Administrative SectionADMINISTRATIVE SECTION
I Letter from Governor Carlson dated February 22, 1995.
Letter to Roger Gustafson, Carver County Engineer dated February 23, 1995.
Letter from Roger Gustafson, Carver County Engineer dated February 3, 1995.
Letter to Dean Schmieg dated February 24, 1995.
' Memo from Bob Generous re: Housing Types dated March 6, 1995.
Carver County HRA Agenda.
' Letter from Brian Grogan, Moss & Barnett re: Cable Communications Update dated
March 1, 1995.
' Final copy of Resolution Establishing Procedures for Filling Commission Appointments dated
February 27, 1995.
Letter to Kit ty Sitter and Fran Hile dated March 6, 1995.
' Correspondence to and from Craig Edwards, National Weather Service.
Note from Rod Grams dated January 28, 1995.
Memo from Richard Wing dated March 3, 1995.
' Memo from Charles Folch dated March 1, 1995.
' Thank you note to Todd Gerhardt dated March 1, 1995.
Status Report, Engineering Projects dated February 28, 1995.
Letter from Municipal Legislative Commission dated February 20, 1995.
' Memo from Steve Kirchman dated March 4, 1995.
Memo from Diane Desotelle re: SWMP Update dated March 7, 1995.
Letter to Bruce Johnson dated March 8, 1995.
STATE OF ZNIIXXESOTA
OFFICE OF THE GOVERNOR
SAIx - r PAUL 55155
612 - 296-3391
ARNE H. CARLSON
Govsxxo$
February 22, 1995
The Honorable Don Chmiel
City of Chanhassen
P.O. Box 147
Chanhassen, MN 55317 -0147
Dear Mayor Chmiel:
I write to inform you that I will present my supplemental budget message next
Tuesday, February 28, to explain why this revised budget is so necessary and
important, and to ask for your help in putting Minnesota's fiscal house in
order.
A supplemental budget is required for three simple, overriding reasons. First,
the U.S. Congress is moving dramatically to reshape the size and scope of the
federal government, with large fiscal implications for Minnesota. Already, the
House has passed the Balanced Budget Amendment to the U.S. Constitution
and the Senate is expected to follow suit soon. Within weeks, federal
lawmakers will present detailed budget packages, outlining cuts in federal aid
to the states, including Minnesota. These cuts will not be timid. We
anticipate reductions of several hundred million dollars per year. Simply put,
a new day has arrived in Washington, D.C. and Minnesota must act now to
meet the new challenge and to seize the new opportunity.
Second, these federal cutbacks are coming on top of a structural problem in
Minnesota's long -term budget, which alone threatens to create a $850 million
gap between revenues and expenditures by the next biennium. As my
Administration outlined in the January 1995 report "Within Our Means," this
gap is created by several key cost drivers, including 1) more children and
elderly 2) generous eligibility requirements for social services, long -term health
1 and nursing home care 3) expensive standards and mandates, particularly in
education and corrections, 4) the high cost of public employee benefits, and 5)
mounting infrastructure needs, especially for school repair and prison space.
The daunting size of this structural gap and our challenge is summarized. well
in the attached opinion piece by University of Minnesota professor John
Brandl.
An Equal Opportunity Employer
S
C
' February 22, 1995
Page Two of Three
' Third, despite the hopes and statements of many, the March forecast will not
provide nearly enough revenue to spend our way out of this long -term
' financial hole. Further, I am unwilling to spend that money now. I will insist
that any additional revenue in the March forecast be dedicated to helping us
prepare for future federal reductions.
' Two options for dealing with these challenges are already off the table. First,
the U.S. Congress is not going to reverse course and decide to return to
' business as usual. An ABC News / Washington Post poll over the weekend
showed that three in four Americans support passage of the Balanced Budget
Amendment. The cuts mentioned above are real and they are coming, as
' early as October of 1995.
As I have said before, I will not sign any broad -based tax increase. The
' February 19 Star - Tribune carried a long article which noted that several senior
DFL legislators may consider extending sales taxes or ending several tax
exemptions to generate new revenue. This is not a viable option. The people
' of Minnesota clearly said in the last election that they will not accept a general
tax increase and neither will I.
' With delay and tax increases off the table, we have only one option: to reduce
spending. I know that is not the message some want to hear. But it is the
reality and I ask your help in seizing this opportunity to restructure and reform
' our government, not only to make it more affordable, but to make it more
effective as well.
' 1 FY 1996 -1997 budget spends fully $1 billion more than in the previous
biennium. In 1990, Minnesota governments ranked sixth among the states in
spending per resident. We rated fourth in per capita health and social services
' spending, eighth in public school spending, 11th in roads and highways, and
18th in higher education. Most Minnesotans would agree that we have not
underfunded government, but we have underachieved on results. The days of
' open -ended funding requests are over. Further, if we refuse to act now, cuts
in later years only get steeper, and more painful.
' We must think anew. We must rethink old assumptions. Specifically, rather
than systematically asking for more money, let us ask ourselves how we can
improve programs to make them more efficient, more responsive, more
' productive. How can administrative services be reformed? How can services
among cities, counties, and school districts be shared? How can competition
February 22, 1995
Page Three of Three
and market incentives be introduced to lower costs and impru
can cities, counties, and school districts cooperate to target re
highest priority items?
My administration is eager to hear your creative ideas, you.
solutions. We believe you have many. For our part, I pron
and our best effort. We want you as a partner, an investor, i }
plans to ensure long -term financial security for Minnesota. r
confident we can secure it.
I look forward to your recommendations. Thank you again
consideration.
Warmest regards,
ARNE H. CARLSON
Governor
CITY OF
CHANHASSSH
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
Mr. Roger Gustafson
Carver County Public Works
600 East Fourth Street
Chaska, MN 55318
Re: MnDOT Speed Study Evaluation of County Roads in Chanhassen Including
Trunk Highway 101 and Kerber Boulevard - File No. PW -262E
Dear Roger:
I am sure you can imagine my sincere disappointment to hear that MnDOT is standing by their "85th percentile"
speed criteria concerning the recently completed speed study analysis of Carver County Roads, Trunk Highway 101
and Kerber Boulevard in Chanhassen. The fact that the 85th percentile speed (speed at which 85% of the traffic is
traveling at or slower) is exceeding the posted speed limit on many of these road segments in Chanhassen is no great
surprise. In fact, the continuous complaints which city staff and Council receive on a monthly, and sometimes
weekly, basis prompted Chanhassen's request to support the undertaking of this study. It was hoped that other criteria
such as existing vertical and horizontal curve design, access and intersection spacing, sight lines and roadway hazard
and obstruction clear zone issues would also be considered with some relevancy. I am also greatly concerned that,
due to the significant growth being experienced in the city, this study will be obsolete, in terms of data, within just
a few short years. Using Galpin Boulevard north of Trunk Highway as an example, there are currently three major
subdivision proposals, one of which has received final plat approval, one of which has received preliminary plat
approval and one that is currently in the process, which would add more than 300 additional units accessing Galpin
Boulevard within the next one to three years. It is likely that additional subdivisions along this corridor will continue
to be generated. This scenario is common along many of the County Road corridors in Chanhassen. Many County
roads that currently appear to function satisfactorily in a rural -type classification will soon be evolving to
characteristics more typical of an urbanized road facility.
I am certain my statements bring no new news or information to you. However, if you become aware of any other
approaches which can be taken with MnDOT to more appropriately balance the overall transportation system needs
as well as the community citizenry needs regarding speed issues, rest assured you will have my undivided attention.
Sincerely,
CITY OF CHANHASSEN
Charles D. Folch, P.E.
Director of Public Works /City Engineer
CDF:ktm
c: City Council Administrative Packet (3/13/95)
g: \eng\charles \letters \gusla(so.I
,4wml� 3/�
FZ&PwZG�
PUBLIC WORKS DEPARTMENT
(612) 361 -1010
FAX (612) 361 -1025
CARVER COUNTY COUhTHOUSE
600 EAST 4TH STREET, BOX 6
CHASKA. MINNESOTA 55318
COUNTY O CAQVEQ
To: Charles Folch, Chanhassen City Engineer
Chanhassen City Hall
690 Coulter Drive
Chanhassen, MN 55317
Bill Monk, Chaska City Engineer
Chaska City Hall
#1 City Hall Plaza
Chaska, MN 55318
I remain concerned about the speed limits that will apparently be established by
MnDOT for these county highways. I welcome your comments regarding this
matter.
Affirmative Action /Equal Opportunity Employer
Printed on Recycled Paper
Contains Minimum 10 ". Post Consumer Waste
Ken Adolph, Victoria City Engineer
Schoell & Madson, Inc.
10550 Wayzata Boulevard
Minnetonka, MN 55343
From:
Roger Gustafson, County Engineer
Date:
February 3, 1995
Subject:
Posted Speed Limits
Attachments:
1. Map A - Exsitng Speed Limits (MnDOT Speed Survey Data)
2. Map B - Proposed Speed Limits
Comments:
MnDOT completed the survey portion of a speed study of county highways in
Victoria, Chanhassen and Chaska this past May. Attached Map A illustrates the
roads surveyed and the 85th percentile speed results. The 85th percentile speed
is considered by MnDOT to be a "voting" process by which the drivers voice their
own speed limit preferences for a given highway corridor. As can be seen by the
survey results, the 'voting" generally favored in -place or higher speed limits.
It is my understanding that MnDOT is planning to finalize the authorization of
speed limits on the listed corridors by the end of February. Further, it is my
understanding that these authorizations will generally be consistent with the 85th
percentile speeds.
I remain concerned about the speed limits that will apparently be established by
MnDOT for these county highways. I welcome your comments regarding this
matter.
Affirmative Action /Equal Opportunity Employer
Printed on Recycled Paper
Contains Minimum 10 ". Post Consumer Waste
L
I I
C
Mr. Dean Schmieg
Park Foreman
15950 Heather Drive
Carver, MN 55315
Dear Dean:
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
Thank you for taking the initiative to assume additional responsibility in the area of play
equipment inspections and record keeping. From' our discussion of yesterday and in talking
with Dale Gregory, Park Superintendent, I understand you are in the process of developing a
realistic and thorough check list system. I compliment you on your efforts in ensuring that
our playgrounds are maintained as safe environments -for recreation.
