances to city
' ordinance. For instance, the SWMP connection fees are required in accordance to Section 18 -63.
Some of the conditions listed may be amenable with further modifications. Listed below are the
City's responses to the conditions of compromise.
Condition No. 1: The condition requiring a conservation easement over the vegetated areas will
be eliminated from the staff report. Based on the proposed grading plan, very little vegetated area
will remain except along the north property line of Lot 1. Therefore, the conservation easement is
no longer applicable.
' Condition No. 2: The subdivision ordinance requires a grading and development plan with each
final plat to ensure that building elevations and type will be compatible with the overall drainage
and grading plan. These elevations may be modified at time of building permit issuance by one or
' two feet, plus or minus, from the proposed grade as long as the drainage pattern is maintained.
We also require this data to ensure the sanitary sewer will be able to serve the proposed dwelling
via a gravity sewer system. This information is also used to verify that the driveway grade will
not exceed 10% which is city ordinance. Therefore, condition no. 2 of staff s recommendations
must remain as is.
' Condition No. 9: The subdivision ordinance (18 -78) and development contract require all of the
public improvements to be initiated within one (1) year and completed within two years from the
date the development contract is executed. There is a section in the development contract
whereby the applicant may request the City Council grant an extension to this deadline. The
reason for this requirement is to ensure that the improvements are installed in an expedient
' manner to minimize erosion and disturbance to the adjacent properties. In addition, no building
permits are issued for the development until the public improvements are installed and the streets
paved with a bituminous surface.
n
Golden Glow Acres
September 25, 1995
Page 11
Condition No. 11: The requirement that the developer pay the cost of extending utilities to the
north line of Lot 2 for future extension is very typical. It is necessary so the adjacent property
owner is able to connect to the utility system and be able to extend it through their parcel for
future development. By looping the water system, it also improves the Ravis' development
proposal from a water quality and fire flow standpoint. This condition must remain as is. Even if
the street from the north is not constructed to the Ravis' property, it is most likely that the
watermain would be extended north to provide a looped water system.
Condition No. 13: This condition may be modified. We will delete the portion of the condition
as follows: "Direct access to all lots be limited to the proposed private street." The requirement
for a cross - access easement will need to remain.
Condition No. 14: Storm sewer improvements will be further reviewed during the final
construction plan review process. Upon quick review of the project, we believe if the project was
approved with just a four -lot subdivision it may only require drainage swales between the lots.
However, since this development is down stream of the property to the north, additional runoff
may be created and directed towards the wetlands on this site. Therefore, staff believes there
should be an area designated for stormwater treatment. The developer will receive credit for the
oversizing of the drainage basin. The credit will be applied to the development SWMP
connection fees. The exact credit is determined upon review of the final construction plans. The
proposal to waive the S WMP fees is unacceptable. These fees are required by city ordinance.
Condition No. 16: The storm drainage would be reviewed in conjunction with the final
construction drawings.
Cul -de -sac Easement: Requirement of a cul -de -sac easement is not mentioned in the April 19,
1995 staff report to the Planning Commission because staff recommended denial of the proposal.
Discussions of the cul -de -sac originated based on meetings following the Planning Commission
meeting. The City does have the authority to require dedication of street right -of -way to construct
a public street to city standards to access the proposed development. The proposed cul -de -sac
could serve as a turnaround to meet the City's private driveway ordinance and serve as a terminus
for a future public street from the north. If the property to the north develops in some other
fashion than what staff had considered as Option E, the cul -de -sac easement could be vacated. At
least with this scenario, there are more options available for development to occur. If the cul -de-
sac /street is constructed, the other two parcels (Infanger and Kohman) could gain access to a
public street which would also give these parcels potential to further subdivide. Should the cul-
de -sac be constructed in the future, access to proposed Lots 2 3, and 4 shall be limited to the
public cul -de -sac and the private driveway would be removed along the south side of proposed
Lot 1.
Staff met with Mr. Ravis and Council member Senn on Friday, August 18, 1995 to further discuss
concerns Mr. Ravis had with staff s conditions of approval. Council member Senn directed staff
Golden Glow Acres
September 25, 1995
Page 12
to consult with the City Attorney on ways in which the Ravis' could be reimbursed for
construction of the private driveway if the adjacent parcels request to subdivide and propose to
use the private driveway.
According to Mr. Roger Knutson, City Attorney, if the adjacent properties wanted to gain access
to the Ravis' private driveway to service their developments, they would have to negotiate on their
own behalf the easement rights to use the Ravis' private driveway with the property owners that
have rights to the driveway. The other alternative would be for the adjacent property owners to
petition the City to acquire an easement and construct a street through the Ravis parcel to service
their development needs. This would require a §429 improvement project.
Staff also discussed with Council member Senn and Mr. Ravis the need for the cul -de -sac
easement and the effects on development. One of the concerns was that if the cul -de -sac was
constructed in the future; homes in the Ravis plat should meet the necessary setbacks at this time
to accommodate a potential future cul -de -sac. On Lot 2 the setback should be 50 feet versus the
' standard 30 feet from the front property line to facilitate the possible future cul -de -sac. There
appears to be sufficient room on the lot to accommodate this setback requirement. Mr. Ravis does
not seem opposed to the idea as well, but does not want to be assessed for street from the north
when and if it happens.
RECOMMENDATION
' The Plannin g Commission recommended the City Council adopt the following motion:
' "The City Council recommends denial of the preliminary plat for Subdivision #94 -22 for Golden
Glow Acres for 4 single family lots as shown on the plans dated November 18, 1994 for reasons
' outlined in the staff report."
Should the City Council wish to approve the preliminary plat, staff recommends the City Council
' adopt the following motion:
"The City Council approves the preliminary plat for Subdivision #94 -22 for Golden Glow Acres
' for 4 single family lots as shown on the plans dated November 18, 1995, with the following
conditions:
1. The vegetated areas which A411 not be aff-ected by the develep-me-M wi I I be preterated 1 9-T-a
censer-vation easement. The eensen easement shall permit ppani 1g, removal of dead
A-F and underbrush. All heal y-4rees-ever- 6 1, ealiper at 4'height
not be penn-i-Red ta:hp, remeved.. Staff shall provide a plan whiGh shows the loroation of
conser-vation easement and the applicant shall provide the legal dese . The
applicant will be required to plant 13 replacement trees as shown on the tree inventory.
e
Golden Glow Acres
September 25, 1995
Page 13
2. Building Department conditions:
a. Revise Grading and Utility Plan to indicate lowest floor level elevation, top of
foundation elevation and garage floor elevation. This should be done prior to final
plat approval.
b. Revise the Grading and Utility Plan to show standard designations for dwellings.
This should be done prior to final plat approval.
C. Submit soils report to the Inspections Division. This should be done prior to
issuance of any building permits.
3. Fire Marshal conditions:
a. Submit street names to Public Safety for approval.
b. A ten foot clear space must be maintained around fire hydrants.
C. Fire hydrant location is accepted.
4 Full park and trail fees shall be collected per city ordinance in lieu of land acquisition
and /or trail construction.
5. The applicant shall provide the city with a $500 escrow prior to the city signing the final
plat for review and recording of the final plat documents and guarantee boulevard
restoration.
rei
VA
8.
Importing or exporting material from the site will require approval of a haul route. The
haul route shall be submitted to the City for review and approval.
Lot 4 shall utilize an internal ejector pump system to service the lower level of the
dwellings, if necessary. The use of a forcemain shall be prohibited.
All areas disturbed as a result of construction activities shall be immediately restored with
seed and disc - mulched or wood -fiber blanket or sod within two weeks of completion of
each activity in accordance with the City's Best Management Practice Handbook. Erosion
control fence shall be installed at the edge of the construction limits and not within the
wetland buffer zone.
Golden Glow Acres
September 25, 1995
Page 14
9. The applicant shall enter into a development contract with the City and provide the
necessary security to guarantee installation of the public improvements and compliance
with the final plat conditions of approval.
10. The applicant shall report to the City Engineer the location of any drain tiles found during
construction and shall relocate or abandon the drain tile as directed by the City Engineer.
11. The applicant shall be responsible for extending municipal utilities to the north line of Lot
2 and to the Infanger and Kohman properties to the east for future extension. Lots 2,
3 and 4 will be charged at time of building permit issuance a hookup charge in the -ame t
of $ 2,425 f or aeh ?et. in accordance to city ordinance. The applicant shall be
reimbursed for providing sanitary sewer and water service to the Infanger and
Kohman properties. The city shall collect a connection charge in accordance to city
ordinance when the properties subdivide and building permits are issued. The city
shall then reimburse the applicant out of the connection charge for the cost of
providing sanitary sewer and water service:
12. The applicant shall receive the necessary access permit from the Carver County Highway
Department for relocating the driveway access prior to the City signing the final plat.
13. T''r ^+ access al lo shal be li to + A cross - access
mrcv rrr� proposed Y
easement agreement shall be prepared by the applicant to maintain access to Lots 1, 2, 3
and 4 via the proposed private street.
' 14. The applicant shall design and construct a storm drainage system to convey runoff from
the development and pretreat the storm runoff to SWMP standards to discharge into the
wetlands in lieu of paying SWMP water quality fees. The applicant shall pay the City a
SWMP water quantity fee in the amount of $2,811.60. This fee is payable prior to the
City signing the final plat.
15. Wetland buffer areas shall be surveyed and staked in accordance with the City's wetland
ordinance. The City will install wetland buffer edge signs before construction begins and
will charge the applicant $20 per sign. The applicant shall submit a letter to the City
documenting that there will be no alterations to the wetland as a result of the project.
16. The applicant shall provide detailed storm sewer calculations for 10 -year and 100 -year
storm events and provide ponding calculations for the stormwater quality pond in
accordance with the City's Surface Water Management Plan for the City Engineer to
' review and approve. The grading plan shall be revised to include a storm drainage system
which will convey runoff from the private street to the pretreatment pond.
r
Golden Glow Acres
September 25, 1995
Page 15
17. Detailed construction plans and specifications for the utility improvements shall be
required for review and formal approval by the City Council. Construction plans and
specifications shall be in accordance with the City's latest edition of Standard
Specifications & Detail Plates.
