1b-1. The Preserve at Bluff Creek 4th Addition: Approve Final Plat9
CITY OF
CHANgASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
7901 Park Place
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
www.ci.chanhassen.mn.us
MEMORANDUM
TO: Todd Gerhardt, City Manager
FROM: Kate Aanenson, Community Development Director
DATE: August 8, 2011 0�
s
SUBJ: Final Plat Approval
The Preserve at Bluff Creek 4 Addition
Planning Case No. 06 -14
PROPOSAL SUMMARY
16 -1
Chanhassen Residential Development Partners, LLC, the developer, and LDK
Homes, the builder, are requesting final plat approval for The Preserve at Bluff
Creek 4 Addition. The plat includes 19 lots and 3 outlots. Because this
development is a PUD, design standards are required.
BACKGROUND
On Monday, May 8, 2006 the Chanhassen City Council approved the rezoning of
the land within the plat for "The Preserve" from Agricultural Estate District, A2, to
Planned Unit Development - Residential, PUD -R; approved a conditional use permit
to permit development within the Bluff Creek Overlay District and alterations
within the flood plain; and approved the preliminary plat for "The Preserve"
creating 155 lots, 15 outlots and right -of -way for public streets.
Final plats:
• 1 Addition was platted in June of 2006 and included 53 lots
• 2 nd Addition was platted in May of 2007 and included 12 lots
• 3` Addition was plated in 2010 and included 25 lots
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
Todd Gerhardt
The Preserve at Bluff Creek 4th Addition
August 8, 2011
Page 2 of 11
Development Design Standards
Setbacks:
*The entire development, including the public and private streets and Outlots, may not exceed 30
percent hard coverage. Individual lots will exceed the 30 percent site coverage (see Lot
Impervious Coverage Analysis Attachment #5).
Materials and Design
LDK proposes ten home styles with different options for each style (see attachments). The
finished square footage of the homes ranges from 1900 square feet to 2750 square feet. There is
room for additions such as three- season porches and decks. No two adjacent housing units may
be of the same style or color scheme.
FINAL PLAT REVIEW
The 4 th Addition continues the street Degler Lane to provide access to the 19 lots. Outlot A will
be platted into lots in the next addition, and Outlots B and C will be used as an internal trail. The
19 lots to be platted are consistent with the original preliminary plat approval.
Ten of the lots will be adjacent to Bluff Creek. There is a city trail that runs between the back of
the lots and the creek. These homes will have a walkout -style construction.
Standards
Lyman Boulevard
50 feet
Exterior Eastern (Perimeter)
Setback
50 feet (creek on west)
Front Yard garage side
25 feet
Front Yard on corner lots
20 feet
Side Yard
5110 feet minimum; 15 feet between units
Rear Yard
15 feet
Hard Surface Coverage*
30% averaged over the entire site
Wetland: Buffer and buffer setback
16.5 feet and 40 feet
Bluff Creek Primary Zone boundary
40 feet with the first 20 feet as buffer
Minimum lot size
Average 8,000 square feet
Public street
60 -foot right -of -way; 32 -foot paved
Private street
40 -foot right -of -way; 28 -foot paved surface
*The entire development, including the public and private streets and Outlots, may not exceed 30
percent hard coverage. Individual lots will exceed the 30 percent site coverage (see Lot
Impervious Coverage Analysis Attachment #5).
Materials and Design
LDK proposes ten home styles with different options for each style (see attachments). The
finished square footage of the homes ranges from 1900 square feet to 2750 square feet. There is
room for additions such as three- season porches and decks. No two adjacent housing units may
be of the same style or color scheme.
FINAL PLAT REVIEW
The 4 th Addition continues the street Degler Lane to provide access to the 19 lots. Outlot A will
be platted into lots in the next addition, and Outlots B and C will be used as an internal trail. The
19 lots to be platted are consistent with the original preliminary plat approval.
Ten of the lots will be adjacent to Bluff Creek. There is a city trail that runs between the back of
the lots and the creek. These homes will have a walkout -style construction.
Todd Gerhardt
The Preserve at Bluff Creek 4th Addition
August 8, 2011
Page 3 of 11
Block/Lot
Area
Front Setback
Rear Setback
Side Setback
B1 Ll
7,211.46
25 feet;
20 feet on corner lots
15 feet
5/10 feet minimum;
15 feet between units
BI L2
7,200.00
it
it
"
BI L3
7,200.00
It
"
BI L4
7,200.00
it
"
BI L5
7,203.46
it
"
BI L6
0,713.83
it
"
B 1 L7
9,299.56
if
"
BI L8
7,915.32
"
BI L9
7,200.00
"
B 1 L 10
7,200.00
"
B2 L1
9,424.21
"
B2 L2
7,800.00
"
B2 L3
7,200.00
"
B2 L4
7,200.00
"
B2 L5
7,323.90
"
B2 L6
7,853.96
"
B2 L7
8,921.97
"
B3 L1
7,200.00
"
B3 L2
7,200.00
"
Outlot A
32,940.19
N/A
N/A
N/A
Outlot B
3,233.69
N/A
N/A
N/A
Outlot C
354,673.42
N/A
N/A
N/A
EASEMENTS AND RIGHT -OF -WAY
The private streets located in The Preserve at Bluff Creek 4 th Addition will be in a 40 -foot wide
outlot. There are no public streets in this addition.
Blanket drainage and utility easements must be platted over Outlots A and B. Private utilities
(e.g. storm sewer that only conveys runoff from a private street) within outlots shall be owned
and maintained by the Association.
GRADING AND DRAINAGE
The lots within the 4 th addition were mass graded with the 2 "d addition in order to balance the
earthwork.
Drainage calculations were reviewed for Pond 1 and storm sewer sizing. The pond calculations
show a deficiency in water quality volume. Maps related to the storm sewer drainage areas do
Todd Gerhardt
The Preserve at Bluff Creek 4th Addition
August 8, 2011
Page 4 of 11
not match the proposed grading plan. The developer must submit revised plans, drainage maps
and calculations meeting city standards.
The proposed driveway grades must be between 2 and 10 percent.
RETAINING WALLS
No retaining walls are proposed in the 4 Addition. In the 5ch Addition, a 245 -foot long retaining
wall is proposed on the east property line, north of Mills Drive. The maximum height of this
retaining wall is four feet. There may be an opportunity to reduce the height of this wall or
eliminate this wall when the property to the east develops. This wall will not be constructed until
the lots are platted.
ITTILITIRS
Lateral sanitary sewer and watermain will be installed within Phase 4 of the final plat. Lateral
utilities to serve the future lots will be installed when the area is final platted.
When the area south of Lyman Boulevard is final platted, an 18 -inch diameter watermain must be
installed on the south side of Lyman Boulevard to the east property line. The developer will be
reimbursed the cost difference between an 8 -inch lateral and the 18 -inch trunk watermain with
final plat approval of that area of the development.
Homes with a low floor elevation of 935' or lower will require a pressure- reducing valve within
the house.
The developer will be responsible for extending lateral sewer and water service to the lots;
therefore, the sanitary sewer and water connection charges will be waived.
The assessments for the 2005 MUSA improvements were paid in full with the first phase.
Each new lot is subject to the sanitary sewer and water hookup charges. A portion of these fees
is collected with the final plat and is calculated as follows:
SAC fee partial payment: 19 units x $608.00 /unit = $11,552.00
WAC fee partial payment: 19 units x $1,618.00 /unit = $30,742.00
The remainder of these fees will be collected with the building permit and are based on the rates
in effect at the time of building permit application. Based on the 2011 fees, this amounts to
$1,418.00 /unit for the SAC fee and $3,775.00 /unit for the WAC fee. The party applying for the
building permit is responsible for payment of these fees.
Todd Gerhardt
The Preserve at Bluff Creek 4th Addition
August 8, 2011
Page 5 of 11
STREETS
The development is subject to the arterial collector fee which must be paid in cash with the final
plat and is calculated as follows:
3.46 developable acres x $2,400 /acre = $8,304.00
Future phases of the development will be subject to this fee at the rate in effect at the time of
final plat.
The developer will construct a five -foot wide concrete sidewalk on the north side of Degler
Circle.
A street light should be added at the intersection of Degler Lane and Degler Circle.
The developer must apply for a temporary driveway permit for construction access off of Lyman
Boulevard. This access will limit the construction traffic from existing residences in the earlier
phases and will also limit the damage from the construction traffic to existing streets.
A temporary hammerhead turnaround must be installed at the terminus of Degler Circle within
the 4 addition. This turnaround shall be removed when the adjacent area is final platted and
Degler Circle is extended.
