TO: Don Ashworth, City Manager
FROM: Charles Folch, Director of Public Works /City Engineer
DATE: July 19, 1994
SUBJ: Approve Plans and Specifications for Upper Bluff Creek, Phase IIB Trunk Utilities;
Authorize Advertising for Bids
Project No. 91 -17B -2
The project plans and specifications for 1
Improvement Project No. 91 -17B -2 have be
Associates. This is the second stage of the
The overall project staging has been coordiq
development in the Upper Bluff Creek sere
needs.
TpWr Bluff Creek, Phase IIB Trunk Utility ,� ►
>rep4pd by the project consultant, Bonestroo & Iq 1�
:vio4y ordered Phase II improvement project.
I to be"""-, mpatible and consistent with continued
area aj*d meet the overall infrastructure system
This project involves the installationftrunk watermain a*g Galpin Boulevard from its current
terminus near the city cemetery, in ;ediately south of Timbi "wood Drive, and extend north under
State Trunk Highway 5 connecting to an existing 20 -inch tank watermain located south of the
Windmill Run Addition omT- installation of this trunk watain segment will fulfill the final
WS
link in providing looped water service into the Bluff Creek Vea. This is an important step in
meeting the consume e s . mproving overall water quality.
This project wild alsclude a bid alternate for extendmgW watemairi'rom in Boulevard
along the proposed South F
ki mgjoad right -of -way to serve the schoot ��� is alternate also
includes installation of a smal lift st.�a d id ecessary to service the
school site on an interim basis from Galpin ule�rd the impetus for this alternate is based
on previous contract commitments made withltiechool district in terms when sewer and water
would be available the building and recent de ° !,$ in development plans for the properties along
Bluff Creek east of Timberwood through which the permanent trunk sewer facility will be
constructed next year. If the trunk sanitary sewer associated with the South Frontage Road
Project No. 93 -26 continues to experience delays, it may be recommended in the near future that
the bid alternate work be included with this project (No. 91- 17B -2).
1
MEMORANDUM
Don Ashworth
July 19, 1994
Page 2
A copy of the project plans and specifications are available in my office for review. Due to their
size, they are difficult to include in the Council packets. The current estimate of costs for this
project is $463,000 which includes $48,000 for the bid alternate. The current project schedule
anticipates construction to begin late summer and be substantially completed by late fall.
It is therefore recommended that the City Council approve the plans and specifications for the
Upper Bluff Creek, Phase IIB Trunk Utility Improvement Project No. 91 -17B -2 dated July 11,
1994 and that authorization be given to advertise for project bids.
ems
Attachments: 1. Letter from Phil Gravel dated July 18, 1994.
2. Title Sheet.
3. Location map.
c: Dave Hempel, Assistant City Engineer
Jerry Boucher, Utility Superintendent
Phil Gravel, Bonestroo & Associates
g Aeng \charles \cc \upper. iib
0 al-i76 -Z
Otto G. Bonestroo, RE. Howard A. Sanford. P.E. Agnes M. Ring, A.I.C.P. L. Phillip Gravel. P.E.
Robert W. Rosene. RE.* Keith A. Gordon. P.E. Thomas W. Peterson, P.E. Karen L. Wiemeri. P.E
Bonestroo Joseph C. Anderlik, P.E. Robert R. Pfefferle. P.E. Michael C. Lynch. P.E. Gary D. Kristofitz, P.E.
R. Malad, P.E. F Todd Foster, P.E.
Rosene Marvin L. Sorvala, FE. Richard W. Foster. P.E. James
Richard E. Turner, P.E. David O. Loskota. P.E. Jerry D. Pertzsch. P.E. Keith R. Yapp. P.E.
y Anderlik & Glenn Thomas E. Cook,
oyes, RE. Jerry AC Bourdon, RE. Kenneth P Anderson, P.E. Shawn D. Gustafson. RE.
Robert G. Schunicht, P.E. Mark A. Hanson, P. E. Mark R. Rolls, P.E. Cecilio Olivier. P.E.
A ssociates Susan M. Eberlin, C.P.A. Michael T Rautmann. P.E. Mark A. Seip, P.E. Paul G. Heuer, P.E.
*Senior Consultant Ted K. Field. P.E. Gary W. Morien. P.E. John P Gorder. P.E.