18. On Lot 2, the setback should be 50 feet versus the standard 30 feet from the front property
line to facilitate the possible future cul -de -sac.
19. The applicant shall dedicate a 60 foot cul -de -sac over Lots 1 and 2 so the southerly
terminus abuts the Kohman parcel south of Lot 1.
20. If the public street /cul -de -sac is constructed in the future, access to Lots 2, 3 and 4
shall be limited to the public street /cul -de -sac and the private driveway along the
south side of Lot 1 shall be abandoned and removed in conjunction with the project."
ATTACHMENTS
1. Alternative development proposals.
2. Memo from Dave Hempel and Diane Desotelle dated April 10, 1995.
3. Application.
4. Letter from the applicant dated November 24, 1994.
5. Memo from Steve Kirchman dated December 13, 1994.
6. Memo from Mark Littfin dated November 23, 1994.
7. Memo from Jill Kimsal, dated April 11, 1995.
8. Minnegasco dated December 1, 1994
9. Memo from DNR dated November 30, 1994.
10. Memo from Carver County Engineer dated December 30, 1995.
11. Public hearing and property owners list.
12. Excerpt from City Council minutes dated September 9, 1991.
13. Planning Commission minutes dated April 19, 1995.
14. Letter from William Infanger and Russell Kohman dated September 9, 1995.
15. Preliminary plat dated November 18, 1994.
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
Re: Alternative Development Proposals for Ravis Property and Adjoining Parcels
LUR File No. 95 -4
Dear Resident:
This letter is a follow up to our previous neighborhood meeting regarding the Ravis development
(Golden Glow Acres). As promised, please find attached a copy of five alternatives to
subdividing the Ravis property and adjoining parcels. In addition, I have attached a preliminary
assessment roll from the costs of constructionl these improvements assuming the City was
petitioned by the benefitting property owners ,The City has reviewed the Ravis development
.
proposal and feels that a public street (Option E) i a feasible alternative to the proposed private
driveway scenario and therefore the City is notin support of the private driveway access to serve
solely the Ravis parcel.
Please review the attachments I have enclosed. I would like to schedule a neighborhood meeting
to discuss these alternatives on March 9 at 6:00 p.m. in the City's Senior Center located
on the lower level at City Hall. If you have any questions and are unable to attend the meeting,
please feel free to contact me
Sincerely,
CITY OF CHANHASSEN ,.
David C. Hempel
' Assistant City Engineer
DCH.jms
Attachments
' c: Charles D. Folch, Director of Public Works /City Engineer
Sharmin Al -Jaff, Planner II
I gAeng \dave \letters \ravis
February 24, 1995
MEMORANDUM
TO: Sharmin Al -Jaff, Planner H
FROM: Dave Hempel, Assistant City Engineer
DATE: January 30, 1995
SUBJ: Alternative Development Proposals for Ravis Property
File No. 95 -4 LUR
Attached are five alternatives to subdividing this neighborhood. I have listed below the pros
and cons of each option.
All options maintain existing homesites and Mr. Kerber's "Twins" garage is removed in all
options. Dashed lines represent existing property lines. Solid lines represent proposed lot lines.
Utilities would be able to be extended to each option; however, Option E would require less
utility and street construction.
OPTION A
This option develops the northerly portion of the site with a public street (assumes Ravis
subdivision proposal over the south half).
Pros
Co ns
- City street
- Utilitizes properties to their full
potential
- Adequate intersection spacing on
Lake Lucy Road
- Access limited to Lake Lucy Road
- Allows for Berming along Powers
Boulevard and Lake Lucy Road
- Requires properties to be
consolidated and replatted
- Tree loss
- Significant grading /filling
- Rear yards against Powers
Boulevard
- House type mostly ramblers versus
walkouts
- Still requires private driveways to
serve parcels to the south
OPTION B
This option is similar to Option A but extended to service all parcels.
EM
Basically the same as Option A except
serves all the parcels.
- City street
- Utilitizes properties to their full
potential
- Adequate intersection spacing on
Lake Lucy Road
- Provides room for berming along
Powers Boulevard
- Access limited to Lake Lucy Road
OPTION C
Pros
Cons
Same as Option A but this option does not
need private driveways.
- Becomes a long (1075') cul -de -sac
with one access point
Con
Same as Options A and B except allows
two access points and the long cul -de -sac
is reduced in half.
Same as Options A and B except the long
cul -de -sac issue is resolved.
OPTION D
Basically the same as Option B except access is from Powers Boulevard and Lot 6 would
have access on to Lake Lucy Road.
W;o
- City street
- Utilizes properties to their full
potential
- Adequate intersection spacing on
Powers Boulevard
- Provides room for berming along
Powers Boulevard and Lake Lucy
Road.
0
- Requires properties to be
consolidated and replatted
- Tree loss
- Significant grading /filling
- Rearyards against Powers
Boulevard
- House type mostly ramblers versus
walkouts
OPTION E
This option combines the use of private driveways and a public street to develop the site. Least
disruptive to existing features and also allows for the area to develop, for the most part,
independently of each other.
$
- Minimizes site grading /filling and
tree loss; retains existing
topographic features for the most
part
- Provides a mixture of house types,
i.e. walkout, rambler, etc.
- Allows for parts of the area to
develop independently of the rest
- Provides public street access
- Curb cuts align with or across from
existing driveways
- Adequate intersection spacing -
- Room for berming along Powers
Boulevard and Lake Lucy - Road
- Maintains use of existing driveways
- Most likely the most feasible from
and economic standpoint
- eliminates long dead -end cul -de -sac
."t
- Still requires two or more parcels to
replat in order to develop layout
DCH:ktm
Attachments: Options A, B, C, D & E
gAeng\dave \memos \ravis
;MU P
GRAV
lb
IS
'� I
RAVIS
OP?70N*
t
I�
ERBER-,
P
11
sI 64
'� I
RAVIS
OP?70N*
t
i
3
MU I
I
I
� zal �
-� KERBER
GRAVLUM -
/$ 0
RSON l
{_____
to � - - -- -L - - --
�HMAN
F NGER
I '
G
1
1
1
f 23
l
Z �
MU ,
Za
s' KERS6
GRAVLUM
lb
ON
/7
: HMAN
1 FANGER
I
I _
I
F
N.
NL
�pnar �
o.
aPnav,a
d
r,*%
L
U IUE.
Bit Vb.
OrF?�
—i —I —I r f D
c'==r vi-
3
CD CD CD -
CD
CD
CD a �,
CD C
0 CD D
O O N ccnn
3 ti N
Q A) N
(D 0
0 3
CD
O cn `G (On K
? (D
N CD
y c 3
cn
�G O
O d •0
O p p
Q
CD O G
0 O CD
d
0-0
O = .► C
:3 CL 0-
m CD CD 0
c
3 0
Q0 � M
0 y a C
o nM n
o_ m m
N .-. O O
�c 3
�vv
f o o �
< (/)
CD W
0 �' f O
CD N C
CD
N O Q
O -�
CD
.0�. O °
W n m
3 EE's 5
.- <
CCD N 0• W
O CD O
3 m _
3 O O O
N (ND Q
Cl) z °
CD
m
I CD
N
CD c
O �•
O
CD
O
N
Q
CD Q
O
N
N � CD
D rn cr
n c
12
w
J
Ln
(Jl
� - N
-a
Z = T. = = G) A
o >o
cn O •=
O
T O Oo mo �� Co m
N
m
r
CD G CD RL ;:
y
Z v �.� �4, m y C T W
3 o H 3
m Z o
O
z
*
O
oa cD
�
CD ( 0 O
o CD
Q C 'N O ca
Q
O
..
n Q c n
N N N A N w
N
E 9 Q c
CL c�< a
N N 0) i+ A N Oo
o 0 o O O o O
N
o
CD j3 O (D
0 WON0N3(D a cc) O
O
N `G O CD
C- CD
0 O v CD
O Q D
to in -+ EA to
W
.% .0 . C
w W O W W O
W
C -4 a
A ? N ? ? N A
A
CT �X'�
� N -+ N W O ► N--►N CA) 0)
N
< O 'o
o m �.
Cl)
D
ci
m a)
IT1 Z
cc a . z CD
D
oK)m
n�
CD CD
�ZD
�co
A
o
m
v n
CD N
EA csa to tsi to
O O O O O O O O O O O O N O
cch
O
CD
G
N N _0)) N N O N
N
0) 0) (D 0) 0) � 0
�O 0) W 00 0) -+0)W co O
O
169 69 69 4A 69 (0%
69
_W _W N 0) O cD Oo
?NNNNW
W
O
O
4A 69 6
cn u, rn 0 0 -4
L"
00 00 -
W
A
CA) Wc
W
N
W
!�A EA fA EA 69 fA
N
A A (lf W W W V
D
O
V V Cfl a7 O) co
v v
V 0) 0) N
—i —I —I r f D
c'==r vi-
3
CD CD CD -
CD
CD
CD a �,
CD C
0 CD D
O O N ccnn
3 ti N
Q A) N
(D 0
0 3
CD
O cn `G (On K
? (D
N CD
y c 3
cn
�G O
O d •0
O p p
Q
CD O G
0 O CD
d
0-0
O = .► C
:3 CL 0-
m CD CD 0
c
3 0
Q0 � M
0 y a C
o nM n
o_ m m
N .-. O O
�c 3
�vv
f o o �
< (/)
CD W
0 �' f O
CD N C
CD
N O Q
O -�
CD
.0�. O °
W n m
3 EE's 5
.- <
CCD N 0• W
O CD O
3 m _
3 O O O
N (ND Q
Cl) z °
CD
m
I CD
N
CD c
O �•
O
CD
O
N
Q
CD Q
O
N
N � CD
D rn cr
n c
12
w
J
Ln
(Jl
1
1
1
1
1
1
1
1
1
1
1
1
�s
1
1
1
1
s
I
!o
p s�E
:.
