1d. 2012 Street Recon Project: Accept Feasibility and Call PH0 CI1'II OF CgANgASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.nnn.us MEMORANDUM TO: Paul Oehme, Director of Public Works /City Engineer FROM: Alyson Fauske, Assistant City Engineer DATE: December 12, 2011 04_7 SUBJ: 2012 Street Reconstruction Project No. 12 -01: Accept Feasibility Study; Call Public Hearing PROPOSED MOTION "The City Council accepts the feasibility report for the 2012 Street Reconstruction Project No. 12 -01 and calls the public hearing for January 23, 2012. City Council approval requires a simple majority vote of the City Council present." BACKGROUND At the May 9, 2011 work session, staff reviewed with Council the proposed 2012 Street Reconstruction project. On May 23, 2011, the City Council authorized the preparation of the feasibility study. On November 9, 2011, a neighborhood meeting was held to discuss the proposed proj ect. DISCUSSION Every year the City considers streets that are in poor condition to be rehabilitated or reconstructed. For the 2012 Street Improvement Project, staff is proposing to i reconstruct approximately 1.1 miles of streets. The street segments within the proposed project were identified by the City's Pavement Management software, site investigations and utility problems in the area. The streets in Minnewashta Heights are 40 years old and cannot be cost effectively repaired with minor maintenance or even a bituminous overlay. The streets were sealcoated in 1994 and 1999. GAENG\PUBLIC\ 2012 PROJECTS \12 -01 Minnewashta Hts recon \12 -12 -2011 accept feasibility.doc Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Paul Oehme 2012 Street Reconstruction Project December 12, 2011 Page 2 Watermain Improvements The streets are in poor condition with an average pavement condition index of 38. A road under 45 typically indicates distress that would require a full depth reconstruction. The west portion of Shore Drive has a pavement condition index between 52 and 64; however these scores are artificially high since there are three watermain break patches in this vicinity. The plat for the area shows the roadway right -of -way is 50' wide. The existing road section is bituminous pavement with no curb and gutter. The watermain in this area is 40 years old and should be replaced at this time. The mains are made of cast iron and ten documented breaks have been recorded in this area. Water services between the lateral watermain and the right of way is proposed to be replaced, as well as the curb stop. Sanitary Sewer Improvements Staff has investigated and televised the condition of the sanitary sewer in this area. Approximately 1,600 feet of sewer is proposed to be replaced due to the condition of the pipe. No sanitary sewer backup problems have been recorded in this area however a number of pipe sags have been identified and these areas should be replaced at this time. The sanitary sewer services that access these sections of the pipes are also proposed to be replaced between the lateral sewer and the right of way. The remaining sewer pipe is in good structural condition, although some require mineral removal, grouting and/or lining to reduce the incidence of inflow and infiltration. These minor repair areas are also proposed to be fixed at this time. Storm Sewer Improvements The Minnewashta Heights plat area is approximately 56 acres in size and the actual watershed within the project area is 32 acres. Currently there is very little stormwater infrastructure or piping system in G:\ENG\PUBLIC\ PROJECTS\12 -01 Minnewashta Hts recon \12 -12 -2011 accept feasibility.doc PY 1 Minnewashta N N Heights Park U a � , O g a. jgy E ad e �i PGA w a W E O a Qp� �0d O � v W W CL o W Sh o " rlDriv e Estimated PC I =5 Estimatetl PCI =64 Estimated PCI =4 Watermain Improvements The streets are in poor condition with an average pavement condition index of 38. A road under 45 typically indicates distress that would require a full depth reconstruction. The west portion of Shore Drive has a pavement condition index between 52 and 64; however these scores are artificially high since there are three watermain break patches in this vicinity. The plat for the area shows the roadway right -of -way is 50' wide. The existing road section is bituminous pavement with no curb and gutter. The watermain in this area is 40 years old