Loading...
1d. Accept Utility Improvements in Minger Additioni TO: Charles Folch, Director of Public Works /City Engineer FROM: Dave Hempel, Assistant City Engineer. DATE: October 18, 1994 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 f SUBJ: Accept Sanitary Sewer and Water Improvements in Minger Addition Project No. 94 -13 Staff has received a letter from Mr. Peter Knat requesting the City consider acceptance of referenced project. According to Mr. Kna( completed in accordance with the approved �j bituminous asphalt. The public utility improi Staff has performed a walk- through inspect CITY OF CHANHASSEN Action by My AAdm--in��ist��.ator l;;rdorsed� bit lAoditie - �lscte DW Submitted to Commissar Date Submitted to Council CT I/ roject Engineer with Terra Engineering, Inc., to ublic utility improvements in the above - e, the public utility improvements have been ins and specifications including the first lift of ,nts hake been tested and approved by City staff. n of tie project and found that some minor adjustments are required by the contractor prior to final acceptance by the City. For the record, the utility portion of the project shall include only the warmain and sanitary sewer system. The storm sewer and ponding facilities shall be considered 0. acceptance upon completion of the final wear course (streets) in 1995. V The City has received lvhe necessary bond guaranteeing the utilities for two years from the�cceptance date. r ' that the City Council accept the Letter from Peter 1994. Location map. c: Mr. Pat Minger, Minger Construction I g: \eng \dave \cc\minger.I 1 is utilities in Minger Addition, nditioned upon the contractor Engineering, Inc. dated October 10, 0FfIC & WNEEPJNG COPY Received Revision No. — Approve Date A by ity Council DM MEMORANDUM It is therefore recot Project No. 94 -13 completing any A . U0 jms Attachments: 1. r ' that the City Council accept the Letter from Peter 1994. Location map. c: Mr. Pat Minger, Minger Construction I g: \eng \dave \cc\minger.I 1 is utilities in Minger Addition, nditioned upon the contractor Engineering, Inc. dated October 10, 0FfIC & WNEEPJNG COPY Received Revision No. — Approve Date A by ity Council DM MEMORANDUM TERRA ENGINEERING, INC. Land Planning - Civil Engineering - Consulting 5301 Edina Industrial Blvd. Suite #7 Edina, MN 55439 (fax) 831 -3093 831 -2989 October 10, 1994 David Hempel City of Chanhassen PO Box 147 Chanhassen, MN 55317 RE: Final Acceptance Utility Construction Minger Addition , Dear Dave: The sanitary sewer, storm sewer, and watermain construction for the project described above is considered completed in general conformance with the plans and specifications for the project. Deviations from the plans and specifications, if observed by Terra Engineering, Inc., have been reflected in the record drawings and tie sheets which will be submitted under separate cover. Please consider this letter an application for final acceptance of the sanitary sewer, storm sewer, and watermain for this project. If you need any additional information, please call. I Sincerely, o�'& I J I Peter Knaeble, P.E. cc: Pat Minger, Minger Construction Y Or "'AMM = OGi 121994 DEBT all-l" w POND }.r -. i 0, I VL E ET � oN POND P ARK w CRE O K F m � m 18 ) LYMAN BLVD. — - - 1 0 O O c 0 m N C N 8700 —� O O 0 m 8800 — 1n 0 N 8900 —_ O 2 a It a z I 0 O In N a n a I � Po TONE EEK DR VE• C PARK PARK��I