(612) 937 -1900 i FAX (612) 937 -5739 Aefion by City Admtn%tre»
TO: Don Ashworth, City Manager
FROM: Charles Folch, Director of Public Works/City Engineer 4-
DATE: January 5, 1994
Endorse
Modifier_. -
Rejede
Dat
Date Submtted to Commiss+on
Date Submitted to CounCil
SUBJ: Receive Feasibility Study for Trunk Highway 5 South Frontage Road ( Galpin Boulevard to
McGlynn Drive) and Galpin Boulevard (Trunk Highway 5 to Timberwood Drive) and Area Trunk
Utilities - Project No. 93 -26
Attached is a feasibility study as prepared by Barton - Ashman & Associates for the proposed construction of
roadway and trunk utility improvements in Section 18 in Chanhassen. The elements of the proposed project consist
of the construction of a south frontage (collector) road from Galpin Boulevard (County Road 19) east to McGlynn
Drive, the reconstruction and widening of Galpin Boulevard (County Road 19) from Trunk Highway 5 south to
Timberwood Drive, and the extension of trunk sanitary sewer and watermain from their current terminus associated
with the Upper Bluff Creek Trunk Utility Improvement Project- No. 91 -17B. These trunk improvements were
petitioned by and will benefit nearly 200 acres of land• i mminen t for development consisting of the proposed
elementary school site, the Trunk Highway 5 Partnership property and the Heritage Development property. The
proposed improvements to Galpin Boulevard are consistent with Carver County's future function and design criteria
for this roadway.
The feasibility study describes in further detail the design elements for the proposed project, environmental impacts,
permits required, costs and proposed funding. The typical procedure on public improvement projects such as this
is for the City Council to receive the feasibility study document and have approximately one month's time to review
the document and become familiar with the proposed improvement projeci prior to holding a formal public hearing.
It is therefore recommended that the City Council formally receive the feasibility study for the Trunk Highway 5
south frontage road (from Galpin Boulevard to McGlynn Drive) and Galpin Boulevard (CSAH 19) from Trunk
Highway 5 to Timberwood Drive and area trunk` utilities, Project "No. 93 -32 and call for a public hearing at their
regular meeting on Monday, February 14, 1994. ENSE EM'S UPDATE
Attachments: 1. Feasibility Report. The feasibility repaft for this project
2. Staff report dated September 8, 1993. was received by the City Council at their
3. Staff report dated Decembers, 1993. regular meeting on Jamey 10, 1994• The
project en9 , Barton- AsdYnam, will be
c: Dave Hempel, Assistant City Engineer present for the public hearing on February 14,
Dave Warzala, Barton- Aschman Associates, Inca 1994 to prey a presentation of the feasi-
Steve Schwanke, RLK bility study and its findings. It is re-
connended that the City Council approve the
feasibility study and audxrize prepara-
tion of plans and specifications for Project
No. 93 -26.
11
MEMORANDUM
•Io1±'v 9 Is
F,gm
PETITIONING
PROPERTY
•
91
SEP -09 -1993 11 :09 FROM RLK ASSOCIATES+.LTD.... TO
rpi post -R" brand fax transmittal memo 7M
�ASSOC)ATES LTD. oo. f;!.
V
922 Mainstreet
Hopkins. Mn.
55343
(612) 933-09
fax: (612) 933• t t Sa
,:. I PrA "N" .1 33 - C i')')e
Fox• ¢ yx# X33 — S ,
September 8, 1993 '
Charles D. Folch P.E. '
Director of Public Works\City Engineer
City of Chanhassen
690 Coulter Drive '
P.O. Box 147
Chanhassen, MN 55317
RE: Petition to provide public improvements to serve the '
Chanhassen Corporate Center site and adjacent property
Dear Mr. Folch: '
On behalf of Heritage Development Company and the Trunk Highway 3
Partners, RLK Associates has been authorized to petition the City
of Chanhassen for public improvements to serve the 137 -acre ,
Chanhassen Corporate Center (per the attached legal description)
and the 24 -acre Heritage Development site (per the attached legal
description). please place this request on the next available City
Council meeting. The respective entities have requested to be
notified when the feasibility study becomes available and the
estimated costs associated with the proposed public improvements.
