Loading...
1c. Approve Selection of Official Mapping Consultant for TH 101 Realignmentn TO: CITY OF � CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 AcbA by City Administrator Don Ashworth, City Manager R�rC:e Dote Su m;;; to Ccrmission FROM: Charles Folch, City Engineer/Director of Public Works Council DATE: April 5, 1994 L/- I ! -�i � - SUBJ: Approve Selection of Engineering Consultant for Official Mapping of Trunk Highway 101 South Realignment - PW333 As requested by the City Council at their regular meeting on Monday, March 14, 1994, requests for quotes have been solicited from three consulting firms who have satisfactorily provided services to the City in the past. The three consulting firms are Bennett, Ringrose & Wolsfeld (BRW), Orr- Schelen- Mayeron & Associates (OSM), and Strgar- Roscoe- Fausch (SRF). At staffs' requests, Fred Hoisington has administrated the solicitation of quotes process with the three consultants. Fred has done a very good job in the initial and follow up contacts with the consultants to ensure that each had an adequate understanding of the workscope and that quotes received represented equivalent work task efforts. Staff believes that the final quotes as presented have accomplished that goal. The quotes for official mapping Trunk Highway 101 south from the south end of Market Boulevard to future Trunk Highway 212 are as follows: SRF - $12,000, BRW - $11,350, OSM - $9,930. The OSM quote assumes that the ' City will provide record legals for this project. The additional cost for the City to provide this information is estimated to approximately $650. Adding this cost to the OSM base bid results in a worktask total cost of approximately $10,570. This is approximately $780 lower than the next lowest quote received. Staff firmly believes that any of the three consulting firms could adequately conduct this work effort. If the deciding factor is economics, then staff recommends that the contract be awarded to OSM at a base quote of $9,930. g Aeng\cnad. \ccUn apping t uv Igo u 6 l; . a Dili u jms Attachment: Memo from Fred Hoisington dated April 5, 1994. ' c: Dave Hempel, Assistant City Engineer Fred Hoisington, Hoisington Koegler Group, Inc. - Dave Mitchell, OSM Jon Horn, BRW Jim Dvorak, SRF g Aeng\cnad. \ccUn apping t uv Igo u 6 l; . a Dili u 612 835 — .3160 HOISIHGTON KOEGLER HoisiVon Koegler Group Inc. H K gi 1 ' Date: From: ' To: 1 Subject: MEMORANDUM April 5, 1994 Fred Hoisington Charles Folch, City Engineer City of Chanhassen 396 P02 APR,' 05 '94 0'9:27 Transmittal of Quotes for Trunk Highway 101 Official Mapping We have received quotes from three firms to assist the City with the official mapping of Trunk Highway 101 from the end of Market Boulevard on the north to future Trunk Highway 212 on the south. The quotes were surprisingly close (copies attached) necessitating followup questions to clarify the respective work programs and what the City will be expected to provide. The results are as follows: SRF $ $12,000 BRW $ $11,350' OSM $ $9,930' Will do research at Carver County to obtain record legal descriptions. Expects City to provide record legals and estimates a cost of $80 /parcel or $640, by others, for this work. ' Certainly, all three firms are more than qualified to do the work in question. BRW has provided us with the vertical. and horizontal alignments for the new Highway 101 as part of the HKG Corridor Study. OSM has been working within the corridor on public utility plans. Adding in the cost to the City for providing record legal descriptions, the difference in fees between the two is $780 with OSM being the low quote. i� 17 L CHAt\'HAS \93 - :1 \f0LCH,MLM Land Use /Environmental ■ Planning / Design 72/V1 II....1 _.....A IQ..:... 41c . 1!:_x.._.