Sincerely,
Todd Hoffman, Pa
I TH:ns
'
cc: Mayor and City = Council . ,, .", , . , -.11'.,
Park and Recreation Commission
Dale Gregory, Park Superintendent
'
Personnel File
u
February 24, 1995
MEMORANDUM
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
TO: Don Ashworth, City Manager
FROM: Bob Generous, Planner H
DATE: March 6, 1995
SUBJ: Housing Types
At the February 27, 1995 City Council meeting, there was some concern expressed by
Council that the city was approving a disproportionate number of multi - family and single -
family attached developments relative to the amount of single - family detached developments.
Staff believes that this assumption is due to the fact that five prominent townhome or
twinhome developments have come through the city for review in the last three years. Staff
has assembled the attached housing information for Council's use.
The city's policy, as expressed in the comprehensive plan,
alternatives for Chanhassen residents: 66 percent large to
density, and 6 percent high density residential. Based on
developments, the city will not meet these targets without
family projects.
L
is to provide an number of housing
or low density, 28 percent medium '
xisting and proposed
additional townhome and multi-
C
I HOUSING POLICY
I Housing Availability Policy No. 8 of the Comprehensive Plan states,
' "The development of alternate types of housing will be considered to supplement
conventional single family homes. Chanhassen is committed to providing housing
alternatives (called "life cycle housing" in the Metropolitan Council's new Blueprint).
The future land use plan is evidence of this commitment. Land designated for future
single family units (1990 - 2000) will accommodate approximately 2,400 units. Land
designated for alternative forms of housing will accommodate approximately 1,500
' units. As future development occurs, it is anticipated that alternative forms of housing
will increase as a component of Chanhassen's total housing stock."
EXISTING CONDITIONS
Currently, there are 218 twin home units within the city. Housing types are distributed as
S follows: detached single - family homes, 4,475 units (81 %); twin homes, 218 units (4 %);
townhouses, 309 units (5.6 %), and multifamily, 529 units (9.6 %).
COMPREHENSIVE PLAN
Year 2000 Housing Unit distribution projection based on the comprehensive plan.
Percent
Residential - Large Lot/Low Density 66
Residential - Medium Density 28
Residential - High Density 6
Estimated Housing Distribution based on approved and in process development and existing
housing stock.
Percent
' Residential - Large Lot/Low Density (detached) 77
Residential - Low Density (attached) 4
Residential - Medium Density 12
Residential - High Density 7
DEVELOPMENTS
The following number of residential developments have received approval or are under review
within the city since 1992:
# of Units Percent
Single - family detached 1,039 63
Townhouses 613 37
Total 1,652 100
Development
# single- family detached
# single- family attached
Hiscox Addition
Highlands on Lake St. Joe
Windmill Run
Royal Oaks
Lotus Lake Woods
Oaks at Minnewashta
Tower Heights
Shenandoah Ridge
Church Road
TJO Addition
Minger Addition
Minnewashta Landings
Olivewood
Shadow Ridge
Mission Hills
Shamrock Ridge
Creekside
Brendan Pond
Point Lake Lucy
Lake Ann Highlands
Hobens Wild Wood Farm
Autumn Ridge
Cunningham Addition
Rogers/Dolejsi
Stone Creek
Bluff Creek
Trotters Ridge
Oak Ponds /Oak Hills
Lake Susan Hills 9th
Prairie Creek
Willow Ridge
Meadows at Longacres
Woods at Longacres
Hall/s Great Plains Estate
Powers Place
1
33
35
23
7
44
13
20
3
3
17
27
9
17
16
47
44
19
20
3
3
134
141
78
49
91
36
112
115
36
Total 1,039
Percent 63%
194
92
46
209
O
48
613
37%
CARVER COUNTY HRA
J A
Telephone (612) 448 -7715
Fax (612) 448 -6006
500 PINE STREET N. SUITE 300
CHASKA, MN 55318
CARVER COUNTY HRA
THURSDAY, MARCH 9, 1995
1108 VILLAGE ROAD, LAKE GRACE APARTMENTS
CHASKA, MN
1:00 P.M.
AGENDA
I. CALL TO ORDER
H. APPROVE THE MINUTES OF THE PUBLIC HEARING
III. APPROVE MINUTES OF PREVIOUS MEETING
IV. FINANCIAL REPORT
V. MHFA LOANS
VI. PROGRAM REPORTS
a. Transitional House
b. Benton Meadows
c. Partners for Environmental Protection (PEP)
d. Hamburg house
VII. CHANHASSEN SENIOR HOUSING
VIII. ADMINISTRATIVE MATTERS
a. Hiring of new employee
b. Office Space
c. HRA Insurance
IX. ADJOURN
CARVER COUNTY HRA
500 Pine Street, Suite 300 Ph (612) 448 -7715
Chaska, Minnesota 55318 Fax (612) 448 -6506
CARVER COUNTY HRA
BOARD MEETING
THURSDAY, FEBRUARY 9, 1995
1108 VILLAGE ROAD, LAKE GRACE APARTMENTS
CHASKA, MN 55318
M[INUTES
PRESENT: Peg Boyle, Ken Frey, Carol Griffith, Stan Hamerski
ABSENT: Cal Haasken
Staff: Julie Frick, Julie Ann McConnell
The regular meeting was called to order by Peg Boyle, Chairperson of the Carver County
HRA, at 1:10 p.m.. A quorum was present.
The minutes of the January 12, 1995 annual meeting were reviewed at this time.
MOTION: ( Hamerski- Griffith) To approve the minutes of the January 12,
1995 regular meeting. All present voted aye.
The Financial Report was reviewed at this time.
MOTION: ( Hamerski- Griffith) To approve cash payments dated January 13
thru January 31, 1995, check numbers 6540 thru 6590 and cash
payments dated February 1 thru February 9, check numbers 6591
thru 6598 and cash receipts dated January 1, 1995 thru January
31, 1995. All present voted aye.
MHFA Loans were reviewed at this time.
McConnell reported on the HRA's HOME Rental Rehab project with Gestach & Paulson
Construction as the applicants. MHFA has approved the application pending some
additional documentation. The total project cost will be $66,087.00. No motion was
necessary.
MOTION: (Griffith - Hamerski) To approve Emergency Ioan number 10 -07 -06
for $127.00. All present voted aye.
Program reports were reviewed at this time.
McConnell updated the Board on the Transitional Housing Project. An MHFA
commitment is expected after February 23, 1995. Frick explained that upon written
commitment, a line of credit will be established at Mid- America Bank that will be secured
against a Certificate of Deposit. Acquisition costs will be secured in the form of a
mortgage against the property.
MOTION: (Hamerski -Frey) Authorizing Frick to sign any loan documentation
necessary to process transitional housing loan contingent upon
Barbara Portwood's review and approval. All present voted aye.
At this time the Board was asked to refer to the summary sheet the intern, Christina,
compiled outlining the status of her projects.
Frick updated the Board on the Cologne water tower project. The job is currently being
bid -out.
Regarding Benton Meadows, Frick informed the Board that Keith Traxler has filed a
lawsuit against the HRA involving the home with the cracked foundation. To date, the
BRA has offered to pay Traxler for materials and labor. Traxler has filed suit for $86,000.
Hamerski asked if Barbara Portwood, HRA attorney, would review the suit and advise.
The Chanhassen Senior Housing Proposal was discussed at this time.
m�.
Barbara Portwood, Holmes & Graven Attorney representing the Carver County HRA,
provided the Board with a letter outlining how the project would foreseeable proceed.
Brad Wirt, Miller & Schroeder Financial, explained the Series A and Series B bonds that
would be financing the project.
Sharmin Al -Jaff, Planner for City of Chanhassen, spoke on behalf of the Senior
Commission. The Commission has provided positive input on the project.
Carole Kron presented floor plans and a model of the exterior elevations of the project.
Gary Fields, Springsted, explained the development costs, financing and future operating
budget.
MOTION: (Hamerski -Frey) To commit $31,000 a year towards the
Chanhassen Senior Housing development for the life of the bonds. All present voted aye.
Administrative Matters were discussed at this time.
McConnell discussed personnel matters.
Frick reported on the pending foreclosure of a property that the HRA has a $13,924.73
lien against. Young America State Bank has the first mortgage. An offer has been made
on the property. The offer made would cover the mortgage at Young America State Bank
yet the HRA would only be able to retrieve approximately $3,000 with this current offer.
The Board asked that BRA staff inspect the property and see if it would be wise to
purchase.
MOTION: (Frey - Griffith) To raise the mileage from .29 to .30 per mile as
per the recommended IRS rate. All present voted aye.
MOTION: (Griffith- Hamerski) To adopt personnel policy. All present voted
aye.
MOTION: (Frey - Griffith) Excessive comp and vacation time is to be paid
to Frick in order to comply with the new policy. All present voted
aye.
Frick updated the Board about the office bookkeeping. The audit from Baune, Dosen &
Company is expected to be done next month.
Regarding office space, the situation remains unchanged.
MOTION: (Frey - Hamerski) To adjourn. All present voted aye.
The meeting adjourned at 3:40 p.m..
Attested
L
L AW OFFICES C` // �7 C" /0
MOSS & BARNETT a ;�
' A PROFESSIONAL ASSOCIATION c
4800 NORWEST CENTER
90 SOUTH SEVENTH STREET
' MINNEAPOLIS. MINNESOTA 55402 - 4129
BRIAN T. GROGAN TELEPHONE (612) 347.0300 TELECOPIER (612) 339 -6686
(612) 347.0340
CABLE COMMUNICATIONS UPDATE
TO: MOSS & BARNETT CLIENTS AND INTERESTED PARTIES
' FROM: BRIAN T. GROGAN, ESQ.
DATE: MARCH 1, 1995
Ocopyright 1995, Moss & Barnett, A Professional Association
VIDEO DL9LTONE - WHAT DOES IT MEAN FOR YOUR COMMUNITY?
To make a telephone call to a neighbor most of us utilize a "dialtone"
provided by our local telephone company, also known as our local exchange
carrier. On July 16, 1992 the Federal Communications Commission (FCC) ruled
that local telephone companies can provide us with video services, much like
those provided by our existing cable operator, via a " video dialtone" (VDT).
The FCC initially envisioned VDT service where the local telephone company
would act as a common carrier providing a link between consumers and video
information providers. Due to a series of court decisions, however, the FCC
on January 11, 1995 began a proceeding which may ultimately allow local
telephone companies to own much of the programming on their VDT systems.