Please contact me if you have any questions regarding this matter. '
Sincerely,
RLK S CI
/keven ScNwanke
cc. Paul. Krause, City of Chanhassen planning Director
Dennis Dirlam, Trunk Highway S Partnership
Kevin VonRiedel, Heritage Development
Pat Gannon, Chanland Partnership
9375739 P.01
• Civil Enpineerinq • Transportation • Infrastructure Redevelopment
" Landscape Architecture 0 Construction Management
SEP -0S -1993 11 :10 FROM RLK ASSOCIATES,.LTD.... TO 9375739 P.02
' 922 Mainstreet
RLK Hopkins. Mn.
55343
ASSOCIATES LTD. (612) 933.0972
far (612) 933.1153
' HERITAGE DEVELOPMENT 24 -ACRE SITE
A Legal Description
' west of the centerline of the creek, SE one- quarter of section 15,
township 116, range 23.
to
Civil En2ineering Trensporlation Intrastrveture Redevelopment
• Landsaape Amhltecture 0 Construction Managome It
SEP -08 -1993 11:10 FROM RLK ASSOCIATES,.LTD.... TO
RLK
ASSOCIATES LTD.
9375739 P.03
.
922 Mainstreet
Hopkins. Mn.
SS
343
(612) 933 -0.072
tax: (612) 933-1153
CHANHASSEN CORPORATE CENTER
A Legal Description
r ct t: The West Half of the Northeast Quarter of Section 15.
Township 116 North. Range 23 West of the 5th Principal Meridian.
rac 2. That part of the North Half of the Northwest Quarter of
Section 15. Township 116 North. Range 23 West of the 5th
Principal Meridian, lying southeasterly of the centerline of County
State Aid Highway No. 117 as traveled and southerly of the
centerline of State Trunk Highway No. 5 as described in Book L of
Miscellaneous - Page 472.
• Civil Engineering • Transponatian • Infrastructure Redevelopment
- Landscape Architecture • Construction Management
1
1
H I —WAY 5 PAR TNER SH I P
A! Xinnesota Limited Partnership
CEAERAL PARTNERS:
DENNIS P. DIRLAN (612) 931 -1602
401 1. DLANCBAR (612) 881 -0542
June 30, 1993
15241 CREEQSIDE COURT
IDEA PNAINIE, M1 55344
' City of Chanhassen Planning Commission
Chanhassen, MN
' Attn: Paul Krause
Re: W1 /2 of the 1NE1 /4, Bection 15, 'township 116, Range 23,
Containing 8 acres of land, more or less.
' Dear Mr. Krause:
We are the general partners of the Bi -Way 5 Limited
Partnership which owns the Mary Welter farm. As you are aware, we
recently completed the sale of the West 40 acres to the City of
Chanhassen for the proposed school site. We are also negotiating
' a sale of the southern most 40 acres located directly east of the
Timberwood development. It is contemplated that the purchasers
will be submitting a PUD to the City for approval.
' We are requesting that the City consider our petition to
extend utilities to service the above captioned property. It will
' be necessary to extend water and sewer to the two 40 acre parcels
referenced above.
We are also requesting that the City approve the proposed
' east /west collector raod which will connect new Carver County Road
19 to Audubon Road. It is my understanding that this road will
extend along the northern boundry of Timberwood easterly through
' McGlynn properties to the east. Obviously, this road will service
both of the parcels which I have mentioned.
If you have any questions, please contact either of us and we
' will be most happy to discuss this with you. You may also contact
Mr. Robert Morehouse of Morehouse Realty, who is working with the
purchasers. Thank you for your attention to this matter.
HI -WAY 5 LIMITED PARTNERSHIP
r am, eneral Partner
J n Blanchar, General Partner
' cc: Robert Morehouse
BARTON- ASCNMAN ASSOCIATES INC.
r
111 Tniro Avenue Sox.n. Su 350 - Minneapolis. Minnesota 55401 USA • (612) 332 -0421 • Fax (612) 332- 6180
MEMORANDUM TO: Charles Folch, City of Chanhassen I
COPIES TO: Roger Gustafson, Carver County I
Harold Eriksen, HGA
FROM: James Unruh '
DATE: December 8, 1993
SUBJECT: Galpin Boulevard (CSAH 19) Reconstruction Alternatives ,
As discussed at our November 16, 1993, meeting, Barton- Aschman has developed and
analyzed various alternatives forlhe reconstruction of Galpin Boulevard (CSAH 19) _
between Timberwood Drive and Trunk Highway 5. This memorandum and its .'
attachments briefly describe the alternatives and their comparative costs and impacts. It
is anticipated that the Chanhassen City Council will select an alternative at its
December 13, 1993, meeting.
