Loading...
4 Rice Lake Manor 2nd AdditionCITYOF CHAN E 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 TO: Todd Gerhardt, City Manager FROM: Sharmeen A1-Jaff, Senior Planner DATE: August 11, 2003 SUB J: Executive Summary for Preliminary Plat to subdivide One Single Family Lot with an area of 2 acres into 4 Lots, Kurt Miller EXECUTIVE SUMMARY The applicant is requesting preliminary plat approval to subdivide one single family lot with an area of 2 acres into 4 lots. Proposed Lot 2 contains an existing single family home. The remaining 3 lots will be reserved for future development of single family homes. The site is zoned Single Family Residential District and located northwest of the intersection of West 86th Street and Tigua Lane. Access to Lots 1, 4, and the westerly 115 feet of Lot 3 is gained via West 86th Street. Access to LOt 2 and the northerly 115 feet of Lot 3 is gained via Tigua Lane. All lots will exceed the minimum 15,000 square foot lot area, the 90 foot lot frontage, and 125 foot lot depth requirements. The Planning Commission and staff are recommending approval of the subdivision with no variances subject to conditions outlined in the attached staff report. Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www. ci.chanhassen.mn.us PLANNING COMMISSION SUMMARY On July 15, 2003, the Planning Commission reviewed and approved this application unanimously. They added one condition relating to the location of the driveway on LOt 3. The summary and verbatim minutes are attached. RECOMMENDATION Staff and the Planning Commission are recommending approval of the subdivision. The recommendation is located on page 6 of the attached staff report. ATTACHMENTS 1. Staff report. 2. Planning Commission summary and verbatim minutes dated July 15, 2003. The City of Chanha$$en * A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. CITY OF PC DATE: July 15 2003 CC DATE: August 11, 2003 REVIEW DEADLINE: 8-12-03 CASE #: 2003-11 SUB By: A1-Jaff STAFF REPORT Z PROPOSAL: LOCATION: APPLICANT: Preliminary Plat ~o subdivide One Single Family Lot with an area of 2 acres into 4 Lots 8590 Tigua Lane - Located at the northwest intersection of West 86th Street and Tigua Lane Kurt and Lynne Miller 8590 Tigua Lane Chanhassen, MN 55317 (952) 937-2476 or (612) 910-7580 PRESENT ZONING: 2020 LAND USE PLAN: Single Family Residential District - RSF LOw Density Residential ACREAGE: 2 Acres (87,151 Square Feet) DENSITY: 2.0 Units per Acre SUMMARY OF REQUEST: Request to replat one parcel into four single family lots. The site contains one single family home. Staff is recommending approval of the subdivision subject to conditions. Notice of this public hearing has been mailed to all property owners within 500 feet. LEVEL OF CITY DISCRETION IN DECISION-MAKING: The City's discretion in approving or denying a preliminary plat is limited to whether or not the proposed plat meets the standards outlined in the Subdivision Regulations and Zoning Ordinance. If it meets these standards, the City must approve the preliminary plat. This is a quasi-judicial decision. Rice Lake Manor Second Addition July 15 August 11, 2003 Page 2 BACKGROUND On June 26, 1980, the City Council approved a subdivision of 39.8 acres into 8 single family lots, Rice Lake Manor. SITE ANALYSIS The applicant is requesting approval to subdivide 2 acres into four single family lots. Proposed Lot 2 contains an existing single family home. The remaining 3 lots will be reserved for future development of single family homes. The site is zoned Single Family Residential District and located northwest of the intersection of West 86th Street and Tigua Lane. Access to Lots 1, 4, and the westerly 115 feet of Lot 3 is gained via West 86th Street. Access to LOt 2 and the northerly 115 feet of Lot 3 is gained via Tigua Lane. All lots will exceed the minimum 15,000 square foot lot area, the 90 foot lot frontage, and 125 foot lot depth requirements. Staff is recommending approval of the subdivision with no variances subject to conditions outlined in the staff report. i ! PRELIMINARY PLAT The applicant is proposing to subdivide a 2 acre site into 4 single family lots. The density of the proposed subdivision is 2.0 units per acre. All the lots exceed the minimum 15,000 square feet of area, with an average lot size of 21,788 square feet. Rice Lake Manor Second Addition July 15 August 11, 2003 Page 3 Staff notes that the proposal is consistent with the Comprehensive Plan and is consistent with the Zoning Ordinance. WETLANDS No wetlands exist on site. SURFACE WATER MANAGEMENT PLAN (SWMP) Surface Water Management Fees Water Quality Fees Because of the impervious surface associated with this development, the water quality fees are based on single-family residential development rates of $949/acre. Based on the proposed developed area of approximately 2 acres, the water quality fees associated with this project are $1,898. Water Quantity Fees The SWMP has established a connection charge for the different land uses based on an average citywide rate for the installation of water quantity systems. This cost includes land acquisition, proposed SWMP culverts, open channels, and storm water ponding areas for mnoff storage. Single- family residential developments have a connection charge of $2,348 per developable acre. This results in a water quantity fee of approximately $4,696 for the proposed development. At this time, the estimated total SWMP fee, due payable to the City at the time of final plat recording, is $6,594. Other Agencies The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Riley-Purgatory-Bluff Creek Watershed District; Minnesota Pollution Control Agency) and comply with their conditions of approval. GRADING/DRAINAGE/EROSION CONTROL The applicant is proposing to custom grade the three newly created lots (Lots 1, 3 and 4). Detailed grading, drainage, tree removal, and erosion control plans will be required for each lot at the time of building permit application for City review and approval. The existing and proposed drainage for the site will runoff to the south toward Tigua Lane. From there, it is collected in catch basins and routed through storm sewer to an existing swale on the east side of Tigua Lane. · Proposed runoff rates for the site must be submitted to ensure that the existing storm sewer is sized sufficiently. · Erosion control measures and site restoration shall be developed in accordance with the City's Best Management Practice Handbook (BMPH). Staff recommends that erosion Rice Lake Manor Second Addition July 15 August 11, 2003 Page 4 control fence be used for the area adjacent to the existing manhole at the northeast comer of the site. UTILITIES The proposed sanitary sewer will be considered a public utility line since it will serve more than one lot. In addition, the lift station will be designed by the City and paid for by the developer. The underlying parcel has been previously assessed for utilities on the existing lot unit and those assessments have been paid. Since the applicant is now proposing more units that what was previously assessed, the three additional units will be charged a watermain lateral connection charge at the time of building permit issuance. The current 2003 connection charge is $4,513. The sanitary sewer connection charges will be waived because the developer will be installing the lateral sewer main. Sanitary sewer and water hookup charges along with the Met Council's SAC fee will be due on all of the lots at the time of building permit issuance. All of these charges are based on the number of SAC units assigned by the Met Council. The current 2003 sanitary hookup charge is $1,440/unit, the water hookup charge is $1,876/unit and the SAC fee is $1,275/unit. Public utility improvements will be required to be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates. Detailed