Loading...
1c. Approve Plans and Specs for the Wetland Restoration and Trail Construction on Powers Blvd. and SWMP Water Quality Project on Lotus LakeCITY OF /(-I 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612)937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: Don Ashworth, City Manager Coordinator FROM: Diane Desotelle, Water Resources �' i I Todd Hoffman, Park and Recreation Director Y� Action by City Administrator Endorsed� Modifie DIe Submitted to Commission Debt Submitted to COMA - , � — DATE: May 12, 1995 ' SUBJ: Approval of Plans and Specifications for Wetland Restoration and Trail Construction - Powers BoulevardReconstruction Project No. 93 -29 and Yuma Drive/ Lotus Ravine Watex Quality Project - SWMP 12A ' BACKGROUND Two surface water management projects authorized by the City Council and noted above are ' ready for the bidding process. Since both;of these projects are considered small when it comes to bidding, staff plans to bid the two projects together in order to keep the field of potential bidders more diverse. ' The first part of the project s i th e wetland restoration and trail construction associated with the Powers Boulevard reconstruction project. A dike and control,, structure will be constructed near the north end of the existing`wetland located north of Lyman Boulevard and east of County Road 17. In addition, the wetland =will - be by excavating upland area along its western edge. The control str re will allow a permanent pool of water to be created in the wetland. These % .a a improvements vVT° f 'V , en erate more diverse habitat, an aestlietically pleasing envionment, and a wetland bank for the City ": The trail construction is an 8 -foot wide bituminous pathway across the dike and running along the •eastern. side „of the_ wetland where!.i# will then connect up to ' Barbara Court. Attached are the constructions plans for this `part of the project. The detailed plans and specifications are in Diane Desotelle's;office for further review. The second part of the project is the water quality improvement project near Lotus Lake. Attached are the construction plans for this part of the project. Wetland 1 was excavated last ' February after the City Council approved the grading permit. The next phase of this project includes raising the water table of Wetland 2 and installing outlet control structures at each of the wetlands. The existing storm sewer on the south end of Wetland 2 will also be tied into the Don Ashworth May 12, 1995 Page 2 wetland for pretreatment. The detailed plans and specifications are in Diane Desotelle's office for further review. ANALYSIS Both of these projects have been through extensive engineering and design work. In general, the public is supportive of the plans. Staff has been trying to obtain a drainage easement to install storm sewer on the north end at 655 Carver Beach Road. If the easement does not go through, the storm sewer along Carver Beach Road and through the lot on the north end to the sedimentation pond will not be installed. The storm water will continue to run through the property as it always has and no changes will be made. Upon approval of the plans and specifications the following schedule is proposed for the project. Advertise for Bids May 26, 1995 Bid Opening June 20, 1995 Award Contract June 26, 1995 Start Construction July 10, 1995 Complete Construction September, 1995 RECOMMENDATION Staff recommends that the City Council approve the plans and specifications for the Wetland Restoration and Trail Construction along Powers Boulevard and the Yuma Drive/ Lotus Ravine Water Quality Project located near the northwest arm of Lotus Lake. Attachments c: Charles Folch, City Engineer Dave Hempel, Assistant City Engineer Kate Aanenson, Planning Director g:\eng \diane\swm p \yum aproj \p &s.m em - ---- --------------- — - - ------ b Z > t b t o „ r \ \ j P D x / OdO Ll -x < 0 < > o m 0 K: M m z 8 p ---j to r C DOE WJ31 0 - u > WJ3k Zl 0 - c- 'M DAB CITY OF CHANHASSEN Bonestroo WATER QUALITY IMPROVEMENT PROJECT 0 R gene Anderlik & 'a i CITY PROJECT NO. SWMP-12A Associates VIM �s Y Q r 0 r� s 0 L Z n 0 m my� N_o �F1 A >16i y m> M A Ac;Ax g � yyy C �� NZ� C15 O O y P Oy O R y > 8 O K F4 a4�g AC R a= 9 M T IEEE t"a W two W � y O y � L*> a* m 0 0 O 0 > z � oN T � V 00 O m Z - r- r (O > D C (3 - ' O O Z;o a zv N rrl z O N rri z v M v rn M x D ri n x = r z � D O z IEEE t"a W two W � y O y � L*> a* m 0 0 O 0 > z � oN T � V 00 O m Z - r- r (O > D C (3 - ' O O Z;o a zv I ME MADE: a: \GSAM11\PL — 511T \.C- T\17W-T.O.0 WE: uor 17. 1995 9:02° / i t %�' \ii` N L� s� I � } } I } i t / fly' V " v \ \ 5••. i / a� $ Eli %� o a � , M03E9 NY WY ASEx 6 Mw CaAK 17 WMAr0 Mf110AYM 02e.1e. AND PARK MA MY a a w ac (n M& ORADINO n—b. Nw fM SWW 0— S. NO PATMMAY PIAN 3ALr •.. toe een. 6r. etflro.•3a w MLnNa1. �. \X \ \ 1 roE: u o ;u--D 3023ADO i 113051[6[9 OAARJ Br: tt9� µ D,O6FDt V6g M StA1E aJC 3 SiAN1CS SECPW 136.03 10 91 t7NE o.r3 ME HAVE: W.\CSAH17\PUw- SHT\KE T\17KTDCT.DW DATE: ro710. 1995 3:27P 0 f %1 a S 4 j b O \ O � D 4 C m D s z 5 T Z T 0 o Z m Q N � n F M N M �...1.1k eRY �; Ar HilD�60ee. 16a 1 1 A • m D m N zN n an N Do i > N r $ r r � Fn 58 H m o c) D O e ( s) (9 @G z \ O U O s N Z D m x N A D 4 C m D Ul r D D zm ?� O X N o Z O N N V mO O N N C r N O m r �...1.1k eRY �; Ar HilD�60ee. 16a 1 c n C m0 z In zm m D m N zN n an N Do i > V O D C D nl � m m ZO 55 M Om r m m = C T O P m f L m m Z Z 1 O n O N m v J O O O I x C Z x mm z z C �o -0 00 xzs _� �z m O D x� nAO A APO m o az MPO Po oo-. oz mm 1 N; Nn OZ n z Z z p Z n - �� mZ D ;n A 00 xs xA mr{ z z� m mm V1= co OZ A yn o m m s 0'U o D IM Z an S :1 N O m z z x N D F� C 2. b 8N - R A Z> n O z ,o D m OO v � ti 0 Z m p ° m D \ O Z X ° C�A�SASSSR Ul C4" 17 11ERAO If11CATI0N AO PMiC 7All X w P]Ic r ETIA 7H IfTa ETAL PATHWAY DETAtS �...1.1k eRY �; Ar HilD�60ee. 16a 1 N 0� 5 8 z Ul N ° p DvN k g � i ;o 5 8 z Ul N ° p ;o x 0 r P - T � eo u 9 9999 D O (f . Y 1 3aa f _ 8 .. V v 7R t A R D wow, a9w nc . E . Tqe 0e .EPpt! T 23YEA10 er uE m —A �r arccr swwasal .w nuI i Au . dAr ArosmrcD Aw er: as P< � 590eu OKY�1 UMEx M STArt � R � . sIANrtS SCCIgv ]16.07 10