1d. 2012 Street Recon Project: Accept Feasibility and Call PH0
CI1'II OF
CgANgASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
7901 Park Place
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
www.ci.chanhassen.nnn.us
MEMORANDUM
TO: Paul Oehme, Director of Public Works /City Engineer
FROM: Alyson Fauske, Assistant City Engineer
DATE: December 12, 2011 04_7
SUBJ: 2012 Street Reconstruction Project No. 12 -01: Accept Feasibility
Study; Call Public Hearing
PROPOSED MOTION
"The City Council accepts the feasibility report for the 2012 Street
Reconstruction Project No. 12 -01 and calls the public hearing for January 23,
2012.
City Council approval requires a simple majority vote of the City Council
present."
BACKGROUND
At the May 9, 2011 work session, staff reviewed with Council the proposed 2012
Street Reconstruction project.
On May 23, 2011, the City Council authorized the preparation of the feasibility study.
On November 9, 2011, a neighborhood meeting was held to discuss the proposed
proj ect.
DISCUSSION
Every year the City considers streets that are in poor condition to be rehabilitated or
reconstructed. For the 2012 Street Improvement Project, staff is proposing to
i
reconstruct approximately 1.1 miles of
streets. The street segments within the
proposed project were identified by the
City's Pavement Management software,
site investigations and utility problems in
the area.
The streets in Minnewashta Heights are 40
years old and cannot be cost effectively
repaired with minor maintenance or even a
bituminous overlay. The streets were
sealcoated in 1994 and 1999.
GAENG\PUBLIC\ 2012 PROJECTS \12 -01 Minnewashta Hts recon \12 -12 -2011 accept feasibility.doc
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
Paul Oehme
2012 Street Reconstruction Project
December 12, 2011
Page 2
Watermain Improvements
The streets are in poor condition
with an average pavement
condition index of 38. A road
under 45 typically indicates
distress that would require a full
depth reconstruction.
The west portion of Shore Drive
has a pavement condition index
between 52 and 64; however
these scores are artificially high
since there are three watermain
break patches in this vicinity.
The plat for the area shows the
roadway right -of -way is 50' wide.
The existing road section is
bituminous pavement with no
curb and gutter.
The watermain in this area is 40 years old and should be replaced at this time. The mains are made of
cast iron and ten documented breaks have been recorded in this area. Water services between the
lateral watermain and the right of way is proposed to be replaced, as well as the curb stop.
Sanitary Sewer Improvements
Staff has investigated and televised the condition of the sanitary sewer in this area. Approximately
1,600 feet of sewer is proposed to be replaced due to the condition of the pipe. No sanitary sewer
backup problems have been recorded in this area however a number of pipe sags have been identified
and these areas should be replaced at this time. The sanitary sewer services that access these sections
of the pipes are also proposed to be replaced between the lateral sewer and the right of way. The
remaining sewer pipe is in good structural condition, although some require mineral removal,
grouting and/or lining to reduce the incidence of inflow and infiltration. These minor repair areas are
also proposed to be fixed at this time.
Storm Sewer Improvements
The Minnewashta Heights plat area is approximately 56 acres in size and the actual watershed within
the project area is 32 acres. Currently there is very little stormwater infrastructure or piping system in
G:\ENG\PUBLIC\ PROJECTS\12 -01 Minnewashta Hts recon \12 -12 -2011 accept feasibility.doc
PY
1
Minnewashta
N
N
Heights Park
U
a
�
,
O
g a.
jgy
E
ad
e �i PGA
w a
W
E
O
a
Qp� �0d
O
� v
W
W
CL
o W
Sh o " rlDriv e
Estimated
PC I =5
Estimatetl
PCI =64
Estimated
PCI =4
Watermain Improvements
The streets are in poor condition
with an average pavement
condition index of 38. A road
under 45 typically indicates
distress that would require a full
depth reconstruction.
The west portion of Shore Drive
has a pavement condition index
between 52 and 64; however
these scores are artificially high
since there are three watermain
break patches in this vicinity.