and should be replaced at this time. The mains are made of cast iron and ten documented breaks have been recorded in this area. Water services between the lateral watermain and the right of way is proposed to be replaced, as well as the curb stop. Sanitary Sewer Improvements Staff has investigated and televised the condition of the sanitary sewer in this area. Approximately 1,600 feet of sewer is proposed to be replaced due to the condition of the pipe. No sanitary sewer backup problems have been recorded in this area however a number of pipe sags have been identified and these areas should be replaced at this time. The sanitary sewer services that access these sections of the pipes are also proposed to be replaced between the lateral sewer and the right of way. The remaining sewer pipe is in good structural condition, although some require mineral removal, grouting and/or lining to reduce the incidence of inflow and infiltration. These minor repair areas are also proposed to be fixed at this time. Storm Sewer Improvements The Minnewashta Heights plat area is approximately 56 acres in size and the actual watershed within the project area is 32 acres. Currently there is very little stormwater infrastructure or piping system in G:\ENG\PUBLIC\ PROJECTS\12 -01 Minnewashta Hts recon \12 -12 -2011 accept feasibility.doc Paul Oehme 2012 Street Reconstruction Project December 12, 2011 Page 3 the area. The majority of the stormwater runoff generated by this neighborhood discharges directly into Lake Minnewashta. The area is fully developed so construction of new stormwater treatment ponds to treat run off before it discharges in to Lake Minnewashta is not an option. Three options for stormwater management were reviewed. Most likely the final design will be a combination of the three. The options staff has looked at are as follows: Option A: This option would pipe approximately 8.65 acres of storm sewer runoff from the central portion of the project area to an existing storm sewer pond west of the project area. A portion of the TH 7 runoff that currently is treated in this pond would need to be diverted to the west. Staff has worked out the details for the TH 7 stormwater diversion and is having MnDot review this plan. The northwest portion of the development would be treated in a dry pond in the Minnewashta Heights Park open space. This pond would hold water after larger storm events but would be dry and mowed most of the time. The southern half of the project area would be treated with small rain gardens. These rain gardens would be constructed in the right -of -way and on private property. The gardens would be optional for residents that would like to participate and take on maintenance of the gardens. These gardens would only be constructed where they show the most benefit. This option is the most disruptive to the neighborhood and the most expensive. r ,. y t T �.. �'� f, '��' , �. 1 - � 'v • � �°�..� a•,�y. � i ^ may,, Q -F -.. y 3013 5tr I'p, "'I P",r R 0 100 Zp Im 5 �N��M opuonn irt. r u.e..M.�..d TKflniUl ReWN v �av�.�F� Option B: This option is similar to Option A but the runoff treated in the westerly pond would only be the runoff from Maplewood Circle. The storm sewer pipe that proposed in Option A that would be constructed from Greenbriar Avenue to Dogwood Road is eliminated in this option. The westerly pond would treat 2.74 acres of the project site. The rest of the stormwater improvements would be the same as Option A. GAENG\PUBLIC\ 2012 PROJECTS \12 -01 Minnewashta H?1 \12 -12 -2011 accept feasibility.doc Paul Oehme 2012 Street Reconstruction Project December 12, 2011 Page 4 Option C: This option is the same as Option B but adding and underground iron filtration system in the roadway for stormwater treatment. L Lw d Luke I y 2012 Street Improvement Prol�'t opcwn C I R 0 100 200 �i �af1 StormwaUr "M mart l' Feel TeMnIW Report "�P W rope G:\ENG\PUBLIC\ PROJECTS\12 -01 Minnewashta Hts recon \12 -12 -2011 accept feasibility.doc Paul Oehme 2012 Street Reconstruction Project December 12, 2011 Page 5 An Iron - Enhanced Sand Filtration system is an underground treatment system that captures suspended solids, particulate phosphorus, and dissolved phosphorus. The iron forms rust (iron oxide) and the dissolved phosphorus attaches to these iron oxides, thereby removing it from the stormwater runoff. This