All dead -end streets must be barricaded according to the Minnesota Uniform Traffic Control
Device Manual.
LANDSCAPING
Tree protection fencing shall be installed prior to construction around all areas designated for
preservation and /or at the edge of proposed grading limits.
A walk - through inspection of the silt /tree preservation fence shall be required prior to
construction.
No burning permits shall be issued for tree removal. All trees removed on site shall be chipped
and used on site or hauled off.
Applicant shall remove all ash species from the planting schedule. The applicant shall substitute
another species with approval from the City.
The developer shall work with staff to develop and install appropriate markers at lot lines to
demarcate the primary zone.
The applicant shall submit a plan for the revegetation of any areas of grading within Outlot A.
The plan shall incorporate native plants and be consistent with the City's Bluff Creek Natural
Todd Gerhardt
The Preserve at Bluff Creek 4th Addition
August 8, 2011
Page 6 of 11
Resources Management Plan Appendix C. Special attention should be paid to areas with steep
slopes (greater than 3:1). Staff recommends that the Hill Prairie planting list be used for the
restoration.
In addition to the conditions, staff also recommends that the existing landscape security be
increased to cover the proposed development or a new security be established equal to 110
percent of the construction costs.
BUILDING INSPECTIONS
A final grading plan and soils report must be submitted to the Inspections Division before
permits can be issued.
Retaining walls over four feet high require a permit and must be designed by a professional
engineer.
Each lot must be provided with separate sewer and water services.
PARKS AND RECREATION
The Park and Recreation Commission recommended at the time of preliminary plat that the City
Council require the following conditions of approval concerning parks and trails for The Preserve
PUD:
1. The payment of full park dedication fees at the rate in force upon final plat approval in lieu of
parkland dedication. For 2011 the Park dedication fee is $5,800 per dwelling. Based on
approval of 19 lots with the 4` Addition, the total fee due and payable with the final plat is
$110,200.00.
2. The applicant shall provide all design, engineering, construction and testing services required
of the "Bluff Creek Trail." All construction documents shall be delivered to the Park and
Recreation Director and City Engineer for approval prior to the initiation of each phase of
construction. The trail shall be 10 feet in width, surfaced with bituminous material and
constructed to meet all city specifications. The applicant shall be reimbursed for the actual
cost of construction materials for the Bluff Creek Trail. This reimbursement payment shall be
made upon completion and acceptance of the trail and receipt of an invoice documenting the
actual costs for the construction materials utilized in its construction. This trail has been
constructed.
Todd Gerhardt
The Preserve at Bluff Creek 4th Addition
August 8, 2011
Page 7 of 11
RECOMMENDATION
Staff recommends that the City Council adopt the following motion:
"The Chanhassen City Council approves the Final Plat for The Preserve at Bluff Creek 4 th Addition
subject to the following conditions:
Planning Department Conditions of Approval
1. All homes shall comply with all standards of the PUD.
Building Inspections Conditions of Approval
1. A final grading plan and soils report must be submitted to the Inspections Division before
permits can be issued.
2. Retaining walls over four feet high require a permit and must be designed by a professional
engineer.
3. Each lot must be provided with a separate sewer and water services.
City Engineer/Water Resources Coordinator Conditions of Approval
1. The grading plan must identify the existing and proposed 100 -year floodplain.
2. Due to the anticipated timing of the final plat with respect to the timing of formal approvals
from FEMA, the proposed lots that are within the current floodplain may be preliminary
platted subject to FEMA approval of the LOMR.
3. Any grading within the floodplain will require a Conditional Use Permit.
4. Hydraulic calculations must be submitted with the final plat submittals.
5. Any retaining wall four feet high or taller requires a building permit and must be designed
by an Engineer registered in the State of Minnesota.
6. The developer must pay $11,552 for the partial payment of the SAC fees and $30,742 for
the partial payment of the WAC fees with the final plat. The remainder of these fees will be
collected with the building permit and are based on the rates in effect at the time of building
permit application. Based on the 2011 fees, this amounts to $1,418.00 /unit for the SAC fee
and $3,775.00 /unit for the WAC fee. The party applying for the building permit is
responsible for payment of these fees.
7. The arterial collector fee for this phase is $8,304.00 and must be paid in cash with the final
plat.
Todd Gerhardt
The Preserve at Bluff Creek 4th Addition
August 8, 2011
Page 8 of 11
Sidewalks adjacent to private streets and within privately owned outlots can be used by the
public.
9. If the applicant wishes to pursue an exemption for impact to Wetland A, the applicant shall
furnish information to substantiate the exemption request. The applicant is advised that,
even if impacts would be exempt from WCA, they may not be exempt from the
requirements of the Army Corps of Engineers.
10. A wetland buffer with a minimum width of 16.5 feet shall be maintained around all
wetlands and wetland mitigation areas. Wetland buffer areas shall be preserved, surveyed
and staked in accordance with the City's wetland ordinance. The applicant shall install
wetland buffer edge signs, under the direction of City staff, before construction begins and
shall pay the City $20 per sign. All structures shall maintain a setback of at least 40 feet from
the wetland buffer edge.
11. All structures shall maintain a 50 -foot setback from the ordinary high water level of Bluff
Creek. All structures shall maintain a minimum 40 -foot setback from the primary corridor.
No alterations shall occur within the primary corridor or within the first 20 feet of the
setback from the primary corridor. The 50 -foot setback, primary corridor boundary, 40 -foot
structure setback and 20 -foot grading setback shall be shown on the plans.
12. The applicant shall submit a plan for the revegetation of any areas of grading within Outlot
A. The plan shall incorporate native plants and be consistent with the City's Bluff Creek
Natural Resources Management Plan Appendix C. Special attention should be paid to areas
with steep slopes (greater than 3:1). Staff recommends that the Hill Prairie planting list be
used for the restoration.
13. The proposed sanitary sewer and storm sewer outlet in the vicinity of Pond 2 shall be
revised to ensure: 1. The runoff from the outlet will not compromise the integrity of the
sanitary sewer; and 2. The sanitary sewer is not located below the normal water level
(NWL) of Pond 2.
14. Pond 5 shall be constructed prior to the construction of all areas which drain to it.
15. Erosion control blanket shall be installed on all slopes greater than or equal to 3:1. All
exposed soil areas shall have temporary erosion protection or permanent cover year round.
The following schedule of stabilization must be adhered to for disturbed soils: All exposed
soil areas must be stabilized as soon as possible to limit soil erosion but in no case later than
14 days after the construction activity in that portion of the site has temporarily or
permanently ceased. All exposed soil areas tributary to Bluff Creek must be stabilized as
soon as possible to limit soil erosion but in no case later than seven (7) days after the
construction activity in that portion of the site has temporarily or permanently ceased. The
normal wetted perimeter of any temporary or permanent drainage ditch or swale that drains
water from any portion of the construction site, or diverts water around the site, must be
stabilized within 200 lineal feet from the property edge, or from the point of discharge into
Todd Gerhardt
The Preserve at Bluff Creek 4th Addition
August 8, 2011
Page 9 of 11
any surface water. Stabilization of the last 200 lineal feet must be completed within 24
hours after connecting to a surface water. Stabilization of the remaining portions of any
temporary or permanent ditches or swales must be complete within 14 days after connecting
to a surface water and construction in that portion of the ditch has temporarily or
permanently ceased. Pipe outlets must be provided with temporary or permanent energy
dissipation within 24 hours after connection to a surface water.
16. Street cleaning of soil tracked onto public streets shall include daily street scraping and street
sweeping as- needed.
17. The applicant shall be proactive in addressing potential run -on problems in the vicinity of the
extreme southeast corner of the property. This would potentially involve vertically tracking
equipment up and down the graded faces of the slope to increase roughness and prevent
rilling. Similar practices shall be used behind the homes along the central part of Outlot A.
18. At this time, the estimated total SWMP fee, due payable to the City at the time of final plat
recording, is $26,543.80.
19. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g.,
Riley- Purgatory-Bluff Creek Watershed District, Minnesota Pollution Control Agency
(NPDES Phase II Construction Site Permit), Minnesota Department of Natural Resources (for
dewatering), Army Corps of Engineers, Minnesota Department of Transportation, Minnesota
Department of Health) and comply with their conditions of approval.
20. The applicant shall submit a plan for the revegetation of any areas of grading within Outlot
A. The plan shall incorporate native plants and be consistent with the City's Bluff Creek
Natural Resources Management Plan Appendix C. Special attention should be paid to areas
with steep slopes (greater than 3:1). Staff recommends that the Hill Prairie planting list be
used for the restoration.
