1e. High Zone Water Tower Project: Approve Change Order #10 CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Paul Oehme, Director of Public Works /City Engineer DATE: October 10, 2011 P M, SUBJ: High Zone Water Tower Construction Project No. 08 -03: Approve Change Order #1 PROPOSED MOTION "Approve Change Order #1 for the High Zone Water Tower Construction Project No. 08 -03 in a deduct amount of $37,707.00." City Council approval requires a simple majority vote of the City Council present. BACKGROUND On July 11, 2011, Council approved the plans and specifications and authorized advertising for bids. Council also approved an agreement for purchase of easements with School District 276 for permanent utility, temporary construction and future access needs for the new water tower. On August 4, 2011, the Minnetonka School Board approved an easement agreement for constructing the water tower on the southwest corner of the Minnetonka Middle School West campus. On August 22, 2011, Council accepted the bids and awarded the construction contract to CB &I, Inc. DISCUSSION Staff has reviewed ways to reduce the total cost of this construction project. The proposed change order would switch pipe materials on the project to more cost competitive materials. The products specified were very high quality materials however staff feels the proposed material replacements will have acceptable perform and have an acceptable life expectancy. Also, to access the cellular provider mezzanine staff is proposing to switch out the stairs to a ladder access. The cost breakdown of the proposed change order is as follows: Replace 205 LF of 18 -inch HDPE watermain with 18 -inch PVC C900 DR18. Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Todd Gerhardt High Zone Water Tower Project — Approve Change Order #i October 10, 2011 Page 2 Replace 204 LF of 14 -inch HDPE storm sewer pipe with 15 -inch RCP CL 5 Gasketed joint pipe. Replace 55 LF of 24 -inch HDPE storm sewer pipe with 24 -inch RCP CL 5 Gasketed joint pipe. Replace stairs for mezzanine access with ladder and safety climb system per spec. Reduce the size of the mezzanine access enclosure to two sides 10'x10'. Other deduct changes have been identified during the priming and painting operation however these changes are dependent on weather conditions and other factors during construction. Staff will be reviewing these potential deducts during the construction process. g: \eng \public \_2011 projects \11 -03 -high zone tower project \bkgd appv col 101011.doc