Since local telephone companies providing VDT service do not need a local
franchise, many communities are struggling to determine how to regulate a
service which may ultimately compete directly against existing "franchised"
cable operators. Some communities are attempting to tax VDT service or impose
' franchise fees while others are searching for ways to enforce customer service
standards. The ability of municipalities to act is constrained not only by
federal law but also by state laws governing the telephone services provided
' by these local telephone companies. As VDT systems begin providing service,
franchising authorities will face difficult issues regarding not only how to
regulate VDT service but also how to respond to complaints from existing cable
operators which may still be forced to comply with existing franchise
obligations.
MOSS & BARNETT
A PROFESSIONAL ASSOCIATION
Section 613(b) of the Cable Communications Policy Act of 1984 (47 U.S.C.
533(b)) prohibits telephone companies from providing video programming to
subscribers in their telephone service area. Section 613(b) also prohibits
telephone companies from owning other companies (i.e. cable companies) which
provide video programming services in the telephone company's service area.
This provision is often referred to as the "cable -telco cross ownership ban"
and has prevented telephone companies from providing cable television services
unless the community was very small (i.e. less than 2,500 population) or the
service was provided via VDT (see previous article).
This cable -telco cross ownership ban may no longer exist, however, as a
result of a series of court decisions culminating in a decision issued by the
U.S. District Court in Washington, D.C. on January 27, 1995. The decision, a
victory for the United States Telephone Association, overturns the cable -telco
cross ownership ban on First Amendment grounds. In issuing her summary
judgment Judge Gladys Ressler stated that the ban was overly broad and served
as a "restrictive means" to restrain phone companies from competing with cable
television operators. Kessler also stated that the government could not show
that "the ban solves what it was intended to cure." As many as 1,200 small to
medium sized telephone companies are affected by the decision and six of the
RBCOs have already prevailed in separate federal court decisions in their
territories.
Kessler's decision combined with earlier court decisions appears to allow
telephone companies throughout the country to purchase and operate cable
television systems within their service territory. Judge Kessler will soon
issue an injunction regarding FCC and Justice Department enforcement of the
cable -telco cross ownership ban. Wording of Kessler's injunction will be
crucial in determining whether the cross ownership ban continues to be
enforced to any meaningful degree.
LOCAL IMPACT OF PROPOSED FEDERAL LEGISLATION
On February 1, 1995 U.S. Senator Larry Pressler (R- S.D.), Chairman of the
Senate Commerce, Science and Transportation Committee, distributed a
"discussion draft" of a telecommunications - reform bill which calls for
deregulation of most levels of cable service. The key elements of the
legislation with respect to local franchising authorities include:
1. All cable rate regulations would be lifted one year after enactment;
2. State and local barriers to cable entry into the provision of
telephone services would be lifted one year after the date of
enactment;
3. Telephone companies could provide cable service;
2
MOSS & BARNETT
A PROFESSIONAL ASSOCIATION
4. Telephone companies would not have to obtain a local franchise to
' provide video dialtone service; and
5. Local franchising authorities could possibly require the payment of
"competitively neutral fees" as compensation for the use of public
' rights -of -way.
Both telephone companies and cable television operators expressed optimism at
the "pro- competition" provisions within Pressler's bill and with the
aggressive time frame for opening local exchange, cable and long distance
markets.
' On February 15, 1995 Senate Democrats released their 99 page proposal for
telecommunications reform which parallels many of the provisions contained
within the Hollings bill which passed the Senate Commerce Committee in 1994
' when Senator Ernest Hollings (D -S.C.) chaired the Committee. The Democrats'
proposal would require the RBOCs to demonstrate that they have opened
themselves up to local telephone competition prior to their entering the long
' distance or manufacturing markets. Long distance companies cheered the
Democrats' proposal while the RBOCs and cable operators criticized the package
for maintaining certain existing regulations which they believe are preventing
competition.
WHYARE CABLE RATES INCREASING?
' Subscribers across the country have recently received notices from their
cable operators that cable rates will soon be increasing by as much as $1.50
to $2.50. A large percentage of these rate increases are the result of the
FCC's "going forward" rules which allow cable operators to add new channels of
programming to their existing expanded basic tiers of service. Operators are
allowed to charge up to $0.20 for each channel added and an additional $0.30
to cover applicable license fees associated with adding the new channels.
Those cable operators with unused channel capacity have taken this opportunity
' to add new programming services and passed these increased costs on to
subscribers. These rate increases are generally occurring at the same time
operators are taking inflationary increases and /or passing through certain
external cost increases.
' The result for many communities is a substantial increase in the rates
charged to subscribers. Some relief, however, may be available for
' subscribers if a simple form is submitted to the FCC. FCC rate regulations
allow franchising authorities or a subscriber to submit FCC Form 329 within 45
days of an expanded basic tier rate increase. Submission of Form 329
authorizes the FCC to regulate the rates charged by the cable operator for the
t expanded tier of service. Those communities where Form 329 has not yet been
submitted should consider filing this form to require FCC review of the
operators' proposed rates. Submission of FCC Form 329 will not result in any
additional time or financial commitments by the franchising authority since
the rate regulation review of expanded tier rates will be conducted by the FCC
and all communications will exist between the FCC and the cable operator. For
' a free copy of FCC Form 329 please contact Susan Olson at Moss 1, Barnett
(612- 347 - 0390).
3
MOSS & BARNETT
A PROFESSIONAL ASSOCIATION
Throughout 1994 a trend developed where small and mid -sized cable
operators began to be acquired by larger multiple system operators (MSOs).
This trend occurred because the smaller system operators were no longer in a
position to deal with the complexity of federal law governing the provision of
cable television service or because they simply were not positioned to take
advantage of future opportunities to provide alternative services over their
systems. Larger MSOs have taken advantage of this situation by strategically
acquiring systems in an attempt to form "clusters" of systems primarily in
larger markets. These MSOs hope to improve the technical capabilities of
system clusters and eventually compete with local telephone companies to
provide voice, video and data services.
The consolidation of the cable industry has resulted in numerous
transfers of ownership requiring local franchising authorities to review
proposed transactions. In the last Cable Communications Update an article
detailed the transfer procedure and referenced a free paper regarding
transfers of ownership by contacting our office. One issue which franchising
authorities should be particularly sensitive to, however, is the manner in
which the cable system assets will be "valued" following completion of a
transfer. In other words, franchising authorities should make sure that the
buyer of the system will not attempt to revalue the system in such a way as to
ultimately increase the monthly fees paid by subscribers for such items as
converters, remote controls or various services provided by the new operator.
SHOULD CITIES MANDATE SYSTEM UPGRADES
DURING FRANCHISE RENEWAL
In our representation of franchising authorities during a franchise
renewal process, one of the first issues raised by city officials is the need
for technical improvement to the existing cable system serving the community.
Typically the cable system is somewhat antiquated and the operator has
postponed improvements until a new franchise can be negotiated and executed.
The discussion usually focuses on the existing capabilities of the system
which may be as low as 300 to 330 MHz, providing the equivalent of
approximately 30 channels of video service. Problems with this type of
antiquated cable system usually fall into three categories.
1. Lack of adequate channel capacity to meet subscriber demand;
2. Poor signal quality particularly at the extremity points of the
system; and
3. Poor reliability in that the system may experience numerous outages
because of antiquated equipment.
F1
MOSS & BARNETT
A PROFESSIONAL ASSOCIATION
When considering the type of upgrade or rebuild to require in franchise
' documents many franchising authorities seek an improvement to 550 MHz (the
equivalent of 60 channels of capacity) on up to 625 MHz or 750 MHz. Decisions
regarding the appropriate capacity of the system will vary depending upon the
community's needs and the future plans of the cable operator.
' One issue, however, which should not be overlooked is the concept of
choosing = to require in writing that the cable operator must upgrade the
cable system. The rational is that a cable operator will likely be forced to
upgrade the system, despite a written franchise requirement, in order to meet
subscriber demands and successfully compete for subscribers with alternative
providers such as Direct Broadcast Satellite (i.e. Direct TV) or the local
' telephone company. Including a system upgrade requirement in a franchise
document may only serve to allow a cable operator to "pass through" to
subscribers costs associated with the upgrade.
' If one assumes current rate regulations will be maintained, it is
entirely possible cable operators could attempt to pass through to subscribers
' some or all of the costs associated with a franchise imposed system upgrade in
the form of an external cost or other allowed pass through. The decision
regarding whether franchising authorities should include upgrade language
within the franchise documentation will vary depending upon the location of
the system in relation to a larger market and the financial capabilities of
the operator to take advantage of future services which may be provided over
the system.
The materials in this Cable Communications Update have been compiled from
a variety of sources. We have not addressed many important points which may
apply to your situation. You should consult with legal counsel before taking
' any action on matters covered by this Cable Communications Update
Brian T. Grogan is an attorney with the Minneapolis law firm of Moss &
Barnett. He practices primarily in the areas of cable television and
telecommunications law. Mr. Grogan represents municipalities and.governmental
entities across the United States in franchise renewals, municipal ownership,
rate regulation, transfers of ownership, video dialtone proceedings, Federal
Communications Commission filings, First Amendment issues, and other
communications- related concerns. For additional information regarding the
' topics addressed in this Cable Communications Update please feel free to
contact our office.
I
383ZBTG
i
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE: February 27, 1995 RESOLUTION NO:
MOTION BY: SECONDED BY:
A RESOLUTION ESTABLISHING PROCEDURES FOR FILLING
COMMISSION APPOINTMENTS
WHEREAS, City Commission members serve to research; conduct public
hearings, including sending notices of the hearings to effected parties and
listening /recording public comments from said hearings; and to review or visit similar
proposals /products /regulations in other cities /locations, etc; and
WHEREAS, it is important that each council member and council member- elect
has the opportunity to participate in the selection of commission members who are
citizens of the community serving in their commission capacity to provide advice to the
City Council as described above.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Chanhassen as follows:
1. That an advertisement announcing the Commission vacancies be placed
in the official newspaper twice after the first of the year. To ensure that
as many applications as possible are received, the ad shall make no
notation as to the number of incumbents seeking reappointment.
2. The terms for the Commissions will become effective April 1st.
3. Commissions shall interview all new applicants for vacancies. Following
the interview process, the commission shall recommend to the city
council enough candidates to fill the vacant positions plus two additional
candidates.
