1g. Consider Granting Extension to Byerly's Interim Use Permit Project 93-2F C ITY O
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
Asti, by City AdminttNa
MEMORANDUM Er
TO: Charles Folch, City Engineer/Director of Public Works
FROM: Dave Hempel, Assistant City Engineer �`(��� .,.... t� C r•;�asiort
DATE: December 6, 1994
SUBJ: Consider Granting Extension to Byerly's Interim Use Permit No. 93 -2
Attached is a letter dated November 15, 1994
to the interim use permit /grading permit for the
not commence on schedule. In addition, the
problem on the hillside which required extens
expired on November 15, 1994. The remaiiiin'l
able to be completed by July 1, 1995. Saf
applicant and extension to Interim Use .rm
conditioned upon the applicant extendinn` t n
ktm
Attachments: 1
2
c: Charlie J
g: \eng \dav a \cc \byerlys
Mr. Charlie James requesting an extension
ly's project. Apparently the site grading did
;ant has encountered a severe groundwater
ran tile. The interim use permit for this site
�i g work is relatively minor and should be
emends that the City Council grant the
tdig Permit No. 93 -2 until July 1, 1995
ary�ecurity requirements to July 31, 1995.
Letter frotri'`Charlie James dated Nov anber 15, 1994.
a"
Locatori map.
UFFICIAL ENGINEERING COPY
Received
Revision No.
Approve City Engineer
Date Z,6—
Approved by City Council
Date
� I
4e:r� r)
MF
MIES
_4 '3z` z
November 15, 1994
1
Mr. Dave Hempel
1 Asst. City Engineer
Box 147
Chanhassen, MN. 55317
7
J
Re: Byerly's West Village Center
Lear Mr. Hempel:
By this letter I am requesting
issued for the above mentioned
not commence on schedule and t;
schedule.
We are currently resolving two
course of this project.
�+ +i65irS95 Q.A„4y =�
�['
an extension of the grading permit
project. As you know, grading did
herefore will not be completed on
issues that have arisen in the
1. We have a mutual agreement with Dean Johnson to reduce the
1 grades on our respective parcels to eliminate the need for
retaining walls. Both of our original plans contemplated site
measured retaining walls once the rough grading was complete. We
1 are presently cutting the slope wherever possible to a 3:1 grade.
Northwest has approximately three more days of work on the common
slope between the townhomes and Byerly's.
1 We have hired Kahnke Bros. to hydromulch the slope as soon as
Northwest is finished.
1 2. We have drain -tiled the entire length of the hill behind
Byerk -' because of a unexpected. This spring has
saturated the soils and we have been unable to complete the
1 grading. After the drain tile was installed, it was determined
that additional tiling would be required. We have been awaiting
the consultation of the testing agency and the engineers before
finishing the slope. At the weekly jobsite meeting this morning,
1 we arrived at a plan of action. We will install an additional
line of draintile with pitwashed rock and tie into the lines
previously constructed.
1 Thank you for your patient understanding.
Si e
f
u�. f
Charles Wm. Jame
1
ATTACHMENT 1
1 T. F. James Company P.O. Box 24137 Minneapolis Minnesota 55424 (612) 828 -9000
REAL ESTATE DEVELOPMENT
f
PROJECT LOCATE;
wa
N
Wu
EI
ram
7vir '71
MV-11 _ POW;
I - Poll it
maw
r[.f
_Q
a3 �`, .� 1 11111 �1�11 1111111
■ wu� uu:
Li
nn
► fit, � �� : � � r,
L I
w
Von
G ATTACHMENT 90