4.5 Award of Bids-1994 Street Repair ProgramMEMORANDUM
CITY OF q ' s
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
TO: Don Ashworth, City Manager
FROM: Charles Folch, Director of Public Works /City Engineer
DATE: June 23, 1994
SUBJ: Award of Bids for 1994 Street Repair Program
Project No. 94 -8
Aetion by CftY Administw w
Ibndors D WA
3-
bb SUbmtited to Commissbn
Dale Submitted to CoNtf
On Wednesday, June 22, 1994, bids were received and opened for the 1994 Street Repair
Program. A total of two bids were received with the low base bid being received from Allied
Blacktop Company at $138,557.50.
The bid package included two alternates for consideration. Alternate A consisted of substituting
the gray granite chips, which are currently used only on collector streets, for buckshot rock on
the entire project; however, due to the prices received, this alternative will not fit within budget
limitations. Alternate B consisted of sealcoating and bituminous overlay repair work to the
Kerber Boulevard trail. This work will be paid for through Park funds.
It is therefore recommended that the 1994 Street Repair Program Project No. 94 -8 be awarded
to Allied Blacktop Company with a base bid contract amount of $138,557.50 and the Alternate
B trail work at $7,804.
ktm
Attachment: Bid Tabulation
c: Dave Hempel, Assistant City Engineer
Bill Bement, Engineering Technician II
Mike Wegler, Street Superintendent
g : \ eng \ch ar I es\c c \sea 1c oat.94
CITY OF CHANHASSEN
1994 STREET REPAIR PROGRAM
EUPROVEMENT PROJECT NO. 94 -8
2:00 P.M., JUNE 22, 1994
BID TABULATION
CONTRACTOR
BASE BID
PRICE
ALTERNATE
A
ALTERNATE
B
BID
BOND
Allied Blacktop Company
$138,557.50
$54,796.00
$7,804.00
5%
Master Asphalt Company
Astech Asphalt Surface
Technologies Corp.
$143,613.50
$56,650.00
$7,967.60
5%
Commercial Asphalt
Wm. Mueller & Sons,
Inc.
Midwest Asphalt
Bituminous Roadways
Valley Paving, Inc.
L
7
7