21. A temporary hammerhead turnaround must be installed at the terminus of Degler Circle
within the 4 th Addition. This turnaround shall be removed when the adjacent area is final
platted and Degler Circle is extended.
22. All dead -end streets must be barricaded according to the Minnesota Uniform Traffic Control
Device Manual.
23. Blanket drainage and utility easements must be platted over Outlots A and B.
24. Drainage calculations were reviewed for Pond l and for storm sewer sizing. The pond
calculations show a deficiency in water quality volume. Maps related to the storm sewer
drainage areas do not match the proposed grading plan. The developer must submit revised
plans, drainage maps, and calculations meeting city standards. After construction, an as-
built of the pond is required to ensure it is built according to plan.
Todd Gerhardt
The Preserve at Bluff Creek 4th Addition
August 8, 2011
Page 10 of 11
25. The proposed driveway grades must be between 2 and 10 percent.
26. Add street light at the intersection of Degler Drive and Degler Circle.
27. The developer must apply for a Carver County temporary driveway permit off of Lyman
Boulevard for construction access.
28. The developer must work with staff on changes required (redlines) to meet city standards.
29. The location of wetland buffer and /or Bluff Creek Overlay signage must be shown on the
plan. This signage must be installed prior to final approval of the improvements and must
indicate that the area is to remain undisturbed except as allowed by a vegetation
management plan approved by the City of Chanhassen.
30. All disturbed areas within the Bluff Creek the Bluff Creek Overlay District must have an
approved vegetation management plan that includes the incorporation of native seed mixes
appropriate to the moisture regime and soil types.
31. Based upon recent bids solicited by the City, it does not appear that the engineer's estimate
of cost accurately reflects current prices. Specifically, erosion control would be $13,235.00
and storm sewer would be $62,711.00 plus excavation required for pond construction. Any
funds held as assurance must reflect these prices.
32. The Owner /Applicant and the Contractor must provide a completed and signed Contractor
Responsibility and Landowner Statement Form provided by the Minnesota Board of Soil
and Water Resources to the City prior to the commencement of any land disturbing
activities.
33. The NPDES Permit Number 000019096 was terminated on July 17, 2010. As this
construction is just one phase of a larger project, a NPDES Construction Stormwater Permit
must be applied for and received prior to the commencement of any earth disturbing
activities.
Environmental Resources Coordinator Conditions of Approval
1. Tree protection fencing shall be installed prior to construction around all areas designated for
preservation and /or at the edge of proposed grading limits.
2. A walk- through inspection of the silt /tree preservation fence shall be required prior to
construction.
3. No burning permits shall be issued for tree removal. All trees removed on site shall be
chipped and used on site or hauled off.
Todd Gerhardt
The Preserve at Bluff Creek 4th Addition
August 8, 2011
Page 11 of 11
4. Applicant shall remove all ash species from the planting schedule. The applicant shall
substitute another species with approval from the City.
5. The developer shall work with staff to develop and install appropriate markers at lot lines to
demarcate the primary zone.
6. The applicant shall submit a plan for the revegetation of any areas of grading within Outlot
A. The plan shall incorporate native plants and be consistent with the City's Bluff Creek
Natural Resources Management Plan Appendix C. Special attention should be paid to areas
with steep slopes (greater than 3:1). Staff recommends that the Hill Prairie planting list be
used for the restoration.
7. In addition to the conditions, staff also recommends that the existing landscape security be
increased to cover the proposed development or a new security be established equal to 110
percent of the construction costs.
Parks and Recreation Department Conditions of Approval
Park and Trail fees in the amount of $110,200.00 or the fee in effect at the time of final
platting and shall be shall be paid as per city ordinance prior to recording the plat.
2. The applicant shall provide all design, engineering, construction and testing services required
of the "Bluff Creek Trail." All construction documents shall be delivered to the Park and
Recreation Director and City Engineer for approval prior to the initiation of each phase of
construction. The trail shall be 10 feet in width, surfaced with bituminous material and
constructed to meet all city specifications. The applicant shall be reimbursed for the actual
cost of construction materials for the Bluff Creek Trail. This reimbursement payment shall be
made upon completion and acceptance of the trail and receipt of an invoice documenting the
actual costs for the construction materials utilized in its construction. This trail has been
constructed."
ATTACHMENTS
1. Location Map.
2. Application.
3. The Preserve at Bluff Creek 4 th Addition Final Plat.
4. Lot Area Tabulation.
5. Lot Impervious Coverage Analysis.
6. Lot Study Sketch.
7. Lot Type Exhibit.
8. House Designs.
g: \plan\2006 planning cases \06 -14 the preserve \final plat documents -4th addition \preserve 4thaddition fp.doc
The Preserve 4 t " Addition
Planning Case No. CYO — 14
CITY OF CHANHASSEN
7700 Market Boulevard — P.O. Box 147
Chanhassen, MN 55317 — (952) 227 -1100
DEVELOPMENT REVIEW APPLICATION
PLEASE PRINT
Applicant Name and Ad p ress: Prop rty wner Name and Address
A4 AJ S' !
Contact: Contact:
Phone: ?J7-tf7 - /?a F x: YTl -2f2fl Phone: 952- 41 - W
gSoP ax:
Email: Email: @
NOTE Consultation with City staff is required prior to submittal, including review of development
plans
Comprehensive Plan Amendment
Conditional Use Permit (CUP)
Interim Use Permit (lUP)
Non - conforming Use Permit
Planned Unit Development*
Rezoning
Sign Permits
Sign Plan Review
Site Plan Revie (SPR)*
✓ Subdivision *�n�I"'/
Temporary Sales Permit
Vacation of Right -of- Way /Easements (VAC)
(Additional recording fees may apply)
Variance (VAR)
Wetland Alteration Permit (WAP)
Zoning Appeal
Zoning Ordinance Amendment
Notification Sign - $200
(City to install and remove)
X Escrow for Filing Fees /Attorney Cost **
- $50 CUP /SPR/VAC/VAR/WAP /Metes & Bounds
- $450 Minor SUB
TOTAL FEE $ oZ S U GK 17 p
An additional fee of $3.00 per address within the public hearing notification area will be invoiced to the applicant
prior to the public hearing.
*Five (5) full -size folded copies of the plans must be submitted, including an 8 % X 11" reduced
copy for each plan sheet along with a digital copy in TIFF -Group 4 ( *.tif) format.
* *Escrow will be required for other applications through the development contract.
Building material samples must be submitted with site plan reviews.
NOTE: When multiple applications are processed, the appropriate fee shall be charged for
each application.
SCANNED
PROJECT NAME:
LOCATION:
l le5 ,0- ✓-e a / 9 /G& bee- it r1V f"t
LEGAL DESCRIPTION AND PID:
"jvo - I
TOTAL ACREAGE:
WETLANDS PRESENT: YES NO
PRESENT ZONING:
REQUESTED ZONING:
PRESENT LAND USE DESIGNATION:
REQUESTED LAND USE DESIGNATION:
REASON FOR REQUEST:
FOR SITE PLAN REVIEW: Include number of existing employees:
and new employees:
This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the
Planning Department to determine the specific ordinance and procedural requirements applicable to your application.
A determination of completeness of the application shall be made within 15 business days of application submittal. A written
notice of application deficiencies shall be mailed to the applicant within 15 business days of application.
This is to certify that I am making application for the described action by the City and that I am responsible for complying with
all City requirements with regard to this request. This application should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership
(either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person
to make this application and the fee owner has also signed this application.
I will keep myself informed of the deadlines for submission of material and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any
authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of
my knowledge.
AK-1�
Signature of ApKicant �L.�.,. -/ Date
Signature drf Fee Owner Date
& \planWorms \development review application.doc
SCANNED
THE PRESER VE A T BL UFF CREEK 4 TH ADD /T /ON
KNOW ALL PERSONS Br MESE PRESENTS !hv Oaglw Gand Company, GG asvfv Ixnife0 hob.lity cwnpany ownw v/ top /vllvw %ng
dearribed properly sifuufa0 in the Canty o/ Cane -, Slvla al Minnesafv. (a wd.