The '-formation presented in this memorandum will also be included in the forthcoming
TH 5 South Frontage Road Feasibility Study. '
Over iew
Independent School District 112 is proposing to construct a new elementary school on the '
property east of Galpin Boulevard and south of TH 5 (see Figure 1). A new frontage road
is proposed along the south side of the school site. Trunk Highway 5 is scheduled for '
upgrading to a four -lane divided roadway in the late 1990s. _
Galpin Boulevard will be reconstructed to two lanes in each direction with left -turn lanes
along the west side of the school site. From south of the school site to Lyman Boulevard, ,
Galpin Boulevard will be widened to 52 feet; it is likely that pavement striping would
limit traffic to one through lane in each direction.
Occupation of the elementary school is scheduled for the fall of 1995. The proposed ,
roadway and utility improvements including the south frontage road along the south side
of the school site, reconstructed Galpin Boulevard between Timberwood Drive and TH 5,
and all utilities must in -place at that time.
Alternatives for the reconstruction of Galpin Boulevard between Timberwood Drive and '
TH 5 have been developed and are illustrated on Figures 1 through 4. Table 1
summarizes the comparative cost estimates and the impacts of the alternatives. Figure 5
shows the existing and proposed profiles of Galpin Boulevard, which are the same for both '
alternatives.
re-. 7 PARSONS
LNEDTRANSPORTATION GROUP
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
{612) 937 -1900 • FAX (612) 937 -5739 Actim by dry M
TO: Don Ashworth, City Manager
FROM: Charles Folch, Director of Public Works/City Engineer
bd wsed_��
00ditie
IWK!e =
.Ate &*Mktsd b Q n wwp
Council
DATE: December 8,1993 _ 090 Submitted m
11 -i3 -q 3
SUBJ: Select Preferred Alignment Alternative for Galpin Boulevard South of Trunk Highway 5; Amend
Feasibility Scope - Project No. 93 -26
' Earlier this fall the City commissioned the consulting firm of Barton- Ascbman Associates, Inc. to oonduct t
feasibility study for the Trunk Highway 5 south frontage rood between Galpin Boulevard and Audubon Road and
area trunk utility improvements, Project No. 93 -26. An important road element of this project is the improvement
of Galpin Boulevard from Trunk Highway S south to Tnnbeiwood Drive. During the process of oonducting the
' feasibility study, Barton- Aschman has identified 2 alignment alternatives for this segment of Galpin Boulevard.
Alternative No. 1 basically proposes to load the road widening area on the east side of Galpin Boulevard.
Conversely, Alternative No. 2 proposes the widening to be loaded on the west side. A oost estimate/impact
' summary matrix has been prepared for each of the two alternatives. Alternative No. l (widening along the eait side)
is further differentiated into three options to deal with the roadway side slope, i.e. retaining wall, 2:1 back slope and
3:1 back slope. From a purely economic standpoint, Alternative No. . l implementing a 3:1 roadway back slope is
' the recommended choice; however, the engineer and staff wanted to present these alternatives and oorresponding
information to the Council for further discussion and confirmation.
Selecting the preferred alignment alternative is important at this point in time in order to allow preliminary surveying
' work and the €c otechnical investigation to be accomplished in a timely manner and . corresponding information
included in the study report. r
' Unless pertinent questions or concerns are raised by Council which may require further investigation, it is staffs
recommendation to select Alternative No. 1 as the preferred roadway alignment for Galpin Boulevard from Trunk
Highway 5 south to Timberwood Drive as a part of the overall south frontage road Project No. 93 -26.
