1d. Accept Public Utility Improvements in Shadow RidgeCITY OF - l ek.
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
ktkm by City MminlstraW
MEMORANDUM 6ldnr4sd_ 17 W kWh
TO: Charles Folch, Director of Public Works /City Engineer
10 Mbmitted to Commission
FROM: Dave Hempel, Assistant City Engineer
19 Submitted to Council
DATE: February 21, 1995
SUBJ: Accept Utility Improvements in Shadow Ridge
Project No. 94 -15
Staff has received a letter from Mr. Gerald B
Inc., requesting the City consider acceptance
referenced project. According to r. Bac
completed in accordance with the ap
bituminous asphalt. The public utility i i
Project Engineer with Schoell & Madson,
)ublic utility improvements in the above-
► public utility improvements have been
specifications including the first lift of,
ave been tested and approved by City
1
L
n
r
staff. Staff has performed a walk -throu inspection o he project and found that some minor
adjustments are required by the contr r. The streets 11 be considered for acceptance upon
completion of the final wear course reets) in 1995.
c: Bill Coffman, Coffman Development
g.\eng Wave \pmjects\shadow \utility.cc
OFFICIAL ENGINEERING COPY
Received
Revision No.
Approved by.0fty Engineer
Approved by City Counoil
Date
SCHOELL &► MAOSON, INC.
ENGINEERS • SURVEYORS • PLANNERS
SOIL TESTING • ENVIRONMENTAL SERVICES
10580 WAYZATA BOULEVARD • SUITE 1 • MINNETONKA, MN 55305 -1525
06123 846.7601 • FAX L6123 846 -90615
February 6, 1995
Mr. Dave Hempel
City of Chanhassen
690 Coulter Drive
PO Box 147
Chanhassen, MN 55317
Subject: Shadow Ridge
Chanhassen, MN
Dear Mr. Hempel:
We verify that all public improvements in Shadow Ridge are completed
and are in compliance with the approved plans and specifications,
with the exception of the bituminous wear course which will be completed
during the 1995 construction season. Therefore we would like to request that
the City of Chanhassen accept the utility portion of this project for
ownership and maintenance.
Our basis for this verification is having provided construction staking
and part -time observation of the construction work.
Thank you for your cooperation.
Very truly yours,
SCHOELL & MADSON, INC.
Gerald L. Backman �.
GLB /sks
cc: Bill Bement - City of Chanhassen
Bill Coffman - Coffman Development
Mark Coffman - M.S. Coffman Construction Co.