system is also known as the Minnesota Filter because it was developed at the St. Anthony Falls Laboratory at the University of Minnesota. Several communities- such as St. Louis Park and Prior Lake- and watershed districts have used this system successfully for stormwater treatment where standard treatment ponds are not an option. Raingardens (biofiltration areas) are stormwater management practices intended to mimic natural conditions. They treat runoff from smaller drainage areas and promote infiltration, which reduces the volume of water getting to Lake Minnewashta and removes the nutrient load associated with the infiltrated volume. These areas may be planted with a variety of plants ranging from prairie species to a perennial garden to shrubs and mulch. Raingardens have been installed on homeowner properties along Pontiac Circle and Foxford Road, and in Lake Ann Park. There are no specific areas within the proposed project area where raingardens would be required. Participation in the raingarden program would be voluntary. A holding cell is an area where stormwater runoff is temporarily held as it is slowly released downstream. The holding cell would be an open, grassed area. The final stormwater design will be presented at the public hearing in January based on the feedback received from the neighborhood meeting and the costs associated with each alternative. The feasibility report was prepared by WSB & Associates. A copy of the feasibility report is available in the Engineering Department. G:\ENG\PUBLIC \_2012 PROJECTS \12-01 Minnewashta Hts recon \12 -12 -2011 accept feasibility.doc Paul Oehme 2012 Street Reconstruction Project December 12, 2011 Page 6 A neighborhood meeting was held on November 9, 2011 to discuss the proposed project and to answer questions. Approximately 35 people representing over 20 properties attended. All of the residents' questions were answered at the meeting and/or with a follow -up after the meeting. PROJECT FUNDING Funding for the project is anticipated to come from several sources. Forty percent (40 %) of the street improvement costs would be assessed back to the benefiting property owners, per the City's assessment practice. The remaining 60% of the street cost would be a City cost. All of the utility replacement and storm sewer costs will be paid by the City. Funding Source Amount Feasibility Study Budgeted Estimate Streets: Assessments/Revolving Assessment Fund $1,700,000 $1,579,800 Watermain: Water Utility Fund $700,000 $479,200 Sanitary Sewer: Sewer Utility Fund $300,000 $227,500 Storm Sewer: Surface Water Utility Fund $400,000 $287,130 to $392,830 $3,100,000 $2,575,530 to $2,681,230 The estimated costs include 10% contingency and 10% indirect costs. It is proposed that the five lots that constitute Minnewashta Heights Park be assessed for the project. This is consistent with past projects. The estimated assessments are calculated as follows: Total Estimated Street Improvement Cost: $1,581,700 Assessed: 40% of $1,581,700 = $632,680 91 lots assessed: $632,680 - 91 lots = $6,952.53/lot The estimated assessment assumes a standard pavement section of 2' of sand, 1' of Class 5 and 3.5" of bituminous. Staff has requested that the soils engineer provide an alternative pavement design using fabric or other technology to reduce the amount of sand and/or Class 5, thereby reducing the street cost and assessment. This recommendation will be available prior to the public hearing. At the neighborhood meeting, residents expressed an interest in upgrading the street lights within the neighborhood. The City owns two street lights on Maplewood Circle. These street lights are in poor condition and should be replaced. Staff has requested Xcel to submit a price to replace these street lights with Xcel's standard street lights. The remaining street lights in the project area are owned by Xcel and are cobra head type fixtures that are attached to wood poles. Staff has contacted Xcel to obtain costs to upgrade the existing street lights within the project. If the property owners want to replace these lights the cost to upgrade would be assessed to the properties. Xcel should have the estimated costs to staff in January, 2012. GAENG\PUBLIC\ 2012 PROJECTS \12 -01 Minnewashta Hts recon \12 -12 -2011 accept feasibility.doc Paul Oehme 2012 Street Reconstruction Project December 12, 2011 Page 