ktm -
Attachment: Memo from Barton- Asebman dated December
c: Dave Hempel, Assistant City Engineer:
James Unruh, Barton- Aschman
Roger Gustafson, Carver County Engineer
Thomas & Marian Schmitz, 8190 Galpin Boulevard
Dale F. & Marcia Wanninger, 8170 Galpin Boulevard
Mitchell & Mary Krause, 2380 Timberwood Drive
James L. & Linda J. Leirdahl, 2350 Timberwood Drive
Lawrence & F. Raser, 8210 Galpin Boulevard
TABLE 1
GALPIN BOULEVARD RECONSTRUCTION ALTERNATIVES
COMPARATIVE COST ESTIMATEAMPACTS SUMMARY
Alternative 1 Alternative 2
Widen Galpin Boulevard to east along school site Widen Galpin Boulevard to west
Widen Galpin Boulevard to west along Timberwood
Roadway Construction
Same for
Both Alternatives
East Back Options
Retaining Wall 2:1 Backslope
3:1 Backslope
3:1 Backslope
3 Residential Properties
Right•of- -Way
0.3 ac = $7,500 0.2 ac = $5,000
0.2 ac = $5, 000
0 $120,000 each = $360,000
(0 $25,000 per acre)
East Side Temporary Easement
0.3 ac = $6,000 0.3 ac = $6,000
0.4 ac = $8,000
0.2 ac = $4,000
(0 $20,000 per acre)
West Side Easements &
$20,000 $20,000
$20,000
None
Restoration at Residences
Retaining Wall Construction
200 ft. 0 8 ft. ht.
None
None
None
® $40 /s.E = $64,000
TOTALS
$97,500
$31,000
$33,000
$364,000
Tree Removals
None
One 24" Fir
Two 24" Firs
None
m
D
D
-4
0
t
N
n
I
3
2
to
D
N
n
M
t
n
BARTON- ASCHMAN ASSOCIATES, INC.
• Alternatives
Under Alternative 1 (Figures 1 and 2), Galpin Boulevard would be widened to the east
along the school site and to the west along Timberwood Estates. This alternative
' minimizes impacts to the three existing residences along the west side of Galpin
Boulevard and to the mini golf/driving range business northwest of the TH 5 /Galpin
Boulevard intersection. Lowering of the Galpin Boulevard profile (as shown on Figure 5)
will require that the front yards of the residences be re- landscaped. The driveways will
also need to be reconstructed.
' Some impacts occur in the northwest corner of the Timberwood Estates. Section S-B on
Figure 2 shows three grading options for the area. Table 1 summarizes the comparative
costs and impacts of the grading options.
Under Alternative 2 (Figures 3 and 4), Galpin Boulevard would be widened to the west
along the school site and along Timberwood Estates. However, the alignment would be
adjusted at TH 5 to minimize impacts to the mini golf/driving range business north of
' TH 5.
The three existing residences would be purchased or condemned as roadway right -of -way .
' under this alternative. The middle property is currently for sale. The listed price was
$118,900 as of November 18, 1993. An assumed cost of $120,000 for each property was
utilized in the comparative cost estimate.
' Recommended Alternative
It is recommended that Alternative 1 be selected because of its substantially lower right -
of -way costs. The 3:1 backslope grading option of Alternative 1 is also recommended.
Retaining wall costs are eliminated and a stable groundslope is provided. The two fir
' trees that would be impacted seem to be in marginal condition. Some scrub growth would
have to be cleared. However, the 36 -inch mature oak tree would be preserved.
I dmv
rs
2
DILATED VIA SCHOOL
O. DEVELOPMENT
MATCH SCHOOL
SITE GRADING
.
1 TEMP
ESMT
i AS
I REC
i
I
I
I
I
I
GALLPN BLVD
I
88 OALPIN Ne
BLVD
14 1 12' 12'
1 AN= 1 ♦N= 1 •NR
24 C-GI 8624 C-O ( ,...
SECTION B -B
FEASIBILITY STUDY
CITY OF CHANHASSEN
PROPOSED R/W, I
W/O RETAINING WALL I
PROPOSED R/W I
W/ RETAINING WALL
240 24• so
FIR OAK
"r.I WIRM SCALE- r- 2W
WALL
WIDEN GALPN BLVD TO THE EAST ALONG SCHOOL SITE
WIDEN GALPN BLVD TO THE WEST ALONG'
TH S South Road
(Imm GWn mto McG Rod)
FIGURE 2
W^nT0N- ASC~M, assocu►TE§6 W.V . Galpin Boulevard (CSAH 19) Galpin Blvd. Typical Sections
(tfm 7krkwwood Dike to TH f) U*n :
I
.ROPOSE
ESTATE P .J
DEMENT ' ..:.. #:. :�..
,._.