Tomas R. Anderson, A.I.A. Paul J. Gannon. A.I.A. Charles A. Erickson -
Engineers & Architects Donald C. Burgardt, P.E. Daniel J. Edgerton, P.E. Leo M. Pawelsky
Tomas A. Syfko, P.E. A. Rick Schmidt, P.E. Harlan M. Olson
Frederic J. Stenborg. P.E. Philip J. Caswell, P.E. James F Engelhardt
,
Ismael Martinez, P.E. Mark D. Wallis, P.E.
July 18, 1994 Michael P. Rau, P.E. Miles B. Jensen. P.E.
t
Mr. Charles Folch
City of Chanhassen
690 Coulter Dr. CITY 0 L
'
P.O. Box 147
Chanhassen, MN 55317
JUL
JUL i " 1994
Re: Upper Bluff Creek District -Phase 2B
Trunk Utility Improvements
City Project 91 -17B ENC UR DEPT,
Our File No. 39311B
Dear Charles:
'
Attached for your approval are final plans and specifications for the next phase in the Upper Bluff
Creek district improvements. This project will extend gravity sanitary sewer northward from the lift
station near the cemetery on Galpin Boulevard. The project will also place watermain along Galpin
Boulevard between the cemetery and the Windmill Run Addition (Rottlund) north of Highway 5.
An alternate bid is included in the plans to provide a temporary sanitary sewer lift station at the
'
school site. This lift station and an accompanying force main could provide sanitary sewer service
to the school until the trunk gravity sewer along Bluff Creek is able to be constructed.
'
on the O'Shau ness or Gateway West OPUS
The plans do not include any improvements gh y y ( )
property west of Galpin Boulevard. Provisions will be made for future construction through those
properties once they have completed their development plans and decisions on the frontage
road /wetlands are made.
The plans have been designed to conform with the proposed reconstruction of Highway 5 and Galpin '
Boulevard. This will require that the water main crossing under Highway 5 be overburied
approximately 8 feet to facilitate the future highway grade.
The City Attorney is supposed to be working on the easements for the project. Permits will be
required from MnDot, The Department of Health, Carver County, and the MPCA. We will
complete the necessary permit applications. ,
Feel free to contact me if we can be of any further assistance.
Sincerely, I
BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. '
PU 4UIVA
Phil Gravel
2335 West Highway 36 • St. Paul, MN 55113 • 612 -636 -4600 ,
_ war -low
PLAN MMBOL
COLN" LINE --------
SECTION UK - -
- - --
Oula R LBE --- --
--- - - - - --
sMIEENIN LINE .._...-----------•--
RIONT -OF -WAY —
— — —
PRESEM RIONT -W -WAY -- --
------ —
CONTROL OP ACCESS LINE -- .-
- - -. --
PROPENY LINES
REUIHNC WALL
RALROM
FIENCE
CENIOIRI E OR 9AS8J IE --
- -. —._
1ELPORNY EASEMENT LINE
PERNYIENT EASEMENT LINE — H[
—
TREE
0 .
SIMIIW
0 k
W ILITY sYMBOLB
P6wERMLITY POLE
0
ANCHOR WIRE
STREET LIONT
NINNIOLE
>RAc 1c
TIUFFF1C WON
TOMMONE MANHOLE
m
SMRfMr BYICR MM04M
smm SEWER MWIOLE
CA" am
D
GTE VRWE
»