The plat for the area shows the
roadway right -of -way is 50' wide.
The existing road section is
bituminous pavement with no
curb and gutter.
The watermain in this area is 40 years old and should be replaced at this time. The mains are made of
cast iron and ten documented breaks have been recorded in this area. Water services between the
lateral watermain and the right of way is proposed to be replaced, as well as the curb stop.
Sanitary Sewer Improvements
Staff has investigated and televised the condition of the sanitary sewer in this area. Approximately
1,600 feet of sewer is proposed to be replaced due to the condition of the pipe. No sanitary sewer
backup problems have been recorded in this area however a number of pipe sags have been identified
and these areas should be replaced at this time. The sanitary sewer services that access these sections
of the pipes are also proposed to be replaced between the lateral sewer and the right of way. The
remaining sewer pipe is in good structural condition, although some require mineral removal,
grouting and/or lining to reduce the incidence of inflow and infiltration. These minor repair areas are
also proposed to be fixed at this time.
Storm Sewer Improvements
The Minnewashta Heights plat area is approximately 56 acres in size and the actual watershed within
the project area is 32 acres. Currently there is very little stormwater infrastructure or piping system in
G:\ENG\PUBLIC\ PROJECTS\12 -01 Minnewashta Hts recon \12 -12 -2011 accept feasibility.doc
Paul Oehme
2012 Street Reconstruction Project
December 12, 2011
Page 3
the area. The majority of the stormwater runoff generated by this neighborhood discharges directly
into Lake Minnewashta. The area is fully developed so construction of new stormwater treatment
ponds to treat run off before it discharges in to Lake Minnewashta is not an option.
Three options for stormwater management were reviewed. Most likely the final design will be a
combination of the three. The options staff has looked at are as follows:
Option A: This option would pipe approximately 8.65 acres of storm sewer runoff from the central
portion of the project area to an existing storm sewer pond west of the project area. A portion of the
TH 7 runoff that currently is treated in this pond would need to be diverted to the west. Staff has
worked out the details for the TH 7 stormwater diversion and is having MnDot review this plan. The
northwest portion of the development would be treated in a dry pond in the Minnewashta Heights
Park open space. This pond would hold water after larger storm events but would be dry and mowed
most of the time. The southern half of the project area would be treated with small rain gardens.
These rain gardens would be constructed in the right -of -way and on private property. The gardens
would be optional for residents that would like to participate and take on maintenance of the gardens.
These gardens would only be constructed where they show the most benefit. This option is the most
disruptive to the neighborhood and the most expensive.
r
,. y t
T �.. �'� f, '��' , �. 1 - � 'v • � �°�..� a•,�y. � i ^ may,,
Q -F -..
y 3013 5tr I'p, "'I P",r
R 0 100 Zp Im 5 �N��M opuonn
irt. r u.e..M.�..d TKflniUl ReWN v �av�.�F�
Option B: This option is similar to Option A but the runoff treated in the westerly pond would only
be the runoff from Maplewood Circle. The storm sewer pipe that proposed in Option A that would be
constructed from Greenbriar Avenue to Dogwood Road is eliminated in this option. The westerly
pond would treat 2.74 acres of the project site. The rest of the stormwater improvements would be
the same as Option A.
GAENG\PUBLIC\ 2012 PROJECTS \12 -01 Minnewashta H?1 \12 -12 -2011 accept feasibility.doc
Paul Oehme
2012 Street Reconstruction Project
December 12, 2011
Page 4
Option C: This option is the same as Option B but adding and underground iron filtration system in
the roadway for stormwater treatment.
L
Lw d Luke
I y 2012 Street Improvement Prol�'t opcwn C I
R 0 100 200 �i �af1 StormwaUr "M mart
l' Feel TeMnIW Report
"�P W rope
G:\ENG\PUBLIC\ PROJECTS\12 -01 Minnewashta Hts recon \12 -12 -2011 accept feasibility.doc
Paul Oehme
2012 Street Reconstruction Project
December 12, 2011
Page 5
An Iron - Enhanced Sand Filtration system is an
underground treatment system that captures suspended
solids, particulate phosphorus, and dissolved phosphorus.