Nsi4l � w .• ••• a. � ' tr F •'.. , .1,•� Yom"' f. " - i n ' 1[ '� :�. ,
, ROADWAY �•. -
4. '-
-� ,
IL
dW
.r �' i '•: > _ Y rU ,� y :�: `; � 't � ''t � -' • . . /'qw
' LEGEND - . :. = '''++�►
..'� ��
PROPOSED CALPIN _ •� ''
' BLVD. ' ::
_ a
TEMPORARY `: r ;L
,*
EASEMENT: r ,;
�f M PERMANENTs.r,, '
R/W TAKING O
- -• -- VaSTING R/VY ._' r � �r►. y, ' '
' FEASIBILITY STUDY
" CITY OF CHANHASSEN FIGURE 1
■AATON•ASCH MAN ASSOCLATM NC. Gal ,
] pin Boulevard Layout
rm I r .AP M. TRAMPCWTATM4 0 . Alternative
N SCHOOL
3RADINO
SECTION D -D
FEASIBILITY STUDY
CITE' OF CHANHASSEN
TH S South Frontage Road
,.
per Ge" 8mA*vW to McG rA Fto@4
_MOPMENT
24• 24•
FIR FR
SCALE- t•- 2a
WIDEN OALPIN BLVD TO THE WEST
[ FIGURE 4
.ARTO"� -^SC1 MAN ^SSOCIAT UNIM Ga lpin Boulevard (CSAR19) Galpin Blvd. Typical Sections
A lternative 2
• . • 1 , r7r � �c ' i,�'�"� ti �,� - „tom
,+, :, - I • N • s" Vii-; 'y►+ r •�" f'* +
r - ,
.;:. �:�, • •' .ski" � � � ... �` -' �... �►z. ,+ � ....'
61POSED -0
ESTATE--
DE ENT �' ` �►»��: .- .;_j
j tW*
W JIM
'• FUTURE ,ROAbW' 'pe3.}
o r
to '� ±, . y: ._•
E § } EN Tt� � 4 >
ROPf,RT1ES -�-
T = ~ Z- ;cry ` - '• { .rT� ,� T1 ;r • . �� ► "� �
r _ + ;
'`� i •!a�'`•isf + 'tom
rf
LEGEND:
w r3
PROPOSED GALPIN
r • f z +: . c. �:
TEMPORARY
EASEMENT
PERMANENT
R/W TAKING
- - - -- E)OSnNG R/W
FEASIBILITY STUDY
s
CITY OF CHANHASSEN FIGURE
r -
■APTO^1•ASCHMAN A INC. Galpin Boulevard Layout
IU P&PAW O TRANNPIIOWAT1 a,a. Alternative 2
.... . .. -------
: €: : €: 4 . €.
:3: .t.
j
:3:
:f:
:i:
.7
:f:
.i.
: €:
.:.......:::::
! .:.
.. ...:...... .......................:....... .: . }..
.. .. .......5........... ........... • . t
}:
CONI�ECTl01t : i°
. . .....................
..........
................... ::.... : :: ::::
............... ...............................
...................
.........
:i: :1: .7
:i: t
:tail' 1330'
................... :......... :......... : ......... :......... :.........:.
EI::968:78
.s. :f:
:j:
c
.e0'
PV1�
6.09 �9 .93�
�i�
'P.VC: i . f?l:_969.'69'
•4•
Ek•
• : €'
8
7
.03
�PWCS
0'0.:9
87 ;9Ga� : €: :t:
:j:
t.
: €:
. PVT • s • • •D00'• Q79•
xx S: � €�
2 E '9T0:6E:
t_ •k
:.i
4 •1
M�'2
..... ...............................
t� i�
ro�Ertrr 1<�Nt: � �.ta
. .. . . .. .................
•EiESICEI
€ : StdE�
3•
stil... .
it+a�irEli� ieaw:
.t.
tyirC tti; t►i;,7,t�
J i'
Es tas�ss:
26:EC.
•3•
• oEiti� vier
Iveva►tc
: €:
Tx
t..
.t. ►'
€. .� :::t 3 'lN4 Q31E
.ice 2:.
....... ....... ....... ....... .................
....... ....... ....... ........ .........:........ ....... ..
......... ....... ....... ........ .........:........ ....... ..
�fl�tillfi (I111}1�1
:........ ....... ........:......... .........:........ ....... ..
ltsllPCRIIRaf. � E71E$riM9:
:.4................. i
atNEW4Y:.