CAM ER ..
Stitt R,.
1
(v !p
CD ��-s 8� u/)
1
7 , r-
a� zC� zr 3 T74
7 5 - 7 Z '
7 C
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
TO: Sharmin Al -Jaff, Planner II
FROM: Diane Desotelle, Water Resources Coordinators
David Hempel, Assistant City Engineer Aw
DATE: April 10, 1995
SUBJ: Golden Glow Acres, James Ravis - File No. 95 -4 LUR
Upon review of the preliminary plat drawings dated ;September 29, 1994 and prepared by Engelhardt
Associates, Inc., we offer the following comments _recommendations:
WETLANDS
The edge of a large ag -urban wetland touches t
delineator. A 0 to 20 foot wide buffer with an
in the City's Wetland Ordinance. Staff requir
the wetland as a result of the project.
�i
Davis property and has been staked by a trained wetlan
erage 10 foot wide buffer will be maintained as required
a letter documenting that there will be no alterations to
Wetland buffer areas shall be surveyed atd staked in accordance with the City's wetland ordinance. The
City will install wetland buffer edges`signs before building construction begins and will charge the
applicant $20 per sign. 4 ,
a:
DRAINAGE
Surface Water
�
The city has adopted a'9 faee Water Management Plan (SWMP) that serves as a too ' protect, preserve
and enhance water resources. The plan . identifies, from a regional perspecttve,;the storm water quantity
and quality improvements necessary to allow�fii development tt - #ake` place and minimize its impact
to downstream water bodies. In general, the water quantity portion of the plan uses a 100 -year design
storm interval for ponding and a 10 -year design stbrm.nterval for storm sewer piping. The water quality
portion of the plan uses William Walker, Jr.'s P644net model for predicting phosphorus concentrations
in shallow water bodies. An ultimate conditions model has been developed at each drainage area based
on the projected future land use, and therefore, different sets of improvements under full development
were analyzed to determine the optimum phosphorus reduction in priority water bodies.
Stonn Water Quality Fees
The SWMP has established a water quality connection charge for each new subdivision based on land use.
Dedication shall be equal to the cost of land and pond volume needed for treatment of the phosphorus
MEMORANDUM
Sharmin Al -Jaff
April 10, 1995
Page 2
load leaving the site. The requirement for cash in lieu of land and pond construction shall be based upon
a schedule in accordance with the prescribed land use zoning. Values are calculated using market values
of land in the city of Chanhassen plus a value of $2.50 per cubic yard for excavation of the pond. Since
there is no downstream water quality basin for this site these fees will be charged according to the volume
of ponding needed for the site. A credit for the one existing house/lot has been applied. The proposed
SWMP quality charge has been calculated at $800 /acre for single - family residential developments. This
proposed development of 2.14 acres (less the existing home site on Lot 1 = .72 acres) would then be
responsible for a water quality connection charge of 1.42 acres which equates to $1,136.00. This fee will
be waived if the applicant constructs an appropriate sediment basin to pretreat the stormwater runoff from
the site.
The site drains to the southwest into the ag /urban wetland. Since this wetland is shown to receive all
stormwater discharge including hard surface areas, staff recommends that a sediment trap should be
provided in accordance with the City's SWMP to pretreat the stormwater before it is discharged into the
wetland. Staff recommends the applicant develop a storm water drainage plan to convey runoff from the
driveways down to a stormwater treatment pond. Detailed storm drainage calculations will be required
for review and approval by the City prior to final plat.
Storm Water Quantity Fees
The SWMP has established a connection charge for the different land uses based on an average city-wide
rate for the installation of water quantity systems. This cost includes land acquisition, proposed SWMP
culverts, open channels and storm water ponding areas for runoff storage. Since the SWMP does not
propose any improvements on this site, the applicant should be required to pay the City the stormwater
quantity charge. Single family residential developments have a connection charge of $1,980 per
developable acre. This proposed single - family residential development of 1.42 acres would then be
responsible for a water quantity connection charge of $2,811.60.
GRADING
The grading and utility plan proposes to grade a private street from Powers Boulevard (County Road 17)
to service the proposed four lots. As a result of the grading most of the significant pine trees along the
southerly property line will be lost. The existing driveway access point is proposed to be relocated to tie
into the proposed private street from Powers Boulevard. The Carver County Highway Department will
need to issue an access permit for the proposed private street. Between 6 to 8 feet of fill is needed to
build up the house pads for Lots 3 and 4. Staff is wondering if there is additional material on site to be
utilized for the development of these house pads or will material be imported to the site? If material is
to be imported or exported, approved haul routes will need to be submitted to the City for review and
approval.
EROSION CONTROL
All disturbed areas, as a result of construction, shall be seeded and mulched or sodded immediately after
grading to minimize erosion. Erosion control fence is proposed adjacent to the wetlands within the buffer
zone. Staff recommends erosion control be placed at the construction limits and not encroaching upon
the buffer zone.
' Sharmin Al -Jaff
April 10, 1995
' Page 3
UTILITIES
Sanitary sewer service is available to the site from the west; however, sanitary sewer is not deep enough
' to service Lot 4 without an ejector pump in the lower level. According to the plans, the applicant is
proposing the use of a 3 -inch forcemain which is not desirable nor necessary in this situation. There are
alternative measures to be employed such as an ejector pump from the lower level. Staff recommends
' that Lot 4 be required to make use of an ejector system for the lower level so that the main level and
above will be on a gravity sewer system. This is much less of a maintenance item for the homeowner
and, from a reliability standpoint, a superior alternative.
Water service is available from Powers Boulevard. The applicant is proposing to extend a 6 -inch water
service line down for water service to the new lots as well as fire protection. As denoted in the
alternative development proposals, this site can also be served by public utilities and streets from the north
through a public improvement project. If this application is approved, staff recommends that the sewer
and water construction be in accordance with the City's Standard Specifications and Detail Plates. Upon
completion of the utility improvements, the utilities should be turned over to the City for ownership and
' maintenance. The applicant will need to enter into a development contract with the City and provide the
necessary security to guarantee installation of the public improvements.
' STREETS
Back in September of 1991 in conjunction with Lundgren's WillowRidge subdivision which lies directly
' to the west of this site, access and utility service to this site were explored. Utilities were extended to
the west line of this site in conjunction with WillowRidge's development proposal. Access into the Ravis
parcel from WillowRidge was another matter, however. The Ravis parcel does have frontage along
Powers Boulevard (County Road 17) which allowed other alternatives to provide access to the Ravis
property rather than WillowRidge. Staff concluded at that time a cul -de -sac from WillowRidge was not
feasible. A cul -de -sac from Lundgren's WillowRidge would have involved losing a lot of trees and by
the time the cul -de -sac was extended through to the Ravis property, there was very little property left to
be developed. Staff has recently explored some other alternative development possibilities on the Ravis
property and adjoining parcels. Attached is a memo that was sent to the residents lying south of Lake
' Lucy Road and west of Powers Boulevard (Attachment 1). This memo explores five alternatives to
subdividing the neighborhood. Staff met with the residents regarding the alternative development
proposals back on March 9, 1995. At that meeting there was numerous discussions pertaining to private
' driveway access points along Powers Boulevard as well as all of the options listed within the memo. The
general consensus was that no one alternative could be completely agreed upon by all affected parcels.
Staff did propose Option E as a viable option in developing the neighborhood, including the Ravis parcel.
This alternative also provided the most flexibility for the other adjacent parcels to subdivide as well. The
' private driveway proposal, as submitted, limits access to only the Ravis parcel and no future access to the
adjoining parcels. Staff feels that this area can and should be developed under a different alternative
which includes a public street. Therefore, at this time staff recommends that the subdivision as proposed
' be denied due to premature street access to development. If a private driveway was allowed to be
constructed, the remaining parcels (Kohman and Infanger) will have limited subdivision potential, if any.
11
Sharmin Al -Jaff
April 10, 1995
Page 4
STAFF RECOMMENDATION
Staff recommends that this subdivision proposal be denied on the basis of premature street access to the
site. Staff has demonstrated that public street and utility improvements can be installed to service this
development and the adjoining parcels.
Should the Planning Commission and City Council approve the proposal as submitted, staff has outlined
the appropriate recommendations and conditions below.
Utility construction shall be in accordance with the City's latest edition of Standard Specifications
and Detail Plates. The final plat shall dedicate drainage and utility easements over the sanitary
sewer and water lines. The easement shall be a minimum of 20 feet wide.
2. Importing or exporting material from the site will require approval of a haul route. The haul route
shall be submitted to the City for review and approval.
3. Lot 4 shall utilize an internal ejector pump system to service the lower level of the dwellings, if
necessary. The use of a forcemain shall be prohibited.
4. All areas disturbed as a result of construction activities shall be immediately restored with seed
and disc - mulched or wood -fiber blanket or sod within two weeks of completion of each activity
in accordance with the City's Best Management Practice Handbook. Erosion control fence shall
be installed at the edge of the construction limits and not within the wetland buffer zone.
5. The applicant shall enter into a development contract with the City and provide the necessary
security to guarantee installation of the public improvements and compliance with the final plat
conditions of approval.
6. The applicant shall report to the City Engineer the location of any drain tiles found during
construction and shall relocate or abandon the drain tile as directed by the City Engineer.
7. The applicant shall be responsible for extending municipal utilities to the north line of Lot 2 for
future extension. Lots 2, 3 and 4 will be charged at time of building permit a hookup charge in
the amount of $2,425 each lot.
8. The applicant shall receive the necessary access permit from the Carver County Highway
Department for relocating the driveway access prior to the City signing the final plat.
9. Direct access to all lots shall be limited to the proposed private driveway. A cross - access
easement agreement shall be prepared by the applicant 'to maintain access to Lots 1, 2, 3 and 4
via the proposed private driveway.