construction plans and specifications will be required at the time of final platting. The applicant will also be required to enter into a development contract with the City and supply the necessary financial security in the form of a letter of credit or cash escrow to guarantee installation of the improvements and the conditions of final plat approval. Permits from the appropriate regulatory agencies must be obtained, including but not limited to the MPCA, Department of Health, Watershed District, MnDOT, etc. STREETS The site is proposed to be accessed via an existing streets along the south and east portions of the property. PARK DEDICATION Park and trail fees shall be paid as required by ordinance for the three new lots only. The total fee based on 2003 park fee requirements is $2,400 per lot or $7,200 for the three lots, payable ant the time of final plat recording. TREE PRESERVATION/LANDSCAPING The developer for the Kurt Miller property development has submitted tree canopy coverage and preservation calculations. They are as follows: Total upland area (excluding wetlands) Baseline canopy coverage Minimum canopy coverage allowed Proposed tree preservation 2.0 ac. or 87,151 SF 9.5 % or 8,307 SF 25 % or 21,788 SF 9.5 % or 8,307 SF Rice Lake Manor Second Addition July 15 August 11, 2003 Page 5 The developer does not meet minimum canopy coverage allowed, therefore the difference between the minimum coverage required and proposed tree preservation is taken to calculate the required replacement plantings. Difference in canopy coverage (21,788-8,307) 13,481 SF Total number of trees to be planted 12 trees (one tree provides 1,089 SF of canopy) All replacements must meet minimum size requirements. COMPLIANCE WITH ORDINANCE - RSF DISTRICT Lot Lot Lot Home Area Width Depth Setback Ordinance 15,000 90' 125' 30' front/rear 10' sides BLOCK 1 Lot 1 15,045 90' 151' 30'/30' 10' Lot 2 39,991 313' 274' 30730' 10' Lot 3 comer Lot 16,935 231' 138' 30" 147' 10' Lot 4 15, 180 110' 138' 30730' 10' Total area 87,151 square feet SUBDIVISION- FINDINGS 1. The proposed subdivision is consistent with the zoning ordinance; Finding: The subdivision meets all the requirements of the RSF, Residential Single Family District and subdivision ordinance. . The proposed subdivision is consistent with all applicable city, county and regional plans including but not limited to the city's comprehensive plan; Finding: The proposed subdivision is consistent with the comprehensive plan. . The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are suitable for the proposed development; Finding: The proposed site is suitable for development subject to the conditions specified in this report Rice Lake Manor Second Addition July 15 August 11, 2003 Page 6 . The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by this chapter; Finding: The proposed subdivision is served by adequate urban infrastructure. 5. The proposed subdivision will not cause environmental damage; Finding: The proposed subdivision will not cause significant environmental damage subject to conditions of approval. The proposed subdivision contains adequate open areas to accommodate a house pad. 6. The proposed subdivision will not conflict with easements of record. Finding: The proposed subdivision will not conflict with existing easements, but rather will expand and provide all necessary easements. e The proposed subdivision is not premature. A subdivision is premature if any of the following exists: a. Lack of adequate storm water drainage. Lack of adequate roads. Lack of adequate sanitary sewer systems. Lack of adequate off-site public improvements or support systems. Finding: The proposed subdivision will have access to public utilities and streets. PRELIMINARY PLAT "The Planning Common rocommonds City Council approves the preliminary plat for Subdivision //03-11 for Rice Lake Manor Second Addition for 4 lots as shown on the plans dated November 19, 2002, subject to the following conditions: 1. City Forester Conditions: a. The applicant shall submit a landscape plan to showing a minimum of 12 trees to be planted. b. A minimum of two deciduous, overstory trees shall be required in the front yard of each lot. c. The applicant shall be responsible for installing all landscape materials proposed in rear yard areas. d. Tree preservation fence shall be install at the edge of the grading limits on lots 3 and 4, block 1 prior to any construction. 2. On the grading and utility plan: a. Show all existing and proposed easements. b. Label each of the new lots as custom graded. c. Show the rear lookout elevation for Lot 3. Rice Lake Manor Second Addition July 15 August 11, 2003 Page 7 d. Show the location of the existing wood fence. e. Show the existing sanitary service to Lot 2. f. Show and label the existing 8-inch DIP watermain in West 86th Street. g. Add a row of silt fence in back of the curb near the existing sanitary manhole. h. Move the lift station to within five feet of the common property line of Lots 3 and 4. 3. All plans must be signed by a professional engineer registered in the state of Minnesota. 4. Detailed grading, drainage, tree removal, and erosion control plans will be required for each lot at the time of building permit application for City review and approval. 5. Proposed runoff rates for the site must be submitted to ensure that the existing storm sewer is sized sufficiently. 6. The lift station will be designed by the City and paid for by the developer. 7. Sanitary sewer and water hookup charges along with the Met Council's SAC fee will be due on all of the lots at the time of building permit issuance. , Since the applicant is now proposing more units than what was previously assessed, the three additional units will be charged a watermain lateral connection charge at the time of building permit issuance. 9. The applicant is required to install the sanitary and water services to the property line of the proposed lots. 10. Draintile is required to be installed in back of the curb on Tigua Lane. 11. Based on the proposed developed area of approximately 2 acres, the water quality fees associated with this project are $1,898 and a water quantity fee of approximately $4,696 for the proposed development. At this time, the estimated total SWMP fee, due payable to the City at the time of final plat recording, is $6,594. 12. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Riley-Purgatory-Bluff Creek Watershed District; Minnesota Pollution Control Agency) and comply with their conditions of approval. 13. Building Official Conditions: a. Soil reports must be provided for all lots where fill soils are placed or soil correction work is done. b. The owner and or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. 14. Park and trail fees shall be paid as required by ordinance for the three new lots only. The total fee based on 2003 park fee requirements is $2,400 per lot or $7,200 for the three lots, payable ant the time of final plat recording. Rice Lake Manor Second Addition July 15 August 11, 2003 Page 8 15. The driveway serving Lot 3 shall be located to the north as far as reasonably possible." ATTACHMENTS , 2. 3. 4. 5. Application and Notice of Public Hearing Memo from Matt Saam, Assistant City Engineer. Memo from Steven Torell, Building Official dated June 30, 2003. SWMP Work Sheet. Plans dated November 19, 2002. CITY OF CHANHASSEN ., 690 COULTER DRIVE CHANHASSEN, MN 55317 (612) 937-1900 ': DEVELOPMENT REVIEW APPLICATiON ADDRESS: ..~' ~ -J'F! k"PHONE (Day time) (~-~'z ,- (~'~ 7' ~ W 7~ -'l-~ ~ TELEPHONE:. ~..