Loading...
3t. Wetland Bankingf u MEMORANDUM CITY OF CHANHASSEN 3 8 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 TO: Don Ashworth, City Manager FROM: Diane Desotelle, Water Resources Coordinator U) X�' I DATE: June 6, 1995 f U SUBJ: Wetland Banking BACKGROUND The City has the opportunity to add approximately one half acre of wetland mitigation to our wetland bank as part of the Lake Lucy Road extension project. Staff is working on an agreement with Mr. Jerome Carlson to enter his property at the intersection of Lake Lucy Road and Highway 41 to excavate and seed an area adjacent to an ag /urban wetland. This area has had a history of dumping and filling, and therefore, it is no longer defined as wetland (see attached figure). Most of the material can be removed and replaced on -site in various areas of the road construction project. Some of the materials, however, may have to be taken to a landfill or discarded off site. If this is the case, Mr. Carlson has agreed to pay for the extra costs to haul the material. The consultant on the project also walked a portion of the property at Mr. Carlson's request to confirm_ that he did not have other wetlands on site that may need mitigation in the future if development of the property should occur. Since there did not appear to be any wetlands on -site (see attached letter), the City will pay for the entire mitigation (accept for additional excavation and disposal costs) and acquire the entire bank for future road or surface water management projects. I ANALYSIS This project will be very timely and cost effective since the equipment and labor is already mobilized for the Lake Lucy Road extension project (No. 92 -12). The City's cost to complete the mitigation will be approximately $13,700 and will be funded by the Surface Water Management Program (see attached cost estimate). Don Ashworth June 6, 1995 Page 2 Staff believes that this project proposal exemplifies the "partnering" concept between government and private parties and will be a win /win situation for the City and the property owner. In addition, the intersection of Lake Lucy Road and Highway 41 will be more aesthetically pleasing and offer more diversity in habitat for vegetation and wildlife. RECOMMENDATION Staff recommends that City Council approve the wetland mitigation at the southeast corner of Lake Lucy Road and Highway 41 in order to provide some wetland bank for future City projects. Attachments c: Charles Folch, City Engineer Dave Hempel, Assistant City Engineer Kate Aanenson, Planning Director g: \eng \diane\w etlands \bkcarlsn.cc / 1. \ �.Q� \: I I�� I I N I I 111 I I I I �o 0 1 0 - -- -- -- /IS O N -� - ° z z 0 0 0 � 3 3 0 z o V V W V � J w 0 z z 0 w Q Q w LLI \ r r � Q Q � O O U �\ w w /IS O N -� - WILLIAM R. ENGELHARDT ASSOCIATES, INC. 1107 HAZELTINE BOULEVARD CHASKA, MINNESOTA 55318 (612) 448 -8838 June 7, 1995 City of Chanhassen c/o Ms. Diane Desotelle 690 Coulter Drive Chanhassen, MN. 55317 RE: Jerome Carlson Property Wetland Evaluation Dear Diane: On Tuesday, May 6, 1995, I conducted a one hour on -site wetland evaluation of approximately 25 acres of the Jerome Carlson property. The section of the property evaluated extends from the high line wires and fence west to Highway 41 and from the woods south of the Lake Lucy Road extension project, south to the Jacobson property. This area was evaluated for the existence of any wetland basins. No wetland basins were identified on this portion of the property. This finding is consistent with the City of Chanhassen's Wetland Classification Map. Very truly yours, WILLIAM R. ENGELHARDT ASSOCIATES, INC. Stephen Albrecht Training Certified Wetland Delineator SA /las enc. 1 LAKE LUCY WETLAND EXPANSION COST ESTIMATE Excavation and Disposal (On -Site) Landscaping Surveying Engineering 3,000 C.Y. @ $ 3.70 /C.Y. _ $ 11,100 Lump Sum = $ 1,000 Lump Sum = $ 600 Lump Sum = $ 1,000 Total Cost = $ 13,700 Additional Excavation and Disposal Costs: Excavation Fill Off Excavation Materials Excavation Off -Site and Disposal, Compactable Site and Disposal, Unsuitable Off -Site and Disposal, Rubble $ 5.85/C.Y. $ 7.20 /C.Y. $18.00 /C.Y.