10. The applicant shall design and construct a storm drainage system to convey runoff from the
development and pretreat the stonn runoff to SWMP standards to discharge into the wetlands in
lieu of paying SWMP water quality fees. The applicant shall pay the City a SWMP water
quantity fee in the amount of $2,811.60. This fee is payable prior to the City signing the final
plat.
Sharmin Al -Jaff
April 10, 1995
Page 5
11. Wetland buffer areas shall be surveyed and staked in accordance with the City's wetland
ordinance. The City will install wetland buffer edge signs before construction begins and will
charge the applicant $20 per sign. The applicant shall submit a letter to the City documenting
that there will be no alterations to the wetland as a result of the project.
12. The applicant shall provide detailed storm sewer calculations for 10 -year and 100 -year storm
events and provide ponding calculations for the stormwater quality pond in accordance with the
City's Surface Water Management Plan for the City Engineer to review and approve. The grading
plan shall be revised to include a storm drainage system which will convey runoff from the
private street to the pretreatment pond.
13. Detailed construction plans and specifications for the utility improvements shall be required for
review and formal approval by the City Council. Construction plans and specifications shall be
in accordance with the City's latest edition of Standard Specifications & Detail Plates.
ktm
Attachment: Alternative Development Proposals
I c: Charles Folch, City Engineer
I ,:Ieng\diane \planning \.Ilis,ppI
CITY OF CHANHASSEN
690 COULTER DRIVE
CHANHASSEN, MN 55317
(612) 937 -1900
DEVELOPMENT REVIEW APPLICATION
APPLICANT: S t P_ s C'„ CA � LS OWNER: Sa."_ c C'_Ppl c C2.ykf '
ADDRESS: /� 4 0 Po w y r 1� I UrX . ADDRESS:
SA
( L 3
�1, cut /l 4. C' Y1 � �� l� s�5 I
TELEPHONE (Day time) �%- i ° � TELEPHONE:
1.
Comprehensive Plan Amendment
11. Vacation of ROW /Easements
2.
Conditional Use Permit
12. Variance
3.
Grading /Excavation Permit
13. -1L Wetland Alteration Permit
4.
Interim Use Permit
14. Zoning Appeal
5.
Planned Unit Development
15. Zoning Ordinance Amendment
6.
Rezoning
7.
Sign Permits
8.
Sign Plan Review
Notification Signs J50
9.
Site Plan Review
X Escrow for Filing Fees/Attomey Cost"
$100 CUP /SPRNACNARMAP
$400 Minor SUB/Metes & Bounds , "P' .
10.
Subdivision $Z4& 0
TOTAL FEE $ lllo. o c)
A list of all property owners within 500 feet of the boundaries of the property must
Included with the application.
Twenty -six full size folded copies of the plans must be submitted.
8%" X 11" Reduced copy of transparency for each plan sheet.
NOTE - When multiple applications are processed, the appropriate fee shall be charged for each application
" Escrow will be required for other applications through the development contract
PROJECT NAME v ) gL,— 1 - A -
LOCATION j Z..a—
LEGAL DESCRIPTION a '
' PRESENT ZONING 5
REQUESTED ZONING S c
PRESENT LAND USE DESIGNATION �--�-
' REQUESTED LAND USE DESIGNATION /—
REASON FOR THIS REQUEST j .,-�
'
This application i n must be comp leted in full and be typewritten or clearly printed and must be accompanied by all information
p
and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the
' Planning Department to determine the specific ordinance and procedural requirements applicable to your application.
This is to certify that -I am making application for the described action by the City and that I am responsible for complying
' with all City requirements with regard to this request. This application should be processed in my name and I am the party
whom the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of
ownership (either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the
authorized person to make this application and the fee owner has also signed this application.
I will keep m yself self informed of the deadlines for submission of material and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any
' authorization to proceed with the study. The documents and information I have submitted are true and correct to the best
of my knowledge.
I also understand that after the approval or granting of the permit, such permits shall be invalid unless they are recorded
against the title to the property for which the approval /permit is granted within 120 days with the Carver County Recorder's
Office and the original document returned to City Hall Records.
lf� Z71
Signature of Applicant at
' Signature of Fee Owner Date
Application Received on Fee Paid Receipt No
' The applicant should contact staff for a copy of the staff report which will be available on Friday prior to the
meeting. If not contacted, a copy of the report will be mailed to the applicant's address.
A q No 19
Ch asser, Aw.
To : Sha VI ra in A 1- XgL f f�
T b e /ieye. f tier fOj ia ., ;jsg ; ri forrNa.f ;or% Wa
assist !t ou > ri @ i - � kQ, S L4 1 )isi o�
�tppJ ;caf:ov� �Golde.v, Gl o w Acres Sccbn.;f - fed
b �, hl w
�..►; f e, a v. d
v►. ws Q.1 f .
e.
m OVar) t v
Gh axkasSeh
1o.om4sa. wQ.
1; y e.
C. i t hH e %,% a V la w
.0 a. V%j
for L4-C t o L A.
�ay�4Q, g4rdQ.v�.
L o t- w QY ¢. 4. 6 l e,
t O 4.0 t
1 ; s b 4 p a r mil, a si K4
'� •- r o
e r t o c�
a-t
6 6 00 1Q w trs 1 vd
4.K d 4 v%
GL. dr t O 1 M 1 h at
l o± . ye
al. Vvta vL ., �V.S
�ow
� W
a. w %A I
YA h -+ 4 n QJ r a 4 or
C-Ji't1% VAoJ�ra'l• LI. . Sf CL (So Y►ac.e.ivej
5 �now �'J Io4,i pr fo it a a. l(o VA alwa
U& wa {S alac 9.
A ioA 0Q•�O.'��+ - %'Jl,S A NI Se N h oh�n
Sc.kool S%S+e� v+, w: i - E s YOroad sgk.lectl
+ c.l a. s s 4L .
T'I0 W8.VQ4+ j Q S Doti 1ne COO),Ip��.�ll�';e�
O C�avt.�a.SSEh
� G�ay►.9C
Slghif�CaA��W
ov eve t h v. �as
-� iva. �tQars.
Give V%
C 1� av� e + o o Y J 1r i tn�a. M j w ar tt y% L a h S Q.t-ir i h a a reQ
a Sigy►i f icv.yt"t' ihcrc.4.5e �'1n c a ►� bowers
,%A wti►er w a., 'ntA
11A Q.Va U40 iK ct�h c�Pt i6lnS i+ 4WlA
+ \-L A 1(� Q. o �e I a. inn o y i h a � w•� o '� 1� � i 4 r �. a.
car )pasica lid Yv►arri Qe� war �[�h!M C 0%L wi'y
ScOn. °�qo. G�t�dr �lt {�t c� �'o.w�t
V. s a s VK a l t 4L V" 1 o f w f a. V% o_w h a
Gt.�. Q h�. ► ti► t Me.a►. � �K. 0.1 1g T Q.N 0. K C � - } � t S 4-10 lf� Y' 0 0.G
W � l l a i s o �o r o �r ; c4 .e, t..�. S t... � -E � a� d i'� i e 71 a. � 'F �• ►.► ds
� o � Q.� ► Y Q.1M. Q ri� .
Q. V Y► o do a.%A'�
t 4 i.�Yw. o-� Dew.avrs — G 4br:a.1 1.wY►�
S c4 r y , a ti ovr s 1'y\ C. S W Q. C. ; f- i ca ( l 4 Gary
Eck. b0 (0-k
V\ e 4 k. i H am. tit't S �t v► s'� i \ Y1 a V a. o S "� tit a't
' 1
W o w IJ ) .o .9- d) ► Q, � f �` w•L o ar
1
anti t y C-%4 NP r a.w'E I y Yov- A N I t n a.V� 6 a.S S %'h I
b er \ i e. y e, w a v e. 4 CA, It.
Irv► Q. �-(; S 'Ir 1ti e s �. o b a y i y e. S. T N%
�i�� � o� '�6►� p
0. V% a j
S � ° �V1 i sr iC a,v�.'4
t -) A 11 Iof s o.r'e- w 0- 11 Aloova V�,:u.W% 10+ S izQ. 1
b�� ld,. -
L, S s, 1p l O-C , o. ,N. 4L
3� T �► e.
- ja *. o k a S ti► a ti a - E w o �,�. (j l
'
b4i It ���5 ih w' - �1� t s�rrckv�c��Kg
ThQ ro IQO a 1 re vk a k VI '
C I70.vtq t°� O (CLV h Cocatti kr_s ,
V
5 1 T h Q t.e. i 1 i t �-t a h.� r o 4. cp k3 l d. INS
't �► e, c 9 c u V r a- \-�-4e-r,"�
F�l
r
6 e e4 s Q.,N. 4v Q b �.
�roYid�� f or ta. �<<i , � iec
w et c%v e-
re irsd
T�,.W- la
say QS -�' � I
V Q e, S C h 1
p %4t)
CL h d %3 r o v i d s
a b d
'
"�i
e oy Q.
4 r e. �! a.V• y o
' aL a Y� '� r
Q-�e.t '�
�.a.-{c c►„ �r e.
4 i h g .