.1.1 A, !HE PRES[RVE Al BCUEr CREEK !RO AOOIRON, acrvrding (o Ilia rttorded pat fhereo% Cwrer .-",, Minnesoty.
rwyW and plol(ed as ME PRESERVE AT BLUES CNEEK IM AOOIROV vnd does I—, donate —
Iw pub! %c u e /were- th. public xpys and also tled %cafes a epsemonfs as shown vn I pvl /w dmmo and
Oeglw land c' - i ih<y cwnpany, has caused these resents to ve signed oy i<s
P pP he al /ices fh.s d dvY old e, a innesa�i� l p
OEQER UNO CCY/PANY, LLC
ey
/Is
STA 1E L1e NINNESOA
LWNY
.IS ore9oln9 %ns .omen wv al OOq/wged be CwnPVny, v Min solo bm.lea /,o Y P y bah b l oI Iha c p
Lund a an
mry Public. Cwny, Minnesota owe.
My Cvmmiss;on E.rpircx _
/ Craig W re tlo y curl/ /y 1— Ih;s plat was pc epwed by me w undw my direct svpervisim; fool I am o tluly CicensW Lond
Sm wsd veyw in A Stole of Minnesota; that Iles plv< ,§ b lvl c
f re d,iv o(ipn of the boundary survey that all mo(hemoh'cal dam and
lM1Of all r wo(w boundp n on f J n s p/v d vn� /s dap %cfed n s P here been w s by v e/ vicnN v ra
ends, ox do /nod in Minn sofa Sfaf , on 50501, Subd. S, v v/ 1 w do(o l / IM1is wfillcafo avr
slivwn vnd labeled wr , this plot: v end p he ys pre showy. and /abNed vn I fh s plat.
Ovmd Inis _____ day o/
V — ___ -. __ —
SIAM W NMNESO A
COUN/Y LK NENNEPIN
r", Instrument was -- edged baler, — an
QEY COIMCIL. Orr OE CNANNASSEN, N—Eso.
fi %s plot v/ ME PRESERVE AT BCUEE CREEK IM AOOIRM' rps opprowd and pccopfetl V, Ina Cil Council o/ Ina .1 v/ Chpnnasson,
regular mcehny (hwop/ hold In dvy al sod of cwnplipnro mm I e
p onsions o/ Minnesota Sfvfvlex. Srcfivn 508.0!, subd 2 p
City CWnU. CLIy o/ Chonhass
By
COUNEY Twlm Carly County, M--t.
Ch.- —, Mmnerom Laws or lgll. f is plat has bew —1— Ins day o/
10 No
.lphn E. Fieemyw. —y v eyv
COUNrr AUDITOR— MEASWM .. C County NMmAOf9
v vR n or you
y v 20 p rs nary dean pv %J Iw /and described an 1 is P.I. O—d (hl.
y I 20.�_ —_
I-- E,I- Co y - 1-1Irea —
c"" c— County{ MEI—
1 —by cwfi(y that (n 1 a/ ME PRESERVE AT EEUTF CREEK IM A VnW wax bled In;s _ day o/
20, al aa/ac �M., ax opdamwl N _,
Mark Lundgren, Caren Counly Rl—
CITY OF CHANHASSEN
RECEIVED
JUL 1 5 2011
CHANHASSEN PLAIUWNG DEPT
Westwood
Professional Services, Inc.
meal l aI 2 s/melr —
SCANNED
L
THE PRESER VE A T BL UFF CREEK 4 TH ADD /T /ON
-- - - - -- -- - - - - - - - - - - - - - - - - - -- - - - - - - -
ca - - - - -- .ri_
N88 ° 54'43 • W 40500 _
NO /• Pow '•
OJ /7•
4 JOp •_ _ g
NBB • W 'r
9.100
0
N88°54YJ•W
Rd
2
2q
N88 ° 54'4J "W J27. 00
411Z S
I rr4-
87 ° 41'03 2 122.41;
- ILE NO.
OC. NO.
Ine d�enfvl�vn o/ 1 I A, ME �PF la
v. A, ESEFN.
eiuir ceceK ieo Aao,ncr..m�n
bevy ry 01 °05'1 J' E
0 - - mo m: 'nen b 74 am w- md,w,nenl
awe b „ad,>� No. zwz/
• ad olw:
lvund an0
-- d b� / L;-- Nv. 411",,
i
Westwood
Plofesslonal Servkes, ITK
sneer z o/ z .heels
SCANNED
\i W
l• \ may o ��
✓ Il7L_
,'- �1- )r_ ^/--/ - r�-
l \L_.: VL_
� ,�
\)r
, L_I
J �
OUTLOT C
`
�
�X l�
vv,c.v,
2 r
n
a
n}�
+ x,
-NBB 44 I24 .0
\ -. 1 ° °S X5416 ZOs = - ' =..
\xL ORs200.00
4
iss�s
° OUTLOT
xae xu•w ,ave
ILSB ^ f `• $ \ \ `a 6- %JBB ° 54 4J'W •O Rl O `si�
,..
A o
°�
m .
� I
°0 0, %^ \ \ \\. � \ v moo° ,`�,. ei�g\ ; -..•; - -I -
oa
'
- - �,o ,°r su.- -� '
-
4
tll °oP�o
acx
• q
\.. \ \\ 7
\ \\ s ° \\ \a \ ap8 % °r\ 0 .'\ J \ 6 \ Yi 2
T •'' } 2 2
o___
v
,� NBB °54'4J'W IBJ.BJ
OI•E ,e
w� \4 � �N73
0 50
„ro, vw
/;
I { / ,
\ \ \• moo° 612
g
Rd
2
2q
N88 ° 54'4J "W J27. 00
411Z S
I rr4-
87 ° 41'03 2 122.41;
- ILE NO.
OC. NO.
Ine d�enfvl�vn o/ 1 I A, ME �PF la
v. A, ESEFN.
eiuir ceceK ieo Aao,ncr..m�n
bevy ry 01 °05'1 J' E
0 - - mo m: 'nen b 74 am w- md,w,nenl
awe b „ad,>� No. zwz/
• ad olw:
lvund an0
-- d b� / L;-- Nv. 411",,
i
Westwood
Plofesslonal Servkes, ITK
sneer z o/ z .heels
SCANNED
THE PRESERVE AT BLUFF CREEK 4' ADDITION
20101049
July 7, 2011 Final Plat Areas
---------------------------------------------------------------------------
Parcel name: B1L1
Perimeter: 361.4961 Area: 7,211.,46 sf 0.166 acres
---------------------------------------------------------------------------
Parcel name: B1L2
Perimeter: 360.0000 Area: 7,200.00 sf 0.165 acres
---------------------------------------------------------------------------
Parcel name: BIL3
Perimeter: 360.0000 Area: 7,200.00 sf 0.165 acres
Parcel name: BIL4
Perimeter: 360.0000 Area: 7,200.00 sf 0.165 acres
---------------------------------------------------------------------------
Parcel name: B1L5
Perimeter: 360.7967 Area: 7,203.46 sf 0.165 acres
---------------------------------------------------------------------------
Parcel name: B1L6
Perimeter: 407.7257 Area: 9,713.83 sf 0.223 acres
Parcel name: BIL7
Perimeter: 402.1512 Area: 9,299.56 sf 0.213 acres
CITY OF CHANHASSEN
RECEIVED
JUL 1 5 2011
CHANHASSEN PLAVMNG DEPT SCANNED
Parcel name: BILE
Perimeter: 373.8864 Area: 7,915.32 sf 0.182 acres
---------------------------------------------------------------------------
Parcel name: B1L9
Perimeter: 360.0000 Area: 7,200.00 sf 0.165 acres
---------------------------------------------------------------------------
Parcel name: BIL10
Perimeter: 360.0000 Area: 7,200.00 sf 0.165 acres
---------------------------------------------------------------------------
Parcel name: B2L1
Perimeter: 410.5659 Area: 9;424.21 sf 0.216 acres
---------------------------------------------------------------------------
Parcel name: B2L2
Perimeter: 370.0000 Area: 7,800.00 sf 0.179 acres
---------------------------------------------------------------------------
Parcel name: B2L3
Perimeter: 360.0000 Area: 7,200.00 sf 0.165 acres
---------------------------------------------------------------------------
Parcel name: B2L4
Perimeter: 360.0000 Area: 7,200.00 sf 0.165 acres
---------------------------------------------------------------------------
Parcel name: B2L5
Perimeter: 364.2719 Area: 7,323.90 sf 0.168 acres
SCANNED
Parcel name: B2L6
Perimeter: 381.4313 Area: 7,853.96 sf 0.180 acres
---------------------------------------------------------------------------
Parcel name: B2L7
Perimeter: 401.4817 Area: 8,921.97 sf 0.205 acres
---------------------------------------------------------------------------
Parcel name: B3L1
Perimeter: 360.0000 Area: 7,200.00 sf 0.165 acres
---------------------------------------------------------------------------
Parcel name: B3L2
Perimeter: 360.0000 Area: 7,200.00 sf 0.165 acres
---------------------------------------------------------------------------
Parcel name: OUTLOT A
Perimeter: 1727.1269 Area: 32,940.19 sf 0.756 acres
Parcel name: OUTLOT B
Perimeter: 293.8948 Area: 3,233.69 sf 0.074 acres
---------------------------------------------------------------------------
Parcel name: OUTLOT C
Perimeter: 2762.6930 Area: 354,673.42 sf 8.142 acres
Parcel name: TOTAL BOUNDARY
Perimeter: 4213.3832 Area: 538,315.00 sf 12.358 acres
SCANNED
Site Impervious Coverage Calculations
Total Site Area
79.86 t ac.
