1j. Approve Contract Amendment No. 1 for the 1994 Sanitary Sewer Rehabilitation Program Project 94-9CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: Don Ashworth, City Manager FROM: Charles Folch, Director of Public Works /City Engineer DATE: December 5, 1994 Arti ^r, p,- Cly Administrator Dr`... • ,o Cot" IZ ,, r, I SUBJ: Approve Contract Amendment No. 1 for the 1994 Sanitary Sewer Rehabilitation Program - Project No. 94 -9 ' The Council may recall from the September Vii, 1994 meeting that very favorable bids were received for this year's sanitary sewer rehabilition program. In fact, the awarded contract was ' more than $60,000 below the engineer's estimate and,, budgetary amount for this year. During staffs presentation for the award of bids, it was mdicatsd that due to the favorable bidding it may be prudent to investigate the opportunity to:expand the scope of this project to make efficient use e" of dollars. Staff and the project engm�er have reviewed the televising tapes produced this summer and are recommending additional sewer line and manhole sealing. This change order proposes to clean and seal an additiq tral 1,700 lineal feet "bf main line. The total amount of this ' contract amendment is $14,404.50' In addition, it is proposed that a time extension be added to the project completion schedule.Tbr these added work iteni Adding this contract amendment to the original contract would s4i11 total nearly $50,000 below original estimate and budgetary ' amount for this year's project It is therefore re mmended that: Ff W , pprow Contract Amendment No. 1 to the ' 1994 Sanitary Sewer: =Rehabilitation Program in the amount of $14,404 0 y Waing a revised contract amount of $103,762.59 , addition, the completion date e °project is therefore extended to December 23, 1994, Project No '94-9 ktm ' Attachment: Contract Amendment No. 1 ' c: Dave Hempel, Assistant City Engineer Jerry Boucher, Utility Superintendent Jon Horn, BRW ' Greg Brown, BRW g: \eng\char1es \cc \94reh ab. co ,ti, r- CITY OF CHANHASSEN City Cu"" L. Contractor Copy CONTRACT AMENDMENT Inspector Copy CITY Of CHANIIASKI Project: 1994 Sanitary Sewer Rehabilitation Program pMOTH City Project Number: 94-9 Amendment Number 1 (One) DEC 0 6 1994 Date: November 30, 1994 Contractor: Visu -Sewer Clean & Seal, Inc. ENGINEERING DEPT. The additions, revisions and corrections contained herein shall be made to the contract documents for the project and shall become a part of the Scope of Work. Description of Changes: A. The Contractor will perform additional work as recommended by BRW, Inc. and approved by City staff to rehabilitate additional segments of existing sanitary sewer within the city. The Contractor televised additional portions of existing sanitary sewer as a part of the contract. BRW has reviewed the videotapes depicting the existing sewer conditions and has recommended that rehabilitation work be performed for some of the additional sanitary sewer segments as detailed below. The additional sanitary sewer rehabilitation work has resulted in an increase in the contract quantities for a number of existing bid items as follows: BID SCHEDULE A - SEWER REHABILITATION Seq. No./ Mn /DOT No. Item Unit Unit Price Original Contract Quantity Quantity Increase/ (Decrease) Amount Add/ (Deduct) I/ Sewer Main 0503.603 Cleaning LF $1.05 3,325 1,700 $1,785.00 2/ Sanitary Sewer 0503.603 Joint Test EA $19.50 525 290 $5,655.00 3/ Sanitary Sewer 0503.603 Joint Seal GAL $5.75 350 250 $1,437.50 4/ Manhole Sealing 0506.602 Chemical GAL $12.00 300.00 400 $0800.00 7/ Televise 0503.603 Sewer Line LF $0.34 2,476 800 $272.00 10/ Furnish and Install 0506.603 Manhole Steps EA $35.00 70 13 $455.00 Net Contract Change Add $1450 CA1 -1 B. A contract time extension is granted for the project as a result of the additional work detailed above. The original contract for the project included a completion date November 18, 1994. A contract time extension of thirty -five (35) calendar days is granted for the additional work. The revised project completion date is, therefore, December 23, 1994. SUMMARY a Current Contract Amount $88,758.09 Item A Net Add $14,404.50 Contract Amendment No. 1 Add: $14,404.50 Amended Contract Amount: $103,162.59 APPROVALS RECOMMENDED BY: BRW, Inc. BY: itle Project Manager r Dat ACCEPTED BY: Visu -Sewer Clean & Seal, Inc. BY r,/ 5& - Title Date APPROVED BY: City of Chanhassen BY: Title City Engineer Date CA1 -2