Loading...
1f. Accept Utility Improvements in Stone Creek 4th Addition11 1 I MEMORANDUM 1 CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 TO: Charles Folch, Director of Public Works /City Engineer FROM: Dave Hempel, Assistant City Engineer OFFICIAL ENGINEERING COPY Received RP,vizic . No. Approved by ' Engirmw Approved by City Council DATE: August 16, 1994 Efate SUBJ: Accept Sanitary Sewer and Water Improvements in Stone Creek 4th Addition Project No. 94 -2 Staff has received a letter from Mr. Derrick Passe, Project Engineer with Passe Engineering, Inc. requesting the City consider acceptance of he public utility improvements in the above - referenced project. According to Mr. Passe, the public utility improvements have been completed in accordance with the approved plans and specifications including the first lift of bituminous asphalt. The public utility improvements have been tested and approved by City staff. Staff has performed a walk- through inspection of the project and found that some minor adjustments are required by the contractor prior to final acceptance by the City. For the record, the utility portion of the project shall include only the watermain and sanitary sewer system. The streets, storm sewer and ponding facilities shall be considered for acceptance upon completion of the final wear course (streets) in 1995. It is therefore recommended that the City Council accept the public utilities in Stone Creek 4th Addition, Project No. 94 -2, for perpetual maintenance and ownership conditioned upon the developer and /or contractor supplying the City with an acceptable maintenance bond guaranteeing the utilities for a two -year maintenance bond guaranteeing the utilities for a`zwo -year period commencing on the date of acceptance and the contractor completing any outstanding punch list items by September 15, 1994. ktm Attachments: 1. Letter from Derrick Passe of Passe Engineering, Inc. dated August & 94. 2. Location map. NY Admint reW En+� emu= C : Mr. Hans Hagen Wdif1ed Rejecte g:\eng\dav6projects \stonecrk.4th\acceptutl De — - Dote Submitted to Commissioe DW Submitted to cmffm - ;� A. -A? a August 2, 1994 PAS 9445 East River Road, Suite 203 • Minneapolis, MN 55433 • (612) 755-6240 • FAX (612) 755 -1362 Dave Hemple City of Chanhassen 690 Coulter Dr. P.O. Box 147 Chanhassen, MN 55317 I Dear Dave: J All utility construction for Stone Cree been completed and tested. To the best work is in accordance with the approved specifications. We hereby request that Chanhassen accept these improvement and sureties placed by Hans Hagen Homes for { 4th Addition has of my knowledge, this plans and the City of that all cash the same be released. Please contact me at 755 -6240 if you have any questions regarding this matter. Sincerely, Derrick J. Passe Project Engineer I Copy: Hans Hagen Homes F = � s� F� Aiu u U ATTACHMENT 1 J BEECRE ME a ND 7 0 ( C.R. 18 ) BLVD. I ! O p O O C fl- \. N c li 8700 -1 \� g 1 I � I V! z PO Oct -- - G a -� PROJECT LOCATIO1 PARK �y ATTACHMENT 2 ID I Am,