Site Impervious Components:
Streets
8.37 ac.
Sidewalks
1.24 ac.
Trails
1.68 ac.
Homes & Drives
10.61 ac.
Overall Impervious Coverage
22.11 ac. (27.7X')
Allowable Impervious Coverage
2396 cc. (30.09)
Excess Impervious Coverage
1.85 ac. (80,586 sf)
Maximum Impervious Area for Homes & Drives 12.67 ac. (551,905 sf)
(Excess coverage allotted to homesites)
Allowable Impervious Coverage per Lot 3,631 sf
(551.905 sf Maximum Homes and Drives area / 152 homes)
C)) Additional Imp. Coverage Potential per Lot 571± sf
1259)) (3,631 sf Maximum — 3,060 typicol coverage)
Vanelli)
59)) X
v m w
- - _ - oee 4/27/06 sheet 1 op 1
The % -XX 20031110[m .DWG
". a rm e r s.rvw� °�'"� Prepared fad Lot IIIIpeTV10U9 WIN So"
°- Pemtom Land Co. Preserve
mo m
952-M-5150 Analysis
Z" MZRU
�Rff 1-305-M-51.50 YYeatwood r.nompmm a.oe.a nn.m. yip Wen Prairie, Minnesota &5394 C6anh -sm, Ittianeeota Sxhiblt A
02006 Westwood Professional Services, Inc.
J
o G
l5' dear
q a raq e
::�# U eaSerricrr
Sc f 20'
'Zo'
� 5
`G K a
w
M -O AORMIIWYMMIISMN�.
All
OM
I WK
L 3 4 1 ,
1�lr
a > , ' I"
c
60' Lot - 45' Pad _ \
® 24 40' Pad Width
- Side Load Option
o' ice 2ao' wa'
NOT FOR CONSTRUCTION
o.. 6/19/06 s� t 1
The Preserve
Ryland Homes at Bluff Creek Fad s-
�,- A.,— w.lood
M— % = 5" rmr awe. saw ooa� aeo�r
x isi° �i
1p��Ia
p
1 /woa son. RoDF xExi PER e4i °��g� 5
SOfFI SO WDGE 'T SMOOTH PAwEL 9GYNC � "�!=� §4
AauN. — T s
FAStlA SYSIFY yy 7�pJ pp p
O.NO
12
WEE
Tr
1R
SADOIE AS 0.E09 B
- KW. 5^F. F1T • �
fA90A SYSId
o °
o We
Nxn 90 xc k
mad Posy
( oRZ d 9oNc
e" FTwJ
R
Yxn s9wc e:
!.T.i1RdlAwr' HW9: WiAP REWIRED W ALL SIRUCNRES Cpad P653 y
PIC — Q HWEE NfiAP INSTA ANO
INSPECnON NECG30 C TO N . 91BNITTFD
A THIS OiflCE PHId i FlNK INSPECnON.
LEFT SIDE ELEVATION a nAdwc HE Ow worernaN REp R D RIGHT SIDE ELEVATION
VF111xC PLUS ATTA.. EAVE fLA$HWc
SCAIE: Vr -r -o- asvccnox aEauRm. 9
scut: i /� "• _
xEED OONPIETE NUTHER PROiECnaN BEFORE wsuunox
TU—M GLA$$ REOD AT dmna+ CUSS
PAnO —
LOi wd15 YVSf BE NSA$F AT nYE Oi
fOOTWC .—T.
}1 /Y' Ar CM NW SE N—S APPLR:O 3
_E iTNAI I.—T.
NOT APPLY 9OWG OR HWSE WRAP UxTM1
AFTER —ATNWG aSPECTIpI
SLLL — 0.EOWR0 PRlgt TO —C—S
NAAYUN Da AY WDTN AT CURB Ia FE£i
TO PR—TY uxE C<
MSHNIC - —P NOTES 00.E NFfP SCREEDS U
R REWIRd FM BRICK - SNCL9 - STONE VdEd R !
0� RO022T POST BEAU CONNEC—
WIdE POST ANO BENZ OR dPDd COx —Cn% IS
USED,
THE oE9d SMALL EE a AL90ROANCE WTN �[
PROW90x3 aF MIS CODE —Tw --TM �
Alx. BE PRONOFD TO dSURE A—ST U— Q
NMI. 9l T k AND UTERK 019'IACFlAENT. SYOOrN PAVE 9pNC
a
Y N
ALUU, soar e: z'-B' ❑ R O
ASgA sK1EN ONIG � ONW
!t
® SApq.E AS RE09 W
Y' 1PoY 005 �
W ma n d POS k � � I 12
R dL d SIOINO � I �5
(B' Elp'.) 5 /T2 ROOF PITON
ASCIA SYSIEY U C
T - �
0 C ON C
�Oaa�Q�� �aO� ORZ. LP 9pNC (a 6
ee UPPORr Poor
e••.1e^ Wam cDL
NNn srowc a f e �
mad Posrs � � � � G• mw eos E
� ro za^ cwr. E
FlREMCE
YARD M BE
FlMAA fAALf9 STONE CONt. 90EWAUf NAIm SURFACE ORIYEWAY
FRONT ELEVATION
NDDEE:
SCALE: T /a` -1�o• STONE:
s RS E
ae.aaE TOxE
REAR ELEVATION
n S
S
/Np,A SOR. ROOP NNT Pfl1 r( 3
SOP]. ROOF AREA: 301 w =° = 3
SOPTIT; 301 HEAR RIOCE � ! ° ^Y'Ar $E
i u. WT
ASdA sniEu
SApgE AS REO9 c
C 6 O HG R
°� unn aomcx'� 3
Wm1ER Posrs
Y
ONH: 4
I I ANC
__ __ ___ y
MMG b'NIE GWr. CANT. _ S . O L r
I,— MUP REWIRED ON Al STN CAMES.
'Ic— Of _SE M wSiALLAMIN AND 0
IN9 ECnON REWRD — uusT BE suBMTRO
To LHIS OfF12 P %dl m %NK INS E TW.
EAVE FLA514N6 . .. MOLECnW REWIRED Ry
W _14 PWE ATTACHED --INS
INSPEC9W REWIRED.
- -------- -
NEED caP,ciE MATHEIt PROrecnW RESORE malunW ,
a adxc n adn�crs rE9PERED doss —1 AT Exm3oR d.Aa
(3' z. E%P.) CORNEA
PAnO OOOIis OP z4 u CAN�T. NNIt dNC S x ORE. m .1 9dNG
FA POR � . �
RIGHT SIDE ELEVATION L IRWS uusr SE 9sAdc AT nNE a LEFT SIDE ELEVATION
FWnNO IN-1.
s-1 /r• RE%£CIILE NWSE xuu3EAS APR—.
s cxE: , /4•• -r -a• e°iaRE RxAL wsPErnan scA,E: V4•• -r -a
W NOT APPLT 9 I N0 di NWSE MRI➢ UN1LL
rArm sxEAnlmc ma>ECnoN
t
SILT PENCE REO.SRED P %dl ro INSPEC11axs q 1
14
dR4EWAY 71 AT WRR PEEi Sj
10 PR 1 UNE
— ING g
- S
-
B-- SN
MPP N— ORE MAP —S
REWIRED Fdt BRI[R B.— Ld1E NEIEFR y
3" mY RO R
85022, POST BEAx COXNECnW
1 FRE POST AND BEAN W BE TIE 1N .O CWSRFIC9W IS 1 1
USIA• DE S i SNAIL I ALC E E- xl
]
ME PR PR En WOE AGAINST CWNECnON ]
RE PRONOEO ro ENSURE AGAINST UNR
IAIERAL OISPLALEMENT. -
w � g a g
Lwn SN AAES F rg
N
W
FASdA SKLfY IASdASSO 51� 2]TY' MDE OAdE SADIXE AS REO9 � 6
m m OVHC
3/11 R 6/11 ROOF %TCH S
ROOF PINE OLNO b•/MC
Mi. IP 9dxo I W
6 T %Y W 13 �S.ADO,E AS REO9 7
® ®
` 1`♦ 4/11 ROOF PINT FASdA SKn:u z a
r� F
OINC ;i ®®®®®®®® ' (gtE.'9dxOq
® ® ® ® ® ® ®® ao 22
I PEPMACAST lY3u. CWVYN
II (WMx ascw °•a xcwl ® ® ® ® ® ® ®®
I, OPT. 14" CANT.