F
:£
�� _
:........ .......
:........ .......
................ ...............
.......:........
.......:........
..............:..... ...... :::: :
�.
tl�TlC .
.. ....... .. I,
.. ....... ..
......... ....... ........:.....
.7.
:i:
��.
:........ ....... ........:......... ........ ::
E'
��: (
:.................. ........:........ ..... ....... .......
.I+rq€
M • O
'
1•
.i. •�
:/ •�. T
CbYC•O•le• 7:70• :€ ..E..• ..
tEVr.
:1
t2:tt.:•t;PS .3S••
:€
�p.� • PEIDP4�(H
:d:
........:........ .......
........:........ ....... .
TiT.7 77.:77
T. K
t • a 9E1
'• :a�lo:3a•
•t•
:�
tr:t'aot=1
:i
c .
N,P
Nt
EXISTING :
y
t.
..........
1
:�:
ST1 • t•
EX r10
..... ... ........ ...... .....:........ :..::.:
..... .........
... ..... .........
ItROF
0.6 I . - •A •t• : :fM�B�EIYCQO
: • €: :3: :: : €:
...... ...
........ .:.:::::
........ ... ..
:.
.
................. .
M t78[0:
: €:
•:• :�: T fRW11N:'
•t• .. .i.
is
.:
:1.:
.... : » »'
€:
t.
::
is
t
{7�Y
s ..
. ........ .
....... ...
.. ii
.....•.. ......:
.. jt
i •
s
:i:
t.
::
{
.. :3'
}•
....... ......
....... .......
....... ....... .... ...
. ..... ....... ........ ......... .....
FEASIBILITY STUDY
CITY OF CHANHASSEN
TH S South Frontage Road
(fmm
FIGURE 6
M1AnTOFdwASCaM0Iiw ASSOCIATBE% 4141110. " W.0F Gal ifs Boulevard
Galput Boulevard (CSAH 19) P
P A4ASO AS TRAN4SPOaTATOM MOUP (t�^TM^�"^"0 �TMh Profile
1
1
1
CITY OF CHANHASSEN
AFFIDAVIT OF MAILING NOTICE
STATE OF MINNESOTA )
' ) ss
COUNTY OF CARVER )
1
I, Karen J. Engelhardt, being first duly sworn, on oath
deposes that she is and was on January 31 , 19 94 ,
the duly qualified and acting Deputy Clerk of the City of Chan-
hassen, Minnesota; that on said date she caused to be mailed
a copy of the attached notice of Public Hearing for TH 5 South Fron tage
Road (from Galpin Blvd /CSAH 19 to McGlynn Rd) and Galpin Blvd (from TH5 south
to Timberwood Drive) Road, Grading, Drainage and Utility Improvements
to the persons named on attached Exhibit "A ", by enclosing a copy
of said notice in an envelope addressed to such owner, and
depositing the envelopes addressed to all such owners in the
United States mail with postage fully prepaid thereon; that the
names and addresses of such owners were those appearing as such
by the records of the County Treasurer, Carver County, Minnesota,
and by other appropriate records.
I
ren J. En e hardt, 6 eputy Clerk
Subscribed and sworn to
before me this 31st day
of January 19 94 "' �_--- --- - -+
6S 1 KIM T NIEUWISSEN
` NOTARY PUBLIC- MINNESOTA
;� CARVER COUNTY
1 �`' My Commission Expires MAY 29, 1998 i
Notary
January 27, 1994
CITY OF
CHANHASSEN
690 COULTER DRIVE a P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
Re: Notice of Public Hearing for Trunk Highway 5 South Frontage Road (from Galpin
Boulevard/CSAH 19 to McGlynn Road) and Galpin Boulevard (from Trunk Highway 5
to Timberwood Drive) Road, Grading, Drainage and Utility Improvements
Project No. 93 -26
Dear Property Owner:
Notice is hereby given that the City Council will consider the feasibility report for Trunk
Highway 5 South Frontage Road (from Galpin'Boulevard/CSAH 19 to McGlynn Road) and
Galpin Boulevard (from Trunk Highway 5 to Timberwood Drive) Road, Grading, Drainage and
Utility Improvements, Project No. 93 -26 at then regular meeting on Monday, February 14, 1994
at 7:30 p.m. in the City Council Chambers located at City Hall, 690 Coulter Drive.