4. Incumbents who are reapplying for their position do not need to be
interviewed by the commission members and should not be involved in
the interviews and selection of their competitors. They do need to be
interviewed by the city council.
1995. Passed and adopted by the Chanhassen City Council this 27th day of February,
1 ATTEST.
' Don Ashworth, City Clerk/Manager
YES
1
lJ
17
u
L
Donald J. Chmiel, Mayor
NO ABSENT
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
March 6, 1995
Chanhassen Elementary School Student Council
c/o Ms. Kitty Sitter and Ms. Fran Hile
7600 Laredo Drive
Chanhassen, MN 55317
Dear Council Members:
Thank you for hosting me at your meeting of February 21, 1995. I enjoyed having the
opportunity to speak with you. Your long list of ideas for helping manage Chanhassen Pond
Park is an indication of your enthusiasm in taking on this project. Below please find a
tabulation of your ideas and my response to each. Please note that your lists were condensed
to avoid duplication of similar ideas. You will also note that those ideas which can be
carried out by students are highlighted with an asterisk.
* 1. Pick Up Trash: I encourage each classroom to organize a field trip to Chanhassen
Pond Park this spring. Trash clean -up should be included as one activity of each trip.
2. Install "No Littering" Signs, Install "Pick -up After Your Pet" Signs,
Install Signs with Park Rules: Park rule signs are located at each
entrance to the park' (see attached map). The rules listed on each sign are:
Park Hours: 6 a.m. - 10 p.m.
Motorized Vehicles Restricted to Roadways and Parking Areas Only
Glass Containers Prohibited
Alcoholic Beverages Restricted to Canned Beer Only
No Pets Allowed
Snowmobiling on Designated Trails Only
Help Keep Your Parks Clean, Please Do Not Litter
a
Add Trash Cans: Trash cans are not currently maintained at the park. I will discuss
locating a trash receptacle at each entrance to the park with Dale Gregory our Park
Superintendent. If Mr. Gregory also believes that this is appropriate, he will have the
trash receptacles put in place.
0
Chanhassen Elementary School Student Council
' March 6, 1995
Page 2
4.
Install Recycle Bins: Currently all trash collected from city parks is separated at our
central collection point and recycled. However, for ease of operation, recycle
containers may be purchased in the future.
'
S.
Construct a New Bridge: The existing bridges were constructed by local boy scouts
as Eagle Scout Projects. The bridges are weathered and aging, but remain in sound
condition. The main bridge will eventually be replaced with a wider and much
stronger bridge capable of holding a pick -up truck. This future replacement project
will cost approximately $15,000. Other future improvements will include widening
and blacktopping of the main trail from Laredo Drive to Sierra Trail.
6.
Install Fences: Fencing detracts from the overall beauty of our parks. However, if
some form of permanent separation between public and private properties is necessary,
fencing is often installed.
'
7.
Install Rocks in Erosion Areas: Several large erosion areas do exist within
Chanhassen Pond Park. Erosion intensifies the pollution of the pond through increased
water runoff. This excessive runoff carries high levels of nutrients and sediments into
'
the pond. The city's Surface Water Management Plan has been developed to help stop
this type of pollution. Look for improved management of storm water runoff entering
the park over the next two summers.
'
8.
Install Wood Chips on the Trail: The majority of rain water entering the pond must
cross the trail on its way to the pond. Wood chips would be carried by the water flow
into the pond.
'
9.
Mow Grass: The city mows the trail and entry ways to the park. The remainder of
the is intentionally left to naturally.
park grow
'
10.
Install Picnic Tables: Two picnic tables were installed along Kerber Boulevard
overlooking the park. Other acceptable picnic areas offering convenient access and
groomed turf (mowed) are not available within the park's interior.
'
11.
Need Warming Shelters for Skating: Many residents use the ponds in their
neighborhood for skating each winter (an estimated 20 to 30 each year). The city is
'
unable to provide warming houses for each of these locations.
* 12.
Plant Flowers, Plant Seeds, Plant Tree: Planting trees offers the best return on our
investment. Ms. Sitter and Ms. Hile are organizing a spring tree planting project with
the help of the Minnesota Department of Natural Resources (MnDNR). The tentative
project date is Saturday, April 29.
Chanhassen Elementary School Student Council
March 6, 1995 '
Page 3
13. Feed Animals: Wildlife management in public park systems does not typically ,
include wildlife feeding programs. The vegetation found in the park offers a wide
variety of natural food sources for the birds and animals who live there.
* 14. Install Bird Houses: Blue bird and wood duck houses are maintained within the
park. These houses mimic the birds natural nesting locations — typically old trees for
wood ducks and old fence posts for blue birds. These artificial nesting boxes are ,
necessary since the majority of the old trees and fence posts once found in Chanhassen
have been removed. If the school has access to nesting houses which they could
donate, the city would be happy to place them within the park. '
15. Rake Leaves: All the leaves which fall in Chanhassen Pond Park are left undisturbed.
Decaying leaves are an important part of the natural life cycle found at Chanhassen '
Pond Park.
*16. Submit Articles to the Villager Reminding People of Rules: This type of
reinforcement of rules which our society must follow is invaluable. Classes should
again consider writing letters to the editor after completing their field trips to the park.
17. Clean the Water, Keep Oil Out of the Water: Again, the city's Surface Water
Management Program is working towards cleaning up the city's water resources.
Some elementary students may have participated in the signing of storm water catch
basins throughout the city. These signs, which were spray painted on the street covers
of the storm water system, remind people not to dump oil or other pollutants into this
system.
*18. Conduct an Animal Object Survey, Look at Leaves: These educational projects can
be carried out during your field trips to the park.
Again, thank you for your interest in Chanhassen Pond Park. Your partnership in maintaining
and managing this natural resource is to be commended. I look forward to working with you
this spring. Please contact me if I can be of any further assistance.
Sincerely,
Todd Hoffman, CLP
Park and Recreation Director
TH:k
' Chanhassen Elementary School Student Council
March 6, 1995
' Page 4
Enclosure: Park Map
' pc: Mayor and City Council
Park and Recreation Commission
' Chanhassen Villager
Dale Gregory, Park Superintendent
Diane Desotelle, Water Resources Coordinator
r
u
C
L
r
/;
i
all Vg m'--'
_1
i
NOTE All d-men5ions and fa CJldy locations are apprO mate.
Key: C PiCniC Areas O Seating Areas
24ssive park area accommodating the observation of plants and wildlife in a natural environment.
0
\TIONS. Plant materials
should be installed
to encourage wildlife by providing both habitat and food sources.
The following are suggested as a general guide.
_P LANT SPECIES
WILDLIFE
CATEGORY PLANT SPECIES
WILDLIFE
Eastern Whi Pine
Fir
Bird Species
Fruit 8 Berry Plants Sand Cherry
Pheasant
Reed d C
C edar
American Plum
Butterflies
Norway Pine
Grapes
Spruce
Fall Fruits Red Osier Dogwood
Robin
Switcngrass
Pheasants
Mountain Ash
Cardinals
Big Blueslem
Mallards
Buffaloberry
Chickadees
Little Bluestein
Deer
Cotoneasters
Finches
Indiangrass
Rabbits
Wood Ducks
Sideoats Gramme
Woodchucks
Pheasants
Birch
Butterflies
Winter Fruits Black Chokecherry
Bird Species
Aspen
Bets
Red Splendor Crabapple
Willow
Moths
Euonymus
tiaekberry
Sumac
Cherries
Oak
Nuts i Acorns Oak
Wood Duck
Butternut
Pheasant
Red Mulberry
Robin
Black Walnut
Mallards
Amur Chokecherry
Bluebird
Shagbark Hickory
Spuirels
Black Cherry
Cardinal
Deer
Serviceberr Y
Woodpeckers
"�•• "•"•"'• "' •'�"•. uv
M J
SHELTER_ Install wood duck houaea.
or r r rh
at 9—nis
CHANHASSEN POND PARK
MASTER PLAN
POND
1
PURPOSE Establish a
GENERAL RECOMMEND,
Grasses 6 Legumes
Fruit d Berry Plants
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
March 7, 1995
Mr. Craig M. Edwards
Area Manager
U.S. Department of Commerce
National Weather Service
6301 34th Ave. South
Minneapolis, MN 55450
Dear Mr. Edwards:
Thank you for your letter of March 3, 1995. It will be my pleasure to attend your formal
ceremony at the new weather service facility on June 2 at 10:00 a.m. and to serve as a
keynote speaker.
I would like to take this opportunity to welcome you to our community. I look forward to
listening to weather reports and hearing the "official" statistics from Chanhassen.
Sincerely,
Donald J.
Mayor
DJC:k
PC: Dean T. Braatz, Hydrologist in Charge
Dr. Thomas R. Carroll, Director NOHRSC
a40 ,j Of 00 00
o �
1ArsS Of'+�P
Mayor Don Chmiel
City of Chanhassen
690 Coulter Drive, P.O. Box 147
Chanhassen, MN 55317
Dear Mayor Chmiel,
4" 1�
U.S. DEPARTMENT OF COMMERCE
National Oc and Atmospheric Administration
N 6301 34 Ave.
Minneapolis, MN 55450
March 3, 1995
Three offices of the National Weather Service will be moving from
the Minneapolis /St. Paul Airport location to 1733 Lake Drive West
in Chanhassen. The move will occur at staged intervals. The
North Central River Forecast Center will move on March 13th, the
Forecast Office on March 15th and the National Operational
Hydrologic Remote Sensing Center (NOHRSC) on May 2nd.
Approximately 60 employees will work out of the new facility
built by Merrimac Construction.
Also located on the 10 acre plot is the Next Generation Weather
Doppler Radar (WSR -88D), installed in August of 1994, the upper
air inflation and launch building, communication towers and a
local weather station.
The move to this leased facility will allow the National Weather
Service to more efficiently coordinate our mission of providing
critical water and weather forecasts and warnings. Atmospheric
scientists and water resource engineers will utilize the latest
technology to prepare valuable forecasts for commerce, industry,
aviation interests and the general public.
A formal ceremony is planned for Friday, June 2, 1995 at LOAM to
officially mark this important milestone. You are cordially
invited to attend and serve as a keynote speaker.
To facilitate planning and publicity we would like to confirm the
Senator's participation at his earliest convenience.