__1'_ cc 67n . / /,i N O�c nnLn 612- 835 -3160 HOISINGTON KOEGLER 396 P03 APR 05 '94 09:23 SRF STRGAR - ROSCOE-FAUSCH, INC. CONSULTING ENGINEERS & PLANNERS TRANSPORTAnON ■ =L ■ S TRUCT 3RAL s ENVIRONTNMNTAL ■ PARMNTC March 30, 1994 Mr. Fred Hoisington, AICP HOISINGTON KOEGLER GROUP, INC. ' 7300 Metro Boulevard Suite 525 Minneapolis, Minnesota 55439 , RE: PROPOSAL FOR PROFESSIONAL. ENGINEERING SERVICES FOR T.H. 101 MAPPING FROM WEST 86TH STREET TO LAKE DRIVE EAST Dear Mr. Hoisington: I As you requested, we are pleased to submit this proposal for the work outlined in your March 18, 1994 correspondence. Based on our current understanding of the work, we ' have determined the following tasks are necessary to complete the project. Collect all available data from HKGI and Chanhassen (reports, alignment, profile , mapping, T.H. 212 mapping). • Research property descriptions and section breakdowns at Carver County. , • Perform field surveys as necessary for control. ' • Prepare basemap. • Enter alignment and right -of -way. ` • Develop legal descriptions. ' ^ "i](onument�corrtd6r�( right- of-way at each property line and at PCs and PTs of • curves). • Compute earthwork for EAW. right-of-way ma to HKGI and Chanhassen ma to include property and I • Deliver ri 9 Y P ( map P P Y right -of -way lines, alignment information and appropriate angles and distances; it will not include topographic and planimetric information). I Suite 150, One Carlson Parkway North, Minneapolis, Minnesota 55447 -4443 (612) 475 -MO FAX (612147.•~ -2429 612 5 160 HOIGINGTON KOEGLER Syr PO4 APR 05 '94 09:2 =1 1 Mr. Fred Hoisington, AICP -2- March 30, 1994 We would propose to be compensated for the work on an hourly basis at a rate of ' 2.5 times salary cost for the actual time expended, for out-of-pocket expenses (printing, reproduction, etc.) at cost and mileage at a rate of $0.27 per mile. Invoices would be ' submitted on a monthly basis for work performed the previous month with payment due within 30 days. We estimate the cost of the work as outlined to be $12,000. If the field work cannot be completed prior to the time the trees leaf out or if the alignment previously developed needs to be revised, the cost could be greater. The estimate of cost is based on the ' outlined Scope of Work. It is understood that if the scope or extent of work should be adjusted at any time, the project cost will be adjusted accordingly. ' We appreciate the opportunity to provide services to the Hoisington Koegler Group, Inc. and the City of Chanhassen. We are prepared to begin work immediately upon receipt of your authorization to proceed. Sincerely, STRGAR- ROSCOE- FAUSCH, INC. mes R. Dvorak, P.E. Senior Associate Timothy D. Phenow, P.E. Principal ' JRD:TDP:bba cc: Charles Folch, City of Chanhassen 1 V C_�. ^_� _ELF =,I B x W INC. Plarming `I'rarisportation P,ngirneer ng Urban Desibn HOISINGTON KOEGLER 396 P05 AFR 05 '94 09:21D 1 March 31, 1994 Mr. Fred Hoisington, AICP Hoisington Koegler Group, Inc. 7300 Metro Boulevard Suite 525 Minneapolis, MN 55439 RE: TH 101 Official Mapping Quote .fo Engineering/Surveying Services. Thresher Square Dear Fred: 700 Third Street So. Minneapolis, The following quote is submitted for engineering an surveying services WN 55415 required for the official mapping of Trunk H i ghway 101 (TH 101) as requested 612/ ?70.0700 by your March 18, 1994, Request for Quote. Our understanding of the project Fax 612 370 -137^ requirements, the proposed scope of work, and a cost estimate for our services ueny,_r are detailed below, Milwaukee Minneapolis Orlando Phoenix Portland San Dies' Seattle Don:9ld W. hin�rose Richard P. Woisfeld Thom4 F, Caxroll Craig A. Amundsen Donald E. Hunt John 13. McNamara Richard D. Pilgrim Dale N. Beckmann Jeffery L. Benison Ralph C, Blum Gary J. Friehson Jol l C. I.t nch Paul N. 133y Sabri A4yaz Gary A. Ehrrt Anthony bleiipelmanr Arijy f'akaln. Martha McPlie._ Howard P. Presto < Dennis P. Prob t PROJECT UNDERSTANDING As specified, the official map will be prepared in accordance with Minnesota Statute 462.359 which states: "The official map or neaps shall be prepared in sufficient detail to permit the establishment of the future acquisition lines on the ground. In unplatted areas, a minimum of a centerline survey shall have been made prior to the preparation of the final draft of the official map." The officially protected corridor for TH 101 is to be a 200 to 250 foot wide right =of =way between future Lake Dri-ve.E.ast'and the northerly right-of-way line of the proposed TH 101 and TH 212 interchange. Mapping services for the proposed TH 101 and TH 212 interchange are not to be included as a part of this quote, This mapping has been performed as a part of the official mapping of TH 212 by Mn /DOT. SCOPE OF WORK The following is a detailed description of the scope of work required by the project: Research and Preliminary Layout � 1. 