1g. Consider Granting Extension to Byerly's Interim Use Permit Project 93-2F C ITY O CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 Asti, by City AdminttNa MEMORANDUM Er TO: Charles Folch, City Engineer/Director of Public Works FROM: Dave Hempel, Assistant City Engineer �`(��� .,.... t� C r•;�asiort DATE: December 6, 1994 SUBJ: Consider Granting Extension to Byerly's Interim Use Permit No. 93 -2 Attached is a letter dated November 15, 1994 to the interim use permit /grading permit for the not commence on schedule. In addition, the problem on the hillside which required extens expired on November 15, 1994. The remaiiiin'l able to be completed by July 1, 1995. Saf applicant and extension to Interim Use .rm conditioned upon the applicant extendinn` t n ktm Attachments: 1 2 c: Charlie J g: \eng \dav a \cc \byerlys Mr. Charlie James requesting an extension ly's project. Apparently the site grading did ;ant has encountered a severe groundwater ran tile. The interim use permit for this site �i g work is relatively minor and should be emends that the City Council grant the tdig Permit No. 93 -2 until July 1, 1995 ary�ecurity requirements to July 31, 1995. Letter frotri'`Charlie James dated Nov anber 15, 1994. a" Locatori map. UFFICIAL ENGINEERING COPY Received Revision No. Approve City Engineer Date Z,6— Approved by City Council Date � I 4e:r� r) MF MIES _4 '3z` z November 15, 1994 1 Mr. Dave Hempel 1 Asst. City Engineer Box 147 Chanhassen, MN. 55317 7 J Re: Byerly's West Village Center Lear Mr. Hempel: By this letter I am requesting issued for the above mentioned not commence on schedule and t; schedule. We are currently resolving two course of this project. �+ +i65irS95 Q.A„4y =� �[' an extension of the grading permit project. As you know, grading did herefore will not be completed on issues that have arisen in the 1. We have a mutual agreement with Dean Johnson to reduce the 1 grades on our respective parcels to eliminate the need for retaining walls. Both of our original plans contemplated site measured retaining walls once the rough grading was complete. We 1 are presently cutting the slope wherever possible to a 3:1 grade. Northwest has approximately three more days of work on the common slope between the townhomes and Byerly's. 1 We have hired Kahnke Bros. to hydromulch the slope as soon as Northwest is finished. 1 2. We have drain -tiled the entire length of the hill behind Byerk -' because of a unexpected. This spring has saturated the soils and we have been unable to complete the 1 grading. After the drain tile was installed, it was determined that additional tiling would be required. We have been awaiting the consultation of the testing agency and the engineers before finishing the slope. At the weekly jobsite meeting this morning, 1 we arrived at a plan of action. We will install an additional line of draintile with pitwashed rock and tie into the lines previously constructed. 1 Thank you for your patient understanding. Si e f u�. f Charles Wm. Jame 1 ATTACHMENT 1 1 T. F. James Company P.O. Box 24137 Minneapolis Minnesota 55424 (612) 828 -9000 REAL ESTATE DEVELOPMENT f PROJECT LOCATE; wa N Wu EI ram 7vir '71 MV-11 _ POW; I - Poll it maw r[.f _Q a3 �`, .� 1 11111 �1�11 1111111 ■ wu� uu: Li nn ► fit, � �� : � � r, L I w Von G ATTACHMENT 90