rAaD ro eE
�� GRACED 6iWE d1C, aDEWAU( MAIN'1 WRFACE DRINEYIAT
VAK SIdNO S SraxE W/
CORNEA P. CM LEDGE
I FRONT ELEVATION HW 475, =
E: 149.367 Q
I REAR ELEVATION 31.431 STEVE s
iB e
s F—�iFl
D �
FA OA SK,FU
NMa SNCm PANG -
x' -o• 2•_b•
oNNC oxlc ovTc
SAwLE AS RE09
,2 R
S C 9dNG • �S R y
2`b' GG
OMEN PoSR
; s
E ��tvLL Y
ONIO ONIC CANT. OSNG yy
6 ] 6
Ptcm 11RM Hwm m m ALL SMUCn1Rm. A
PICTURES OP XWSE m INSiAWnw ANO GG
RECORD CARD MUST w SUBNITIED R
ro MIS OfF10E PPow ro iMAl INSr+ECnw. 9
N:
PWS RARNN DAM PTOrECiNNI REWX®
w OnE1lWG PWS ATTACXm EAN: RASIMIO
WsPECnw REOIIPm. 9
( wz. w saxc Nnx aaxD a xEm mIPICTE MEANER PROrecnw eESwE Ixsuunw
a^ Efp.) CwxER Posrs F i r ' fuEtMa N ca vEn PxODSTS Nwz. LP solxc
iEYPEAm aASS RE09 AT E %IFNOR OLASS (B" E%P.)
PAnO DOdK
LOT Ww5 WST BE NSABIE AT nYE w
RIGHT SIDE ELEVATION Fao we iNSPECnw LEFT SIDE ELEVATION
scAxe: , /a " -r -a• .s-Vr REfTErnsc NwsE xuueEns APPUm
BETORE RxAi WsPErnw
scALE: V4••.r -o-
DO NOT APPLY Sl w XWSE YAIAP UNIL
unm sXE.sTmxc WsPECnw jl
w FENCE REWIRED Pww m WSFECnws
T
T P d UNE NOM zA
Ar WRa fEET e
TO PROPERTY UXE
3
TOLES wE NEEP SCREmS M
REWIRED fw wICK - sNCW - STINIE N1IfFR 3
R'N)221 POST BEAM CONNECnw
F
NNEPE PORT ANO BEW w dROER Cw51RUC1NW i5 5/12 ROOF Pliw
SHS
Usm. THE STALL BE W ACCwOANCE WM
ME PWINSIWS a TS - ACAS CWNECnw
PRON
�� BE Cm io ExsVRE ACWNST UWR
3 LATERAL aSPLACfxwT.
3
VDOOa sbfr. Roof —T - PER
s s
T. SOF CAMrRAR9CES W Yy
u. SOFP,T a y �
FASCIA sYSTd ' -ASYSTU Q 6
o.Nc
a al
NARp STUCCO PANEL % NARd STUCCO PANEL LU �a
B" rRlu BD --- - - - - -- -_ -I
wi, lP 901NO S /I3 ROOF Mlw SADaE As RE09 2'- ' �S Y
O- TAZA SYSIT
ON0 L2 e
a a O ~ ' E ) Si01NC
Is" ExP.)
6'MWm
l a o
•S WPPORT POST b
wi. 34" CHIT. 86' }IS" N90C COL y
F. FlREPLACE S
ARO m BE
FlXAI fPADm -E LONG 90fRAU( S- HARD 91RFACE d814WAY ` ®p�
'!S
FRONT ELEVATION uzoue 4
REAR ELEVATION scuE ' /' ""' "' S2JA: R wE ys °e
12 U2
z �Y
v
e F, Ye ¢
'AMA mrty o•r°w �i�j!x
o G
NNC wlc beNc
s 999
/12 1`— BOOT %TN i
« q
12 1
I a � _________
�NC � Y
oY�c oNNC o c
Y
Nwx 9wxc r< a+z IP srolxc aflz IP 9dxc Mxn 9002c N aPn u 2r
CORNER PBSTS (6" E1wJ (e" E..) CORNER POSiS RREP CE CAl2T.
NB M RAP REBUINED ON ALL SIRI I—.
LEFT SIDE ELEVATION ro X05 �� �°� TMw RIGHT SIDE ELEVATION
SCAtE I /••• -+' -B' ON oB NNO ATTAOIED E RA RE QU IR ED
NO
INSPE EN REWIRED.
NEED CWPlF1E NEA.. PROTECDBN BEFORE INSUUTIW
TEMPEPED CLASS RE09 AT E—Oft CLASS
PAno DOORS
LOT IRONS MUST BE NSABIE AT TIME OF
F wsPECnON s p
6/12 ROOF %nH —1 FlxnLECNSPECWOn NUMBERS _ED Y
6/12 ROOF
DO NOT APhY 90WC OR HWSE YAAP U..
AFTER 91EATHIN. w9+ECnox U
12 12 9LT FEN, NEgNRED PIeOR ro wSPECnWS n
° i / SOFT TM BOOf A —T P ER �e ro ...7Y UNE room Ar Wfla 2a FEET ° 12
SO 1. BDx NEVI RIOfF °' nDY BO
—INS - — N. ONE MFEP SCREEDS W {Y
WxxD FOR ENN. - SNCW - STONE M216ER BD.D/!A— 90wG 0
U ca
—..I —T BM —TIO2 (1r EIR)
_ °HEA£ POST IND BEAM OR .— _S2RUCnax IS m E
Y. SOF21T • � p USED. ME DESIGN — BE IN ACCppAN. wTx
fASOA SY31FM ON1B n1E PflOM9IXIS OF nR5 — _BVE 'O.N.—
A uT n TO ENSUNE ABNNST UPU
U FT
C M6NT. D N
FA
B SOFT
OVHC - FASCIA SYSTflI G ONTO W
all, 8. 11MY BO
dtL IP SIOwG
°• Exv.)
•/13 BOOT %iLH
4/12 ROOF %iW • /12fl00f �°
4/I2 ROOF %TCH %
b
0 G 00 W 6
p ❑ 91WM WDOD PAxfL O Y o' yMI
bNH aS 9 POST , , 1111111111 ®1111 O 11 ®11 ° OR2. W 9dNC (p F
24 "�2a" STIXiE BASE ®1113®®®®®
®11111111111111 ®®®® SroxE °
REAR ELEVATION Bo TS ® ® ® ® ® ® ®® 1111®®
SCALE: 1 /a•'.1' -O' RNK BNADEO STONE ONC. 90Eb/Lt N_ 9JRFAIZ OR1-1
E V E N
FRONT ELEVATION
xW°E: S Y '
�W Po515 SCALE 1/• f P J).P�Ti SiONE� R
S0. FT.: 2,418 N
Y9
�° •� A I!°
MIN �
tA,a ran >wa A A R d
3 .a
5
ad
a
raau °Y
I LEFT SIDE ELEVATION RIGHT SIDE ELEVATION
n s w�A o i
To I O�f51�C To FlNAL xd ON.
SCUE: J /tC'.f•_P 1
F
EAl2 — NO/ILE DAM ..-T. RE—D i
SPECTION
Ox UN—AT"
S dIm EAIE f1A911NO FLf
.
NEED CWP NEAMFA PPOtECndl RRORE —171ON ,iFF
TEMPERED — .09 AT ExTENdt dA55 9
TI0 DOORS
LOT IRONS MUST BE MSAgE AT TIME of 6
F—o INSPECTION
3
-0 IINAAL INBPECTION NUMBERS MILER
A . -TI"ON xRM UNTIL 4
SILT IENCE REWIRED — TO WSPECngNS 3/Ix R—
M NTW I R
T UM DPoAEWAT — AT WNB x{ iFET NL
O�PROPERTY -E
•� ' m „m,; rr ,°,`�'T„ � • MSNINC - N .-E ORE MEEV SCREEDS x z e
T; Na I(M m
REWIRED ON BMCN - TUCCO - STONE TkO1EER S �J F
S022T POST BEAN CWNECTIgN !'