7 SCHEDULE The proposed project schedule is as follows: Public Hearing; Order Plans & Specifications Approve Plans & Specifications; Authorize Ad for Bids Assessment Hearing Project Begins Most work completed By Substantial Completion Attachments: 1. CIP pages 2. Resolution 3. Resident comments January 23, 2012 February 27, 2012 April 23, 2012 May, 2012 End of August, 2012 October, 2012 G:\ENG\PUBLIC\ PROJECTS \12 -01 Minnewashta Hts recon \12 -12 -2011 accept feasibility.doc ■ r r r r r r r ■ r r r r r r r Capital Improvement Program 2011 that 2015 City of Chanhassen, MN Project # ST -012 Project Name Annual Street Improvement Program Department Street Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Streets/Highways Account #1 601 -xxxx -4751 Account #3 Priority n/a Account #2 Account #4 Description Total Project Cost: $9,700,000 knnual project to rehabilitate and reconstruct streets in the City. Current 5 -year plan shows the following neighborhood areas: 2esidential 2011 - Timberwood Drive neighborhood, Saratoga, Santa Vera, Chippewa, Picha and Kerber (S of W 78th), Target lane and W 78th Street (Powers Blvd to Market Blvd) 2012 - Greenbriar, Fir Tree, Elm Tree, Dogwood, Shore Drive and Maplewood Circle (Reconstruction) 2013 - Greenwood Shores and West 78th Street (Powers to Market) 2014 - Dartmouth Drive and Cypress Drive 2015 - Carver Beach area (south and west of Carver Beach Road) e City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective. :habilitation projects extend the life of the street. In cases with utility or poor sub grade needs to be replaced or where streets have deteriorated a point where rehabilitation will no longer be practical reconstruction of the street is necessary. A feasibility study is written to consider the :nits of the project and scope of work. Prior Expenditures 3,200,000 Construction Total Total 1,500,000 1,700,000 1,200,000 1,100,000 1,000,000 6,500,000 Prior Funding Sources 3,200,000 Assessment/Revolving Assess Total Street Pavement Managem Total 1,500,000 1,700,000 1,200,000 1,100,000 1,000,000 6,500,000 Budget hWact/Other I this project may decrease maintenance costs. 107 2011 2012 2013 2014 2015 Total 1,500,000 1,700,000 1,200,000 1,100,000 1,000,000 6,500,000 2011 2012 2013 2014 2015 Total 1,200,000 1,700,000 1,200,000 1,100,000 1,000,000 6,200,000 300,000 300,000 r r r r r r r r r r r Capital Improvement Program 2011 thru 2015 City of Chanhassen, MN Project # W -024 Project Name Watermain Replacement Department Water System Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Utilities Account #1 700 - 7025 -4751 Account #3 Priority n/a Account #2 Account #4 Description Total Project Cost: $2,200,000 teplacement of existing water main lines in coordination with the reconstruction of the City street. I Justification I The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects and also to avoid potential cuts in recently improved streets. If significant repairs are necessary to the existing water main, replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement is an ongoing project in the City. Prior Expenditures - 800,050 1 Construction Total Prior Funding Sources 800,000 I Water Utility Fund Total Total 700,000 700,000 1,400,000 Total 700,E 700,000 1,400,000 Bu dget Imp act/Ot h er these projects will decrease maintenance costs. 2011 2012 2013 2014 2015 Total 700,000 700,000 1,400,000 2011 2012 2013 700,000 2014 2015 Total 700,000 1,400,000 131 Capital Improvement Program 2011 thru 2015 Department Sanitary Sewer Improvements City of Chanhassen MN Contact Paul Oehme Type Improvement Project # SS -014 Useful Life Unassigned Project Name Sanitary Sewer Replacement Category Utilities Account #I 701- 7025 -4751 Account #3 Priority n/a Account #2 Account #4 Total Project Cost: $850,000 Description Replacement or rehabilitation of existing_sanitary sewer lines in conjunction with the reconstruction of the City street. Justification the City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by - onsolidating these projects. Prior Expenditures 250 00 Construction Total Total 300,000 300,000 600,000 Prior Funding Sources 2011 2012 2013 2014 2015 Total f - 250,0001 Sewer Utility Fund 300,000 300,000 600,000 Total Total 300,000 300,000 600,000 Budget Impact(Other This project will decrease maintenance costs. 