S O O O '�
R Q 'e
X i S'� r► q
1t` o.� .S ka G N Q
CL ,n
k am Q. '�
� .-� w o w, � b A
wt a r u �- b Q. i y
r yo l a V\ C o I ��a•� G- l a w A
tJi'�� - �h¢ S�chy�owr.�ihu czrP -A-S iS
:f- h v i t_� +; � o ► h't e,
�a Z -AS 10 C. C1ti ati► �tas s n �
R V% Vv& Q *-t S :L Q.. G c 't, y S S u 6 i Y i S i a
1^ ft Q u ti r Q. yw e. �►T s
f 04 46 Q. Qv% i or
}`eQ k.re QAd 't i a- ,.a..� ih a rMNa.:� io� �,�u o•k
e ara '
- ".kern `� �a- •,�,•.� `'�o...�
1
Fl�
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 0 CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
MEMORANDUM
TO:
FROM:
DATE:
Sharmin Al -Jaff, Planner II
Steve A. Kirchman, Building Official '�O -� {-
December 13, 1994
SUBJECT: 94 -22 SUB (Golden Glow JA
I was asked to review the prel
CHANHASSEN RECEIVED, NOV 17 1994,
above referenced project.
es, James Ravis)
nary plat stamped "CITY OF
NHASSEN PLANNING DEPT. " for the
a
Sharmin Al -Jaff ,
December 13, 1994
Page 2
Recommendations:
1. Revise Grading and Utility Plan to indicate lowest floor level ,
elevation, top of foundation elevation and garage floor
elevation. This should be done prior to final plat approval.
2. Revise the Grading and Utility Plan to show standard '
designations for dwellings. This should be done prior to
final plat approval.
3. Submit soils report to the Inspections Division. This should '
be done prior to issuance of any building permits.
enclosure: 1/29/93 Dwelling Type Designation memo
F�
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
MEMORANDUM
TO: Sharmin Al -Jaff, Planner II
FROM: Mark Littfin, Fire Marshal
DATE: November 23, 1994
SUBJ: Golden Glow Acres, James Ravis
Planning Case 94 -22 SUB and 94 -7 WET
I have reviewed the preliminary plat subdivision and have the following requirements:
1. Submit street names to Public
2. A ten foot clear space must
3. Fire hydrant location is acc
approval.
around fire hydrants.
g.\safetyNin1\go1dg1ow, l
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
TO: Sharmin Al -Jaff, Planner I
FROM: Till Kimsal, Forestry Intern
DATE: April 11, 1995
SUBJ: Tree Inventory, Golden Glow Acres, James C. Ravis
The applicant has submitted a tree inventory z
the plan are required replacement plantings to
front yard of the existing home, are along the
will be following the southern and lower east(
removed. The diameters range from four to,,';
appears to be on the neighbor's property.
y coverage calculation Also noted on
All trees, excluding those in the
lines of the site. Since the new road
a number of trees are scheduled to be
not including a 48 inch willow that
the survey, but do not appear to be
, e questionable survival chances.
the four trees are 2 to 10 feet from
Ior's property, their removal can not
Five trees ( 35, 36, 37, 38, and 45) have -been included -a
on the property being developed. Treei 35 through 38
There will be a three to four foot cuf1br the roadway an'
the edge of the cut. Since they appear to be on the neig]
be readily assumed.
The applicant's canopy ,coverage calculations are in order and
13 replacement trees -a"S Aown. sn'.thc, -tree inventory.: During'.
58 must be protected ;fit tiles::by ,fee rotectzz fencing Po '
shall be applied f��tre riear the existing house and along the
Whether or not trees 35 through 3' aric "4 `
resolved by the applicant considering they z
removal or preservation may also make a sl
will be required to plant
ruction, trees 51 through
am a preservation principles
osed_roadwa.
ed ', t 'development plans must be
development property. Their
in canopy coverage calculations.
MEMORANDUM
Ming ^4lasco®
A Division of Arkla, Inc.
December 1, 1994
Ms. Sharmin Al -Jaff
Planner I
City of Chanhassen
690 Coulter Drive
P.O. Box 147
Chanhassen, Minnesota 55317
Re: 94 -22 SUB and 94 -7 WET
Golden Glow Acres
James C. Ravis
094
Dear Ms. Al -Jaff:
f Enclosed is the subdivision print for this project with our gas
mains shown in red. Individual_ service lines are not shown.
Natural gas service is available to this development "from the main
shown on Powers Boulevard. No addition work is anticipated at this
time unless requested by the builder or owner.
The builder or owner should contact Terry Jencks of Minnegasco's
Residential Energy Services, 525 -7607 or 342 -5123, to make
application for natural gas service.
Minnegasco has no objections to this development proposal.
Sincerely,
2
Richard J.% i on, P.E.
Senior De gn Engineer
Engineering Services
612- 342 -5426
cc: Mary Palkovich
Terry Jencks
700 West Linden Avenue
P.O. Box 1165
Minneapolis, MN 55440 -1165
t M �SnTATE OF
U�.J IE Z (Ou �
DEPARTMENT OF NATURAL RESOURCES
METRO WATERS - 1200 WARNER ROAD, ST. PAUL, MN 55106
PHONE NO. 772 -7910 FILE NO.
November 30, 1994
City of Chanhassen, Planning Department
Sharmin Al -Jaff, Planner II
690 Coulter Drive, P.O. Box 147
Chanhassen, MN 55317
RE: Golden Glow Acres, James Ravis, Lake Lucy (10 -7P), City of
Chanhassen, Carver County (City #94 -22 SUB and 94 -7 WET)
Dear Ms. Al -Jaff:
We have reviewed the site plans (received November 23, 1994) for the above -
referenced project (Section 2, T116N, R23W) and have the following comments to
offer:
1. The project site does not contain any Public Waters or Public Waters
Wetlands; therefore, no DNR permit is required.
However, it appears there are wetlands on the site that are not under DNR
Public Waters Permit jurisdiction. The project may be subject to federal
and local wetland regulations. The -Department may provide additional
comments on the project through'our review of applications submitted under
these other regulatory programs.
2. The site does not appear to be within a floodplain district.
3. The proposed plan does not indicate how the stormwater will be managed.
You are advised that the DNR would object to having the stormwater routed
directly to the WCA wetland. Stormwater sedimentation /treatment basins,
or other appropriate stormwater treatment features, should be included in
the stormwater management plan. If stormwater is routed directly to the
wetland, it can cause sedimentation and water level bounces that are
detrimental to wildlife values and water quality.
4. There should be some type of easement, covenant or deed restriction for
the properties adjacent to the wetland areas. This would help to ensure
that property owners are aware that the U.S. Army Corps of Engineers and
the City of Chanhassen have jurisdiction over the areas and that the
wetlands cannot be altered without appropriate permits.
5. The project area appears to be within the 1000' shoreland district of Lake
Lucy (10 -7P), a recreational development water. The development must be
consistent with city's shoreland management regulations. In particular
you should note:
a. The project area (lots 3 and 4) contains steep slopes. Topographic
alterations should be minimized in this area.
b. The structures in the development should be screened using
topography, existing vegetation, color, and other means approved by
the city.
C. The applicant should be commended for planning to place a 10' buffer
of natural vegetation around the WCA wetland. This buffeed�
will improve wildlife habitat in the area and improve tl1 %
quality of the wetland. QA
AN EQUAL OPPORTUNITY EMPLOYER
CITY OF CHANHASSENv
City of Chanhassen, Planning Department
Sharmin Al -Jaff, Planner II
November 30, 1994
Page 2
6. The following comments are general and apply to all proposed developments:
a. Appropriate erosion control measures should be taken during the
construction period. The Minnesota Construction Site Erosion and
Sediment Control Planning Handbook (Board of Water & Soil Resources
and Association of Metropolitan Soil and Water Conservation
Districts) guidelines, or their equivalent, should be followed.
' b. If construction involves dewatering in excess of 10,000 gallons per
day or 1 million gallons per year, the contractor will need to
obtain a DNR appropriations permit. You are advised that it
typically takes approximately 60 days to process the permit
application.
C. The comments in this letter address DNR - Division of Waters
jurisdictional matters and concerns. These comments should not be
construed as DNR support or lack thereof for a particular project.
Thank you for the opportunity to comment. Please contact me at 772 -7910 should
you have any questions regarding these comments.
Sincerely,
"�� V 1�
Joe Richter
Hydrologist
JR /cds
c: Riley- Purgatory - Bluff Creek WSD, Bob Obermeyer
U.S. Army Corps of Engineers, Gary Elftmann
City of Chanhassen Shoreland File
PUBLIC WORKS DEPARTMENT
(612) 361 -1010
FAX (612) 361 -1025
CARVER COUNTY COURTHOUSE '
600 EAST 4TH STREET, BOX 6
CHASKA, MINNESOTA 55318
COUNTY OF CAQVEQ
December 30, 1994
TO: Sharmin Al -Jaff, Planner II
FROM: Bill Weckman, Assistant County EngineerRi"
SUBJ: Preliminary Plat
Golden Glow Acres, James Ravis
Following are comments regarding the Golden Glow Acres Preliminary Plat transmitted to Carver
County by your memorandum dated November 21, 1994:
1. Right -of -way widths listed in the Eastern Carver County Transportation Study for roadways
functionally classified as Minor Arterial (Class II) are:
Urban Undivided
2 -lane Roadway
Minimum Recommended
100' 110'
Rural Undivided
2 -lane Roadway
Minimum Recommended
120' 150'
Urban Undivided
4 -lane Roadway
Minimum Recommended
100' 120'
Rural Undivided
4 -lane Roadway
Minimum Recommended
140' 170'
County State Aid Highway (CSAH) 17 (Powers Blvd.)is functionally classified as a Minor
Arterial (Class II) roadway in the Eastern Carver County Transportation Study. The right
of way shown on the plan includes a 100 foot corridor. The corridor as shown would meet
the minimum recommended needs for an urban four lane roadway.
The city may wish to consider an even wider highway corridor along, the proposed subdivision
if a separate trailway is to be constructed along the county highway. Additional width may
also be needed to accommodate public utilities and landscaping.
2. Construction of the proposed driveway access with CSAH 17 is subject to the access permit
requirements of Carver County. Carver County would require that the existing access be
removed as shown on the plan. The preference of the County is to limit the number of
accesses to the County Roads and have the accesses be public roads if possible. If there is
any possibility of the house to the south outside the plat connecting to this new entrance, that
would be desirable. RECEIVED
Affirmative Action /Equal Opportunity Employer
Printed on Recycled Paper
Contains Mininn rn 10% Post Consumer Waste CITY OF CHANHASSEN
3. Any public utility lines that are to be installed within the CSAH 17 right -of -way are subject
to the utility permit requirements of Carver County.