~'---%'"'.,~ "" . Comprehensive Plan Amendment .. Temporary Sales Permit Cmicr~onal Use permit Vacation of ROW/Easements .. Interim Use Permit Vadan~ Non-conforming Use Permit '~"~. Notification Sign ~ [-7 ~.,4:xO -~ X Escrow for Filing Fees/Attorney Cost** ($50 CU P/SPR/VAC/VAR/WAP/Metes '* Escro~ will be required for other applications through the development contract NDTE-'When multiple applications are processed, the appropriate fee shall be charged for each application. :Building material sa~(~les must be submitted with site plan reviews. 'Twenty-slx ful! size folded copies of the plans must be submitted, Including an 8½" X 11" reduced copy of trarts~ency for each plan sheet. . ~ aot all proN~y owne~ within 500 fa ~f 1~ boundarlee of the proN~y aust be i~1~ w~ the Wetland Alteration permit ,, Planned Unit Development* Zoning Appeal Rezoning Zoning Ordinance Amendment · Sign Permits . Sign Plan Review Site PJan Review* PRESENT LAND USE DESIGNATION '~]:~Q~ LAND USE DESIGNATION FOR THIS REQUEST '~---f "This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning .DepmJment to determine the specific ordinance and procedural requirements applicable to yoUr application. 7~ determination of completeness of the applicatiOn shall be made within ten business days of application submittal. A written ,notice of application deficiencies shall be mailed to the applicant within ten business days of application. -]'h~ ~slo certlfythat I am making application for the described action by the City and that I am responsible for complying with all City requirements with regard to this request. This applicat, ion should be processed in my name and I am the party whom 'the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership (either copy of Owners Duplicate Certificate of-Title; Abstract of TRle or purchase agreement}, or I am the authorized person to make :this application and the fee owner has also signed this application. ! will keep myself informed of the deadlines for submission of matedal and the progress of this application.' I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of 'l'he city hereby notifies the applicant that development review cannot be completed within 60 days due to public hearing ~'equirements ..and agency review. Therefore, the city is notifying the appr~.ant that the City requires an automatic 60 day extension for development review. Development review shall be completed within 120 days unless additional review extensions are approved by the applicant. ~rc~en Re~c~d on Fee Paid Receipt No. 'The applicant should contact staff for a copy of the staff report which will be available on Friday prior to the meeting. If not contacted, a copy of the report will be mailed to the applicant's address. NOTICE OF PUBLIC HEARING CHANHASSEN PLANNING COMMISSION MEETING TUESDAY, JULY 15, 2003 AT 7:00 P.M. CITY HALL COUNCIL CHAMBERS 7700 MARKET BLVD. APPLICANT: Kurt Miller PROPOSAL: Subdivision Request LOCATION' 8590 Tigua Lane NOTICE: You are invited to attend a public hearing about a proposal in your area. The applicant, Kurt Miller, is requesting replat of Lot 8, Block 1, Rice Lake Manor into 4 lots on property zoned Residential Single Family; located at the northwest corner of the intersection of West 86th Street and Tigua Lane, 8590 Tigua Lane. What Happens at the Meeting: The purpose of this public hearing is to inform you about the applicant's request and to obtain input from the neighborhood about this project. During the meeting, the Chair will lead the public hearing through the following steps: 1. Staff will give an overview of the proposed project. 2. The applicant will present plans on the project. 3. Comments are received from the public. 4. Public hearing is closed and the Commission discUsses the project. Questions and Comments: If you want to see the plans before the meeting, please stop by City Hall during office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to someone about this project, please contact Sharmeen at 227-1134 or e-mail saljaff@ci.chanhassen.mn.us. If you choose to submit written comments, it is helpful to have one copy to the department in advance of the meeting. Staff will provide copies to the Commission. Notice of this public hearing has been published in the Chanhassen Villager on July 3, 2003. Smooth Feed SheetsTM Use template for 5160® DAVID & SHARON NICKOLAY 3500 TIGUA LN CHANHASSEN MN 55317 BRENT W POPPENHAGEN & KARl J BERG 8501 TIGUA LN CHANHASSEN MN 55317 BEVERLY A FIEDLER B521 TIGUA LN CHANHASSEN MN 55317 JOSEPH & GAYLE HAUTMAN TRUSTEES OF TRUSTS 8551 TIGUA LN CHANHASSEN MN 55317 J CHARLES & BONNIE J EHLERS 8485 MISSION HILL LN CHANHASSEN MN 55317 ERIC L PETERSON KATHERINE M WELCH 8561 TIGUA LN CHANHASSEN MN 55317 PAUL C LYONS 8571 TIGUA LN CHANHASSEN MN 55317 MISSION HILLS GARDEN HOMES HOMEOWNERS ASSN 2681 LONG LAKE RD ROSEVILLE MN 55113 SCOTT E & SHANNON L FIEDLER 8511 MISSION HILLS LN CHANHASSEN MN 55317 STEVEN M & TRACY A SCHEID 451 MISSION HILLS CT CHANHASSEN MN 55317 JEFFREY G & LEA J NORDOS 461 MISSION HILLS CT CHANHASSEN MN 55317 DAVID T & CORRINE A NAGEL 8550 TIGUA LN CHANHASSEN MN 55317 JOHN A & CATHRYN P MAZEIKA 8525 MISSION HILLS LN CHANHASSEN MN 55317 ROCHELLE R GREAVES TRUST 8581 TIGUA LN CHANHASSEN MN 55317 KURT D & LYNNE MILLER 8590 TIGUA LN CHANHASSEN MN 55317 RICHARD K & THERESA A HESS 8561 MISSION HILLS LN CHANHASSEN MN 55317 NADINE N NELSON 484 FRISCO CT CHANHASSEN MN 55317 GEORGE J CARLYLE & JANELLE VEILLEUX CARLYLE 8560 MISSION HILLS LN CHANHASSEN MN 55317 SUNITA GANGOPADHYAY & SHUBHAGAT GANGOPADHYAY 8571 MISSION HILLS LN CHANHASSEN MN 55317 RONALD S & BARBRA T EWING 8570 MISSION HILLS LN CHANHASSEN MN 55317 THOMAS J BOURNE 471 FRISCO CT CHANHASSEN MN 55317 RANDY V ROSETH & PENNY P WHITE 450 MISSION HILLS CT CHANHASSEN MN 55317 TONY L & PATRICIA J FERGUSON 8495 MISSION HILLS LN CHANHASSEN MN 55317 GORDON A & BRENDA M SCHAEFFER 8591 TIGUA LN CHANHASSEN MN 55317 LAWRENCE D & NANCY E STEIN 8541 MISSION HILLS LN CHANHASSEN MN 55317 JAMES A & MARILYN L CRAWFORD 8581 MISSION HILLS LN CHANHASSEN MN 55317 BRIAN M & DAWN M RODELL RILEY 8580 MISSION HILLS LN CHANHASSEN MN 55317 SHARON A NICKOLAY TRUSTEE OF TRUST 3500 TIGUA LN CHANHASSEN MN 55317 DANIEL T & KELLY A FASCHING 8550 MISSION HILLS LN CHANHASSEN MN 55317 ROSEMARY B WILL 475 FRISCO CT CHANHASSEN MN 55317 AVERY® Address I. abels Laser 5160® Smooth Feed Sheets TM Use template for 5160® KLINGELHUTZ DEVELOPMENT CO 350 HWY 212 E PO BOX 89 CHASKA MN 55318 MICHELLE J ERICKSON-CODY 442 MISSION HILLS WAY E CHANHASSEN MN 55317 LUANN M MARKGRAF 401 RICE CT CHANHASSEN MN 55317 DAVID A KRAWCZAK & CHRISTINE CASMER 417 RICE CT CHANHASSEN · MN 55317 KAAREN S WOOD 418 RICE CT CHANHASSEN MN 55317 SUSAN M HEINEMANN 421 RICE CT CHANHASSEN MN 55317 JOEL C BREDEMEIER 422 RICE CT CHANHASSEN MN 55317 i BONNIE M HOGHAUG 425 RICE CT CHANHASSEN MN 55317 KATHLEEN M JOHANNES 430 MISSION HILLS WAY E CHANHASSEN MN 55317 PATRICIA A ADAMS 429 RICE CT CHANHASSEN MN 55317 KAREN L BLENKER 405 RICE CT CHANHASSEN MN 55317 JACOB L & ANGELA M HERTEL 446 MISSION HILLS WAY E CHANHASSEN MN 55317 JEAN M KAMRATH 434 MISSION HILLS WAY E CHANHASSEN MN 55317 JOHN D & MARY JO EICHLER TRUSTEE OF TRUST 25628 CORDOVA LN RIO VERDE AZ 85263 LARRY M & MARLENE R NASH 409 RICE CT CHANHASSEN MN 55317 TANDEM PROPERTIES 7808 CREEKRIDGE CIR MINNEAPOLIS MN #310 55439 KRISTINE M MARTENS 438 MISSION HILLS WAY E CHANHASSEN MN 55317 JAMES M SCOTT 458 MISSION HILLS WAY E CHANHASSEN MN 55317 JOYCE I MANCINO 413 RICE CT CHANHASSEN MN 55317 PAUL D JUAIRE 462 MISSION HILLS WAY E CHANHASSEN MN 55317 AVERY® Address Labels DANIEL T MILLER 454 MISSION HILLS WAY E CHANHASSEN MN 55317 BEVERLEY K DAVIS 466 MISSION HILLS WAY E CHANHASSEN MN 55317 CARMEN M SCHALLOW 428 MONK CT CHANHASSEN MN 55317 MICHAEL W HANSEN 482 MISSION HILLS WAY E CHANHASSEN MN 55317 KELLY SILVIS 986 CARRIAGE LN CHANHASSEN MN 55318 ROBERT J & ARLENE T HART 474 MISSION HILLS WAY E CHANHASSEN MN 55317 MARK D PILATE 470 MISSION HILLS WAY E~115 CHANHASSEN MN 55317 ANN C ERHARD 424 MONK CT CHANHASSEN MN 55317 GARY & CARA