S ' ce �rlreJly,
M: Edwards
- g Manager
f
- De an B aatz
- iy,drol9q! - §`E in Charge
Df: Tffi&ff Carroll
Director NOHRSC
���p fSMO5q�
4
Z
s kz
/�� 1141
""Ia4
fc-,�
,,0000004 .1004
0 04;
4 ,00ll e
le -eoolool
SEN f CHANHASSEN FIRE DEPARTMENT
' ` Q►� / �F P.O. BOX 97 7610 LAREDO DRIVE CHANHASSEN, MN 55317
Q � O� BUS. PHONE 934.9191 MINNEWASHTA STATION NO. 2 PHONE 474.7094
V
' MEMORANDUM
TO: Don Ashworth, City Manager ,
FROM: Richard Wing, Assistant Fire Chief
' RE: Harold, Brose, Shop Superintendent
DATE: March 3, 1995
' On Friday evening, February 20, 1995, Pumper 208 would not start.
Out of my concern for the truck being out of service all weekend,
' I called Harold at home. The truck had a major problem. As of
2:00 A.M. Saturday morning, the lights were still on and Harold
still at work trying to get the truck back in service which he
did accomplish.
' Our thanks to Harold, all of his help and positive attitude. It
is people like Harold that make this city "run ".
A
4a,
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
MEMORANDUM
TO: Don Ashworth, City Manager
Don Chmiel, Mayor
City Council
FROM: Charles Folch, Director of Public Works /City Engineer
DATE: March 1, 1995
SUBJ: Update on Construction Contract for the Trunk Highway 101 North Leg
Improvement Project No. 88 -22B
The City Council's agenda for Monday, February 13, „1995 included an item regarding Change
Order No. 2 to the Trunk Highway 101 North Leg Improvement Project No. 88 -2213. This item
was pulled off the consent agenda as Councilman Senn had questions regarding the original
construction contract amount awarded with the project and previous change order items to date.
Unfortunately, I did not anticipate this question coming and, as such, did not have the necessary
documentation in front of me to respond to this inquiry.
As requested, I have accumulated the necessary documentation. On December 14, 1992, the City
Council awarded a construction contract for the Trunk Highway 101 North Leg Improvement
Project No. 88 -22B to C. S. McCrossan Construction, Inc. in the amount of $1,488,449.04. In
February of 1994, staff presented City Council with Change Order No. I to this improvement
project in the amount of $97,869.24. As described in my staff report dated February 7, 1994 (see
attached), approximately 85% of the dollars associated with Change Order No. 1 were the direct
result of changes and modifications required by MnDOT through the permit approval process,
i.e. additional ponding, signal work items, etc. However, this contract had to be let prior to the
December 31, 1992 deadline or risk the loss of the primary funding source, tax increment
financing, for the project. Unfortunately, MnDOT' had not completed their review of the project
plans prior to this date so it was anticipated that some changes would result. In a normal project
plan development process, these changes would have been made to the project prior to bidding
and the costs associated would be included in an original contract awarded. With the approval
Change Order No. 1, the revised constriction contract for this project became $1,586,318.28.
Don Ashworth
Mayor and City Council
March 1, 1995
Page 2
At the Council's February 13, 1995 meeting, staff presented Change Order No. 2 to this
improvement project in the amount of $99,315.93. As indicated in the staff report dated February
6, 1995 (see attached), nearly half of the dollars associated with Change Order No. 2 are the
result of the installation of a trunk watermain looping segment which will be funded from the
City's sewer and water expansion fund. The approval of Change Order No. 2 yields a revised
contract amount of $1,685,634.21. As of this date, the project is substantially completed with
some remaining punchlist work items to be completed. As such, staff does not anticipate further
amendments to this construction contract.
The two change orders for this project amount to approximately a 13% increase over the
originally awarded contract. This is well within the contract additions typically associated with
a project of this magnitude. However, it is important to note that had MnDOT been able to
review the project plans prior to awarding this contract, the resulting change order amounts to
the project would have been as low as 7' /z% of the originally awarded contract. It is also
important to note that these figures represent the construction contract dollars and do not include
the overhead costs associated with the project such as engineering design, engineering
construction stacking and inspection, legal, bonding, etc. Depending on the size and scope of
the project, overhead costs typically fall within a 25% to 30% of construction contract range.
There will also be some costs involved with easements from the railroad. In any case, a total
project cost will be tallied this summer when the project is completed.
jms
Attachments: 1. Staff report dated February 7, 1994.
2. Staff report dated February 6, 1995.
c: Jon Horn, BRW
g: \e n g \charle s \memos \u pdate.101
1�2q 6
v
T H I A C K I R R E R G G R 0 U P
STATUS REPORT
7)&7
�- Y. .Z7
2/28/95
I. CAPITAL IMPROVEMENT PROJECTS
A. TH 101 Northlea (88 -22B)
1. Project is substantially completed.
2. Need to complete remaining punchlist items.
3. Need to reseed area east of Schlenk's
property.
4. Need to complete financial agreement with Twin
Cities & Western Railroad.
5. Have staff (Jerry B., Todd H., Mike W.) sign
off on work prior to final acceptance.
*Consultant: Jon Horn, BRW, 370 -0700
*Contractor: C. S. McCrossan
B. MINNEWASHTA PARKWAY (90 -15)
1. Project substantially completed.
2. A few remaining punchlist items need to be
completed.
a. Verify crosswalk stripping.
3. Need to final state aid contract for
reimbursement.
*Consultant:
Bill Engelhardt, 448 -8838
'
*Contractor:
Brown & Cris
C. TH 5 (COUNTY
ROAD 17 TO TH 41) (90 -17)
1. Project
plans will be completed by July 1,
1995.
'
2. Project
letting has been delayed to post -year
2000.
*Consultant:
James Unruh, Barton- Aschman, 332 -0421
'
-1-
D. PRE - TRUNK UTILITIES. PHASE II (91 -17B)
E.
F.
1. Project is completed and accepted.
2. Contract amendment for the installation of
trunk sanitary sewer through the O'Shaughnessy
(Autumn Ridge) development to be authorized by
City Council on February 13, 1995. This work
to be administrated through the Project No.
92 -12 contract.
*Consultant: Phil Gravel, BRA, 636 -4600
*Inspector: Dave Zielinski, BRA, 636 -4600
*Contractor: Northdale Contracting, Inc.
WEST 78TH STREET DETACHMENT Sc DOWNTOWN IMPROVEMENTS
92 -3
1. Project is substantially completed.
2. Pedestrian trail, retaining wall and handrail
to be constructed in 1996 following slopes
stability testing results over the winter.
3. Surcharging work still in progress. May hire
McCrossan or some other contractor for time
and materials to add additional lifts as
necessary. Check with Braun - Intertec on
timing of next lift.
4. Need to schedule field appointment with SRF
(Denny Eiler and Bud Williams) to evaluate
operation of each traffic signal, i.e.
troubleshooting, etc. See notes from December
meeting including right -hand turn loop
detector from Byerly's access.
*Consultant: Jim Dvorak, SRF, 475 -0010
David Juliff, SRF, 475 -0010
*Contractor: C. S. McCrossan
NEZ PERCE DRIVE EXTENSION (92 -6)
1. Feasibility study prepared and presented to
Council on 7/13/92.
2. Public hearing held was held 8/2/92. Project
was tabled until legal proceeding is settled
*Consultant: Bill Engelhardt, 448 -8838
-2-
G. LAKE LUCY ROAD EXTENSION (92 -12)
1. Contract has been let for Stage I (western
'
half) of overall project.
2. Work is scheduled to begin this spring.
3. Need Jerome Carlson, Dave Gestach, and MnDOT
to complete documents for the relocation of
the 60 -foot road access to an 80 -foot access
'
location farther south on TH 41.
'
*Consultant: Al Larson, Engelhardt & Assoc., 448-
8838
*Contractor: Northdale Contracting
H. CHANHASSEN ESTATES 1ST & 3RD ADDITIONS STREET
RECONSTRUCTION PROJECT (93 -10)
1. Wearing course and landscaping needs to be
completed in 1995.
2. Punchlist needs to be prepared. Ponding work
and excavation to begin the end of February.
'
3. Schedule assessment hearing for fall of 1995.
4. Monument sign for neighborhood.
*Consultant: Dave Mitchell, OSM, 595 -5699
'
*Contractor: Brown & Cris
I. GALPIN BOULEVARD RECONSTRUCTION (TH 5 SOUTH OF
'
TIMBERWOOD DRIVE) AND MC GLYNN DRIVE CONSTRUCTION
(FROM GALPIN BOULEVARD TO 1600 FEET EAST), STAGE
I(93 -26A)
'
1. Reinitiate public hearing scheduled for
3/13/95.
'
2. Plan and specification approval by City
Council scheduled for 2/13/95.
'
3. Contract for installation of temporary signals
will be let separately since plan approval
through MnDOT Signal Department will take
slightly longer than the rest of the project
plan approval.
4. Phase II of the project will be delayed until
1996 or later unless development of adjacent
properties construction the public
improvements under private contract.
J.
K.
*Consultant: James Unruh, Barton- Aschman, 332 -0421
POWERS BOULEVARD (CSAH 17) RECONSTRUCTION FROM TH 5 '
SOUTH TO LYMAN BOULEVARD (93 -29)
1. Project plans are being prepared.
2. A public hearing was held at the 1/9/95 City '
Council meeting. Action was tabled until the
financial /bonding analysis report is completed '
by Springsted regarding County -City funding
agreement.
*Consultant: Jon Horn, BRW, 370 -0700
*Carver County Contact: Bill Weckman, 361 -1010 '
LYMAN BOULEVARD RECONSTRUCTION /LAKE RILEY AREA
TRUNK UTILITY IMPROVEMENT PROJECT (93 -32A & B) '
1. A contract was let in the fall of 1994 for the
Stage I improvements consisting of the '
watermain installation along TH 101 from
Chanhassen Hills north to 86th Street, east on
86th Street through the Mission Hills
development and south through the TH 212 '
corridor and John Klingelhutz property.
2. Contract is approximately 65% complete. '
3. Remaining work to be completed in 1995.
4. Stage II project plans are currently being '
completed.
5. It is anticipated that some soil surcharging '
work will need to be conducted on the south
side of Lyman Boulevard near Quinn Road.
6. Stage II contract may be let in the fall of '
1995 or early 1996 depending on project
bonding.
