Loading...
1c-1) Halla's Great Plains Golf Estates Final Plat ApprovalCITY OF /C-) CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: Don Ashworth, City Manager FROM: Sharmin Al -Jaff, Planner II DATE: June 21, 1995 SUBJ: Final Plat for Subdivision #86 -31 for Halla Great Plains Addition, Don Halla On September 26, 1994, the City Council approved the preliminary plat for Subdivision #86- 31 for Great Plains Golf Estates as shown on the plans dated June 6, 1994, subject to the following conditions: 1. All areas disturbed during site grading shall be immediately restored with seed and disc - mulched or wood fiber blanket within two weeks of completing site grading unless the city's (BMPH) planting fates dictate otherwise. All areas disturbed with slopes of 3:1 or greater shall be restored with sod or seed and wood fiber blanket. ' This condition is still applicable. 2. The applicant shall work with the City in developing a landscaping reforestation plan on the site. This plan shall include a list of all trees proposed to be removed and their size. The vegetated areas which, will not be affected by the development will be protected.,by,a conservation easement. The conservation easement shall permit pruning, remc yal,of dead or diseased vegetation and underbrush. All healthy trees over 6" caliper at" 4' height shall not be permitted to be removed. Staff shall provide a ' plan which shows the location of the conservation easement; and the applicant shall provide the legal description. This plan shall include a list of all trees and size proposed to be removed. The plan shall be submitted prior to final plat approval. Staff shall review the need for screening long Lots 1, 2, 3, 4 and 5, Block 4 as it relates to the existing single family homes to the south. ' Staff has met with the applicant on several occasions to discuss landscaping and outline the City's expectations. The applicant has incorporated some berms and ' vegetation along the easterly and westerly edge of Hwy. 101. This buffer is well 1 Halla's Great Plains Estates June 21, 1995 Page 2 designed and meets the requirements of the city ordinances. The applicant must proved additional three trees per lot from the city's approved tree selection list. 3. Lot 4, 5, 7, and 8 Block 3, shall be custom graded and shall provide a tree preservation plan for staff approval prior to issuance of a building permit. Staff shall have the right to require a change in house pad and location if it will result in saving significant vegetation. A snow fence shall be placed along the edge of the tree preservation easement prior to grading. This condition still applies. The plans reflect a 60 foot wide easement running south of Lyman Boulevard. We note that the lot and block numbers have changed from the previous submittal. The revised lot and block numbers are Lots 2, 3, 5, and 6, Block 1. 4. Dead end access roads in excess of 150 feet in length shall be provided with Chanhassen Engineering and Fire Department approved provisions for the turning around of fire apparatus. The turning radius of a fire apparatus access road shall be designed; shown on site plan; and, approved by the Chanhassen Engineering and Fire Department. This condition has been met. Columbine Trail and Hibiscus Trail will connect to the existing gravel road looping the street system. 5. Fire apparatus access road shall be designed and maintained to support the imposed loads of fire apparatus and shall be provided with a surface so as to provide all - weather driving capabilities. The road shall be in place prior to construction of new dwellings. This applies to homes which are in excess of 150 feet of State Hwy 101. This condition has been met. 6. Street names: a. Maple Court is not acceptable. The City already has 5 streets with "Maple" in the name. I b. The street between Hwy. and Halla Nursery Vista. Halla Vista Drive. 101 and County Road 14 is named both Birch Drive The street must have only one name. Eliminate C. Rename "Golf View Circle." Submit alternative name. I ET Halla's Great Plains Estates June 21, 1995 ' Page 3 The applicant has submitted revised street names that are acceptable. Halla Nursery ' Drive shall be labeled Halla Nursery Drive East for that portion lying east of Hwy. 101 and Halla Nursery Drive West for that portion running west of Hwy. 101. ' 7. Building Department conditions: ' a. Use Carver County licensed septic site evaluator. This condition has been met. b. Submit boring logs of borings done on each proposed ISTS site with a unique identification for each to Inspections Division. This condition still applies, however, it should be modified by adding the following language " and indicate boring numbers for each site on the Site Grading, Drainage ' and Soil Erosion Plan. C. Stake and identify proposed property lines, proposed ISTS sites and percolation ' and boring locations. This condition needs to be modified to read as follow" Evaluate existing ISTS on lot 10, Block 1 and repair or replace the ISTS if it is a failing or noncomplying system. Repair or replacement, if necessary, must be done on a acceptable ISTS site other than the site currently labelled as the (SECONDARY) site. " d. Provide a preliminary evaluation report on the ISTS sites from Resource Engineering. This condition has been met. As a result of the evaluation, this condition will be modified to read " Plat Lot 1, Block 4, and Lot 1, Block 5, as outlots. e. Revise the preliminary grading plan to show standard dwelling type designations for proposed house pads. ' The changes have not been made in accordance with the city's Standard Dwelling ' Type Designation. 