NrDRANr
e
WRTU LINE —.—
SEW
—..—
srom Sm" —.—
WARTED ELECTRIC —
—.—
-[ - —
PAW GAS
WORM
TELEPNOLK
SINNED CHILE TY -
-
.ea, --
'.. SILT FENCE
APP'A01WD: DAR: 7 L
aTr or a
1994 COUNCIL
DONALD CHMIEL ...............MAYOR
COLLEEN DOCKENDORF...COUNCIL MEMBER
MICHAEL MASON........ COUNCIL MEMBER
MARK SENN ............ COUNCIL MEMBER
RICHARD WINO ......... COUNCIL MEMBER
DON ASHWORTH .............. MANAGER
CHARLES FOLCH ..............ENGINEER
mxx
1 COVER SWEET
Z LOCATION PLANAETALS
3 SANITARY SEWER AM WATER MAN
4 SANITARY SEWER AND WATER MAN
5 WATER MAN
6 WATER MAIN
7 CROSS SECTIONS - 76+00 to 66 +00
6 CROSS SECTIONS - 65+00 1 106400
9 CROSS SECTIONS - 107 +00 to 116x00
10 LIFT STATION (ALTERNATE)
NDR: /M6 PLM 0"ATH7 A MAL Q 10 OMM
RED aPEM1T10
16 AUGUST 1604 1:30 AM. C.D.S.T.
C .6
N
V) N ` pp
w 2
Z a , t
a�
W
W
V)
m
K
W a
a
U �
CITY of
MANHASSEN
UPPER BLUFF CREEK PHASE 2B
SANITARY SEWER AND WATER MAIN
CITY PROJECT NO. 91-1713-2
END CONSTRUCTION 118+5
c..rw
4ege. swa �i - i
mRn � t o«N
' ♦i I9n dfNrMM a1 TIpF
PIPE FOUNDATION. k BEDDING IN POOR SOILS
DFSIGN SPECIAL
BEDDING METHODS
FOR PVC PIPE
Cemp.gM 9.cMM
Ir
limq.r D.nee
MJ}DT
6
rt e�e ee1NM ',.
QFSI •N SP ECIAL
0M
BEDDING METHODS NDIE: PROLE T 9 ;X'
DP IN ROADWAY SECTION ROAD 511ML HAVE
IRIS BEOOWO
.. .......................................................... ...............................
R.t..me.JeI 7 -m UtP hMy (Pe1 SnW M 0..
Sum) aq MWM Np Wko b Poet.
�� M+efl IODIC. F -
e NOYe H V s-z
W. Dpm
0 019 a r- Tr« ® Ley N Febb ! @wMM
EMfCN_w_ COH/ROL
SIw Fens. P W FENCE _ TYPE 1
enw
3 t wrW b
1WperL 1neR FelMe
Teo reDOn biMn 11v.u9n Hale.
/.5' b D.V Nb tM prowM.
Y.Me m b eW K Mme
v.J. elM .i:e m ..e. r.a..
EROSION COHIiR111 II.eDepl90 ftdh
e
FEA1rs -TYPE ]
SbM Fame Potts
e11.11 M
s u b
.pP«L sn.. ENE.
SIN Fenn Teo rel mr«Nn
1 neN
3' b 2.0' IMO 1M y.ulM.
B.Me b W receeeeJ E bbe
::: `•• pees ono wiN 1. e.oe lercw '.
EROS" CONTROr Marl - � a� d � e
FENCE _ TYPE
DESIGN SPECIAL
SILT FENCE
1
c.r.p..f.a BxM1Nl
D.SgF•, C— Fig« AJ9re9.b
�
• ^ ANDOT Sl— 31.9. LmW.
• WAD FA W 1.9
♦1 Mln. .CLA B BEOpNG
AeJJirN mebriel e•Sa.r .
i
.�' �COrrlPe.lN 9%.IN
LOAD FACTOR 1.5
1 CLASS C -1 BEDDING
- 11prlW en.ped from /lrm
- rnaw.rA.W .09
.�.4'"°
ll l AN Pw m 1— pea al Iws,q unMw ouN.w row.
DESIGN SPECIAL
BEDDING METHODS FOR NOTE: FOR PROJECT
RCP IN ALL SECTIONS OR 91- 178.1Q'A20"01P
UAL NM.E CLASS
DIP OUTSIDE OF ROADWAY SECTIONS C -1 SED006C
................................................... .................................................. .............................:. _........
Mk*.— 2J ♦ ft ♦ lr
•� 6 oi� F zY'�RV .iN . fovM.Den bitM.ee a
24 Is. •SJOI q S.1l— a tram. edwJ
M TProe. M NtnM rI.
Pymenl 1« n W pipe 16.1-W W M ft 11—
loot el WW p« pl M irrcr F« e.«.pN J ADD G I
plate. q S. NcIRO bNk pyTrRnl eogJ
a a w Md .nR pnc. r« .00 r «1.
DESIGN SPECIAL
IMPROVED PIPE FOUNDATION
FOR RCP or DIP