WILLAERT 420 MONK CT CHANHASSEN MN 55317 THOMAS D KARELS 416 MONK CT CHANHASSEN MN 55317 Laser 5160® Smooth Feed Sheets TM Use template fOr 5160® VINCENT C ANDERSON 425 MONK CT CHANHASSEN MN 55317 CARL L HARSTAD 449 MISSION HILLS WAY' E CHANHASSEN MN 55317 SARAH N KUSNERZ 437 MISSION HILLS WAY E CHANHASSEN MN 55317 E JAMES VALDIMORE & MARTH C JAMES 409 MONK CT CHANHASSEN MN 55317 ANNE THERESA JESKE 421 MONK CT CHANHASSEN MN 55317 BARBARA E WOLTER 400 MONK CT CHANHASSEN MN 55317 JUDITH A LEHMAN 412 MONK CT CHANHASSEN MN 55317 STEPHAN M BRINK 433 MISSION HILLS WAY E CHANHASSEN MN 55317 BRADLEY SCOTT MAPES 445 MISSION HILLS WAY E CHANHASSEN MN 55317 JOHN W HOPKINS 417 MONK CT CHANHASSEN MN 55317 ARTURO F URRUTIA 408 MONK CT CHANHASSEN MN 55317 PATRICIA M HEDTKE 405 MONK CT CHANHASSEN MN 55317 PAUL C & KATHLEEN A CANCILLA 429 MISSION HILLS WAY E CHANHASSEN MN 55317 KLINGELHUTZ DEVELOPMENT CO 350 HWY 212 E PO BOX 89 ~CHASKA MN 55318 DEBRA JEAN NORTON 441 MISSION HILLS WAY E CHAN HASSEN MN 55317 JESSICA J THOMPSON 413 MONK CT CHANHASSEN MN 55317 KRISTIN C HAASE 404 MONK CT CHANHASSEN MN 55317 Address Labels Laser 5160® MEMORANDUM CITYOF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 TO: FROM: DATE: SUBJ: Sharmeen A1-Jaff, Senior Planner Matt Saam, Assistant City Engineer/~d2 July 2, 2003 Preliminary Plat Review of Rice Lake Manor 2nd Addition Land Use Review File No. 03-12 Upon review of the plans dated June 11, 2003, prepared by Otto Associates, I offer the following comments and recommendations: Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 GRADING/DRAINAGE/EROSION CONTROL The applicant is proposing to custom grade the three newly created lots (Lot Nos. 1, 3 and 4). Detailed grading, drainage, tree removal, and erosion control plans will be required for each lot at the time of building permit application for City review and approval. The existing and proposed drainage for the site will runoff to the south toward Tigua Lane. From there, it is collected in catch basins and routed through storm sewer to an existing swale on the east side of Tigua Lane. · Proposed mnoffrates for the site must be submitted to ensure that the existing storm sewer is sized sufficiently. Erosion c°ntrol measures and site restoration shall be developed in accordance with the City's Best Management Practice Handbook (BMPH). Staff recommends that erosion control fence be used for the area adjacent to the existing manhole at the northeast comer of the site. Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www. ci.chanhassen.mn.us UTILITIES The proposed sanitary sewer will be considered a public utility line since it will serve more than one lot. In addition, the lift station will be designed by the City and paid for by the developer. The underlying parcel has been previously assessed for utilities on the existing lot unit and those assessments have been paid. Since the applicant is now proposing more units that what was previously assessed, the three additional units will be charged a watermain lateral connection charge at the time of building permit issuance. The current 2003 connection charge is $4,513. The sanitary sewer connection charges will be waived because the developer will be installing the lateral sewer main. Sanitary sewer and water hookup charges The City of Chanhassen, A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. Sharmeen A1-Jaff July 2, 2003 Page 2 along with the Met Council's SAC fee will be due on all of the lots at the time of building permit issuance. All of these charges are based on the number of SAC units assigned by the Met Council. The current 2003 sanitary hookup charge is $1,440/unit, the water hookup charge is $1,876/unit and the SAC fee is $1,275/unit. Public utility improvements will be required to be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates. Detailed construction plans and specifications will be required at the time of final platting. The applicant will also be required to enter into a development contract with the City and supply the necessary financial security in the form of a letter of credit or cash escrow to guarantee installation of the improvements and the conditions of final plat approval. Permits from the appropriate regulatory agencies must be obtained, including but not limited to the MPCA, Department of Health, Watershed District, MnDOT, etc. RECOMMENDED CONDITIONS OF APPROVAL 1. On the grading and utility plan: a. Show all existing and proposed easements. b. Label each of the new lots as custom graded. c. Show the rear lookout elevation for Lot 3. d. Show the location of the existing wood fence. e. Show the existing sanitary service to Lot 2. f. Show and label the existing 8-inch DIP watermain in West 86th Street. g. Add a row of silt fence in back of the curb near the existing sanitary manhole. h. Move the lift station to within five feet of the common property line of Lots 3 and 4. 2. All plans must be signed by a professional engineer registered in the state of Minnesota. o Detailed grading, drainage, tree removal, and' erosion control plans will be required for each lot at the time of building permit application for City review and approval. 4. Proposed runoff rates for the site must be submitted to ensure that the existing storm sewer is sized sufficiently. 5. The lif~ station will be designed by the City and paid for by the developer. 6. Sanitary sewer and water hookup charges along with the Met Council's SAC fee will be due on all of the lots at the time of building permit issuance. Sharmeen A1-Jaff July 2, 2003 Page 3 , Since the applicant is now proposing more units that what was previously assessed, the three additional units will be charged a watermain lateral connection charge at the time of building permit issuance. 8. The developer is required to install the sanitary and water services to the property line of the proposed lots. 9. Draintile is required to be installed in back of the curb on Tigua Lane. ktm c: Teresa Burgess, City Engineer/Public Works Director g:\eng\projectsXrice lake manor 2nd\ppr.doc TO: FROM: Sharmin AI-Jaff, Senior Planner Steven Torell, Building Official DATE: June 30, 2003 SUBJ: Review of a proposed subdivision located at the northwest Comer of the intersection of West 86~ Street and Tigua Lane. Planning Case: 2003-11 Subdivision I have reviewed the plans for the above subdivision. Following are my comments, which should be included as conditions of approval. 1. Soil reports must be provided for all lots where fill soils are placed or soil correction work is done. 2. The owner and or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. G/safety/st/memos/plan/8590 Tigua Lane DATE FILE NO. PROJECT July 7, 2003 2003-11 Miller Subdivision SWMP FEE WORKSHEET Site Area in Acres Outlot Assessable area ZONING CLASSIFICATION RSF 2.00 0.00 2.00 WATER QUALITY WATER QUANTITY FEES Rate per Acre Acres Total $ 949.00 2.00 $ 1,898.00 Rate per Acre Acres Total $ 2,348.00 2.00 $ 4,696.00 ITEM Storm water pond Outlet structure UNIT each CREDITS QUANTITY 0 0.00 UNIT TOTAL PRICE PRICE $ 949.00 $ - $ 2,50o.0o $ - SWMP FEE SWMP CREDITS 6,594.00 TOTAL SWMP FEE $ 6,594.00 Preliminary Plat of RICE LAKE MANOR SECOND ADDITION A · · ~ Lmm ~ I ! I I .... LU i___! .... C. LC. NO. 8 I ~1,~,~ Lot 8~ Block Carver Countj~ Minneeota Preliminary Utility, Grading, and Drainage-plan of RICE LAKE MAi SECOND ADDITION mmm, CITYOF 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us TO: FROM: Sharmeen A1-Jaff, Senior Planner Todd Hoffman, Park and Recreation Director DATE: July 10, 2003 SUB J: Park Dedication Fees for Planning Case 2003-11, 8590 Tigua Lane I have reviewed the application for replat of Lot 8, Block 1, Rice Lake Manor into 4 lots. The three newly created lots are required to pay a one-time park dedication fee of $2,400 per unit for a