Loading...
2h Feasibility Century Blvd.CIT OF Cig Center Drive, PO Box I47 Minnesota 55317 Phone 612.93Z I900 General Fax 612. 93 7. 5739 ' Fax 612.93Z9152 Fax 612.934.2524 www. ci. chanhassen, m n. us MEMORANDUM TO: Teresa Burgess, Public Works Director/City Engineer FROM: Matt Saam, Project Engineer DATE: December 29, 2000 SUB J: Authorize Preparation of Feasibility Study for Century Boulevard (North of Coulter Boulevard and South of Trunk Highway 5) Street and Utility Improvements - Project No. 97-1C The City of Chanhassen has received a petition from the sole property owner along Century Boulevard for the extension of sanitary sewer, watermain and street improvements. In response to the petition, request for proposals were solicited to four qualified engineering firms. The City has received back three proposals from engineering firms to prepare feasibility studies. The impetus for the petition is two-fold. First, the Trunk Highway 5 improvements to. the north are proposing to connect storm sewer to the future Century Boulevard system. The Trunk Highway 5 storm sewer is scheduled to be constructed in July of 2001 so the Century Boulevard system must be in place by then. Second, the petitioner has a pending development, Arboretum Business Park 4th Addition, which requires utilities from the extension of Century Boulevard. Upon review of the proposals received, it appears the low bid is from Bonestroo, Rosene, Anderlik & Associates. The following table lists the proposals received from the three engineering firms responding to the request for proposals: Bonestroo & Associates $ 696 WSB & Associates $1,800 HTPO , $5,750 1 After the preparation of the feasibility study and public hearing, staff will prepare a request for proposal to provide design, construction and administrative services to the consulting firms listed above. Staff recommends that the City Council authorize Bonestroo & Associates tO prepare a feasibility study for the street and utility improvements for Century Boulevard as outlined in their proposal dated December 20, 2000 conditioned upon the petitioning property owner executing the attached feasibility study agreement to fund the preparation of the feasibility study. Attachments: Petition from Steiner Development. Feasibility study agreement. Proposal from Bonestroo & Associates. c: Fred Richter, Steiner Development Phil Gravel, Bonestroo & Associates §:~eng~public~OT-l'Oauth prep offeas study.doc Y~':'i3~'7~5.~5).;~ i:7~;/ ~..: ~.~'T:A~('_:i~ City of Chanhassen. A rrowin~ communit~ with clean lakes, oualitv schools, a charmin~ downtown, thrivin~ businesses, and beautiful =r/es. A ereat Idace to live. work. and ,l~, -Develoom n , InC. 3610 Counw Road wayzata, MN 55391 (952)4~-5650 Fax (952)473~058 November 16, 2000 Matt Sa~m _AssiStant City Enoineer -C.,ity. of Cnanna~sen P.O. Box 147 Chanhassen, Minnesota 55317 RE: Arboretum Business Park Century Blvd. Extension Dear Matt: Steiner Development is requesting that the City of Chanhassen complete the extension of Century Blvd. to Highway 5 in Arboretum Business Park. This approximate 370 foot extension will tie into the MDOT improvements being constructed on Highway 5. The right of way is rough graded at this time and portions of the mass grading of the adjacent sites to Century Blvd should be coordinated with the City work. Please advise me of you're your proposed schedule to complete Century Blvd. so that Steiner can complete in a timely manner any adjacent work that will be required. Thank you for considering this matter. Sincerely, S~mP:\PROJECTS\Ch~n 5 & 41-Ph~e NO',/ i Ll3u0 EN GiNE'.EE;;'-".& i;EPT, FEASIBILITY STUDY AGREEMENT AGREEMENT made this day of ,2001, by, between, and among the CITY OF CHANHASSEN, a Minnesota municipal corporation ("City"), and STEINER DEVELOPMENT CORPORATION, a Minnesota corporation ("Steiner"). RECITALS A. The City has under consideration Improvement Project No. 97-1C ("the Project"). B. Property under the control of Steiner would benefit by the project. Co The City is only willing to continue its consideration of the Project on conditions that Steiner fund preparation of the feasibility study. NOW, THEREFORE, in consideration of the mutual covenants the parties agree as follows: The City will instruct its consulting engineering firm to prepare a feasibility study for the Project. . o Upon execution of this Agreement, and receipt of $696.00 by the City to fund preparation of the feasibility study for the Project. If the City awards bids for the project, the payment described above shall be refunded to the party making the payment. -1- (SEAL) CITY OF CHANHASSEN BY: Linda Jansen, Mayor AND: Scott A. Botcher, City Manager STATE OF MINNESOTA COUNTY OF CARVER The foregoing instrument was acknowledged before me this day of , 2001, by Linda Jansen and by Scott A. Botcher, respectively the Mayor and City Manager of the City of Chanhassen, a Mim~esota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. NOTARY PUBLIC STEINER DEVELOPMENT CORPORATION Fred Richter, Vice President STATE OF MINNESOTA COUNTY OF The foregoing instrument was acknowledged before me this day of 2001, by Fred Richter, Vice President of Steiner Development Corporation, a Mirmesota corporation. NOTARY PUBLIC g:\eng\public\97-1 c':agreement.doc Bonestroo Rosene nderlil{ & Associates Engineers & Architects Bonestroo, Rosene. Anderlik and Associates, Inc. Js an Afflrrnallve ActJon/£ ual - · ' ' , q Opportunity Ernploye~,,~ Principals: Otto G. Bonestroo, P,E. - Joseph C. Anderlik, RE, · Marvin L. Sorvala, RE. Glenn R. Cook, RE. · ~obert G. Schunicht, RE. · Jerry A. Bourdon, RE. · Robert ~. Rosene, RE, Richard E. Turner. RE. and Susan M. Eberlin, C.RA., Senior ConsuKants Associate Principals: Howard A. Sanford. RE. · Keith A. Gordon, RE. · Robert R. Pfefferle, Richard W. Fo~ter, RE. · David O. Lo~kota, RE. · Robert C. Rus~ek, A.I.A, · Mark A. Hanson, RE. · Michael T. Rautmann, RE. · Ted K.Field, RE. · Kenneth R Anderson, RE. · Mark R. Rolfs, RE. Sidney R ~illiamson, RE., L.S. · Robert R Kotsmith · Agnes M. Ring · Allan Rick Sc~midt, Offices: St, Paul, Rochester, ~illmar and St. Cloud, MN · Milwaukee, WI Website: www, bonestroo.com December 20, 2000 Mr. Natt Saam City of Chanhassen 690 City Center Drive, PO Box 147 Chanhassen, MN 55317 Re: Century Boulevard City Project 97-1C Our File 393gen Dear Matt: We have reviewed your request for professional services for the extension of Century Boulevard dated December :[5, 2000 (copy attached). We can prepare a letter Feasibility Report as outlined in your request for a lump sum amount of $696.00. We trust that you are familiar with our qualifications. We previously completed the reports and design for the other phases of the project. I will be the project manager and will prepare the report. Feel free to contact me if you have any questions or require any further assistance. Sincerely, BONESTROO ROSENE ANDERLIK AND ASSOCIATES Phil Gravel, Associate Principal cc: Teresa Burgess DE(; % g 2000