'V'erify the exact extent of the required mapping. O b tai n and analyze the Minnesota Department of Transportation survey and alignment data for T W 11 7 rl— _I —L. . 3�5 -31E HOISINGTON KOEGLER 396 POE APR 05 '94 09:30 1 Mr. pied Hoisington March 31, 1994 Page 2 Official Map Pre aration We have performed an investigation to determine the requirements of the official mapping process in conformance with Mn /DOT and State Statute ' 462.359. The official mapping process requires that a map be prepared for the proposed roadway centerline and the associated right -of -way corridor. The preparation oflegal descriptions forproperty acquisition from individual parcels ' is not required by the statute; h owever, we have assumed that the City will provide land descriptions and ownership information for all affected properties which are to be depicted on the map. The services required for the preparation ' of the official map are as follows: 1. An official map will be prepared detailing the extent and location of the roadway corridor, as well as identifying property boundaries and ownership data. The official map will require the signature of a Registered Land Surveyor. 2. The official map will be sent to Mn /DOT for review and signature of ' approval. Our scope of work does not include any services required for the adoption and ' filing of the official map with the County recorder as provided for by the ctatnta 2. Obtain current Minnesota Department of Transportation section subdivision /control survey information for Section 24. Review information from section subdivision survey of west half of Section 13 ' as performed by BRW. 3. Determine detailed design information for the proposed TH 101 alignment. The preliminary alignment for TH 101 was generally established by degree of curvature for the Trunk Highway 101 Corridor ' Study. Additional work is required as a part of the official mapping to the determine perform necessary calculations to the roadway alignment parameters. The parameters must be determined to enable a field survey ' of the alignment as detailed below. 4. Conduct a survey to field establish the proposed alignment for review ' by City staff and the Hoisington Koegler Group, Inc. 5. Review the existing topography of the roadway corridor and the proposed vertical alignment for TH 101 to determine preliminary earthwork quantities for the construction of TH 101 within the boundaries of the official mapping. Official Map Pre aration We have performed an investigation to determine the requirements of the official mapping process in conformance with Mn /DOT and State Statute ' 462.359. The official mapping process requires that a map be prepared for the proposed roadway centerline and the associated right -of -way corridor. The preparation oflegal descriptions forproperty acquisition from individual parcels ' is not required by the statute; h owever, we have assumed that the City will provide land descriptions and ownership information for all affected properties which are to be depicted on the map. The services required for the preparation ' of the official map are as follows: 1. An official map will be prepared detailing the extent and location of the roadway corridor, as well as identifying property boundaries and ownership data. The official map will require the signature of a Registered Land Surveyor. 2. The official map will be sent to Mn /DOT for review and signature of ' approval. Our scope of work does not include any services required for the adoption and ' filing of the official map with the County recorder as provided for by the ctatnta 612- 833 -31GO HOISINGTON KOEGLER 39LZI P07 APR 05 1 94 %rte: =0 I Mr. Fred I-Ioisington March 31, 1994 Page 3 , Final Monumentation I 1. A field survey will be performed to monument the final centerline of the corridor. I COST ESTIMATE The estimated costs for services required by the scope of work described above are as follows: Research and Preliminary Layout Official Map Preparation Final Monumentation t Estimated Cost ' $4,450.00 ' $3,500.00 $1,000.00 ' Total Cost $8,950.00 All services required for the official mapping of proposed TH 101 between future Lake Drive East and TH 212 