2b. West 78th Street and Downtown Improvements: Change Order.1 y ab CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 ' MEMORANDUM TO: Don Ashworth, City Manager FROM: Charles Folch, Director of Public Works /City Engineer DATE: July 20, 1994 SUBJ: Approve Change Order No. 4 to West 78th Street and Downtown Improvement Project No. 92 -3 Anyone who has been around the City of Chanhassen for the past couple of years probably has noticed that this downtown improvement project is'earing completion. This project is rather sizeable with many elements to consider and details toaccomplish. As is common with a project of this size, there are typically some changes that need to be made in the field as the work is undertaken, due to circumstances that are not always evident at the time that the project plans are prepared in the office. In addition, there is always some fine- tuning work that must be done, particularly as it relates to traffic signal and electrical -type work. Change Order No. 4 to the West 78th Street and Downtown Improvement Project No. 92 -3, for the most part, represents fine- tuning type work. The basic elements f h Or r No. 4 follows: e b c e a is o C ange de are as fo ows. xw 2. In an effort to maintain the ability to provide Christmas lighting on the boulevard trees, ground fault (GFI) receptacles were inalled for all of the ornamental light pole bases in the median areas. However, in order to meet code requirements, junction boxes were also needed to be installed at each location so that splices could be made which would allow for a smaller conduit necessary to be able to fit into the light bases. 3. Some additional fine tuning included changing over two boulevard ornamental light poles 1 Don Ashworth July 20, 1994 Page 2 to the standard corten poles with shoebox luminaires to maintain consistency on West 78th Street from County Road 17 to Trunk Highway 101. An extra loop detector was added at the intersection of Laredo Drive and West 78th Street to provide better right turn actuation and clearing detection, and miscellaneous electrical work which tied together existing street lighting circuits and provided for conduit - installed wiring at appropriate locations where direct burial in the past has been a problem. 4. A modular block wall was required around the signal controller cabinet at the intersection of Laredo Drive to reduce slopes and improve the ability to maintain the boulevard area around the signal controller cabinet. Additional sidewalk installation is recommended on Great Plains Boulevard and Market Boulevard. The City is contracting with Twin Cities & Western Railroad to install the very much - needed grade crossing mats at the Great Plains Boulevard and Market Boulevard railroad crossings. These sidewalks are very important segments linking the downtown pedestrian and bike facilities to the Trunk Highway 5 and City corridor trail facilities. The walk /trail segments have always been a part of the downtown improvement plan; however, their installation on previous projects has been delayed until the crossings on the railroad could be accomplished. The coordinated and appropriate time to complete this work appears to be now. 6. At each of the newly installed traffic signals, many will notice a rather sizeable aluminum colored cabinet box which are called controllers. Similar size units are found at the railroad crossings on Market Boulevard, Great Plains Boulevard, West 78th Street and Trunk Highway 101 in the downtown area. Addition landscaping is proposed around these cabinets; however, for access and safety reasons they are not able to be fully screened. Therefore, it is proposed to paint these cabinets an earth tone green color. An itemized list for this change order is attached. The total amount of Change Order No. 4 is $36,294.00. This will yield a revised contract amount of $2,770,012.31. It is therefore recommended that the City Council approved Change Order No. 4 to the West 78th Street and Downtown Improvement Project No. 93 -2 in the amount of $36,294.00 yielding a revised contract amount of $2,770,012.31. ktm Attachments: 1. Change Order No. 4. 2. Letter from SRF dated July 21, 1994. gAeng\char1es \cc \change4 S F. 2 9 I WHEREAS: The City of Chanhassen desires the construction of concrete sidewalk on I the uimof cit4da of Market Boulevard from fkda am"+h entrance a of Market Square to T.H. 5, and; WHEREAS: The City of Chanhassen desires the railroad, signal and lighting control cabinets in the downtown area to be pointed "EZC-Green". THEREFORE: In accordance with the terms of the Contract, you are hereby authorized and instructed to furnish and install the EVP detectors and lights as shown on the attached drawings as well as the junction boxes for the ornamental lights and the miscellaneous electrical work. You are also authorized and instructed to construct the modular block wall at the Laredo Drive and West 78th Street Intersection, and the concrete sidewalk along the west side of Market Boulevard. In addition, you are hereby authorized and instructed to paint the