*Consultant: David Mitchell, OSM, 595 -5699
*Contractor (Stage I): Annandale Contracting
-4-
r
L. WELL NO. 7 (94 -3)
' 1. Project test drilling was completed in the
fall of 1994 and was found satisfactory.
2. Need to acquire land for wellhouse from the
Gestach- Paulson property. Staff will continue
negotiations with property owners, however,
City Council was authorized at the 1/23/95
meeting condemnation and quick -take
proceedings for this project if necessary.
3. A separate contract for the wellhouse
' structure will be let in 1995.
4. Contract has been let for drilling and casing
of the well.
'
*Consultant:
Phil Gravel, BRA, 636 -4600
*Contractor:
Layne Minnesota
M. REPAINTING OF
MURRAY HILL WATERTOWER (95 -3)
1. Need to
meet with Jerry B. and select
consultant
to prepare plans and administrate
the work.
D
n
1 -5- -
II. IN -HOUSE PROJECTS
A. 1995 STREET REPAIR AND SEALCOATING
1. Bill and Mike to prepare list of candidate
projects for 1995.
B. PAVEMENT MANAGEMENT PROGRAM
1. Bill and Dan to schedule a review of all city
streets and an update to the Pavement
Management Data Inventory.
C. SPRING WATERMAIN FLUSHING
1. Informational notices to be put in City
newsletter and Villager newspaper.
2. Jerry B. to prepare and send out a special
letter to residents in the Summit Addition
regarding special procedures to be taken.
D. INSTALLATION OF AIR RELIEF MANHOLE IN SUMMIT
ADDITION
1. Jerry B. to schedule work by Machtemes in May.
2. Bonestroo & Associates to provide standard
drawings for the structure.
3. Lundgren Bros. has agreed to fund $1,500
towards this work.
E. SUMP PUMP INSPECTION PROGRAM
1. Need to meet and Don and solicit our RFP's and
select consultant to perform and conduct the
Sump Pump Inspection Program and provide
follow up.
III. PRIVATE D EVELOPMENT PROJECTS (N OT COMPLETEDI
A. LAKE RILEY HILLS (LUR 90-27- PROJEC NO 91 -10A
' 1. Preliminary plat approval (CC 2/25/91).
2. Final plat tentative for 1995, more likely
1996 - project pending.
' *Engineer: William Engelhardt & Associates
' B. ST ONE CREEK FIRST ADDITION (92 - 9)
1. Utilities completed. Outstanding utilities
punch list remaining. Utilities maintenance
bond expires 9/13/95.
2. Wear course to be placed in 1995.
*Developer: Hans Hagen, 572 -9455
*Developer's Engineer: Chuck Plowe, 785 -1043
C. BLUFF CREEK ESTATES (92 -10)
' 1. Wear course to be placed in 1995.
1 2. Maintenance bond (utilities) expires 8/31/95.
' *Developer: Keyland Homes /Chan Development, Gary
Horkey, 894 -2636
*Developer's Engineer: Marc Mogan
' D. WILLOWRIDGE 2ND ADDITION (93 - 4)
1. Project done except for warranty repairs.
1. Maintenance bond (utilities) expires 11/8/95.
' 2. Maintenance bond (streets) expires 12/12/96.
' *Developer: Lundgren Bros. Construction, Mike
Pflaum, 473 -1231 ist, Bob
*Developer's Engineer: Sathre- Bergqu
Payette, 476 -6000
E. WINDMILL RUN (93 -3)
1. Remaining streets punchlist items.
2. Maintenance bond (utilities) expires 12/13/95.
3. Maintenance bond (streets) expires 11/8/96.
F.
G.
0
*Developer: Rottlund Homes, Don Jensen
*Developer's Engineer: Pioneer Engineering, Paul
Cherne, 783 -1880
THE MEADOWS AT LONGACRES (94 -7)
1. Utilities complete and accepted.
2. Need as- builts.
3. Remaining punchlist items on utilities and
need maintenance bond.
4. Wearcourse to be installed in 1995.
*Developer: Lundgren Bros. Construction, Mike
Pflaum /Terry Forbord, 473 -1231
*Developer's Engineer: Schoell & Madson, Ken '
Adolf, 546 -7601
BLUFF CREEK ESTATES 2ND ADDITION (92 -10)
1. Utilities completed and accepted. Utilities '
maintenance bond expires 8/31/95.
2. Wear course to be installed in 1995. '
*Developer:
Keyland Homes, Gary
Horkey, 894 -2636
*Developer's Engineer:
James R.
Hill, Marc Mogan
CHANHASSEN
'
BUSINESS CENTER (93 -1)
1. Remaining streets
punchlist
items.
,
2. Maintenance bond
(utilities)
expires 7/31/96.
3. Maintenance bond
(streets) expires
7/31/96.
'
*Developer's Engineer:
RLK & Assoc., John Dietrich
933 -0972
-8-
I. LAKE SUSAN HILLS WEST 9TH ADDITION (93 -5)
1. Remaining streets punchlist items.
2. Maintenance bond (utilities) expires 1/10/96.
3. Maintenance bond (streets) expires 11/28/96.
*Developer: Joe Miller Homes, Ron Isaak, 454 -4663
*Developer's Engineer: Pioneer Engineering, Paul
Cherne, 783 -1880
J. ROYAL OAK ESTATES (93 -12)
1. Remaining streets punchlist items but project
is basically done.
2. Need maintenance bond (streets).
'
*Developer: Brett Davidson, 470 -9087
*Developer's Engineer: Charles Plowe, 785 -1043
*Contractor: Northdale Const., Tom Wilebski, 428-
'
4868
K. PRAIRIE CREEK TOWNHOMES (93 -14)
'
1. Remaining punchlist items.
2. Pond work, grading, landscaping.
'
3. Maintenance bond (storm sewer) expires
11/17/96.
*Developer: Jasper Homes, James Jasper, 442 -5611
*Developer's Engineer: Rehder & Associates, Greg
Hallings, 452 -5051
*Contractor: Dave Perkins Construction, Chris
'
Perkins
L. STONE CREEK 2ND ADDITION (93 -17)
'
1. Remaining streets punchlist.
2. Utilities installed under Project No. 91 -17A.
3. Maintenance bond (streets) expires 1/9/97.
*Developer: Hans Hagen Homes, Hans Hagen, 572 -9455
-9-
*Developer's Engineer: Charles Plowe, 785 -1043 '
*Contractor: S.R. Weidema, Scott Weidema, 424 -8140
M. TROTTERS RIDGE (93 -18) '
1. Remaining utilities punchlist items.
2. Wearcourse to be installed in 1995. '
3. Maintenance bond (utilities) expires 6/1/96.
*Developer: Tandem Properties, Jim Ostenson, 941- '
7805
*Developer's Eng.: James R. Hill, Joel Cooper,
890 -6044 '
*Contractor: Brown & Cris, Mike Devine, 469 -2121
N. SHENANDOAH RIDGE (93 -20)
1. Remaining utility punchlist items. '
2. Wearcourse to be installed in 1995.
*Developer: Shamrock Dev., Inc., Jim Stanton, 421-
3500
*Developer's Engineer: John Oliver & Associates,
Lynn Caswell, 441 -2072
0. TOWER HEIGHTS (93 -21)
1. Preliminary plat approved contingent upon
extension of Nez Perce Drive - judgement in
favor of the City. Condemnation proceeding on
Beddor parcel.
*Developer: JMS Dev., Jeff Schoenwetter, 949-
8908/922 -1981
*Developer's Engineer: Roger Anderson & Assoc.,
Roger Anderson, 546 -7035
P. BLUFF CREEK ESTATES 4TH ADDITION (93 -22)
1. Remaining streets punchlist items but project
is basically done.
2.
Maintenance
bond
(utilities) expires 1/24/96.
3.
Maintenance
bond
(streets) expires 1/9/97.
-10-
*Developer: Chan Development Co., Gary Horkey,
' 894 -2636
*Developer's Eng.: James R. Hill, Mark Mogan, 890-
6044
*Contractor: Ryan Construction, Tom Ryan, 894 -3200
Q. MISSION HILLS (93 -23)
t 1. Utilities partially completed and accepted.
2. Remaining grading, utility, and street work
over easterly portion.
' *Developer: Tandem Properties, Jim Ostenson, 941-
7805
*Developer's Engineer: Westwood, Dennis Marhua /Ed
' Haskek, 937 -5150
R. THE WOODS AT LONGACRES (93 -28)
' 1. Final plat /construction plans and
specs /development contract approved 6/27/94.
' 2. Construction scheduled for early spring 1995.
'
*Developer: Lundgren Bros., Mike Pflaum, 473 -1231
*Developer's Engineer: Schoell & Madson, Ken
Adolf, 546 -7601
'
S. STONE CREEK 3RD ADDITION (93 -30)
'
1. Utilities installed under Project No. 91 -17A.
2. Remaining streets punchlist items.
3. Maintenance bond (streets) expires 1/9/97.
'
*Developer: Hans Hagen Homes, Hans Hagen, 572 -9455
*Developer's Engineer: Charles Plowe Eng., 785 -1043
'
*Contractor: PCI, Dick Freeberg, 425 -4515
T. HIGHLANDS ON LAKE ST. JOE (93 -31
1. Final plat, development contract, construction
plans and specifications approved 10/25/93.
2. Waiting for annexation with City of Victoria.
-11-
3. Project on hold. 1
*Developer: Lundgren Bros., Mike Pflaum, 473 -1231
'
*Developer's Engineer: Sathre- Bergquist, Bob
Payette, 476 -6000
'
U. EDMUNDS SUBDIVISION (93 -33)
1. Did not proceed with subdivision - bankrupcy
,
pending.
2. Construction plans and specifications and
'
development contract approved 6/13/94.
*Developer: Dan & Robin Edmunds, 943 -8629
*Developer's Engineer: Engelhardt, Al Larson, 448-
8838
'
V. STONE CREEK 4TH ADDITION (94 -2)
1. Remaining utilities punchlist items.
,
2. Wearcourse /sidewalk improvements in 1995.
,
3. Maintenance bond (utilities) expires 8/22/96.
*Developer: Hans Hagen Homes, Hans Hagen, 572 -9455
*Developer's Eng.: Passe Eng., Derrick Passe, 755-
6240
'
*Contractor: Nodland Const., Dave Van Vleet, 428-
8565
'
W. MINNEWASHTA LANDINGS 94 -4
1. Remaining utilities punchlist items.
'
2. Wearcourse to be installed in 1995 (letter of
credit).