will, therefore, be performed for the total not -to- exceed cost of $8,950.00. E p' e - hses in=cu=rred for the preparaiion of the official =nap will be billed directly with no BRW markup. Expenses may include such items as mileage, reproduction costs, document acquisition, etc. We estimate that the expenses for the project will be approximately $250.00. Please call if you have any questions or need any additional information. Sincerely, BRW, INC. n B. orn, PE Project Manager I TRT-T Al 1, I 612-8- HO I S I NGTON KOEGLER 396 POS APR 05 '94 09:31 1 1 B R w In'c. PkXTLtng Trampor=tion Eqi tleerin$ urban Design Thr shi-r Square 700 Third 5rrect So. minnampolis, NN SU151 612 /370.0700 Fox 61 2/3T -'t378 1 Donald W. RinFuo is Richard P. %'Volstald Thomas F. Carroll Gram A. Amundsen Donald E Hunt John i3. McN mon, Mchard D. Pilgrim D 416 N, Beckmarm Jeffcry L, 8e ;on Ralph C. alum GAry I $riCkson John C. Lynch P aul Vii_ Ball, Sal ri Ayox Cary A. that Antmony Heppelmann Ar!js Pakalns 1 MC1 Moward P, prl'btdn 1?tn rt P. Probst April 4, 1994 Mr. Fred Hoisington, AICP Hoisington Koegler Group, Inc. 7300 Metro Boulevard Suite 325 Minneapolis, MN 55439 RE: TH 101 Official Mapping Supplemental Quote for Engineering /Surveying Services Dear Fred: The following supplemental quote is submitted as requested for additional services which may be required as a part of the official mapping of Trunk Highway 101 (TH l X01 ). It is our understanding that the City may wish to have legal descriptions prepared at this time for all land acquisition required from individual properties impacted by the proposed TH 101 alignment. These services were not included as a part of our original March 31 quote since Minnesota Statute 462.359 does not require the preparation of individual legal descriptions as a part of the official mapping process. If the City wishes to have individual legal descriptions prepared as a part of the official mapping, the following is a description of the proposed scope of work and an estimated cost for our services. SCOPE QLV I. Prepare legal descriptions for all property acquisition required for the proposed mapping of TH 101. 2. Calculate areas for all acquisition parcels. It is anticipated that legal descriptions will have to be prepared for approximately eight. properties. It is assumed that individual exhibits will not be required to illustrate the proposed acquisitions since the official map will serve this purpose. Denver Milwaukee Mi mcapolie ' Orlando P}f U�fiLY Portland 1 San Digo sz�ttl� 1 Donald W. RinFuo is Richard P. %'Volstald Thomas F. Carroll Gram A. Amundsen Donald E Hunt John i3. McN mon, Mchard D. Pilgrim D 416 N, Beckmarm Jeffcry L, 8e ;on Ralph C. alum GAry I $riCkson John C. Lynch P aul Vii_ Ball, Sal ri Ayox Cary A. that Antmony Heppelmann Ar!js Pakalns 1 MC1 Moward P, prl'btdn 1?tn rt P. Probst April 4, 1994 Mr. Fred Hoisington, AICP Hoisington Koegler Group, Inc. 7300 Metro Boulevard Suite 325 Minneapolis, MN 55439 RE: TH 101 Official Mapping Supplemental Quote for Engineering /Surveying Services Dear Fred: The following supplemental quote is submitted as requested for additional services which may be required as a part of the official mapping of Trunk Highway 101 (TH l X01 ). It is our understanding that the City may wish to have legal descriptions prepared at this time for all land acquisition required from individual properties impacted by the proposed TH 101 alignment. These services were not included as a part of our original March 31 quote since Minnesota Statute 462.359 does not require the preparation of individual legal descriptions as a part of the official mapping process. If the City wishes to have individual legal descriptions prepared as a part of the official mapping, the following is a description of the proposed scope of work and an estimated cost for our services. SCOPE QLV I. Prepare legal descriptions for all property acquisition required for the proposed mapping of TH 101. 