4. Any proposed grading and installation of drainage structures within the right -of -way of CSAH
17 is subject to review and approval of the county highway department.
5. Development activities (including the installation of both public and private utilities needed
to serve the development site) that result in any disturbance of the county highway right -of-
way (including turf removal, trench settlements, erosion, and sediment deposits) need to be
completed in a manner that leaves the right -of -way in "as good or better condition" than what
existed prior to construction. It is requested that the city include a provision in the
developer's agreement that requires the developer to be ultimately responsible for the final
condition of the county highway right -of -way. A clear understanding of this responsibility will
result in fewer project oversight problems for both the county and the city.
6. Any trees or landscaping completed within the right -of -way must be approved by the County.
When locating shrubs and trees, consideration should be given to maintaining an acceptable
sight distance at the proposed intersection. Any trees or shrubs overhanging into the right -of-
way could be subject to trimming for safety or overhead utility consideration.
7. As this area develops, the traffic on CSAH 17 will increase. The increased traffic will
generate an increased noise level. The County would consider any type of noise abatement
project, if necessary, to be the responsibility of the City or the developer.
Thank you for the opportunity to comment on the preliminary plat for the proposed development.
NOTICE OF PUBLIC
HEARING
PLANNING COMMISSION
MEETING
Wednesday, APRIL 19, 1995
at 7:30 p.m.
City Hall Council Chambers
690 Coulter Drive
Project: Golden Glow Acres
Developer: James Ravis
Location: 6660 Powers Boulevard
Notice You are invited to attend a public hi
area. The applicant is proposing a preliminary plat to subdivide a 2.22 acre parcel into 4 lots
on property zoned RSF, Residential Single Family and located at 6660 Powers Boulevard, Golden
Glow Acres, James Ravis.
What Happens at the Meeting The purpose of this public hearing is to inform you
about the developer's request and to obtain input from the neighborhood about this project.
During the meeting, the Commission Chair will lead the public hearing through the following
steps:
1. Staff will give an over view of the proposed project.
2. The Developer will present plans on the project.
3. Comments are received from the public.
4. Public hearing is closed and the Commission discusses project. The Commission
will then make a recommendation to the City Council.
Questions or Comments If you want to see the plans before the meeting, please stop
by City Hall during office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish
to talk to someone about this project, please contact Sharmin at 937 -1900 ext. 120. If you
choose to submit written comments, it is helpful to have one copy to the department in advance
of the meeting. Staff will provide copies to the Commission.
Notice of this public hearing has been published in the Chanhassen Villager on April 6, 1995.
r ��09 411116'
I
Robert & Lois Petersen
6650 Powers Blvd.
Chanhassen, MN 55317
Russell G. Kohman
6730 Powers Blvd.
Chanhassen, MN 55317
Wendall & Blanche Gravlun
6270 Blue Jay Circle
Excelsior, MN 55331
William & Juliann Infanger
6740 Powers Blvd.
Chanhassen, MN 55317
[Melvin Allrich & Bonnie Thomas Jennie Hays
6681 Powers Blvd. 6691 Powers Blvd.
Chanhassen, MN 55317 Chanhassen, MN 55317
Paul & Sheryll Kreuter
1090 Carver Beach Road
Chanhassen, MN 55317
Stanley & Joy Javurek
6780 Redwing Lane
Chanhassen, MN 55317
Jan & P. Mahin
6781 Chaparral Lane
Chanhassen, MN 55317
Gary Mundahl
6780 Chaparral Lane
Chanhassen, MN 55317
Joseph & Kathleen Hamilton
6820 Chaparral Lane
Chanhassen, MN 55317
Mark Lathrop
6850 Utica Lane
Chanhassen, MN
State of MN in Trust
c/o Carver Co. Auditor
600 East 4th Street
Chaska, MN 55318
Randy Tikalsky _
6801 Chaparral Lane
Chanhassen, MN- 55317
Jeffrey & Laura Bros
6771 Chaparral Lane
Chanhassen, MN 55317
Craig & Stacie Prescher
6790 Chaparral Lane
Chanhassen, MN 55317
Allan & Connie Ott
6840 Chaparral Lane
Chanhassen, MN 55317
Mary Gerk
6831 Utica Lane
55317 Chanhassen, MN 55317
Daniel & Gwen Hennessey
' 6800 Utica Circle
Chanhassen, MN 55317
Gary & Ann O'Neill
6830 Utica Circle
Chanhassen, MN 55317
Harry Murphy
1215 Lake Lucy Road
Chanhassen, MN 55317
Lawrence & Kathleen Kerber
6420 Powers Blvd.
Chanhassen, MN 55317
Layton & Madelyn Paine
1092 Shenendoah Circle
Chanhassen, MN 55317
Russell Paul y
1031 Carver Beach Road
Chanhassen, MN 55317
James Manders
6791 Chaparral Lane
Chanhassen, MN 55317
Pallar & Sokkha Ngep
Chanthan Hour
6770 Chaparral Lane
Chanhassen, MN 55317
Ingrid Gunnbjorg Stephens
6800 Chaparral Lane
Chanhassen, MN 55317
Steven & Sandrea Kvidera
6850 Chaparral Lane
Chanhassen, MN 55317
Robert Boe
6801 Utica Circle
Chanhassen, MN 55317
Bruce & Merridith Arnold
6850 Utica Circle
Chanhassen, MN 55317
Kathleen Mary Koch Kenneth & D. Earhart Edward & Carol Jannusch
6870 Utica Lane 6880 Utica Lane 6831 Utica Lane
Chanhassen, MN 55317 Chanhassen, MN 55317 Chanhassen, MN 55317
Scott & Joanne Reinertson R. Chris & Mary Rumble Thomas & Linda Trusty
6801 Utica Terrace 6861 Utica Lane 6871 Utica Lane
Chanhassen, MN 55317 Chanhassen, MN 55317 Chanhassen, MN 55317
Kenneth & Karen Anderson Richard C. Ersbo Mark & B. Rasmussen
6881 Utica Lane 1211 Lake Lucy Road 6729 Mulberry Circle
Chanhassen, MN 55317 Chanhassen, MN 55317 Chanhassen, MN 55317
Steven & Sharon Veno Wesley & Pamela Johnson Mark & Pamela Wagner
6730 Mulberry Cir. E. 6719 Mulberry Cir. E. 6735 Mulberry Cir. E.
Chanhassen, MN 55317 Chanhassen, MN 55317 Chanhassen, MN 55317
Greg & Martha Pomerantz Barry & Murlyn Pace David & J. Meyer
1321 Heather Ct. 1331 Heather Ct. 6683 Mulberry Cir.
Chanhassen, MN 55317 Chanhassen, MN 55317 Chanhassen, MN 55317
Steven & D. Manning Michael & S. Arbisi Roy & J. Anderson
6687 Mulberry Circle 6693 Mulberry Circle E. 6695 Mulberry Cir. E.
Chanhassen, MN 55317 Chanhassen, MN 55317 Chanhassen, MN 55317
David J. Batt Lundgren Bros. Const. Jeffrey & M. Elder
6699 Mulberry Cir. E. 935 Wayzata Blvd. E. 6696 Mulberry Cir.
Chanhassen, MN 55317 Wayzata, MN 55391 Chanhassen, MN 55317
David Ronnei
6666 Mulberry Cir. E.
Chanhassen, MN 55317
itY t° '�g�t we dt ab se w r ° � t1° Si v�
�..r9�.� o ,►t._.�- .gel _ b__
City Council Meeting - SeF.jmber 9, 1991
ip
,.✓'Dumping nutrients into t site.. Some of it stems from Lake Lucy Road itself
which ap contain some phosphates as�well are flushing
where the salts whi pP Y
right off the street and into the system. So what we're proposing to do is to
capture a portion of those Lake Lucy Road flowages and run it through an
expanded pond with the goal that the total flowage through that area'should be
of a higher quality than it is today. We reviewed 'revised access plans at the
' west curb cut to save some trees and I've got a series of documents. I'll.put
that up later if need be. There's a very significant stand of trees there and
there's really only 1 2 good places to come out on Lake Lucy Road for the'
west entrance. The applicant spent a good bit of time trying to develop a plan
that's most sensitive to- protecting those trees as possible but the Planning
Commission wanted us to explore the idea of realigning the road so it sits on
_ the Ortenblat driveway believing that that would be less destructive. We did
look at alternatives to do that. What we found was that there was only a
nominal improvement in saving the trees and in exchange for that we lost some of
the bigger trees. In addition, doing that would wind up filling part of the DNR
' wetland. Now the DNR doesn't normally allow you to fill wetlands but they said
if you could really demonstrate that you had substantial tree preservation they
might consider it. Based upon what we know today, I don't think we could sell
them on that. I think there was a net benefit of 40 caliper inches of trees
which is hardly substantial enough to allow filling of a wetland, I don't
believe anyway. An approved landscaping Plan has been prepared. However we do
have several changes or additions to that which were being recommenged that we
carried forward throw h the Planning Commission. ccess ancrutlilties to
adjacent to lots owned by Ted Coey and Jim Havis were explored. We concluded
that sewer and water should be stubbed into the Ravis property. The.Ravis
parcel, if you could put the location map back up. The ravis parcel is just
located to the east of the site in this vicinity here. I believe Mr. Ravis has,
if I'm not mistaken, this lot and this lot back here. We did conclude that
sanitary sewer and water should most appropriately be extended from this
property into that area. Access into that area was another matter however.