The iron forms rust (iron oxide) and the dissolved
phosphorus attaches to these iron oxides, thereby removing
it from the stormwater runoff.
This system is also known as the Minnesota Filter because
it was developed at the St. Anthony Falls Laboratory at the
University of Minnesota. Several communities- such as St.
Louis Park and Prior Lake- and watershed districts have
used this system successfully for stormwater treatment where standard treatment ponds are not an
option.
Raingardens (biofiltration areas) are stormwater
management practices intended to mimic natural conditions.
They treat runoff from smaller drainage areas and promote
infiltration, which reduces the volume of water getting to
Lake Minnewashta and removes the nutrient load associated
with the infiltrated volume. These areas may be planted
with a variety of plants ranging from prairie species to a
perennial garden to shrubs and mulch.
Raingardens have been installed on homeowner properties
along Pontiac Circle and Foxford Road, and in Lake Ann
Park. There are no specific areas within the proposed project area where raingardens would be
required. Participation in the raingarden program would be voluntary.
A holding cell is an area where stormwater runoff
is temporarily held as it is slowly released
downstream. The holding cell would be an open,
grassed area.
The final stormwater design will be presented at
the public hearing in January based on the
feedback received from the neighborhood meeting
and the costs associated with each alternative.
The feasibility report was prepared by WSB &
Associates. A copy of the feasibility report is
available in the Engineering Department.
G:\ENG\PUBLIC \_2012 PROJECTS \12-01 Minnewashta Hts recon \12 -12 -2011 accept feasibility.doc
Paul Oehme
2012 Street Reconstruction Project
December 12, 2011
Page 6
A neighborhood meeting was held on November 9, 2011 to discuss the proposed project and to
answer questions. Approximately 35 people representing over 20 properties attended. All of the
residents' questions were answered at the meeting and/or with a follow -up after the meeting.
PROJECT FUNDING
Funding for the project is anticipated to come from several sources. Forty percent (40 %) of the street
improvement costs would be assessed back to the benefiting property owners, per the City's
assessment practice. The remaining 60% of the street cost would be a City cost. All of the utility
replacement and storm sewer costs will be paid by the City.
Funding Source
Amount
Feasibility Study
Budgeted
Estimate
Streets: Assessments/Revolving Assessment Fund
$1,700,000
$1,579,800
Watermain: Water Utility Fund
$700,000
$479,200
Sanitary Sewer: Sewer Utility Fund
$300,000
$227,500
Storm Sewer: Surface Water Utility Fund
$400,000
$287,130 to $392,830
$3,100,000
$2,575,530 to $2,681,230
The estimated costs include 10% contingency and 10% indirect costs.
It is proposed that the five lots that constitute Minnewashta Heights Park be assessed for the project.
This is consistent with past projects. The estimated assessments are calculated as follows:
Total Estimated Street Improvement Cost: $1,581,700
Assessed: 40% of $1,581,700 = $632,680
91 lots assessed: $632,680 - 91 lots = $6,952.53/lot
The estimated assessment assumes a standard pavement section of 2' of sand, 1' of Class 5 and 3.5" of
bituminous. Staff has requested that the soils engineer provide an alternative pavement design using
fabric or other technology to reduce the amount of sand and/or Class 5, thereby reducing the street
cost and assessment. This recommendation will be available prior to the public hearing.
At the neighborhood meeting, residents expressed an interest in upgrading the street lights within the
neighborhood. The City owns two street lights on Maplewood Circle. These street lights are in poor
condition and should be replaced. Staff has requested Xcel to submit a price to replace these street
lights with Xcel's standard street lights. The remaining street lights in the project area are owned by
Xcel and are cobra head type fixtures that are attached to wood poles. Staff has contacted Xcel to
obtain costs to upgrade the existing street lights within the project. If the property owners want to
replace these lights the cost to upgrade would be assessed to the properties. Xcel should have the
estimated costs to staff in January, 2012.