total charge of $7,200. This fee shall be paid at the time of subdivision approval. C.' Kate Aanenson, Community Development Director Matt Saam, Asst. City Engineer The City of Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. CHANHASSEN PLANNING COMMISSION REGULAR MEETING JULY 15, 2003 SUMMAR¥ MINUTES PUBLIC HEARING: REOUEST FOR REPLAT OF LOT 8, BLOCK 1, RICE LAKE MANOR INTO 4 LOTS ON PROPERTY ZONED RESIDENTIAL SINGLE FAMILY, LOCATED AT THE NORTHWEST CORNER OF THE INTERSECTION OF WEST 86m STREET AND TIGUA LANE, 8590 TIGUA LANE, KURT MILLER. Public Present: Name Address Tony Greaves Marty Schutrop 570 West 78th Street 540 Lakota Lane, Chaska Sharmeen AI-Jaff presented the staff report on this item. Commissioner Feik had concerns with the driveway access from Lot 3 onto a curve in the road. Commissioner Claybaugh asked about drainage, especially for Lots 1, 3 and 4. Commissioner Lillehaug wanted staff to discuss the need for a lift station and if the city has looked at options of tying into the sanitary sewer system located to the west of this site. Chairman Sacchet asked for clarification on the tree canopy requirement. Chairman Sacchet opened the public heating. Marty Schutrop, representing the applicant, stated he was the builder and purchaser of the lots once this subdivision is approved. He explained the need for the lift stations. No one else wished to speak and Chairman Sacchet closed the public hearing. After commission discussion the following motion was made. Feik moved, Lillehaug seconded that the Planning Commission recommend approval of the preliminary plat for Subdivision 003-11 for Rice Lake Manor Second Addition for 4 lots as shown on plans dated November 19, 2002, subject to the following conditions: 1. City Forester conditions: ao b. c. do The applicant shall submit a landscape plan showing a minimum of 12 trees to be planted. A minimum of two (2) deciduous, overstory trees shall be required in the front yard of each lot. The applicant shall be responsible for installing all landscape materials proposed in the rear yard areas. Tree preservation fence shall be installed at the edge of the grading limits on Lots 3 and 4, Block 1 prior to any construction. 2. On the grading and utility plan: . . . o . . . 10. 11. 12. 13. 14. a. Show all existing and proposed easements. Label each of the new lots as custom graded. Show the rear lookout elevation for Lot 3. Show the location of the existing wood fence. Show the existing sanitary service to Lot 2. Show and label the existing 8 inch DIP watermain in West 86th Street. Add a row of silt fence in back of the curb near the existing sanitary manhole. Move the lift station to within five feet of the common property line of Lots 3 and 4. All plans must be signed by a professional engineer registered in the State of Minnesota. Detailed grading, drainage, tree removal, and erosion control plans will be required for each lot at the time of building permit application for City review and approval. Proposed runoff rates for the site must be submitted to ensure that the existing storm sewer is sized sufficiently. The lift station will be designed by the City and paid for by the developer. Sanitary sewer and water hookup charges along with the Met Council's SAC fee will be due on all of the lots at the time of building permit issuance. Since the applicant is now proposing more units than what was previously assessed, the three additional units will be charged a watermain lateral connection charge at the time of building permit issuance. The applicant is required to install the sanitary and water services to the property line of the proposed lots. Drain tile is required to be installed in back of the curb on Tigua Lane. Based on the proposed developed area of approximately 2 acres, the water quality fees associated with this project are $1,898 and a water quantity fee of approximately $4,969 for the proposed development. AT this time the estimated total SWMP fee due payable to the City at the time of final plat recording is $6,594. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g. Riley-Purgatory-Bluff Creek Watershed District, Minnesota Pollution Control Agency) and comply with their conditions of approval. Building Official conditions: a. b. Soil reports must be provided for all lots where fill soils are placed or soil correction work is done. The owner and/or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. Park and trail fees shall be paid as required by ordinance for the three new lots only. The total fee based on 2003 park fee requirements is $2,400 per lot or $7,200 for the three lots, payable at the time of final plat recording. 15. The driveway serving Lot 3 shall be located to the north as far as reasonably possible. AH voted in favor and the motion carried unanimously with a vote of 5 to 0. PLANNING COMMISSION COMMENTS In summary the Planning Commission fully supports this subdivision. It complies fully. There was a concern about the lift station servicing only three lots and in view of the possibly of more lots coming in, they asked staff to double check the possibilities of having more lots fie into a gravity system going to the west. CHANHASSEN PLANNING COMMISSION REGULAR MEETING JULY 15, 2003 VERBA TIM MINUTES PUBLIC HEARING: REOUEST FOR REPLAT OF LOT 8. BLOCK 1. RICE LAKE MANOR INTO 4 LOTS ON PROPERTY ZONED RESIDENTIAL SINGLE FAMILY. LOCATED AT THE NORTHWEST CORNER OF THE INTERSECTION OF WEST 86'r~ STREET AND TIGUA LANE. 8590 TIGUA LANE. KURT MILLER. Public Present: Name Address Tony Greaves Marty Schutrop 570 West 78th Street 540 Lakota Lane, Chaska Sharmeen AI-Jaff presented the staff report on this item. Sacchet: Questions from staff. Feik: I've got one. I'm going to address what I guess is Lot 3. In relationship to 2 weeks ago with a drive access directly onto the curve, what are the long term plans of the extension of Tigua, if that's pronounced correctly. I'm not sure. As it relates to how much more traffic, what's going to be, do you think's going to be happening to this other lot to the east. How much more traffic and are you going to be comfortable with the driveway out onto that curve? Because I know last time we had a site like this, there was significant concern up here. Saam: As far as the extension of Tigua, we don't foresee that being extended per se. Feik: But if those other lots were subdivided in the future. Saam: Yeah, there's potential for the large lots on the east side of Tigua, I guess to maybe get one more lot. I believe we have or we've been talking to a property owner now who's pretty much across the street from this site looking at dividing, adding one more lot so we could potentially get about 6 more. Feik: Could those lots be assembled or is there wetlands precluding that from a higher density? Saam: There are wetlands on the south side, directly south of this site on the south side of Tigua which, plus there's 312 coming through. MnDot has purchased right-of-way. So in my mind that really limits the large lots on the south side of Tigua. Feik: I'm thinking more of the east, north east. Saam: Yep, and those are the ones that I said previously that I could see possibly 4 to 6 more lots coming in there. Feik: That looks to be about a quarter section or something. Just kind of the way it lays out. Saam: Yeah I think it was 40 acres that was, yeah so that's. Feik: So I mean if a creative developer were to come in and assemble it, it could be a whole lot more lots. Saam: If a what? Feik: A creative developer came in and assembled the lots, you could probably get 60-70 lots up there. A1-Jaff: I don't believe that is a possibility only because there is Rice Marsh Lake. And to the northeast of this overall subdivision there's quite a bit of wetland. This is an environmental lake so you need 40,000 square feet