2. Calculate areas for all acquisition parcels. It is anticipated that legal descriptions will have to be prepared for approximately eight. properties. It is assumed that individual exhibits will not be required to illustrate the proposed acquisitions since the official map will serve this purpose. X12 -45 -^160 HOISINGTON KOEGLER - 7 97 P02 APR 05 1 94 09:41 Mr. Fred Hoisington, AICP April 4, '1994 , Page 2 COST ESTT The estimated cost to perform the additional scope of work detailed above ' is as follows: Estimated Cost Legal Description preparation $ 2,400.00 Any additional legal description services that may be requested by the City would, therefore, be performed for the total not --to— exceed Cost of $2,400.00. Please call if you have any questions or need any additional iTtformation. Sincerely, BRW, INC. YY n B. frmn, E Proj ect Manager JBH /jal �1 - 8�5 -31b0' April 1, 1994 LJ HOISINGTON KOEGLER Orr CIAMSA SSdiielen =, Inc. Mr. Fred L. Hoisington, AICP Planning Consultant Hoisington Koegler Group Inc. 7300 Metro Boulevard Suite 525 Minneapolis, MN 55439 397 P03 RPR 05 '94 09:42- 300 Park Place center 5775 Wayzata FA)ulevard Minneapolis MN 5541E 1228 6r2 -595 -5775 1- 800 -753 - 5775 FAX 595 - 5774 Engineers Architects Planners Surveyors Re: Proposal for Survey Services for Trunk Highway 101 Official Map Chanhassen, MN OSM Proposal No. 0122.94 Dear Mr. Hoisington: We are pleased to present this proposal for the referenced project which we understand to be the preparation of an Official Map with monumentation and legal descriptions for the affected parcels. (See attached Scope of Services for detail.) We understand that the City of Chanhassen will provide us with: 1. An Owner's and Encumbrances Report for affected properties which will contain record legal descriptions. 2. As built data and record description for TH 101 North of this site. 3., Contour mapping in electronic format for use on our Intergraph CADD system. We propose our services on a basis of cost plus expenses, based on the attached 1994 Fee Schedule which is updated yearly and which indicates the hourly rate for our different staff categories; plus expenses, such as, travel, long distance telephone calls, Cadd time, etc. We will invoice monthly with a detailed invoice indicating the names of our personnel and the hours worked. We estimate the cost of our services to be $9,930, which will not be exceeded without prior authorization. We propose that Dave Mitchell be assigned Project Engineer and Ed Ames be assigned as Project Manager. We greatly appreciate the opportunity to present this proposal for your consideration. We are prepared to start immediately and would complete the official map within 90 days of notice to proceed. We have discussed the proposed work with the Carver County Surveyor and found that he will be doing some Global Positioning (GPS) in this area during the month of May. He would like to see this map prepared on the Carver County Coordinate system and is willing E12- 8 -3160 HOISINGTON KOEGLER 397 PO4 APR 05 '94 09:42 Mr. Fred Hoisington April 1, 1994 Page 2 ' to work with us to accomplish that end. His work would be beneficial to the project in ' defining Section and Property lines if the project schedule can be met. We have included all field survey time in this proposal to respond to your request, but we would look at cost saving potentials through utilization of the County Surveyor's data if time allows. ' If you have any questions or require additional information, please call. Thank you. Sincerely, ' ORR- SCHELEN- MAYERON ' & ASSOCIATES, INC. David E. Mitchell, P.E. ' oject Engineer 0 me,-d-- D. Edward Ames, L.S. Project Manager ' Vice President encl Fee schedule I c: JAT-I I H:\ i. ASI V P, \WSURVEY\DEA \LETMPS \940401.FH I i 61 8?5-j1r0 HOISINGTON KOEGLER SCOPE OF SERVICES FOR P05 APR 05 '94 09:47, TRUNK HIGHWAY 101 OFFICIAL MAP CM OF CHANHASSEN, MINNESOTA To prepare Official Map per Minnesota Statutes 462.359, Orr - Schelen- Mayeron, Inc_, will: A. Calculate final horizontal alignment using HKGI Corridor Study Addendum and tie to Section Lines determined by field survey. B. Review and finalize HKGI vertical alignment and typical section to determine construction limits. C. Calculate right -of -way needs and monument changes in direction of the right -of -way lines. In addition to the requirements of Minnesota Statutes 462.359, Orr- Schelen - Mayeron will: D. Prepare legal descriptions of the right -of -way for the eight (8) parcels of land affected. E. Calculate cut /fill volumes for the project based on horizontal and vertical alignments, typical section, and contours provided by the City in electronic format. H: \f„ A51`W \BJF�SURVEY\012294.PRO 6 I G - V ^C - J 16EJ H O I S I N G T O N KOEGLER 39T POE APR 05 '94 09:43 Orr Sdwlen 3oo Park place Center 612- 595 -5775 OAMS)& wyeron& 5775 Wayzata Boulevard 1 - 800 - 753 - 5775 Asssodates,InC. Minneapolis, NIN 55416 - 1228 FAX 595 - 5774 1994 FEE SCHED U'.