1a. Powers Blvd. (CR 17)-Reinitiate Feasibility Studyu CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 TO: Don Ashworth, City Manager FROM: Charles Folch, Director of Public Works /City Engineer DATE: November 22 1994 SUB J: Reinitiate Feasibility Study for Powers Boulevard (CSAH 17) Improvement Project No. 93 -29 (Career County Cooperative Project) A few of the City Council members may recall that the last time this project came before them was in April of 1992. At the time, a feasibility study had been completed and was presented to the Council for improving a section of Powers Boulevard (CSAH 17) from Trunk Highway 5 to approximately 2,200 feet south. Following q rather peaceful public hearing and a great deal of debate amongst the City Council' the project was voted down) This action was not the result of any objections received concerning the project, but rather, a lack of comfortable understanding as to what or who was the underlying impetus for the project at that time and even more so, that fact that there was going to be no County funding participation with the project It is now 2'/ years later and this project is once again coming before the City Council but with a totally new look. The size of the project has more than doubled with the project limits now extending from Trunk Highway 5 south to Lvman Boulevard. In addition,tthe City has since entered into a joint powers agreement wit Carver County to design, construct and finance this proposed Powers Boulevard (CSAH 17) improvement project One element that does remain the same from the previous project is the proposal to assess the abutting business park Properties along the project. Therefore, the City is required to take the necessary steps including preparing a feasibility study which identifies the primary project elements, project costs, and proposed special assessments, and hold a formal public hearing on the project. The project engineer has provided a tentative project schedule as forecasted at this time (see attachment). If authorized, the feasibility study would be submitted to the City Council at its regular meeting on December 12, 1994 with a public hearing tentatively scheduled for January 9, 1995. During the interim, Carver County has schedule a neighborhood informational meeting for December 8, 1994. It is therefore recommended that the City Council authorize the reinitiation of the feasibility study for the Powers Boulevard (CSAH 17) Improvement Project No. 93 -29 (Carver County Cooperative Project). ]ms Attachments: Letter from BRW dated November 21, 1994. Dave Hempel. Assistant City Engineer Jon Horn, BRW Bill Weckman, Carver County g:':eng�.chazles�ec`feascrl"' ����ytsx,,.,n�xevl t:• -� 1o�� %1j ;� •ray ;;te. �j;wi� :,.•.:,raN November 21, 1994 ' Mr. Charles Folch, PE Director of Public 'Works . Ci of Chanhassen B R Hr INC. 690 Coulter Drive ' Chanhassen, MN 55317; PEE: CSAH 17 (Powers Boulevard) Improvements ' Plaruung City Project 93 -29 Transportation ' Dear Engineering Urban De sign Charles: Thresher Square A public hearing was held on April 27, 1992, for the above - referenced ' 700 Third Street so, project, which included the reconstruction. of CSAH 17 (Powers Boulevard) Minneapolis from Highway 5 t o approximately 2,200 feet south. At that time, the MN 515 Council elected to reject the project due to concerns associated with the 612/370-0700 lack of any County funding. Fax 612/370.1378 The City has since entered into a Cooperative Agreement with Carver ' Denver County to .upgrade a number of County roadways within the City, M inc luding CSAH 17. As a result of this agreement, CSAH 17 is scheduled ivfiruieapoiis .mn*apee for reconstruction in 1995. The project scope has also been extended to Orlando include the reconstruction of CSAH 17 an additional 5,600 lineal feet to the Phoerc x Portland south to L y man Boulevard. San Diego Seattle An Environmental Assessment Worksheet (EA.W) was completed and approved in September, 1994 for the project. The preparation of the EAW W. Ttingrose was mandatory as a result of the nature and length of the project. The ' Donald Richard P. Wolsfeld FA W' did not identify any environmental issues that warranted the Thomas F. Carroll preparation of an Environmental Impact Statement or would result in a Craig A. Amundsen delay in the project construction. ' Donald E. Hunt John B. McNamara A project is currently underway to construct a surcharge embankment Richard D. Pilgrim along a portion of the roadway to enable it to be widened along an area ' Dale N Seetmarm of poor s oils. The surcharge was required to be constructed in 1994 and Jeffery L. Benson Ralph c. Blum remain inplace over the winter months to consolidate the poor soils for ' Cary Erickson roadway construction in 1995. John C. Lynch Paul N. B ay In order for the project to further proceed, the City Council must authorize ' Sabri Ayaz the preparation of a feasibility study to detail the scope, estimated costs Car A. Shret and proposed assessments for the project. It is my understanding that the Anthony Heppelmann businesses along the north end of the project are to be assessed as ' Axij' Pais proposed in 1992, but the residential properties along the southern portion Martha McPhLT of the project will not be assessed. Howard P. Preston Derutis P. Probst - I , ::i j4 it; 1z; Pending City Council authorization, we are prepared to proceed based upon the schedule detailed above. Please let me know if you have any questions or we can provide any additional information. Sincerely, BRW, INC. J B. orn, PE - orn' P r r I oje Manager JBH/lab cc: Bill Weckman/Carver County File 2396AGO Mr. Charles Folch November 21, 1994 Page 2 If the City Council wishes to proceed with the project the following is a tentative project $chedule: Authorize Preparation of F6isibifity'Study. November 28, 1994 Neighborhood Meeting December 8, 1994 Accept Feasibility Study December 12, 1994 . Public Hearing and Authorize Preparation of Plahs and 'Spedfications January 9. 1 Approve Plans and Specifications (Carver County) March 21, 1995 Concur with Plan and Specification Approval (Chanhassen) March 27, 1995 Bid Opening April 25, 1995 Award Contract (Carver County) May 2, 1995 Concur with. Contract Award (Chanhassen) May 8, 1995 Begin Construction May 22, 1993 Since the roadway is designated as a State Aid route, we will be required to submit the plans and specifications to MnDOT State Aid for their review and approval. We propose to submit the plans and specifications for their review in early March, 1995. Any delays in the State Aid review process could result in some delays in the project schedule. Pending City Council authorization, we are prepared to proceed based upon the schedule detailed above. Please let me know if you have any questions or we can provide any additional information. Sincerely, BRW, INC. J B. orn, PE - orn' P r r I oje Manager JBH/lab cc: Bill Weckman/Carver County File 2396AGO