'
3. Maintenance bond (utilities) expires 1/23/97.
*Developer: Ken Durr, 935 -7789
* Developer's Engineer: Sathre- Bergquist, Bob
'
Payette, 476 -6000
X. CHURCH ROAD 2ND ADDITION (94 -6)
'
1. Remaining utiities punchlist items.
-12-
,
2. Need driveway paved.
' 3. Need maintenance bond (utilities).
' *Developer: Greg Reed, 470 -1168
*Developer's Engineer: Engelhardt, Al Larson, 448-
8838
Y. BLUFF CREEK ESTATES 5TH ADDITION (94 -10)
1. Remaining utilities punchlist items.
2. Wearcourse to be installed in 1996 (letter of
credit) .
3. Maintenance bond (utilities) expires 9/12/96.
*Developer: Chan Development Co., Gary Horkey,
440 -9400
*Developer's Eng.: James R. Hill, Marc Mogan, 890-
6044
*Contractor: Ryan Const., Tom Ryan, 894 -3200
'
Z. OAK PONDS 2ND ADDITION (94 -12)
1. Remaining utilities punchlist items.
2. Wearcourse to be installed in 1995.
'
3. Maintenance bond (utilities) expires 10/10/96.
*Developer: Dean Johnson Const., Dean Johnson,
493 -6340
*Developer's Eng.: Meadowood Eng., Bill Dolan,
'
890 -1272
AA. MINGER ADDITION (94 -13)
items.
1. Remaining utilities punchlist
'
2. Wearcourse to be installed in 1995.
3. Maintenance bond (utilities) expires 10/24/96.
*Developer: Pat Minger, 867 -2733
*Developer's Engineer: Westwood, Peter Knaeble,
831 -2989
-13-
BB. OLIVEWOOD ADDITION (94 -11
1. Final plat, development contract, and '
construction plans and specifications approved
8/8/94.
2. Work to commence in spring, 1995. '
*Developer: Arthur Johnson /Harry Peters, 473 -3839
*Developer's Eng.: Schoell & Madson, Ken Adolf,
546 -7601 '
CC. SHADOW RIDGE (94 -15)
1. Remaining utilities punchlist items. ,
2. Wearcourse to be installed in 1995.
3. Need maintenance bond (utilities). ,
*Developer: Bill Coffman, 835 -1270
*Developer's Eng.: Schoell & Madson, Ken Adolf,
DD. AUTUMN RIDGE (95 -5)
1. Preliminary plat approved 1/95.
EE.
2. Final plat, development contract, and
construction plans and specifications approval
pending.
3. Spring, 1995 construction anticipated.
*Developer: Good Value Homes, John Peterson
*Developer's Eng.: Passe Engineer, Derrick Passe,
755 -6240
OAK PONDS 3RD ADDITION (LUR 95 -1)
1. Preliminary /final plat approval pending
spring, 1995.
2. Spring, 1995 construction anticipated.
*Developer: Dean R. Johnson Construction, Dean R.
Johnson, 493 -6340
-14-
' *Developer's Eng.: Bill Dolan, Meadowood
Engineering, 890 -1272
' FF. SHAMROCK RIDGE (94 -18)
1. Preliminary plat approved 12/94.
' 2. Final plat, development contract, and
construction plans and specifications approval
' pending; anticipated spring /summer, 1995.
HH. POINT LAKE LUCY (LUR 95 -2)
1. Preliminary plat approval at Planning
' Commission meeting (2/15/95).
2. Final plat, development contract, and
construction plans and specification approval
pending spring, 1995.
3. Construction anticipated spring /summer, 1995.
' *Developer: Robert Mason Homes
*Developer's Eng.: Schoell & Madson, 546 -7601
1 -15-
*Developer: Ed &
Mary Ryan
*Developer's Eng.:
Charles Plowe Engineering, Chuck
Plowe, 785 -1043
GG. CREEKSIDE (LUR 94 -6)
'
1. Preliminary plat approval in 1/95.
2. Final plat,
development contract, and
construction
plans and specifications approval
pending.
3. Spring, 1995
construction anticipated.
*Developer: Heritage Development, John Dobbs
*Developer's Eng.:
RLK, Fran Hagen /John Dietrich,
933 -0972
HH. POINT LAKE LUCY (LUR 95 -2)
1. Preliminary plat approval at Planning
' Commission meeting (2/15/95).
2. Final plat, development contract, and
construction plans and specification approval
pending spring, 1995.
3. Construction anticipated spring /summer, 1995.
' *Developer: Robert Mason Homes
*Developer's Eng.: Schoell & Madson, 546 -7601
1 -15-
IV. PRIVATE DEVELOPMENT PROJECTS COMPLETED /UNDER WARRANTY
A. WILLOW RIDGE (91 -14)
1. Maintenance bond (streets) expires 4/25/96.
*Developer: Lundgren Bros. Construction, Inc.,
473 -1231
*Developer's Engineer: Sathre - Bergquist, Bob
Payette, 476 -6000
B. SUMMIT AT NEAR MOUNTAIN (92 -4)
1. Maintenance bond (streets) expires 12/12/96.
*Developer: Lundgren Bros. Construction, Inc. 473-
1231
*Developer's Engineer: Sathre - Bergquist, Bob
Payette, 476 -6000
C. THE SUMMIT AT NEAR MOUNTAIN 2ND ADDITION (93 -2)
1. Maintenance bond (utilities) expires 11/8/95.
2. Maintenance bond (streets) expires 12/12/96.
*Developer: Lundgren Bros. Construction, Mike
Pflaum, 473 -1231
*Developer's Engineer: Sathre - Bergquist, Bob
Payette, 476 -6000
D. CHAN HAVEN PLAZA 4TH ADDITION (92 -16) -
ABRA /GOODYEAR SITE
1. Maintenance bond (utilities) expires 7/10/96.
2. No street work on this project.
*Developer: Al Biesner, 560 -0246
Dolphin Development, Joel Harding
*Developer's Engineer: Schoell & Madson, Ken
Adolf, 546 -7601
E. OAK HILL /OAK POND 1ST ADDITION (93 -9)
1. Maintenance bond (utilities) expires 12/13/95.
-16-
2. Maintenance bond (streets) expires 11/14/96.
*Developer: Dean Johnson /Brad Johnson
*Developer's Engineer: Meadowood Engineer, Bill
Dolan, 890 -1272
F. BLUFF CREEK ESTATES 3RD ADDITION (93 -13)
1. Maintenance bond (utilities) expires 11/8/95.
2. Maintenance bond (streets) expires 1/9/97.
*Developer: Chan Development Co., Gary Horkey,
440 -9400
*Developer's Eng.: James R. Hill, Marc Mogan, 890-
6044
*Contractor: Ryan Construction, Tom Ryan, 894 -3200
-17-
V. SURFACE WATER MANAGEMENT PROJECTS
A. Chaparral Pond
1. Project is almost complete.
2. This spring pond will be graded out, contours
smoothed, and area seeded.
3. Need to monitor re- vegetation.
4. Work is being done by City Public Works.
*Contact: Mike Wegler, Public Works, 474 -1987 &
Diane Desotelle, Water Resources Coordinator, 937-
1900, Ext. 156
B. Chanhassen Estates Water Ouality Pond
1. This project is in conjunction with Project
No. 93 -10.
2. Project is almost complete.
3. Surveyors to check contours and grades.
4. Area needs to be re- vegetated and monitored.
*Consultant: David Mitchell, OSM, 595 -5699
*Contractor: Brown & Cris, 469 -2121
C. SWMP - Lotus
1. Three phase project includes excavation of
wetland near Yuma Drive (Wetland 1), raise
water table of wetland off of Bighorn Drive
(Wetland 2), and stabilize the ravine to Lotus
Lake.
2. Wetland 1 excavation is almost complete.
Needs to be graded out, contours smoothed, and
area seeded.
3. Areas where excavated soils were spread need
to be seeded and monitored for re- vegetation.
4. Work on Wetland 2 will begin in March.
5. Work along ravine will begin in late spring or
early summer.
*Consultant: Phil Gravel, BRA, 636 -4600
*Contractor: Public Works (474 -4127) & Yet to be
decided from bids
D. Lake Riley
1. Plans have been designed but need to be fine
tuned.
2. Received Corps permit.
3. Need to incorporate design with Lyman
Boulevard expansion and John Klingelhutz
development.
fl
I1
F
u
*Consultant: Phil Gravel, BRA, 636 -4600
*Contractor: Yet to be decided
E. Wetland Restoration on Powers Boulevard
1. Project was in conjunction with Powers
Boulevard Reconstruction Project No. 93 -29.
2. Wetland restoration and trail will be pursued
even though road project is delayed.
3. Requesting bid from consultant.
4. Plans are to complete project by the end of
the year.
*Consultant: Jon Horn, BRW, 370 -0700
*Contractor: Yet to be decided
F. Fox Path
1. Design completed.
2. Need to hold neighborhood meeting and fine
tune.
3. Lower priority but hope to accomplish in 1995.
*Consultant: Phil Gravel, BRA, 636 -4600
*Contractor: Yet to be decided
-19-
G. Lake Manaaement
1. Lake Management plans and newsletters
completed for Lotus, Riley and Minnewashta.
2. Workshops to be held in late March.
3. Continue water quality monitoring.
4. Planning stage for projects.
*Consultant: Steve McComas, Blue Water Science,
690 -9602
H. Bluff Creek Watershed Plan
1. Technical data to be collected and funding
secured for coordinator.
2. May 1 - Hope to have watershed coordinator
contracted through DNR working on project.
3. Plan will incorporate land use and natural
resource management and Park & Rec. along the
Bluff Creek corridor from Lake Minnewashta to
the Minnesota River.
*Contact: Diane Desotelle, Water Resources
Coordinator, 937 -1900, Ext. 156
g: \eng \charles \status
-20-
FEB -22 -1995 09:35
L( MUNICIPAL,
( j AT M
�..'�..lL � 11 r SS
February 20, 19
I
I
Dennis Kraft
Shakopee City Administrator
Shakopee City Hall
129 Holmes Street South
Shakopee MN 55379
P.01
18M Fifth Strcet Towers
15o South Fifth Street
Minneapolis, MN 55402 -4218
Telephone: (612) 672 -3600
- Facsimile. (612) 672 -3777
r e-
!2
f` 5;4
Dear Donn$,
o p e b r ugry 8, the Board of Directors of the Municipal Legislative Comalisaion (MLC)
unanimously and enthusiastically adopted a motion that would invite additional cities and
counties to join the MLC as associate members in order to combat Representative
Orfield's "tax based sharing" initiatives.