GAENG\PUBLIC\ 2012 PROJECTS \12 -01 Minnewashta Hts recon \12 -12 -2011 accept feasibility.doc
Paul Oehme
2012 Street Reconstruction Project
December 12, 2011
Page 7
SCHEDULE
The proposed project schedule is as follows:
Public Hearing; Order Plans & Specifications
Approve Plans & Specifications; Authorize Ad for Bids
Assessment Hearing
Project Begins
Most work completed By
Substantial Completion
Attachments: 1. CIP pages
2. Resolution
3. Resident comments
January 23, 2012
February 27, 2012
April 23, 2012
May, 2012
End of August, 2012
October, 2012
G:\ENG\PUBLIC\ PROJECTS \12 -01 Minnewashta Hts recon \12 -12 -2011 accept feasibility.doc
■
r
r
r
r
r
r
r
■
r
r
r
r
r
r
r
Capital Improvement Program 2011 that 2015
City of Chanhassen, MN
Project # ST -012
Project Name Annual Street Improvement Program
Department
Street Improvements
Contact
Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
Streets/Highways
Account #1 601 -xxxx -4751 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $9,700,000
knnual project to rehabilitate and reconstruct streets in the City. Current 5 -year plan shows the following neighborhood areas:
2esidential 2011 - Timberwood Drive neighborhood, Saratoga, Santa Vera, Chippewa, Picha and Kerber (S of W 78th), Target lane and W 78th
Street (Powers Blvd to Market Blvd)
2012 - Greenbriar, Fir Tree, Elm Tree, Dogwood, Shore Drive and Maplewood Circle (Reconstruction)
2013 - Greenwood Shores and West 78th Street (Powers to Market)
2014 - Dartmouth Drive and Cypress Drive
2015 - Carver Beach area (south and west of Carver Beach Road)
e City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the
of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective.
:habilitation projects extend the life of the street. In cases with utility or poor sub grade needs to be replaced or where streets have deteriorated
a point where rehabilitation will no longer be practical reconstruction of the street is necessary. A feasibility study is written to consider the
:nits of the project and scope of work.
Prior Expenditures
3,200,000 Construction
Total
Total 1,500,000 1,700,000 1,200,000 1,100,000 1,000,000 6,500,000
Prior Funding Sources
3,200,000 Assessment/Revolving Assess
Total Street Pavement Managem
Total 1,500,000 1,700,000 1,200,000 1,100,000 1,000,000 6,500,000
Budget hWact/Other I
this project may decrease maintenance costs.
107
2011 2012 2013 2014 2015 Total
1,500,000 1,700,000 1,200,000 1,100,000 1,000,000 6,500,000
2011 2012 2013 2014 2015 Total
1,200,000 1,700,000 1,200,000 1,100,000 1,000,000 6,200,000
300,000 300,000
r
r
r
r
r
r
r
r
r
r
r
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # W -024
Project Name Watermain Replacement
Department
Water System Improvements
Contact
Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
Utilities
Account #1 700 - 7025 -4751 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $2,200,000
teplacement of existing water main lines in coordination with the reconstruction of the City street.
I Justification I
The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by
consolidating these projects and also to avoid potential cuts in recently improved streets. If significant repairs are necessary to the existing water
main, replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement is an ongoing
project in the City.
Prior Expenditures
- 800,050 1 Construction
Total
Prior Funding Sources
800,000 I Water Utility Fund
Total
Total 700,000 700,000 1,400,000
Total 700,E 700,000 1,400,000
Bu dget Imp act/Ot h er
these projects will decrease maintenance costs.
2011 2012 2013 2014 2015 Total
700,000 700,000 1,400,000
2011 2012 2013
700,000
2014 2015 Total
700,000 1,400,000
131
Capital Improvement Program 2011 thru 2015 Department Sanitary Sewer Improvements
City of Chanhassen MN Contact Paul Oehme
Type Improvement
Project # SS -014 Useful Life Unassigned
Project Name Sanitary Sewer Replacement Category Utilities
Account #I 701- 7025 -4751
Account #3 Priority n/a
Account #2 Account #4
Total Project Cost: $850,000
Description
Replacement or rehabilitation of existing_sanitary sewer lines in conjunction with the reconstruction of the City street.