2011 2012 2013 2014 2015 Total 3 00,000 300,000 600,000 100 Capital Improvement Program 2011 Mru 2015 City of Chanhassen, MN Project # ' SWMP -019 Project Name Street Improvement Projects -Storm Water Mgmt Account #1 720 - 7025 -4751 Account #3 Account #2 Account #4 Department Surface Water Management Contact Paul Ochme Type Improvement Useful Life Unassigned Category SWMP Priority n/a Description - . Otal K ujcct t Um; .V1,-V,VVV An annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects undertaken by the engineering and public works departments. Justification Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects. Prior Expenditures F - 450,000 1 Construction Total 400,000 400,000 800,000 Total 400,000 400,000 800,000 Prior Funding Sources 2011 2012 2013 2014 2015 Total 450,000 I Surface Water Utility Fund 400,000 400,000 800,000 Total Total 400,000 400,000 800,000 Budget Impact/Other Inventory, inspection and maintenance of new infrastructure will be required. Citywide. No map 2011 2012 2013 2014 2015 Total 118 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: December 12, 2011 RESOLUTION NO: 2011- MOTION BY: SECONDED BY: A RESOLUTION ACCEPTING FEASIBILITY STUDY AND CALLING A PUBLIC HEARING FOR THE 2012 STREET RECONSTRUCTION PROJECT NO. 12-01 WHEREAS, pursuant to resolution of the Council adopted May 23, 2011, a report has been prepared by City staff with reference to the above - referenced project, and this report is being received by the Council on December 12, 2011, and WHEREAS, the report provides information regarding whether the proposed project is necessary, cost - effective, and feasible. NOW, THEREFORE, BE IT RESOLVED by the Chanhassen City Council: 1. The Council will consider the improvement of such project in accordance with the report and the assessment of abutting property for all or a portion of the cost of the improvement pursuant to Minnesota Statutes, Chapter 429 at an estimated total cost of the improvements of $1,581,700. 2. A public hearing shall be held on such proposed improvements on the 23 day of January, 2012 for the 2012 Street Reconstruction Project No. 12 -01 in the Council Chambers of City Hall at 7:00 PM and the clerk shall give mailed and published notice of such hearing and improvement as required by law. Passed and adopted by the Chanhassen City Council this 12` day of December, 2011. - ATTEST: Todd Gerhardt, City Manager Thomas A. Furlong, Mayor YES NO ABSENT Neighborhood Meeting 6:00 p.m. — 7:00 p.m. Wednesday, November 9, 2011 CITY OF 2012 Street Reconstruction Project — Minnewashta Heights City Project No. 12-01 CHANHASSEN City of Chanhassen, MN WSB Project No. 1694-34 COMMENT CARD Name CQ I-I" Phone( t2) T�Y Address 5 - 6 ( --*' {'C- Lb r w E-Mail cz> X-A" I I QhA City c� kle>c_ State AAI\J Zip 31 General Comments: CA" L/ C_&V_ -iot'c - 6 Y y' ovw-'r 4tv— CITY t1€ n, v 7_011 DEPT. Signature Return to the City of Chanhassen 7700 Market Boulevard, P.O. Box 147 Chanhassen, MN 55317 CJt Neighborhood Meeting 6:00 p.m. — 7:00 p.m. Wednesday, November 9, 2011 2012 Street Reconstruction Project — Minnewashta Heights CITY OF City Project No. 12-01 CHANHASSEN City of Chanhassen, MN WSB Project No. 1694 -34 COMMENT CARD Nam Phone ( (.�� S'c� 7 3 Address City e% C CLA 1 L=' Uyy TKE ku C` E -Mail State ryA Zip J J 5 5 f General Comments: o 6 Signatures. Date Return to the City of Chanhassen t ;i 7700 Market Boulevard, P.O. Box 147 - Chanhassen, MN 55317 CJt i s i i Neighborhood Meetin 6:0 p.m. — 7:00 p.m. Wednesday, November 9, 2011 2012 Street Reconstruction Project— Minnewashta Heights CITY OF City Project No. 12 -01 CHANNSEN City of Chanhassen, MN -4 COMMENT CARD Name C rt. i�r.r - Phone (0 Address E - Mail Ce®,,�_�`� bNis. City State Zip General Comments: 1 ;, C d"ClCn 2J 3 ?