ERE PEST MO BEAM OR gNDER BE IN Cd ANCE TON IS AY`
== N o% Ns 0 JNAU ACCOROMCE Ec n Z 41
E PRBE ro Ex
OF MS COOL. ACNNS r COHNECTON
� A: BE PROMDm sLxeE AcuNS LwLm N
TERM dsPL.AdvErr. V
awn a
ALUM. —T M _
SqA MTFY OvNO
w g
OOM PAxEL v3INC
A" iRIY ® STONE
L x
( �S
dli lP5XMN0 SADELE AS
°� Ems.) SYOOM MDOD PMEl A^ iRW 0 G $3
2. 0 D SMOOM PANEL
// ���OOO�Q �0�� qtx. lP SIgNO �1 EjM�E
cNn. S:A B BUPP.T POST
sMWM w wL • TRIU m �
iP'.iP' noex ensE Q8
Mp TO BE 3
FlNAL GRIDm CCNC 90EWAUf HMO SURFACE DRIMERAY ]
ORi. LP 90UID f
REAR ELEVATON � ^ "�> F
S E
FRONT ELEVATION STONE ;F
NWSE: JeT.JSZ a!
SCALE: i /A ^�I' -b' a� STONE Bx d [3
1 l
3
IlDU. S T
FASpA MT>A y 5
LNGI:lIB
,•_p• 1'ADPE AS REDV py1W
ONNc
12
s
- �s � bwc ONIL FASPA SKT]1 k $ ��
__ ----------
_ kk
uNr. —T .
Kc y
c ovnc o;NC I oeNC
Nn� WC tr BDARD/BA— BOARD/BATIEM
COiN POSTS ApNC (1R" EImJ SPNG IIR" EW.) �jt
HOUSE WRAP REOUINED PI ILL STRUCTURES 9
CIURES Di N.. WRAP I.—TON AND
INSPECTpI RECORD CARD MUST BE SUBMITTED
TO IHIs OFFICE .. TO FlNAL INSPECTON.
OPT. R4' C.1
FlRE
FPi GA NNn SIDING ! Ty
EAN: —I GAM PROTECTON REWIRED CORNER POSis
ON ONFILUNO PLUS ATTAPIFD EANE fLAE1NXO
WSPEC1Nw PEPARED.
LEFT SIDE ELEVATION N® �MP�� WuT n PRO E " °" BEFORE wEAATw RIGHT SIDE ELEVATION
ECAEE: 1 /A•• -10- PAro
iaASS REDV AT ExTEPoDR cuss scA� GGGIS
p ^ -r -o-
LOT I N— c11O�N NSABIE AT THE W
—M TERtCTVt HOUSE NUMBERS APPUED
BEFORE -AL WSPECTPI
AFTR OT APPLY SpxO OR NWSE WRAP UNTL
slEAmnc wmECnax
e
SLT FENCE REWIRED PPoPR 1. IECTONS I
B /IR ROOF Plyd Uu OPoNE'WAY WIDTH AT PWB 24 FEET B /1R ROOF PITCN i
TO PROPERTY UNE
FLASHING - Y.EEP NOTES ORE WEEP SOREEDS R
REWIRED fOR BPoPI - STUCCO - 51GNE NENEER
1 /JOOLN SOR. ROOf NRI1 PER —.1 POST BEAN CONNECTW 2 ly
SOFT. ROOF SOf[ W ERE POST AHD BEAU OR CwOEa CM'S CTOH IS C 2 5
—T. SOS NEAR PoOOE USfD TIE OESCW SHALL BE IN ACCOPDANCE W1H B 1RIY BO
SHIL. PPONDFD TO ENSURE AOA WET UPUF iO SNANE 9DINO
e
ALUM. 50TFli h ANO U1Q1AL DISPLACEMENT. SNARE MIND
FASPA MTEU
� INSM
ALAN
lull . SOFFIT tr S- !
FAEOA SYSIEY ON G 6 /t1 ROOF WTCHL
R / Q
4" TPoU BID
T R
zoW �z
-17' E�'iwJ B /1R RODE Plrpl J B Lo 'a
�SADOIt AS R EO 9 SpA M1FL
a
Lot II R) 8rd SUPPdtT PDS BOARD/TATTEN
STp1E BASE
Lai
I i `OPT. R4" DAN, TRIP BO
fds FlREPUCE
_LI YARD TO BE SB
T piIDED GAAON W CPIC. BDEWALK HARD SURFACE .1—Y ` y
s axE \ e
FRONT ELEVATION HWEE: us.Rs
SCALt: I/4 " -1' -O' XBBS SIOYE�
REAR ELEVATION
s g
g d
a �4
ii I�I�I
I�I�I�I
��' ��� s� �.� �. •
I�000000�l �,
I'I1I1I1I'I1I�I
�
l0000
I
1
I
I.� ICI
�
■
ii I�I�I
I�I�I�I
��' ��� s� �.� �. •
I�000000�l �,
I'I1I1I1I'I1I�I
�
l0000
I
I.� ICI
�
a i ll ilim E
W
fA$dA SK1EY {ROHi FACE UUN/MSM BAM WALL y e�C����i
y f }2
_
SADOIE A 0.EO9
owe ONIL r
x
�— NNn 9dND . 4 /I2 ROOF
CORNER vOSK _ 5!
r -a• 1• -e uxT am � � d
ONHL ONIO 0 G I.-°..
ONxL
g ]
N
HWSE WRAP REWRIED 011 All SMULNRfs. C
N RECOm
CAN .—BE SUBMITIEO i C
I i0 MI5 OfS12 PPoOR LO FlNAL WIDECnW. +
EA N: FIASIXNO/ICE DAU 1A.MT. REOUWED `
0� NfllINO�0.US ARAdifD UN: EIASIID1c _ xY
slam.
( pt2 Iv .-G NNn 9OM0 ! OPT. 4" CAT. NNn SgNIC !
4" EIIP.) CORNEA POM HEm CONPIETE WE T— PROIECnON BEFORE MEOUnM FOR FlFEPLACE CORxER PO°i5 00.2. lP SxIING
�,. EE-) 1 �
RIGHT SIDE ELEVATION TvoERma ss am9 At E %rtfiOR cuss LEFT SIDE ELEVATION
sale Vw -r -m LOT AT Tl OF
NO MSPE<nIN NSA&E scAiE: I /e• -I• -n•
>-I/r• amzcnN: xWSE xuuems APPUm
BEFORE FlxK INmECnox
Mf11 91UMMIxG51J1ix5PECnOX SE WPA IMM
SRT RxICE REWIRED PRNIR TO wSPECnOxS F
e
TAnuuY OPoN:wxr rnDM Ar Wae xa rtEr g
TO PROVFAtt LIRE 2 X
FUMING - W£EP HWES ORE WEEP SC 205 i
° /13 ROOF Poidl RE—D FOR BRICK - STUCCO -STONE efNEfR y
B /Ix ROOF PITCH +
R8O22T PoST BEAY CWNECTW
MHERE POST AD BUY OR da9EA LONSiHULndI IS I
M�PRONdONS Of MI5 CCOE PO9n COxxECTCx y
SNALL M PRONOm TO ENS9aE A—ST UPIAT
AD UhRAL dSPUCFYENT.
I /WOUI SOFr. aacF
— " V 9dNL S
�AFF EIE NE Iry 2 (4" Em.) B' 1RIY BD g
f u. samr x °
ASOA SISTEY FABOA - °i B" . Be V
R p
B/Ix ROOF PotCx �0• ❑ ❑ ❑ ❑ 1°�C• oN1C G '/" ROOF PoILH N i
owe , , , , C
/TfATIEN SpNO� - - - --
2 ` -- w a
11 �Loj
R' MIN CO g
AS REO9
°
[
4/12 ROOF PoTLX � _ A —1 Q E
we —A SKTFY p
1 6
owe [[
MHO ON1C O 9
❑ ;; ❑oo 00000000 0000
6.85UPP C0. 33313131333 1313®® (COO Lo ddNC
1 -1 STWE BA4 13®30000 33 133 pq
it ��r. xa•cAr. 1313 313 ® ® ®® 1313®® "mmu eD
_ll FWEPUCE 3313130®313 133133
A0r0 BE
FlxAI daA9m aaz Is dDlxc WNC dOElrAlx xum WRFAtt ONINEwxr
(a• AP.) SidlE
NNn ddxc x
<ORxE11 POS15
FRONT ELEVATION HWSE: N5.2 s
E: -.1115
+!
REAR ELEVATION �°
s :
a p
-
sD.