per lot versus your typical 20,000. There are a number of things that will come into play. Feik: Okay. I'm just concerned with it, that we're going to be comfortable with the driveway coming out on a curve. In the long run. Saam: Yeah, in the long mn we are. We'd like to see it aligned either with the existing one right across the street or, where is that Malt? Okay, this is the lot that we're talking about right across the street. It's right here is the driveway. I don't know it doesn't show up good on this plan. There is another plan... Lillehaug: It's labeled bid driveway. Saam: Yeah, it's on the other side. Lillehaug: It's on this sheet also. Feik: It's further north. Further north around the curve. Saam: Yep that's it right there, I'm sorry. So here's the bid drive, so we'd like you to have it aligned with that existing drive or, and the applicant can talk to this, if they want to turn this lot pad or house pad down in this area and then get it more on the straight away section. I think for sight distance it would probably be better here. You're dropping down and see better around the curve but maybe the applicant can speak to that. Sacchet: Thanks Matt. Feik: That was the only question for now, thanks. Sacchet: Okay. Claybaugh: What is the speed limit on Tigua? Saam: It's 301 believe. Claybaugh: And staff is looking at addressing some of the drainage issues for Lots 1, 3 and 4, I'm assuming through the customer grading. Saam: Yes. And we've requested runoff calculations to ensure that the existing storm sewer in Tigua Lane is sized correctly. Claybaugh: Alright. Looks like there's plenty of areas for swales on Lot 4 and 3. On Lot 1, any concerns with it going onto the adjacent property? Are you satisfied that they'll have enough room to custom grade that and contain that within their own property. Saam: I believe they've be able to custom grade it to swales along the lot lines, and we do have drainage and utility easements, even on the property to the west so that will all. Claybaugh: That's all the questions that I have. Sacchet: Questions? Rich. Slagle: I'll let Steve ask any questions. Lillehaug: I'll go first then. I'm going to pick on you Matt for a little bit here. You know when I pick on you but can we discuss the lift station here a little bit. We got a small lift station, 2 inch force main for it appears to be at this time anyway, for only 3 lots. Can you kind of discuss why we need the lift station and also hit on, there's another sanitary system to the west and discuss if we've looked at options of tying into that sanitary sewer system. Compare it to the gravity versus force main and, I mean force main is expensive to the city to maintain and. Saam: Yeah. Well the existing sanitary that's on the site is in the northeast corner of the site. The elevation or the invert elevation, where that pipe comes into the manhole is higher than the lowest floor of all three of the new lots. So we can't gravity flow to that existing sewer so we had to lift to it. Lillehaug: How about the other sewer? Saam: Yeah, however there is a manhole at the intersection of Mission Hills Lane and West 86th. I think it's about 200 feet possibly to the west. I believe that invert, we did look at that. That is low enough to service, however the construction cost, tearing up the streets, that sort of thing, we gave the applicant the option either, you can either install a lift station, which is costly, or you can go and rip up our whole street. We'd like to avoid ripping up the street whenever we can. That's why we've asked them to pul the lift station in the boulevard. Put the pipe in the boulevard so we won't, we can limit the amount of bituminous repair. That sort of thing. Lillehaug: Who pays for the future maintenance of that lift station? Saam: It's a public line so city maintenance staff will upkeep it and city dollars will. Lillehaug: Okay, and then comment on the typical maintenance, just generally. Gravity versus a force main with lift station. I mean the cost. Saam: Oh it's definitely more attention needed to a lift station. I think twice a year, don't quote me on that but I believe it's twice a year our guys pull out the pumps and check them all and do all that sort of stuff. And then at least twice a week they go around, we have 30 other lift stations in town. They go around and check flows to make sure they're still working, that sort of thing. So it is more of an upkeep per se. Lillehaug: And cost on the city as a whole and not just these residents, correct? Saam: Yeah, I guess you could say that, yep. However this station, like you said, I mean it is a small one so. Electrical power, that sort of thing, there wouldn't be a huge demand on this one. I'm sure the pumps won't have to be very big. Lillehaug: How many other similar size lift stations and force mains do we have in this city that are comparable to this and that service you know 3 residents? Saam: I don't know of the correct answer. I would guess this is probably the smallest one. I haven't heard of one like this before. I mean the other options Commissioner Lillehaug would to require these houses to install in-house grinder pumps. Basically little lift stations or little sump pumps for their sanitary sewer in their own basement. That's something the city has tried to stay away from in the past. We don't like to recommend those. When problems happen, they're privately maintained so when problems happen, residents will call us and it's kind of like well, you're on your own and we don't like, we'd rather have them be able to flush it out into the public right-of-way and then let us take care of it from there. Lillehaug: So you said that other sanitary system will, it is low enough. The invert is low enough and it's only 200 feet away? Saam: If you give me a second I'll double check that. I have the as-builts here. Lillehaug: Okay, and then the distance also. I mean 200 feet is not that much. Sacchet: Which side of the street? Which side of the street too. Saam: Yeah, it's right in the center. Slagle: As you're looking at that Matt, the thing I would like to ask is, is just the difference in the cost. I mean it sounds like the applicant had his choice and he probably chose the lesser of the two, but if we're talking you know, it's not night and day, certainly it might offset the future costs of the city by maintaining our lift stations. Saam: The exact costs I don't have in front of me. We could look at that and maybe the applicant has weighed those costs, I'm not sure. Sacchet: We can ask the applicant what the reasoning was. Lillehaug: And then while you're looking at that, there are 3 watermain services crossing Tigua Lane, and that distance is about, I don't know, 100-150 feet. That will be impacted on the roadway. So that's anticipated to repair that roadway under this plan. So that would be similar construction, you know adding 200 more feet onto the west of that sanitary system. Saam: What's the question? What's the 150 feet, I didn't follow that. Lillehaug: Where the watermain services have to cross Tigua Lane. Saam: Yeah. Lillehaug: We're already disturbing Tigua Lane, about 150 feet of Tigua Lane. Saam: Those will just be 10 foot, you know...it will only be 10 foot like trenches in 3 spots so basically patches in the street whereas the sewer, you know we like to keep that in the middle of the street. If we're going to put gravity in, so that, you'd be clearing out 10 feet on each side that way. Lillehaug: In a special circumstance would the city allow, it appears on West 86th Street there's a boulevard there that looks to be about 40 feet in width. Would the city in a special circumstance allow that sanitary to be placed in the boulevard? And not underneath the roadway. I'm just trying to get around this force main. I don't want to pay for