This project involves the construction of an east/west frontage road lying south of Trunk
Highway 5, the reconstruction of Galpin Boulevard/CSAH 19 and the installation of storm sewer,
sanitary sewer and watermain located in Section 15. A; portion of the said improvements are
proposed to be assessed to benefitting properties of the referenced roadway, drainage and utility
improvements. The cost of said improvements is estimated to be $3,500,000.00.
A copy of the project feasibility report is available for review in the Engineering Department at
City Hall Monday through Friday from 8:00 a.m. to 4:30 p.m.
NOTE Properties located in Timberwood, Estates ;am not proposed to be assessed for this
project. These properties are being notified for informational purposes only.
Sincerely,
CITY OF CHANHASSEN
Charles D. Folch, P.E.
Director of Public Works /City Engineer
CDF:ktm
g:\cng\hearing\frontage
7
u
25- 8520010
25- 8520020
25- 8520030
MITCI & MARY KRAUSE
JAMES L & LINDA J LEIRDAHL
MARK & JULIE TAINTOR
2380 TIMBERWOOD DR
2350 TIMMERWOOD DR
7481 SARATOGA DR
CHANHASSEN MN 55317
CHANHASSEN MN 55317
CHANHASSEN MN 55317
25- 8520040
25- 8520050
25- 8520060
, LAYTON & LINDA ZELLMAN
2290 TIMBERWOOD DR
CURTIS & JANICE OLSON
1961 130TH LN
GREGORY & JULIE MAANUM
6520 MISTRAL LANE
CHANHASSEN MN 55317
COON RAPIDS MN 55448
EDEN PRAIRIE MN 55346
1 25-8520070
25- 8520080
25- 8520090
MARK J FOSTER &
RICHARD D & MARY A FRASCH
DAVID GESTACH
S OLSSON
8000 ACORN LN
8001 ACORN LN
i KAREN
8020 ACORN LN
CHANHASSEN MN 55317
CHANHASSEN MN 55317
CHANHASSEN MN 55317
' 25- 8520100
25- 8520110
25- 8520120
RICHARD M CZECK &
JAMES R & DEBRA ANN LANO
STEPHEN D MCCURRY &
PATRICIA A FOLZ - CZECK
2060 OAKWOOD RDG
BRIDGET HAEFNER
8011 ACORN LN
CHANHASSEN MN 55317
16780 NORTH MANOR RD
CHANHASSEN MN 55317
EDEN PRAIRIE MN 55346
1 25-8520130
STACEY R RICKERT &
25- 8520149
ALVA BRUCE &
25- 8520150
JAMES L & COLLEEN C
MICHELLE M RHEAULT
KRISTINA JOHNSON
DOCKENDORF
2040 OAKWOOD RDG
2051 OAKWOOD RDG
2061 OAKWOOD RDG
' CHANHASSEN MN 55317
CHANHASSEN MN 55317
CHANHASSEN MN 55317
25- 8520160
25- 8520170
25- 8520180
M & JOANN E JANCIK
DAVID G & GAIL E MCCOLLUM
AGHA TAHIR M KHAN &
' JAMES
2050 TIMBERWOOD DR
2048 TIMBERWOOD DR
PATRICIA M KHAN
CHANHASSEN MN 55317
CHANHASSEN MN 55317
2040 RENAISSANCE CT
'25-
CHANHASSEN MN 55317
8520190
25- 8520200
25- 8520210
STANLEY E & CHRISTINE E RUD
ROBERT W & ROBERTA L LAWSON
GERARD E & BONNIE T
, 2030 RENAISSANCE CT
2041 RENAISSANCE CT
MURKOWSKI
CHANHASSEN MN 55317
CHANHASSEN MN 55317
2051 RENAISSANCE CT
CHANHASSEN MN 55317
'25- 8520220
25- 8520230
25- 8520240
CURTIS E & JEAN F BEUNING
ANDREW & SUSAN RICHARDSON
MARK A & NANCY E BIELSKI
2381 TIMBERWOOD DR
' CHANHASSEN MN 55317
8120 PINEWOOD CIR
CHANHASSEN MN 55317
8140 PINEWOOD CIR
CHANHASSEN MN 55317
t2 5-8520250
25- 8520260
25- 8520270
ICHARD & ELIZABETH
WILLIAM P & LANA L MILLER
JAMES J & BONITA J ROEDER