Justification
the City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by
- onsolidating these projects.
Prior Expenditures
250 00 Construction
Total
Total 300,000 300,000 600,000
Prior Funding Sources 2011
2012 2013
2014 2015
Total
f - 250,0001 Sewer Utility Fund
300,000
300,000
600,000
Total Total
300,000
300,000
600,000
Budget Impact(Other
This project will decrease maintenance costs.
2011 2012 2013 2014 2015 Total
3 00,000 300,000 600,000
100
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # ' SWMP -019
Project Name Street Improvement Projects -Storm Water Mgmt
Account #1 720 - 7025 -4751 Account #3
Account #2 Account #4
Department
Surface Water Management
Contact
Paul Ochme
Type
Improvement
Useful Life
Unassigned
Category
SWMP
Priority
n/a
Description - . Otal K ujcct t Um; .V1,-V,VVV
An annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects
undertaken by the engineering and public works departments.
Justification
Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with
federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects.
Prior Expenditures
F - 450,000 1 Construction
Total
400,000 400,000 800,000
Total 400,000 400,000 800,000
Prior Funding Sources 2011
2012 2013
2014 2015
Total
450,000 I Surface Water Utility Fund
400,000
400,000
800,000
Total Total
400,000
400,000
800,000
Budget Impact/Other
Inventory, inspection and maintenance of new infrastructure will be required. Citywide. No map
2011 2012 2013 2014 2015 Total
118
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE: December 12, 2011 RESOLUTION NO: 2011-
MOTION BY:
SECONDED BY:
A RESOLUTION ACCEPTING FEASIBILITY STUDY AND
CALLING A PUBLIC HEARING FOR THE 2012 STREET
RECONSTRUCTION PROJECT NO. 12-01
WHEREAS, pursuant to resolution of the Council adopted May 23, 2011, a report has been
prepared by City staff with reference to the above - referenced project, and this report is being
received by the Council on December 12, 2011, and
WHEREAS, the report provides information regarding whether the proposed project is
necessary, cost - effective, and feasible.
NOW, THEREFORE, BE IT RESOLVED by the Chanhassen City Council:
1. The Council will consider the improvement of such project in accordance with the report and the
assessment of abutting property for all or a portion of the cost of the improvement pursuant to
Minnesota Statutes, Chapter 429 at an estimated total cost of the improvements of $1,581,700.
2. A public hearing shall be held on such proposed improvements on the 23 day of January, 2012
for the 2012 Street Reconstruction Project No. 12 -01 in the Council Chambers of City Hall at 7:00
PM and the clerk shall give mailed and published notice of such hearing and improvement as
required by law.
Passed and adopted by the Chanhassen City Council this 12` day of December, 2011.
- ATTEST:
Todd Gerhardt, City Manager
Thomas A. Furlong, Mayor
YES NO ABSENT
Neighborhood Meeting
6:00 p.m. — 7:00 p.m.
Wednesday, November 9, 2011
CITY OF
2012 Street Reconstruction Project — Minnewashta Heights
City Project No. 12-01
CHANHASSEN
City of Chanhassen, MN
WSB Project No. 1694-34
COMMENT CARD
Name
CQ I-I" Phone( t2) T�Y
Address 5 - 6 ( --*' {'C- Lb r w E-Mail cz> X-A" I I QhA
City c� kle>c_ State AAI\J Zip 31
General Comments:
CA"
L/
C_&V_ -iot'c
- 6
Y y' ovw-'r 4tv—
CITY
t1€ n, v 7_011
DEPT.
Signature
Return to the City of Chanhassen
7700 Market Boulevard, P.O. Box 147
Chanhassen, MN 55317
CJt
Neighborhood Meeting
6:00 p.m. — 7:00 p.m.