this lift station for the rest of our lives here. Saam: Yeah. You know keep in mind we do have 30 other ones. Lillehaug: Right. But I mean this is one less... Saam: The invert of that manhole to the west is approximately yeah, okay I misspoke. It's about 891 or 892 so that wouldn't work either. That's why we need to go with a lift station. Feik: It'd be down to what, 8? Saam: You'd need it to be at least 3 to 4 feet below those basements to get under the footings and have enough...plus yeah, 200 feet so either way we'll need a lift station. And this is then the shortest route to go around to the northeast so my mistake. I misspoke earlier. That elevation to the west isn't low enough. Lillehaug: What do we do when these other parcels develop, are developed? Saam: Well the ones on the east side of the street that Commissioner Slagle is concerned with, there is sewer in all their back yards down in the low ground near the lake and in those wetlands there. So they can connect to that or extend up their own private service off of that. Lillehaug: I'm running out of questions. Claybaugh: Is that a bad thing? Lillehaug: Well it is, I'm trying to shoot this lift station down but. Saam: Don't get us wrong, we'd like to not have to put one in. We see it's only serving 3 houses but we really don't see any other options other than those grinder pumps which we don't like to have people have to deal with them. I mean if their electricity goes out, we're stuck so. Slagle: So Matt, quick question for you. So you don't foresee any future development from any of the other lots that would require using the lift station? In other words, you aren't going to come up 3 years from now that hey guys, we've got to increase the size of this lift station because of whatever. Saam: We looked at, at least our department looked at the lot directly to the south. There's a lot of wetland there and MnDot has approximately half of that parcel for 312 so in our opinion they won't need to connect to that. And even if they would, there's the sewer still to the east there, so with future lot divisions we could have it extended. Sacchet: Is that it for questions from staff?. Lillehaug: Do we anticipate extending that sewer for any of those leftover parcels from 3127 Is this premature? Saam: Potentially it could be extended. With the application that I think we have in now, I haven't reviewed it yet but maybe we look at extending it at that time. That parcel has a public sewer main in it so that's really another issue. Sacchet: Well I have one more question. I was going to hammer on this lift station too and it's just, it's a little hokey but I guess we don't have a better possibility fight now. What scares me a little bit is this seems like this is meant to be a permanent lift station. It's my understand that a fair amount of the lift stations we have in the city are temporary for when the sewer actually gets extended and the lift station will be necessary and it will become a gravity. In this case it's lift station period, is that correct? Saam: Correct, yep. The only temporary that I know of is up I think near you in Highover there. Sacchet: Yeah, that's a temporary one. My other question, which is a little out of character is about the trees. The canopy. We're asking for minimum canopy coverage but there is no canopy there fight now, so how can we ask for tree preservation when there are really that many trees there now? I mean a couple of them are being cut. Like if we look at fight now there is basically according to the calculation, no canopy is lost. I don't think that's necessarily true once the houses go in, but can we still hold them to the 25 percent minimum canopy requirement? AI-Jaff.' Yes. Sacchet: We can. Just want to be real clear about that. Thanks for clarifying. AI-Jaff.' There's a subdivision. They have to maintain that minimum. Sacchet: They have to fit into this framework, okay. Thanks for clarifying that. With that I would like to invite the applicant to come forward. State your name and address and if you want to tell us your story, or anything you have to add from your side, please come up. Marty Schutrop: My name is Marty Schutrop and I'm not the applicant. I'm representing the applicant because he's out of town. I will be the purchaser of the lots once they are approved by the City Council. Sacchet: Okay, so you're a developer? Marty Schutrop: I'm a builder. Sacchet: A builder, okay. And your address is? Marty Schutrop: 540 Lakota Lane. And so I'm basically representing him here and I just read the packet today so I'm kind of... There's on Lot 3, the comment that you were saying about Lot 3 and the driveway. I don't know who was commenting, was it Matt that was commenting or somebody was saying push the house over, the house pad over to the south. I would prefer to put the driveway on the high end of the lot because it does slope up dramatically there. So I don't want to be restricted to where the driveway goes in there, so that's one stipulation that would be something that I'd want to look at. Sacchet: Questions from the applicant. Claybaugh: Could you explain on your comment about the driveway for Lot 3? You said you'd like to justify it to the north end. I guess in looking at the site plan that I have in front of me, I wouldn't have a problem whether it was justified towards the north end of the lot or to the southwest as long as it was to the extreme edge of the curve on Tigua. Marty Schutrop: Yeah the only thing is if we went to the other route, this lot we're proposing as a daylight lot. Lookout windows and that would be, and I would want to put the lookout's on here. Claybaugh: So at this time where would you anticipate that driveway, just based on what you told us here? Marty Schutrop: Toward the high end of the, or to the, that'd be the north. The north side of that lot, yeah. Kind of where his comes down there. It would be kind of conjoining with that, so it would be. Claybaugh: Okay, so it's out away from the... Marty Schutrop: Yeah, I agree. I don't want it to come straight out on the curve either so that's not the right place for it to come out. Claybaugh: With respect to the main over the, the force main and that is an awful small forcemain. And what was your position, your personal position as a builder... Marty Schutrop: And again Matt was the one who said that we should probably go with the lifters. We looked at doing that down at the other end there and the other issue is we were going to have to try and justify it to the neighbors tearing up the street for the amount of time it would take us to put that in and closing that down. Claybaugh: So just so I'm clear, the elevation that you pulled up, the invert elevation for the other sanitary to the west is too low based on the basement elevations that we have for those three lots? Saam: Actually it'd be too high. Claybaugh: I'm sorry, too high. Pardon me. Saam: Yeah. Claybaugh: So that is not an option? Saam: Not without a lift station that way. Claybaugh: Okay. Feik: Is there any excess soils to raise the pads? Marty Schutrop: No. Right now the, where the grades would be, our driveways are going to end up being at about a 9 percent grade right now I believe, is that kind of where we're at, which is 10 percent is the maximum grade for our driveway so... Claybaugh: Right, the garage elevation pads are up pretty high. Marty Schutrop: Right, we can't raise them up any higher than what they are right now. I mean I'd love to because then we could do daylights on all these lots. Claybaugh: As the potential builder for the lots, what was your perspective on utilizing grinder pumps in lieu of the force main? Marty Schutrop: Well I agree. I don't think homeowners want to deal with that and they never maintain them anyway. They only maintain their sump pumps you