�E ' Schedule of direct personnel costs to be multiplied by 2.25 to determine hourly ' fee: Principal $47.00 ' Senior Registered Engineer, Architect, Planner, Surveyor $39.50 Registered Project Engineer, Architect, Planner, Surveyor $34.25 ' Project Engineer, Architect, Planner, Surveyor $27.00 Engineer, Architect, Planner, Surveyor $22.00 Senior Designer $31.50 ' Designer, Level II $27.00 Designer, Level I $24.50 Senior Technician $22.00 ' Technician, Level II $20.00 Technician, Level 1 $16.00 Schedule of direct personnel cost to be multiplied by 2.15 to de termin hourl fee: ' Construction observer $27.00 3- Person Survey Crew $53.00 2- Person Survey Crew $43.00 ' "Direct personnel cost° is defined as salaries plus payroll burden and fringe ' benefits. All personnel assigned to the project will be billed at the rates shown above based on their respective classification multiplied by the appropriate multiplier. ' Schedule of computer cost per hour: Microcomputer $ 5.00 I Microcomputer CAD Workstation $15.00 r wi ll e charged at the above hour] Compute costs � b g Y rates. All other costs, such as vehicle mileage, survey equipment and vehicles, word ' processing, clerical, printing and reproduction costs are included in the hourly fee. ' J I 61 -3160 HOISINGTON KOEGLER April 4, 1994 Mr. Fred L. Hoisington, MCP Planning Consultant Hoisington Koegler Group Inc. 7300 Metro Boulevard ' Suite 525 Minneapolis, MN 55439 Idm CJIMSA Oron & IrtC. 397 P07 APR 05 '94 09:44 30o Park Place Center 5775 Wayzata Baatevard Minneapots, MN 55416 -1228 612- 595.6775 1- 600-753-5775 FAX M -8774 Enffineen ACC itects planners surveyors Re: Supplemental fnforatation Proposal for Surrey Services for Trunk Highway 101 Official Map Chanhassen, MN OSM Proposal No. 0122.94 Dear Mr. Hoism' gton: In our phone conversation of this afternoon you requested additional information regarding our quote of April 1, 1994 for the above referenced project. Specifically you requested additional cost information regarding items we had assumed that the City of Chanhassen ' would provide as a part of this project. Those items of concern are the following. 1. An Owner's and Encumbrances Report for affected properties which will contain ' record legal descriptions. ' Rte• It is OSM's understanding that the City Attorney will require that this item be accomplished by a title company prior to commencing acquisition of any parcels for the T.H. 101 project. It is GSM's opinion that this item should be ' accomplished prior to the development of legal descriptions by our firm. This would be the most practical method of proceeding in that it w1 . 11 provide complete parcel information and minimize potential problems at the time of property acquisition. ' The report provided is certified by the title company. An estimate from the City Attorney is that this report costs approximately $$0.00 per ' parcel. This estimate is a project cost attributed to the project and is independant of the firm preparing the legal descriptions, therefore, a fee would not be cbarged by OSM. I Equal (*pm nity &vpiayer Mr, Fred Hoisington April 4, 1994 Page 2 HOISINGTON KOEGLER 397 P08 APR 05 '94 09:44 f 2. Contour mapping in electronic format for use on our Intergraph CARD system. , PP g Y Responm- If contour mapping in electronic format is not available from the City of ' Chanhassen OSM would ask that the City provide a hard copy of the area. 'le work effort attributed to this task is minimal, therefore, we will not charge an additional fee for this task in the event that contour mapping in electronic format is not ' available. If you have any questions or require additional information, please call. I `X'bank you, Sincerely, ORR- SCHELE.N- MAYERON & ASSOCIATES, INC. 1 David D. KtcheE P.E. Project Engineer D. Edward Ames, L.S. ' Project Manager Vice President c: JAH H:\ CIVIL\ ? SM\F- NGTMR \DDM \LETIERS\040494.M I - I