Wednesday, November 9, 2011
2012 Street Reconstruction Project — Minnewashta Heights
CITY OF
City Project No. 12-01
CHANHASSEN
City of Chanhassen, MN
WSB Project No. 1694 -34
COMMENT CARD
Nam
Phone ( (.�� S'c� 7 3
Address
City e% C CLA 1
L=' Uyy TKE ku C` E -Mail
State ryA Zip J J 5 5 f
General Comments:
o 6
Signatures. Date
Return to the City of Chanhassen
t ;i
7700 Market Boulevard, P.O. Box 147
- Chanhassen, MN 55317
CJt
i
s
i
i
Neighborhood Meetin
6:0 p.m. — 7:00 p.m.
Wednesday, November 9, 2011
2012 Street Reconstruction Project— Minnewashta Heights
CITY OF
City Project No. 12 -01
CHANNSEN
City of Chanhassen, MN
-4
COMMENT CARD
Name C rt. i�r.r
- Phone (0
Address
E - Mail Ce®,,�_�`� bNis.
City
State Zip
General Comments:
1
;,
C d"ClCn
2J
3 ?` .
�✓ Q �LlL�
� f2Q�t✓ /Lei -!c
Signature Date
CIT
tads
Return to th City of Chanhassen
7700 Market Boulevard, P.O. Box 147
Chanhassen, MN 55317
i
s
i
i
CITY OF
CHMSEN
Name --wry
Address
City
Neighborhood Meeting
6:00 p.m. — 7:00 p.m.
Wednesday, November 9, 2011
2012 Street Reconstruction Project — Minnewashta Heights
City Project No. 12-01
City of Chanhassen, MN
WSB Project No. 1694 -34
COMMENT CARD
LaySC,G� Phone s'L Y 7 637
33 d t� t 6 Wi o a A-± E -Mail
State nl n, Zip 5 g f 3
General Comments:
W.4 44yo GwZNA 3A uc ai4 D&V [Pw ±7 To 1,0. AhoL -P,r- '
444,.3 6,4
Signature Date
Return to the City of Chanhassen
7700 Market Boulevard, P.O. Box 147
Chanhassen, MN 55317
Neighborhood Meeting
6:00 p.m. — 7:00 p.m.
Wednesday, November 9, 2011
2012 Street Reconstruction Project — Minnewashta Heights
CITY OF City Project No. 12
CHANHASSEN City of Chanhassen, MN
WSB Project No. 1694 -34
COMMENT CARD
Name c A G Phone (F a_ � C.' 7 1 7Q
n
Addres c�a ?2t J am- E -Mail Mb e4Jtp V ACLI; t.
City iKoC.t S t ors State M Zip
General Comments: -r
&4
Signature Date
Return to the City of Chanhassen
7700 Market Boulevard, P.O. Box 147
Chanhassen, MN 55317
CITY OF
CHANHASSEN
Name cx Ci
Addres -,
City 'r'YU ,wC`
Neighborhood Meeting
6:00 p.m. — 7:00 p.m.
Wednesday, November 9, 2011
2012 Street Reconstruction Project — Minnewashta Heights
City Project No. 12 -01
City of Chanhassen, MN
WSB Project No. 1694 -34
COMMENT CARD
�.t v _l.Q 1 C n `�` one tk � 'A) a 7 t
� E -Mail LA &\ e k ' � • C vv,
1 State " t,� Zip
General Comments:
Si atur
gn .2 /A,2 �G,� -�-✓ Date- . .11- +-t-' -'-
Return to the City of Chanhassen
7700 Market Boulevard, P.O. Box 147
Chanhassen, MN 55317
CITY OF
CHANHASSEN -
Name U
Address
City
Neighborhood Meeting
6:00 p.m. — 7:00 p.m.