` . �✓ Q �LlL� � f2Q�t✓ /Lei -!c Signature Date CIT tads Return to th City of Chanhassen 7700 Market Boulevard, P.O. Box 147 Chanhassen, MN 55317 i s i i CITY OF CHMSEN Name --wry Address City Neighborhood Meeting 6:00 p.m. — 7:00 p.m. Wednesday, November 9, 2011 2012 Street Reconstruction Project — Minnewashta Heights City Project No. 12-01 City of Chanhassen, MN WSB Project No. 1694 -34 COMMENT CARD LaySC,G� Phone s'L Y 7 637 33 d t� t 6 Wi o a A-± E -Mail State nl n, Zip 5 g f 3 General Comments: W.4 44yo GwZNA 3A uc ai4 D&V [Pw ±7 To 1,0. AhoL -P,r- ' 444,.3 6,4 Signature Date Return to the City of Chanhassen 7700 Market Boulevard, P.O. Box 147 Chanhassen, MN 55317 Neighborhood Meeting 6:00 p.m. — 7:00 p.m. Wednesday, November 9, 2011 2012 Street Reconstruction Project — Minnewashta Heights CITY OF City Project No. 12 CHANHASSEN City of Chanhassen, MN WSB Project No. 1694 -34 COMMENT CARD Name c A G Phone (F a_ � C.' 7 1 7Q n Addres c�a ?2t J am- E -Mail Mb e4Jtp V ACLI; t. City iKoC.t S t ors State M Zip General Comments: -r &4 Signature Date Return to the City of Chanhassen 7700 Market Boulevard, P.O. Box 147 Chanhassen, MN 55317 CITY OF CHANHASSEN Name cx Ci Addres -, City 'r'YU ,wC` Neighborhood Meeting 6:00 p.m. — 7:00 p.m. Wednesday, November 9, 2011 2012 Street Reconstruction Project — Minnewashta Heights City Project No. 12 -01 City of Chanhassen, MN WSB Project No. 1694 -34 COMMENT CARD �.t v _l.Q 1 C n `�` one tk � 'A) a 7 t � E -Mail LA &\ e k ' � • C vv, 1 State " t,� Zip General Comments: Si atur gn .2 /A,2 �G,� -�-✓ Date- . .11- +-t-' -'- Return to the City of Chanhassen 7700 Market Boulevard, P.O. Box 147 Chanhassen, MN 55317 CITY OF CHANHASSEN - Name U Address City Neighborhood Meeting 6:00 p.m. — 7:00 p.m. Wednesday, November 9, 2011 2012 Street Reconstruction Project — Minnewashta Heights City Project No. 12-01 City of Chanhassen, MN WSB Project No. 1694 -34 COMMENT CARD ���' S S�k1 Phone (Q ,-, ` I o - E -Mail hoc oe rA SZQ61 CAS 1 ( _ State Zip 33 S General Comments: () C oC L E'r_-_Y� L� CA""W-- G �1) o / Signature Date Return to the City of Chanhassen 7700 Market Boulevard, P.O. Box 147 Chanhassen, MN 55317 Neighborhood Meeting 6:00 p.m. — 7:00 p.m. Wednesday, November 9, 2011 2012 Street Reconstruction Project — Minnewashta Heights CITY OF City Project No. 12 -01 CHANHASSEN City of Chanhassen, MN WSB Project No. 1694 -34 COMMENT CARD Name Phone Address E -Mail City � �g � �; � ,�' State M J'` iN Zip 33 G � General Comments: Gae Ain *C, v % �^ At � l►�l n� LA"'l • � A u> Zo ' 0 Cl 'L ,r 2.S 2. Oon ; C' o t S Signature Date XZ& Return to the City of Chanhassen 7700 Market Boulevard, P.O. Box ,147 Chanhassen, MN 55317 .f Neighborhood Meeting 6:00 p.m. — 7:00 p.m. Wednesday, November 9, 2011 2012 Street Reconstruction Project — Minnewashta Heights CITY OF City Project No. 12 CHMSEN City of Chanhassen, MN WSB Project No. 1694 -34 COMMENT CARD Name p nq'0 - rA11 Phone (61,a) 7� 4 10 6 Address . 65 ZO Do- wa'.'t 44 1a'e -1 E -Mail 06re e gy city _� X �2�5//>,� State /tl//,( Zip General Comments: i Can 1if.Ce, &0 A.C./i &- Q/jJ 7 r ` 7 C z V L6"e' 1 ati s V9 (/ Signature Date 4TY Off;:.;; :�:`:<:;;,<<< t. Return to the City of Chanhassen 7700 Market Boulevard, P.O. Box 147 Now Chanhassen, MN 55317 .f CITY OF CHANHASSEN Name- Address 3 r1 l City "5 Neighborhood Meeting 6:00 p.m. — 7:00 p.m. Wednesday, November 9, 2011 2012 Street Reconstruction Project — Minnewashta Heights City Project No. 12 -01 City of Chanhassen, MN WSB Project No. 1694 -34 COMMENT CARD Phone E -Mail ��y sr�r 117C°�z si r�r rdz State Zip -6 3 General Comments: Q A - 7 4-- & - T /w 1 1415er '.1'G ors . Signature Return to the City of Chanhassen 7700 Market Boulevard, P.O. Box 147 Chanhassen, MN 55317 Fauske, Alyson From: Fauske, Alyson Sent: Wednesday, November 30, 2011 2:57 PM To: 'PHILIP + JR WARTMAN' Subject: Wartman 11 -30 -2011 Hi Phil, Thank you for the feedback. The City's website will be updated in the next couple of days with the information we presented at the meeting. Regards, Alyson From: PHILIP + JR WARTMAN [mai Ito: 1bwmaplewood(amsn.coml Sent: Friday, November 25, 20118:20 PM To: Fauske, Alyson Subject: 2012 Street Reconstruction Project - Minnewashta Heights Alyson, Our thoughts on the reconstruction on Maplewood Circle are that we don't feel that curb and gutter are needed in this type of neighborhood, we are not high -end homes here. With the economy the way it is we would like to see only necessary repairs done. In regards to our cul -de -sac, we would like for the center island to remain as it helps slow traffic down since we have a lot of turn - arounds on our road. The center island may need to be downsized, but we would like to still have a center island - it really does help slow traffic down. It would also prevent .someone from driving down our road not knowing it's a dead end.and drive straight into our house with it being so close to the road: Phil Wartman 3531 Maplewood Circle pbwmaplewood(a)msn.com 952.474.5693