railroad, signal and lighting control cabinets in the downtown area, Payment will be as itemized below: July 21, 1994 8RF No, 0921634 CHANGE ORDER NO. 4 City of Chanhassen 690 Coulter Drive P.O. Box 147 Chanhassen, Minnesota 55317 PROJECT: West 78th Street Chanhassen Project No. 92-3 S.A.P. No. 10-617-10 CONTRACTOR: C.S. McCrossan Construction, Inc. Maple Grove, Minnesota WHEREAS: The City of Chanhassen desires the installation of EVP detectors and lights at the intersection of Laredo Drive with West 78th Street for the Market Boulevard westbound approach, and; WHEREAS: The City of Chanhassen desires to have junction boxes installed at the base of each ornamental light on West 78th Street, as well as some miscellaneous electrical work performed, and; WHEREAS; The City of Chanhassen desires the construction of a small modular block retaining wall near the signal service cabinet, controller cabinet and lighting service cabinet at the Lardeo Drive and West 78th Street intersection, and; WHEREAS: The City of Chanhassen desires the construction of concrete sidewalk on I the uimof cit4da of Market Boulevard from fkda am"+h entrance a of Market Square to T.H. 5, and; WHEREAS: The City of Chanhassen desires the railroad, signal and lighting control cabinets in the downtown area to be pointed "EZC-Green". THEREFORE: In accordance with the terms of the Contract, you are hereby authorized and instructed to furnish and install the EVP detectors and lights as shown on the attached drawings as well as the junction boxes for the ornamental lights and the miscellaneous electrical work. You are also authorized and instructed to construct the modular block wall at the Laredo Drive and West 78th Street Intersection, and the concrete sidewalk along the west side of Market Boulevard. In addition, you are hereby authorized and instructed to paint the railroad, signal and lighting control cabinets in the downtown area, Payment will be as itemized below: NO. 4 72 -1 CHANGE ORDER NO.4 Page 2 Unit Item No. Item 1 -Qty-. Pry Total Price 0565.604 Revise Signal Systems Lump Sum 1 $ 2,307.24 $ 2,307.24 E&F 0545.602 Ornamental Lighting Each 40 $ 381.08 $ 15,243.20 Junction Box 0545.601 Miscellaneous Electrical Lump Sum 1 $10,265.76 $ 10,265.76 Work 0412.604 Modular Block Wall Sq. Ft. 75 $ 25.00 $ 1,875.00 2476.503 Paint Railroad Control Each 2 $ 256.20 $ 512.40 Cabinets 2476.503 Paint Signal/Lighting Each 8 $ 74.55 $ 596.40 Control Cabinets 2521.501 4" Concrete Walk Sq. Ft. 4,100 $ 1.34 $ 5,494.00 TOTAL INCREASE IN CONTRACT AMOUNT (CHANGE ORDER NO. 4) $ 36,294.00 PREVIOUS INCREASES IN CONTRACT AMOUNT $ 110,569.83 ORIGINAL CONTRACT AMOUNT $ 2,623,148.48 REVISED CONTRACT AMOUNT $ 2,770,012.31 ISSUED: STRGAR- ROSCOE- FAUSCH, INC. DATE C.S. McCROSSAN CONSTRUCTION, INC. DATE APPROVED: CITY OF CHANHASSEN DATE CITY OF CHANHASSEN DATE SRF STRGAR- ROSCOE- FAUSCH r INC. CONSULTING ENGINEERS & PLANNERS TRANSPORTAWN r CIVIL ■ STRUCTURAL • ENNIRONWWAL ■ PARKING SRF No. 0921635 ' MEMORANDUM TO: Charles Folch, P.E. City of Chanhassen ' FROM: David Juliff pa.f Engineer ' DATE: July 21, 1994 SUBJECT: WEST 78TH STREET , CITY PROJECT NO. 213 CHANGE ORDER NO.4 ' As requested, we have drafted Change Order No, 4. Explanations for various items included in Change Order No, 4 are as follows: • The signal systems revisions (Revise Signal Systems E and F) are at Laredo and Market Boulevard. It was discovered (after installation) that for emergency vehicles heading south on Laredo to West 78th Street, and then west to Market, there is ' insufficient time to activate the EVP at Market Boulevard, These revisions tie the two signal systems together, so that when the Laredo/West 78th Street EVP is activated, the EVP at Market Boulevard/West 78th Street is activated as well. ' • The reason for the ornamental lighting junction boxes is that with the added conduit (for Christmas lighting), the conduit would not fit through the base of the existing , ornamental lights. Hence, the junction boxes were added so that splices could be made in the conduit and only the conduit necessary for the operation of the individual light would be required to fit through the light base. ' • The "Miscellaneous Electrical Work" is wiring, etc. that Egan -McKay employees ' were contacted by City staff to do. Copies of the invoices are attached for your records, The modular block wall 75 square feet) was used to improve the slope t { 9 A p e around the signal controller cabinet at Laredo Drive and West 78th Street as requested. 1 Suite 150, One Carlson Parkway North, Minneapolis, Minnesota 55447 -4445 3 Charles Folch F i• 11 E�24...t r .. -2- July 21, 1994 • The items "Paint Railroad Control Cabinets' and "Paint Signal/Lighting Control Cabinets" are for the painting of all railroad /signal/lighting cabinets in town in order to improve their aesthetics. • The item "4 Inch Concrete Walk' is for the sidewalk along Market Boulevard between West 78th Street and T.H. 5 which will connect the downtown area with T. H. 5. Please feel free to contact us if you have any questions regarding this matter. DJJ /jal