Wednesday, November 9, 2011
2012 Street Reconstruction Project — Minnewashta Heights
City Project No. 12-01
City of Chanhassen, MN
WSB Project No. 1694 -34
COMMENT CARD
���' S S�k1 Phone (Q ,-, ` I o
- E -Mail hoc oe rA SZQ61 CAS
1 ( _ State Zip 33 S
General Comments:
() C oC
L E'r_-_Y�
L� CA""W-- G
�1) o /
Signature Date
Return to the City of Chanhassen
7700 Market Boulevard, P.O. Box 147
Chanhassen, MN 55317
Neighborhood Meeting
6:00 p.m. — 7:00 p.m.
Wednesday, November 9, 2011
2012 Street Reconstruction Project — Minnewashta Heights
CITY OF
City Project No. 12 -01
CHANHASSEN
City of Chanhassen, MN
WSB Project No. 1694 -34
COMMENT CARD
Name
Phone
Address
E -Mail
City � �g � �;
� ,�' State M J'` iN Zip 33 G �
General Comments:
Gae
Ain *C, v %
�^
At
�
l►�l n�
LA"'l
•
� A u> Zo
'
0 Cl
'L ,r 2.S
2.
Oon ; C' o t
S
Signature Date XZ&
Return to the City of Chanhassen
7700 Market Boulevard, P.O. Box ,147
Chanhassen, MN 55317
.f
Neighborhood Meeting
6:00 p.m. — 7:00 p.m.
Wednesday, November 9, 2011
2012 Street Reconstruction Project — Minnewashta Heights
CITY OF
City Project No. 12
CHMSEN
City of Chanhassen, MN
WSB Project No. 1694 -34
COMMENT CARD
Name p nq'0 - rA11
Phone (61,a) 7� 4 10 6
Address . 65 ZO
Do- wa'.'t 44 1a'e -1 E -Mail 06re e gy
city _� X �2�5//>,�
State /tl//,( Zip
General Comments:
i Can
1if.Ce, &0
A.C./i &- Q/jJ
7
r
`
7
C z V L6"e' 1
ati
s
V9
(/
Signature Date
4TY Off;:.;; :�:`:<:;;,<<< t.
Return to the City of Chanhassen
7700 Market Boulevard, P.O. Box 147
Now
Chanhassen, MN 55317
.f
CITY OF
CHANHASSEN
Name-
Address 3 r1 l
City "5
Neighborhood Meeting
6:00 p.m. — 7:00 p.m.
Wednesday, November 9, 2011
2012 Street Reconstruction Project — Minnewashta Heights
City Project No. 12 -01
City of Chanhassen, MN
WSB Project No. 1694 -34
COMMENT CARD
Phone
E -Mail ��y sr�r 117C°�z si r�r rdz
State Zip -6 3
General Comments:
Q A - 7 4-- & - T /w 1 1415er '.1'G ors .
Signature
Return to the City of Chanhassen
7700 Market Boulevard, P.O. Box 147
Chanhassen, MN 55317
Fauske, Alyson
From: Fauske, Alyson
Sent: Wednesday, November 30, 2011 2:57 PM
To: 'PHILIP + JR WARTMAN'
Subject: Wartman 11 -30 -2011
Hi Phil,
Thank you for the feedback. The City's website will be updated in the next couple of days with the information we
presented at the meeting.
Regards,
Alyson
From: PHILIP + JR WARTMAN [mai Ito: 1bwmaplewood(amsn.coml
Sent: Friday, November 25, 20118:20 PM
To: Fauske, Alyson
Subject: 2012 Street Reconstruction Project - Minnewashta Heights
Alyson,
Our thoughts on the reconstruction on Maplewood Circle are that we don't feel that curb and gutter are
needed in this type of neighborhood, we are not high -end homes here. With the economy the way it is we
would like to see only necessary repairs done.
In regards to our cul -de -sac, we would like for the center island to remain as it helps slow traffic down
since we have a lot of turn - arounds on our road. The center island may need to be downsized, but we
would like to still have a center island - it really does help slow traffic down. It would also prevent
.someone from driving down our road not knowing it's a dead end.and drive straight into our house with it
being so close to the road:
Phil Wartman
3531 Maplewood Circle
pbwmaplewood(a)msn.com
952.474.5693