Q O 9a
so : RoSg�ov'xaEROaA, zw1xim°E" �p;�� 3
samr: sox xEAR roOGE i
gg� �
FAStlA smEBI
�III:I�i
4 � NpG SAWIE AS REOD � �'
R Q
11 Yp
11 yy 3 0
�! Cgc 3
Y
oM¢ I oewc oxw
i
9
Hmz it Banc 6
(w' ExPJ
Qy
„� e: mn uM x!°
RO n ON2 .) 9DINC PN.. FlREP CE CAxT.
NWSE aRAP REQUIRED ON ML SIRUCNRES (! M.)
. a HWSE wRM wsruaAnm Mm RIGHT SIDE ELEVATION 9
mErnm RECORD cum AL BE Wmnrnn
ILEFT SIDE ELEVATION TO THa —CE Prom ro - AL wsxcnm.
EANE ftAS -,4CE DAM ..O CnON REWIRED E
m DNEWNC PONS ATTACHED EAVE MSna1G
NY�ECDON REWIRED.
NEED couaETE MFATXEA PROrECDDN BEFGRE Insw,nm
rEIIPEREO G IASS REQD AT E—OR C LASS a
PAno °oms p a p
EOi IRONS MUST BE NSABIE AT nME OF 3j
R Ec K —E NQUeEAS MPUFD g
DO NOT —1 -.0 OR HWSE wRM urn,
AF'rpi
-- —T.
.1 —CE REWIRED -OR TO I—T—
MA MVM DPolEa•AT — AT WPB 14 fEET 2
0 vRWFAtt LONE
REq.1 C Fm &FCN- SNCCO - SimE IENEFrt . —S Y
"502.2. 1 111 ww8O
w CWXECDm a m1. V —G aHFAE POST AND SEMI m OROFA CONSDm<aON IS
USED, rNE OESIm SNNL BE IN AWmOANtE IMTN
Pos rvs rcnm +�
Z
M. SOFTiT Q 1'_P
g Ing
—A snTEr. oMID � � � s /I1 Roa fryra
e•• mlw w W
S ONE
�6 a
Y C
1/11 ROOF FITCH OwtiO
sir p �
d' 1313 o c x
00000000 0000 D °' "° a
6.6 PMNRD POSR 888 ®®0138 80013
1313
MEJEJEJEJEJEJ ® 13 1313 ® g
131313 ®® ®13 ®®®® CAP —GE e
REAR ELEVATION TO ARD 131313 ®1313 013 8 88®
- AL
sTONE C. 9OEMMJt e" claw BO NARO —CE gilNEw.xv
FRONT ELEVATION ° s
xWK SIgX6! s— W -1' -0• XWSE: Se)391 ea
CORNEA Posrs srmE: zoeeDD + p
Da.elx zrmE 4 d
sO. fT.: uIe _ c3
ar l,�:
�G kl
z oTR
12 12
Ez I,^ EIIP.)
oTRc
a
�° z._a.
°�
�A ONiG SAODIE AS REDW
na x' -o- z• -a' g
oNw DTNO
I a
;I
I
9
NNx ..NO a ORL lP SIDING ORZ. IP A.NG NNx �PnWAL 21'
CORNER POSTS Ew '.) (,•• EfP) SWING a REDUCE CANT.
CpENFR POSTS
HOUSE WRAP REWIRED ON ALL STR1CmREi
PICTUPES K HOUSE MR. NVSTAI ON wsP._ TO
moR A AND
TO -S LEFT SIDE ELEVATION ES OFEIE ro RE` °sTBE CT n ] RIGHT SIDE ELEVATION
rnAl
EATS FLASNINC 1. DAM PR.—ON REWMEE9 /' ^ -, • - a' 3
SCNE: 1 /, " -,• -a' W ONE . — ATTACHED EATS —ING 8
IXSPEC,IW KOUIREO.
N— COU E MSATHER P .-TION BEFORE INSVUTW
TEMPERED p.ASS REOW AT —ON fi.TSt
PAno TOOT y a
LOT IRWS MU ST BE NSABEE AT ONE a 3 7
Y ,/? G REFLE — NWSE NUMBERS APPUf9
B60RE I, —.—TIW y
p R
W NO APPLT NANO OR X WAP UNTIL C
AFNR 91EATMNO MSPECMIH
SRi FINE REWRED PfiOR TO MSPECnWS
MAAMUM NAY AIDTH AT CURB 24 FEET
TO PROP.. UNE I - a
t 1/S001X SOFT. ROOf TENT PEN S� z
y� 1 90Ff. R00f' ARFA: SOS H �S FLASNIXG - a HOLES ORE EMEP SCREEDS =7 W
I sofflT. SOS nEM ROUE pNREp Faf eRMN - S`U.O - STME TERSER F-
tn
m z., Pax eEAU cWl W
AWY. SOFTET a U THE O GN LS.W ON I NDER CWSTRUCnTH IS = 6
FNSpA SKTEY STALL BE M ACCgiD _
FROND
iNE PgONAWS T
O T D 1X15 WOE S ABAINSi U CWx T
SXALL E E m ENWRE AONNPUFi O
M. SORB e
FASpA S,S_ ONIa ORZ. V ApNC ==
A' Tmu SO z S
-- - ' Z
- - -- E E
S 12 , /,R ROOF %iCH SAOpIE AS REO o•- U §§
Y -a' 9
TIRO 0.. � s
oxz. EF vulva
oxz I AOnc . r LED O � � � i•.. �)
u
(r El )
° S 'AO O C0.
IB n s *one qq°
nl rnAO 9
° 51WE CWp 40EWAUt "Al SURFACE gilN:wAY
SmNE
FRONT ELEVATION
SpUE: , /,•' -I' -a' HOUSE: SRT.U, N6
N x sm. e y
coRnlEn POSTS iea'si 2 z0 d
SO.
•
I.wwwwww�wwwwwFriFs
Y
AS
A. f f , VA
5
:d
n
FEWHN:O W All 51RUCNRES
s Y
pCNRES Di nWSE 1NiAF USTA ANO
LEFT SIDE ELEVATION T O _S �c MW CA o Fl N—FOX. RIGHT SIDE ELEVATION
AIE: ] /la's,' -0• —'CIN0/10E DAN PI "CTON REWWEO CALF: ] /
ON D.— —S ATTA —O EAL4 FLASHING Fy
WSPECTW REWmFD. 9 C
e
NEED COMPIETE WEATHER —XCTN BEFORE —LATON (3
TN—ED OLA55 —11 AT EX-I. OIASS 6
PATO DOOSs
LOT IN— MUST BE MSABLE AT THE OF 9
FWTNC .—Fm
}I//2" PF.FIECTM XWSE NUMBERS APPUEU
BEFbPE i1NN IXSPECTON p
0 0 NOT VKY ANTI
SNE—NO IINNSPECTON WTAP •
SILT F£NCE REOUIRW PRIdt TO msPECT OXS ypyS
• %M �y Ntw MALMUM DRILEWAY ... AT CURB YA fFET a /12 ROOF WTCN � P
TO PROPERLY UNE
e
FLASIImc - xTEE EP sa+tms
NEWmED FDR eWa sniao - sra+E LErEER
mm.m 6
N¢ILAaN� R50221 s BENZ CWNECTOX G6
• U=. THE D-GN 91 LL BE AAC<IT ANCE is GXFF
1NE PRON50N5 OF 1195 C —T. —N—ON
SHALL SE FRONDED TO ENWRE —M. —1 1 as
AND —M. m5%AfE .1 J.S /12 ROOF PITCN� 91E0
a �•
fASCIASY5IFL NIO V
S
4 f r s ♦ FA9 U
ONIG ® ® D O �SS /1Z ROK RiCN� a /TO ROOF' PITbI
�1�% BOAPoI/B T,FN sIdNO
f f it A• twu eo h m m
f L b 0-G F7
f 4 4 11 V
FASOA�
II b b b
DRL P mNC
wl.a.oB. ♦ ♦ ♦ ♦ ♦ L`°T�"°"Aa'Fr. (A ^ EIP.) ® ❑ ❑❑ 00000000 0Om O(E%P.)5DNO
T_. WOOp COLVYN 131J®®®13®3 1313®® ♦ TRIP BD JJJ� 666pM
1B "%IB•NVOD BAASE ®®®®®0 ®® 1313®® s�
®®EJEJEJ 0000 F
®®®®®®®® 1313®® AV %BRICK
ARO iO nARO SURF
. E
EO AU% BRICN CONC 50EWAU( ACE DWNY/AY
REAR ELEVATION Fl �
uuE: a /la•• - rva• 9
I FRONT ELEVATION XOU
ae..aiL ertla s YR