NYE LAWSON
8121 PINEWOOD CIR
8101 PINEWOOD CIR
PINEWOOD CIR
CHANHASSEN MN 55317
CHANHASSEN MN 55317
t 141
HANHASSEN MN 55317
25- 8520280
25- 8520290
25- 8520300
REGORY H & JILL K PERRILL
CRAIG & MARY HARRINGTON
GREGORY & B VANDERVORSTE
101 TIMBERWOOD DR
8140 MAPLEWOOD TER
8141 MAPLEWOOD TER
CHANHASSEN MN 55317
CHANHASSEN MN 55317
CHANHASSEN MN 55317
25- 8520310 25- 8520320
GREGORY G & JULIE K SORENSON DENNIS R & JEAN S ROLLINS
8121 MAPLEWOOD TER 2081 TIMBERWOOD DR
CHANHASSEN MN 55317 CHANHASSEN MN 55317
25- 8520340
BRADLEY J FOLEY &
JUDITH A WERNER
2061 TMBERWOOD DR
CHANHASSEN MN 55317
25- 8520350
ROBERT S & NANCY J KROCAK
2051 TIMBERWOOD DR
CHANHASSEN MN 55317
25- 8520370
RANDLE & TERESA CORFMAN
2031 TIMBERWOOD DR
CHANHASSEN MN 55317
25-4520010
MCGLYNN BAKERIES INC
C/O GRAND MET TAX DEPT
200 S 6TH ST MS: 1843
MINNEAPOLIS MN 55402
25 -0150300, 25- 0150400 & 25 -0151100
HI -WAY 5 PARTNERSHIP
C/O DENNIS DIRLAM
15241 CREEKSIDE CT
EDEN PRAIRIE MN 55344
25- 0151400
DALE F & MARCIA WANNINGER
8170 GALPIN BLVD
CHANHASSEN MN 55317
25- 8520380
CITY OF CHANHASSEN
25- 4520020 & 25- 4520030
SHAMROCK PROPERTY PARTNERS
ONE MCGLYNN DRIVE
CHANHASSEN MN 55317
25 -0150600
LAWRENCE & F RASER
8210 GALPIN BLVD
CHANHASSEN MN 55317
25- 8520330
JEFFREY G HEINZ &
JOAN M PADRNOS -HEINZ
2071 TIMBERWOOD DR ,
CHANHASSEN MN 55317
25- 8520360
DAVE J & KAREN K MAENKE
,
2041 TIMBERWOOD DR
CHANHASSEN MN 55317
25- 8520390 & 25- 8520400
RICHARD HARTUNG &
WALLACE OTTO
400 OAK ST S
WACONIA MN 55387
25 -0151700
BETTY O'SHAUGHNESSY
1000 HESSE FARM RD '
CHASKA MN 55318
25 -0151300 t
THOMAS & MARIAN SCHMITZ
8190 GALPIN BLVD
CHANHASSEN MN 55317
u
11
1
1
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
NOTICE OF PUBLIC HEARING FOR
TRUNK HIGHWAY 5 SOUTH FRONTAGE ROAD (FROM GALPIN BOULEVARD TO
' MCGLYNN ROAD) AND GALPIN BOULEVARD /CSAH 19 (FROM TRUNK HIGHWAY
5 TO TMMERWOOD DRIVE)ROAD, GRADING, DRAINAGE AND UTILITY
IMPROVEMENTS
' PROJECT NO. 93 -26
NOTICE IS HEREBY GIVEN that the Chanhassen City Council will meet in the City
Hall Council Chambers located at 690 Coulter Drive on Monday, February 14, 1994 at 7:30 p.m.
to consider the feasibility report for Trunk Highway 5 South Frontage Road (from Galpin
Boulevard/CSAH 19 to McGlynn Road) and Galpin Boulevard/CSAH 19 (from Trunk Highway
5 to Timberwood Drive), Protect No. 93 -26. This project involves the construction of an
t east/west frontage road lying south of Trunk Highway 5, the reconstruction of Galpin
Boulevard/CSAH 19 and the installation of storm sewer, sanitary sewer and watermain located
in Section 15. A portion of the said improvements are proposed to be assessed to the properties
benefitting from the referenced roadway and utility improvements. The cost of said
improvements is estimated to be $3,500,000.00.
' All interested persons may appear and be heard at said time ace.
Charles D. Folch, City Engineer