As you know, the MLC is currently composed of twelve s ubur b s s w hich efforts t shown ti the
bottom of this letterhead. Our group is adamantly oppo
additional tax based sharing policies On our taxpayers. The MLC Board of Directors felt
that additional support from e � abiliti Go b� counties d
s uccess ful in defeating thee onerous tax
part of the regivza will enhance Y we will eat
policies. If we can increase Our size from twelve members to over 20,
gr eatly
increirae our legislative presence and chances of success.
new members would
As we discussed, :any additional funding that may be available due to
be used for developing a public relations p1•ogram which would be undertaken by an
outside public relations firm.
ber war, not The amount of dues to be. abseseed against new mem
ent dues cities
Structur�' amolpnts t $�Z5 Per
addressed at the MLC Board Meeting. Our curr
capita with a $12,000 maximum. We would not expect new "associate members" to pay
the full amount.
I would like to propose associate membership dues for 1995 to be somewhere is the
$1,000 to $2,1500 range, dependi on a city's size. Current MLC cities may have to pay
an additional assessmetlt if additional funds are needed.
an
I am encouraged by the positive yesponse t1le MLC a rece tax a the C apitol a tax based
organization that is willing to aggress el Y lig
Member Cities: Apple Valley, Bloomington, Eagan, Eden Prairie, l:d.ina, Lakeville,
Maplewood, Minnetonka, Plymouth, Roseville, Shoreview, Woodbury
FEB -22 -1995 09 :37
P.01
I
sharing. O clout and ability to preva will only be enhanced by new members. On
behalf of the MLC, I would like to welcome everyone who desires to join. - I
i will schedule an orgar►iVitional meet" as soon as we receive some w ri n g t that
a dditional citisa and counties are willing to associate with the rdLC during the 1995
Legislative Session.
Please feel free to contact me at 228 -9767 if you have any questions.
Sincerely,
Robert G. Renner, Jr.
Lobbyist, MLC
cc: Mayor Jny'I)sroey. MLC Clinir
Bob Erickson. MLC Vice Chair
DISTRIBUTED VIA MAIL AND FAX
RCRjj"%j2_1 wGl•
i
1
1
1
1
1
1
1
-
t
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
MEMORANDUM
C
I TY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
TO: Public Safety Department staff
Carver County deputies
FROM: Steve A. Kirchman, Building Official
DATE: March 4, 1995
SUBJECT: Parking
I spoke with Todd Gerhardt on 3/3/95
suggestions that might be helpful.
Seniors have protested about staff using p
on Coulter Drive. Overflow parking by
to the curbs east of the entrance to theul
concerns about lack of patron parking spa
that the east end of the lower east lot
vehicles.
Four additional City vehicle
spaces must be maintained
"VISITOR PARKING" "' any
also comply with °reserved s
Any additional suggestions
cooperation!
concerns. Todd had a number of
king spaces adjacent to the entry of the Senior Center
ff and deputies on Coulter Drive should be confined
wer east parking lot. The library has also expressed
;s when staff uses the lower east lot. Todd has agreed
be used provided that staff parking is limited to three
soon add to the overc
overcrowding
PC: Todd Gerhardt, Assistant City
g. \�safety\sak4nemos\psdTarking.ps l
in the parking lots, and visitor
in the west lot is between the
City staff and deputies should
Thanks for your
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
MEMORANDUM
TO: Don Ashworth, City Administrator
FROM: Diane Desotelle, Water Resources Coordinator
DATE: March 7, 1995
SUBJ: Update on the water quality project near Lotus Lake
This is an update on the status of the water quality project near Lotus Lake. Staffs goal is to
keep you informed of the status and give a presentation on the whole project after it is
completed. We hope to complete the project`', by the end of 1995. Essentially there are three
phases to this project which I will discuss below:
Phase I : This includes the excavation of approximately 5,000 cubic yards of material at the
wetland along Yuma Drive (Wetland 1 on the attached figure). Public works staff has completed
most of the work. There is still some brush to be cleaned up and some of the side slopes may
need fine - tuning. We may do some seeding in the spring to expedite re- vegetation.
The three sites that received the material, via a Council approved interum use permit, have been
graded out. Erosion control will be installed where necessary as soon as we see changes in the
weather. These areas will also be seeded to expedite re- vegetation.
Staff is working on obtaining drainage easements from both Jeff Kleiner and Mike O'Kelly to
install a storm sewer pipe along their property line to discharge into the sediment basin excavated
on the east side of Wetland 1. Bonestroo and Associates is performing the engineering for the
pipe size and installation. This, along with reconstruction of the wetland outlet and storm pond
outlet off Woodhill Road, will be done this string
Phase II and III This phase includes raising the water table of Wetland 2 and stabilizing the
ravine to Lotus Lake. Originally we were looking at raising the water table of Wetland 2 three
feet and constructing a sediment pond at the outlet of the ravine near Lotus Lake. After some
initial feedback from our first neighborhood meeting on December 14, 1994, we have changed
the specifications. First the water table of Wetland 2 will be raised only two feet and the berm
will not be raised at all. This will reduce the nutrient retention capabilities by only 12 percent
Don Ashworth
March 7, 1995
' Page 2
and is acceptable to the neighbors. Large storms will continue to overflow the berm as they
always have. Second, we have eliminated the sediment pond at the mouth of the ravine. There
would be too much tree loss. Furthermore, slope stabilization and re- vegetation will be done
with bioengineering techniques to reduce the sediment loads by stabilizing some heavily eroded
slopes along the ravine. The channel of the ravine will be re- aligned in order to assist the
channel in finding a more stable meander. The existing channel is a bit out of wack due to
increased flows resulting from development and the creation of additional impervious areas.
Eroded slopes will be stabilized, some trees will be removed to increase sunlight to the area, and
an array of various plants will be added to the area to help tie down the soils. Some surface flow
over the top of the ravine banks from down spouts and yard runoff will also be routed to
controlled areas to reduce erosion.
After our second neighborhood meeting on February 13, 1995, we found that the neighbors are
pleased overall with the project. The sediment pond shown just south of Wetland 2 will be used
' to route most of the ravine through Wetland 2.
We hope that these changes will alter the characteristics of Wetland 2 by creating deeper water
' for emergent vegetation. The water quality into Lotus Lake will also improve. This, in
combination with future SWMP projects around the lake and lawn care and watershed education,
will also help improve the overall water quality draining into the lake.
g:\ eng \diane \swmp \yumaproj \update.cc
II ,
m
m
v
v
s n
G
Z
/,--, /
8
m
m
\1
1
1
1
1
i
1
1
1
1
1
1
1
1
1
1
1
o�
z �,
�•
amp
to
N �>
NO
O �
�
r�
C�
8
m
m
\1
1
1
1
1
i
1
1
1
1
1
1
1
1
1
1
1
CITY OF
CHANHASSEN
I March 8, 1995
i
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
Mr. Bruce H. Johnson
7000 Derby Drive
Chanhassen, MN 55317
' Re: Drainage Complaint - File No. SWMP -19UU
I Dear Mr. Johnson:
I received your letter regarding surface drainage problems in your backyard and also discussed
' this matter further with Mr. Bill Bement of the Engineering Department whom you referenced
in your letter as having had previous meetings with. Your letter you stated a few items of which
I have some concerns. First of all, you .indicated that there has been a low area across your
' backyard which has been a drainage problem since your home was built in 1987. If this is true,
you should have brought this to the attention of your builder back then so that the problem could
have been rectified promptly. Most home builders offer a one -year warranty period so that even
' if the problem was not noticed when you moved in you would likely have had a 12 -month period
to acknowledge a builder- related grading problem. Notifying the City 6 years after the fact does
not allow for reasonable determination of the cause, whether it be the builder's grading, settlement
' or something else.
Second, you indicated that you learned from discussions with Mr. Bement that drain tile was
' installed under the curb on Preakness and along Derby Drive adjacent to your '`lot during the
construction of these streets. -It is your assumption that this drain tile was put in due to drainage
problems. You are correct with regard to subsurface drainage; not surface drainage. It is
' important to point out that drain tile is a device used along roadways constructed in areas of
saturated soils or high ground water. The fact that your sump pump runs quite often is due
' largely in part to subsurface drainage as well as „some surface drainage. High groundwater tables
and spring formations are common in this southwest metro/Lake Minnetonka area.
' Finally, you stated that your neighbor to the south recently ran their sump pump hose to their
sideyard which runs directly into the low area of your backyard exacerbating the problem. I
strongly recommend that you make contact with your neighbor to seek cooperation in modifying
Mr. Bruce H. Johnson
March 8, 1995
Page 2
the location of their discharge point. If you so desire, Mr. Bement and a member of the
Building Department can meet with you and your neighbor to discuss proper sump pump
discharge location and the corresponding City Ordinance.
I can offer two solutions for you to resolve your problem. The first is to haul in a small amount
of material to fill in the low area and grade some drainage swales around the northwest and
southwest portions of your lot. If the quantity of Ell is less than 50 cubic yards you do not need
a City permit; however, we would be happy to advise you on this operation. Your other option
would be to add some shallow draintile from the low area and your sump pump which could be
extended down to the City's roadway drain tile system. This work in City right -of -way would
require a permit. In either alternative, unless you could obtain cooperation from your builder,
you will be responsible for all associated costs.
In conclusion, while I empathize with the frustrations of dealing with a drainage problem, I am
quite confident that any responsibility related to your builder could have and should have been
dealt with promptly. Due to the amount of time that has elapsed it is impossible to determine
whether the initial grading was incorrect, whether the area in the backyard has settled over time
or what else may have been the cause.
Sincerely,
CITY OF CHANHASSEN
Charles D. Folch, P.E.
Director of Public Works /City Engineer
CDF:ktm
c: Don Ashworth, City Manager
Dave Hempel, Assistant City Engineer
Bill Bement, Engineering Technician II
g :1e ngkha rle sl ette rs \johns on. l