That if that lot does have frontage out on Powers, there are some alternatives
for providing driveway access to it. We did conclude that a cul -de -sac however
extending from the Lundgren property made no sense in that area. $ You lost a lot
of trees to get it through there but by the time you got the cul -de -sac through
the Ravis property, there's no Ravis property left to develop. it rG1
ctive means of serving the roperty. T e Coey property, we
did look at various erna ives Tor real igning th western portion of the
street through there hopefully to avoid those trees. Mr. Coey's not involved
in this plat. He did talk to us earlier on about the possibility of becoming
involved in it and decided against it. But we did look at it from a topographic
standpoint and again we concluded that it's not impossible to do things. Run
things out to that property but you did incur significant environmental damage
to do it and there really didn't seem to be any reason to pursue it any further.
As far as utilities go to the Coey property, we are recommending that the
sanitary sewer be stubbed out that way. The lift station that Ps going to be
built in the Lundgren plat is deep enough so it can provide some service to some
of those properties west of the site for a short distance and we figure we might
as put that in as long as we have the ability to do that. On the last matter,
the Planning Commission did not make this a condition. They made a suggestion
or some such language that Lot 14 be looked a! as being removed from the plat.
We're not sure really how to approach that. The developer can speak for
themselves but they believe that the economics of the project are contingent
44
Planning Commission Meeting - April 19, 1995
PRELIMINARY PLAT TO SUBDIVISION 2.22 ACRE PARCEL INTO 4 LOTS ON
PROPERTY ZONED RSF, RESIDENTIAL SINGLE FAMILY AND LOCATED AT 6660
POWERS BOULEVARD, GOLDEN GLOW ACRES, JAMES RAVIS
Public Present:
Name Address
James & Norma Ravis
Bill Infanger
Russell G. Kohman
Bob & Lois Peterson
Roy Anderson
Ed Jannusch
Anita & Harry Murphy
Larry Kerber
6660 Powers Boulevard
6740 Powers Boulevard
6730 Powers Boulevard
6650 Powers Boulevard
6695 Mulberry Circle
6831 Utica Terrace
1215 Lake Lucy Road
6700 Powers Boulevard
Shmmin Al -Jaff presented the staff report on this item.
Mancino: Any questions from the commissioners to staff? Thank you. Is the applicant here
and would they like to make a presentation?
Jim Ravis: I certainly think the staff.
Mancino: Could you please state your name and address.
Jim Ravis: Oh. My name is Jim Ravis. I live at 6660 Powers Boulevard. I'm the applicant.
Staff certainly has looked at options. I don't necessarily agree that they're the best options. I
think the major, key issue here is access. I'd like to ... this is an aerial photograph of this
property. As staff stated, I applied for access to this property through the Willow Ridge
development, when that development, even before it submitted a preliminary plat. I tried to
work with the city to gain access at that time. I believe the staff recommended that that
access be granted. It was not. There are only a few ways you can gain access. The one
through Willow Ridge is now blocked off. There's an access here between the Kohman and
Infanger property and I'm sure that would make them extremely happy to work on that,
although there may be an existing access there. The one that the city has proposed, I believe
has all the same disadvantages as any other. One of the main points that staff made was they
would lose less trees there. That is not true. You can see that there's a significant amount of
mature trees in here. Those trees are now mature. There are other trees back here and at the
public, there was a town meeting or whatever you would like to call it, where all the property
40
Planning Commission Meeting - April 19, 1995
owners and that. The gentleman who owns this property, Mr. Kerber, said he had gone out
and counted them and we would definitely lose more trees by going that way. The access I'm
asking for is for here. At the time that I applied for access, at the time that Willow Ridge
developed, I was told I had sufficient access on my own property. I was also told that that
' access would remove a significant number of trees that the city did not want to let go. This
is a photograph that I took off of my deck last week. That was absolutely not true. You can
see the trees that were there before Willow Ridge developed. All of those trees have been
removed, so I really have a hard time understanding the logic that has been given to me over
the past 3 or 4 years. These are large lots. There are very few trees to be removed. I also
have another two photographs. This is a photograph I took last week of Lots 3 and 4. You
can see that those lots are not vegetated with a lot of trees. This is ... and the other picture that
I gave you, this photograph of Lot number 2 and you can also see that there's ... I feel that at
' this point in time the only proper way to develop this property is through the private
driveway. It does not preclude the staff or the other part of the development that they
recommended from going in. It does not preclude these other properties to develop. There's
an existing access over there. It could be, you also could convert private driveways to a U
shape or semi - circular street ... So I guess what I'm saying is that I feel ... I was told that this
was the proper access... I have provided the staff with a written response, or the Planning
' Commission and City Council with a written response to the staff report. I've also provided
you with a letter from the engineering firm that is helping with this development. I think
those are extremely pertinent to this situation and I'm not going to read them. It will only
take you a few minutes to read those letters. I do have some significant concerns about the
staff report. In three areas, the preservation zone. I think that recommendation was not well
thought out because it's near the homes. Those trees need thinning. I provided a picture with
' a letter. Those canopies on those trees are already innerlinked significantly. If the trees are
not thinned, the growth will be impeded. We will not get the majestic trees that we ought to
have in residential areas. I also have a significant issue with the drainage. There was two
recommendations in the report provided. Staff made one. Gave no reasons for it. I don't
believe at this time, and I have not been asked prior to this, to provide a drainage plan or
what they've said is necessarily feasible. I've discussed it with the engineering firm. We
don't know if that's the right way to propose any drainage solution. This is a significant slope
on these lots. We're trying to maintain that. If you read the DNR report, we've been asked to
maintain that. We provided a significant buffer zone from the wetlands. I think a
' preservation agreement certainly is in' order there, but I think that until we arrive at a drainage
solution, we need to take a look at that and then do what's right. I have some other concerns
in terms of building requirements which I have outlined in my letter to you. I feel we only
ought to live with one requirement, not double requirements, and those are outlined. I think
one of the things that I see that's, I believe the adjacent property owners may not agree to, is
' all the plans for the alternate plans provided by the staff, give you a maximum housing
density. I don't think that that's necessarily appropriate for every development, and I'm sure
41
Planning Commission Meeting - April 19, 1995
there's some property owners here tonight adjacent who may give you the same answer.
What we're doing here and what we proposed I think fits in with the topology of the land and
I guess what I'd like to ask is you approve the preliminary plat and I'll be happy to work with
staff to try to resolve these issues on preservation zones, drainage and building requirements.
Thank you.
Mancino: Does the commission have any questions for Mr. Ravis? Thank you. Sharmin,
have you had time to read through the Ravis' letter?
Al -Jaffa One of them, yes. The Ravis' letter, yes I have. But the engineer's letter that was
submitted just before the meeting, no I haven't.
Jim Ravis: I apologize for that but even though my application has been here since
November, I did not ... until Friday ... so he could not provide a response until today.
Mancino: Thank you. Can I have a motion to open the public hearing please?
Faimakes moved, Nutting seconded to open the public healing. All voted in favor and the
motion carried. The public hewing was opened. -
Mancino: This is a public hearing. Would anyone like to speak on this issue?
Bill Infanger: Yes I would. I'm Bill Infanger, 6740 Powers. I'm one of the two properties
most affected by this development and I concur with the city planner. If Mr. Ravis goes
ahead as he plans to go ahead with this, I'm simply shut off because... local access to County
Road 17, which I doubt that the County's going to approve. In addition... which I would do
for the same reasons Mr. Ravis wants to do it. Mainly to profit from it. I'd move elsewhere.
Concern about the condition of the area. So am I. I'd move elsewhere in Chanhassen where
it was conducive but his plan essentially says, we'll make it more congested and I'll leave at
my expense and I believe at the expense of the owner next to me. So it's certainly not in my
interest, and I basically concur with the city planner.
Mancino: Thank you.
Bill Infanger: Thank you.
Russ Kohman: I'm the neighbor next door to him. I live at 6730 Powers Boulevard and.
Mancino: And your name please.
42
Planning Commission Meeting - April 19, 1995
Russ Kohman: Russ Kohman.
Mancino: Thank you.
Russ Kohman: And I've got several pine trees that sit right on the property line, right on the
edge. Yeah. Where he plans on putting the private road in and if he puts the road in through
the edge, the pine trees will come down because they will not withstand it. You know if you
' cut to their roots, eventually they'll die and I can't afford to ... I bought the land, I'm a single
guy and I bought the land because I wanted to be left alone. I want to live that way. And
' the same as my neighbors. He bought his house. He's got a big house and a large family
and he wants to be left alone. And this is, we didn't really want people building around us or
right on top of us. And we didn't want no, another right -of -way coming in the back way. Or
' coming along side my property, reducing the value of my land and this would throw more
taxes towards... eventually. Not right away. But eventually we would...
Mancino: Thank you very much. Anyone else?
Robert Peterson: My name's Robert Peterson. I live at 6650 Powers Boulevard, which is the
' property just to the north of Mr. Ravis. I'm not here to speak against their development. I'm
for it. They've been good neighbors and I don't have any problem with them developing that
property. I'd like to offer some suggestions however that would benefit both of us. But first,
' let me see if I understand Sharmin.
Al -Jaff: Sharmin.
'
Robert Peterson: I don't know if you, did you get the impression that most of us at that
' meeting favored this plat?
Al -Jaff: No. I said there wasn't a plan that was favored by everybody.
' Robert Peterson: Oh, okay. I didn't hear it well, sorry. Because most of us at that meeting
didn't favor that plan. My suggestion, I went back to two. Can I go over there and point?
' Mancino: Yes.
Robert Peterson: The person that builds a house on this lot, well first of all when we moved
' in here a long time ago, the house was oriented towards the views. The major view which is
this way towards the wetland and towards Lake Lucy, you can see sometimes. Now anybody
building a house here blocks that view. I understand how that can happen. I feel that the
Ravis' could re- locate these two lines, forcing this person to build farther to the south. That
43
Planning Commission Meeting - April 19, 1995
would help me some but it would do something for the Ravis property. Right on this line
here is where the grades starts to drop down quite a bit. If that line were moved to the south,
this property would become a walkout lot which is more valuable than, otherwise it's flat. It
takes a little property away from the other two but they're still well above the minimum.