know. They let them burn out and then they call me when their basements are flooded. Something that I wouldn't want to sell to a homeowner. Claybaugh: Okay, and with respect to the lift station, the force main and the rest of it, the developer's boring the cost and the city maintains it after a set period of time? Is that correct? Saam: Yes. Claybaugh: So obviously you believe in that because you're. Marty Schutrop: Well you know we didn't want to do a lift station either because we're going to end up paying for that cost which I think was going to be more than if we were going to have to gravity feed it, and then you've got the street. Claybaugh: Oh clearly, okay. That's all the questions I have. 10 Sacchet: Any more questions for the applicant? Steve, no questions? Lillehaug: You wouldn't consider having them all, or getting rid of the basements so we don't need to have that lift station? Marty Schutrop: Only if it's multi-family and you let me put 10 units in there. Sacchet: Alright, thank you very much. This is a public hearing so if anybody wants to come forward to address this item, please do so now. Seeing nobody, I close the public hearing and bring it back to the commission for discussion and comments. Who wants to start? Claybaugh: Okay. Comments, let's see. The driveway issue on Lot 3, this seems to be a non- issue. The square footage on the lots, certainly they've got it proportioned or it appears to be well. Again as it's been pounded through the discussion thus far the big issue is the force main and the limited size of it, the necessity to place that infrastructure in place to serve just 3 properties but through the discussion there doesn't appear to be a better alternative so if, I support it in it's current form. Sacchet: Thank you Craig. Bruce. Feik: I support it as well. I would also like to see that driveway moved to the north as far as possible. Sacchet: Rich? Slagle: No comments. Sacchet: No comment. Steve. Lillehaug: I support it but I just want to remind staff to take a look at that lift station. If those parcels to the south and southeast are developed in the turn back land from 312 or whatever through there and sanitary sewer is extended, and if we could possibly get rid of this lift station in the future and tie up with some sanitary that's extended, that'd be great. I'd also like staff to double and triple check to make sure we can't find a sanitary to the west. Other than that I just don't like the idea of putting that small lift station there but it looks unavoidable so I would support it, thanks. Sacchet: Thanks Steve. I don't have too much to add. I think it would be reasonable to make a condition about that driveway on Lot 3, just to be clear. And yeah, if there's anyway around this lift station by all means and I think it's a good idea to ask staff to double check and look at this very carefully before it goes to council. With that, anything else? I'm ready to take a motion. Feik: I'll make a motion. I move that the Planning Commission recommend approval of the preliminary plat for Subdivision//03-11 for Rice Lake Manor Second Addition for 4 lots as shown on plans dated November 19, 2002, subject to the following conditions 1 through 14 with an amendment 15 being added. That the driveway serving Lot 3 shall be located to the north as far as reasonably possible. That's my motion. Sacchet: We have a motion. Is there a second? Lillehaug: Second. 11 Sacchet: Question. Possible friendly amendment. Should we say that driveway should be to the northeast or to the southwest edge of the lot? Feik: Well if he goes south then he's going to lose his lookout. Sacchet: Yeah, good point. Okay, that settles it. No, that's it. We have a motion. We have a second. Feik moved, Lillehaug seconded that the Planning Commission recommend approval of the preliminary plat for Subdivision S03-11 for Rice Lake Manor Second Addition for 4 lots as shown on plans dated November 19, 2002, subject to the following conditions: 1. City Forester conditions: a. b. co d. The applicant shall submit a landscape plan showing a minimum of 12 trees to be planted. A minimum of two (2) deciduous, overstory trees shall be required in the front yard of each lot. The applicant shall be responsible for installing all landscape materials proposed in the rear yard areas. Tree preservation fence shall be installed at the edge of the grading limits on Lots 3 and 4, Block 1 prior to any construction. 2. On the grading and utility plan: a. Show Show Show Show all existing and proposed easements. each of the new lots as custom graded. the rear lookout elevation for Lot 3. the location of the existing wood fence. the existing sanitary service to Lot 2. Show and label the existing 8 inch DIP watermain in West 86m Street. Add a row of silt fence in back of the curb near the existing sanitary manhole. Move the lift station to within five feet of the common property line of Lots 3 and 4. 3. All plans must be signed by a professional engineer registered in the State of Minnesota. . Detailed grading, drainage, tree removal, and erosion control plans will be required for each lot at the time of building permit application for City review and approval. Proposed runoff rates for the site must be submitted to ensure that the existing storm sewer is sized sufficiently. 6. The lift station will be designed by the City and paid for by the developer. . Sanitary sewer and water hookup charges along with the Met Council's SAC fee will be due on all of the lots at the time of building permit issuance. 12 ' ' 10. 11. 12. 13. 14. Since the applicant is now proposing more units than what was previously assessed, the three additional units will be charged a watermain lateral connection charge at the time of building permit issuance. The applicant is required to install the sanitary and water services to the property line of the proposed lots. Drain tile is required to be installed in back of the curb on Tigua Lane. Based on the proposed developed area of approximately 2 acres, the water quality fees associated with this project are $1,898 and a water quantity fee of approximately $4,969 for the proposed development. AT this time the estimated total SWMP fee due payable to the City at the time of final plat recording is $6,594. The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g. Riley-Purgatory-Bluff Creek Watershed District, Minnesota Pollution Control Agency) and comply with their conditions of approval. Building Official conditions: a. b. Soil reports must be provided for all lots where fill soils are placed or soil correction work is done. The owner and/or their representative shall meet with the Inspections Division as soon as possible to discuss plan review and permit procedures. Park and trail fees shall be paid as required by ordinance for the three new lots only. The total fee based on 2003 park fee requirements is $2,400 per lot or $7,200 for the three lots, payable at the time of final plat recording. 15. The driveway serving Lot 3 shah be located to the north as far as reasonably possible. AH voted in favor and the motion carried unanimously with a vote of 5 to 0. Sacchet: And for sn~mmary for the council, we fully support this subdivision. It complies fully. We have concern however that we share pretty much I think all of us about that lift station. We would really like to see a solution that could be accommodated with gravity for the sewer and not needing a lift station, just for three lots. Also in view of possibly more lots coming in, that's something that we ask staff to look into, what the possibilities are in terms of possibly having more lots that could tie into that and double check that really can't be gravity going to the west. Anything else you want to add to the summary? No? Alright, that's it. Thank you very much. 13