They're still about 20,000 feet ... I'd like to see if this plat goes ahead to discuss forcing this
person here to build at least 55 feet away from that line. Naturally I'm selfish but that's my
interest so I can maintain that view without looking at that edge of this house here as much.
And actually ... the view. Second part of this is, it's unusual to have the back of a house facing
the front of a house. That's pretty unusual. We have the same situation here too. I just have
some suggestions on the layout here to be considered that would help my property and the
Ravis property. That was my major concern is the view of my house. Thank you.
Mancino: Thank you. Anyone else?
Larry Kerber: My name's Larry Kerber. I own the property directly north, 5700 Powers
Boulevard. The largest piece. Also the piece they have the whole road proposed on. I have
no intention of giving up a half acre of my land so people behind me, to the south of me can
develop. It also turns all my property around from the way it lays naturally. I have all
walkouts now to the west. That road would turn everything around. It would also take out
about 180 of my trees that were planted on the west side of my property. So I'm sure there's
a solution for this but I don't think we've maybe looked at all the options. I definitely don't,
yeah this one gives me 9 lots. 9 little slivered lots that are totally reversed from the way I
think they should be and the way the land lays but I'm sure there's a solution but I am not in
favor of this one here. But I do think Mr. Ravis should be allowed to develop. At some
point he bought his place. I know he bought additional property 5 years ago, I'm sure to
develop. He bought out the back of the two lots, or one of the lots of the people who were
just up here. At some point he did a subdivision to get that property of his and again when
Lundgren came in, they told him he could develop without access through there so I feel
there's an ordinance in the city for four houses to a private driveway. I don't know if he
meets all the conditions but I think he should be allowed to develop without me developing.
I don't know why I should, why this development should be contingent on me and Bob
Peterson and everyone else splitting their lots up even if they don't want to. So I think he
should develop as long as his plan is legal and meets all the specs of the city.
Mancino: Thank you.
Hempel: Madam Chairperson, maybe I could address a couple of points here that are coming
out of public comment. First of all staff did go through and develop all the documents for
developing the neighborhood. One of the major concerns we had was access onto Powers
Boulevard. That is an arterial street. It's a County Road. It's not, they have jurisdiction with
44
Planning Commission Meeting - April 19, 1995
regards to access points. As Mr. Kerber has indicated, he didn't want to see his property
' develop in this fashion because it changes the lots Mr. Kerber has envisioned and developing
his access points off of Powers Boulevard. I don't believe that will be allowed through the
County. ...to look at at trying to group neighborhoods as a whole to make it work from a
' public street standpoint. To include public improvements. Sewer and water, storm sewer and
yet give some flexibility on these parcels when it comes to developing it ... all that coming at
once in order for this to work. On the other hand we didn't want to see each individual
' property owner coming in with a private driveway proposal out onto Powers Boulevard.
Mancino: So with what we're seeing as Option E, the chain of events, which one does have
' to come in first?
' Hempel: The neighborhood puts together to petition the city to do a 429 project which is an
assessable project, then it would be in the hands of the City Council to determine whether
they want to proceed with conducting the feasibility study and then ordering the improvement
' at that point. It would probably take close to 50% of the benefitting property owners.
Mancino: To do that, thank you. Mr. Kohman, you wanted to come up? Thank you.
' Russ Kohman: I'm not too good on words.
' Mancino: Appreciate it. Thank you. Anyone else?
Robert Peterson: As it relates to most of us that have about an acre maybe, or right at that,
' that are left over, except for Larry Kerber, we could get one more lot out of our property and
it would work fine. I've gone through the numbers and I don't know if the rest of them have
but you take your acre ... cut it in half, pay for a city road, pay for the sewer and the
' assessments and the development and all of that, there's no profit to be had in making one
more lot out of your property. Believe me there isn't. I can show you the numbers. There's
no big advantage for me to cut my ground in half, and I bet everybody else would say the
' same thing. To get one more lot. It doesn't work. I'm talking about a selling price of
$55,000.00 to $60,000.00 on a lot.
' Mancino: Thank you. Anyone else?
Bill Infanger: Just one clarification. I don't necessarily oppose Mr. Ravis' development. I
just oppose his development if it cuts me off from doing exactly the same thing. Mr.
Peterson's comments are apropos. We've also gone through a cost analysis to see if in fact it
could be profitable and the answer might be, no. Not right now, but maybe later on. What I
45
Planning Commission Meeting - April 19, 1995
don't want is a situation where because of what happens now, I can't develop later on. Thank
you.
Mancino: Thank you. May I have a motion to close the public hearing.
Conrad moved, Nutting seconded to close the public hearing. All voted in favor and the
motion cared. The public hearing was closed.
Mancino: Commissioners. Ron.
Nutting: This one's messy. At this point I am in support of staffs recommendation to deny.
I'm not in any position to develop or to lay this thing out property. There needs to be more
work done. I'm not going to comment on the specifics of the development because we're not
talking about moving this one forward. I'm not sure what can be done. Any time you have
this many property owners in a competing interest, you're either at each other's throats or you
come to some accommodation that isn't going to work for everybody. So I guess I'm, at this
point I think there needs to be some more interaction between staff and the developer as well
as continued communications to see if we can come up with'something that makes this work.
I guess Dave's comments sway me a bit in terms of the access onto Powers. Diane's not here
anymore but I'm echoing Diane's comments from the past. From a public safety perspective
and the private drives. I think this is a real problem area for future development so that's all I
have right now.
Mancino: Thanks. Ladd.
Conrad: It's the Planning Commission's job to make sure that areas develop properly. It's the
planning staffs job to do that likewise. The plan before us tonight does not do that. It just
doesn't and because it doesn't, and because it forces individual development which is really
not what we're about, I think this has to be turned down. This is not, the design in front of
us, and I'm not talking about Option A thru E. There may be others. But what we see
tonight is not the solution, and what we see tonight is not the way we can really develop one
parcel at the expense of others. It's poor planning.
Mancino: Thank you. Jeff.
Farmakes: Nothing to add. No comments.
Mancino: Mike.
Meyer: No comments.
46
Planning Commission Meeting - April 19, 1995
Mancino: Bob.
Skubic: I agree with what Ron and Ladd have said.
Mancino: Thank you. Do I have a motion?
' Nutting: I make a motion that the Planning Commission recommend denial of the
preliminary plat for Subdivision #94 -22, for Golden Glow Acres for 4 single family lots as
shown in the plans dated November 18, 1994 for the reasons as outlined in the staff report.
Conrad: Second.
Nutting moved, Conrad seconded that the Planning Commission recommend denial of the
preliminary plat for Subdivision #94 -22, for Golden Glow Acres for 4 single family lots as
shown in the plans dated November 18, 1994 for the reasons as outlined in the staff iepoit.
' All voted in favor and the motion carried unanimously.
' PUBLIC HEARING:
REVISED PRELIMINARY PLAT OF 35.83 ACRES OF PROPERTY INTO 52 SINGLE
FAMILY LOTS AND 2 OUTLOTS ON PROPERTY ZONED RSF RESIDENTIAL SINGLE
' FAMILY AND LOCATED NORTH OF KINGS ROAD AND WEST OF MINNEWASHTA
PARKWAY, HARSTAD COMPANIES.
Public Present:
Name Address
Bill Munig
Linda Scott
Sue Morgan
Keith Bedford
Janet Carlson
Margie Borris
6850 Stratford Blvd.
4031 Kings Road
4031 Kings Road
3961 Stratford Ridge
4141 Kings Road
4071 Kings Road
Kate Aanenson piesented the staff report on this item.
Mancino: Any questions for staff?
47
_ He
Chanhassen Mayor and City Council SEP 1 1
Chanhassen, Minnesota
9 September 1995
GI EE S DEPT.
Mayor Chmiel; Councilmembers Berquist, Dockendorf, Mason, and Senn:
We write this letter reluctantly, to address a situation we had believed was resolved. Recent conversation
with the city planners, however, indicates otherwise. Moreover, it appears that our respective situations in
the matter are being misrepresented.
The problem revolves around the proposed J. Ravis `Golden Glow Acres' development which, as
proposed, abuts our property. As proposed, and without further resolution, this development was rejected
by both the city planners and the Planning Commission in April of this year. Among the reasons for
rejection was the viewpoint, with which we concur, that "allowing the subject site to develop as proposed
could hinder the development of the surrounding properties." This was consistent the view of the city
planners that if the development proceeded as planned, "the remaining parcels ( Kohman and Infanger)
will have limited subdivision potential, if any."
Among our concerns and the reason for this letter:
• From the city planners, we understand that our position, as indicated to them by Mr, Ravis, is that we
have no interest in pursuing any development now or in the foreseeable future and, therefore, are not
factors to be considered by the city in this matter. This is not the case. At least one of us ( Infanger)
would certainly be willing to pursue development, and the other ( Kohman) might be willing to do so
in the future. There has been no discussion with Mr. Ravis about this since a preliminary review at a
neighborhood meeting in March. -
• There appears to be a lobbying effort in this matter by `interested' third parties, whose reasons for
support for the Ravis development and against the city fail to consider either of our views or the
predicament left to us should this continue as planned and who may individually benefit should the
Planning Commission be overruled.
• One way or another, all of this is being given to you in anticipation of a forthcoming council meeting,
from only one perspective, without consideration of its consequences to either of us or possibly others
in the area.
• If this development were approved as is, any future development on our part would be questionable
and, at best more expensive. It would further place us in the position of having to negotiate access
with persons who view us as former antagonists.
In conclusion, we believe that the city's position to date has protected our interests and, contrary to other
notions, is appropriate. We believe there are other ways to reach consensus of benefit to all, not the profit
of a few. We do not believe that these have been adequately explored.
Sincerely,
William Infanger Russell Kohman
cc: D. Hempel, S. Al -Jaff
If this plan is approved for a road between Kohmans and Ravis, l want a siened agreement
from Mr. Ravis that any trees that die in the future will be removed and disposed of at Mr.
Ravis expense.
Russell G. Kohman