8. The applicant will need to provide revised detailed storm calculations for 10 and 100- ' year storm events and provide ponding calculations for storm water quality and quantity ponds in accordance to the City's Surface Water Management Plan for the City Engineer to review and approve. The applicant shall retain on site the ' predeveloped runoff rate as well as provided interim water quality and quantity ponds. Halla's Great Plains Estates June 21, 1995 Page 4 The applicant shall provide detailed pre - developed and post - developed storm water calculations for existing and proposed storm water basins. In addition, water quality pond design calculations shall be based on Walker's pondnet model. This condition has been met. 9. The streets shall be constructed to the City's rural street section. Detailed construction plans and specifications shall be submitted for review and formal approval by the City Council in conjunction with final plat approval. The construction plans shall be designed in accordance to the City's latest edition of standard specifications and detail plates. This condition is still applicable. 10. The applicant shall enter into a development contract with the City and provide the necessary financial security to guarantee installation of the public improvements and compliance with final plat conditions of approval. This condition is still applicable. 11. The applicant shall meet wetland fill and wetland mitigation conditions as stated in the Corps of Engineers Section 404 Permit. Mitigation work shall be implemented prior to or concurrent with wetland fill activity or excavation in future phases of the project. This condition is still applicable. 12. The applicant shall apply for and obtain permits from the appropriate regulatory agencies, i.e. Watershed District, MWCC, Health Department, PCA, DNR, Army Corps of Engineers, Carver County Highway Department and MnDOT and comply with their conditions of approval. This condition is still applicable. The applicant has submitted an application to the DNR and MnDOT. 13. The appropriate drainage and utility easements shall be dedicated on the final plat for all storm water drainageways and ponding areas lying outside the street right -of -ways. The minimum easement width shall be 20 feet wide. Consideration should also be given for access for maintenance of the storm water ponding areas. Outlot A shall be platted as a lot and block. This condition has been partially met. Outlot A on the preliminary plat contained the existing nursery which is now being platted as Lot 10. The condition should be 1 Halla's Great Plains Estates June 21, 1995 ' Page 5 modified by adding the following language: "A drainage and utility easements shall be ' dedicated on the final plat over Outlots A and B from the 910 contour on Outlot A and the 908 contour on Outlot B. 14. The applicant's engineer shall develop a sediment and erosion control plan in accordance with the City's Best Management Practice Handbook. The plan shall be submitted to the City for review and formal approval. ' This condition has been met. 15. The grading plan shall be revised to relocate all berming outside street or trunk highway right -of -ways. The berm shall be limited to 4 feet high with 3:1 slopes along Trunk Highway 101 right -of -ways. In addition, the grading plan shall show all proposed grading as a result of drainage improvements, street and house construction. The applicant's engineer shall work with staff in developing a revised storm drainage plan to accommodate plat revisions. The grading plans show some revisions along the westerly edge of Trunk Hwy. 101, ' however, a berm is still proposed in the Trunk Highway 101 Right of Way, adjacent to Lot 2, Block 1. These berms will need to be relocated in to the lot. ' 16. The lowest floor elevation of all buildings adjacent to storm water ponds or wetlands shall be a minimum of three feet above the 100 -year high water level. All storm water ponds shall have side slopes of 10:1 for the first ten feet at the normal water level and no more than 3:1 slopes thereafter or 4:1 slopes throughout for safety purposes. This condition has been met except on Lot 15, Block 1, adjacent to Pond "A." ' However, Creekwood Drive is lower than the lowest floor elevation proposed on Lot 15, Block 1, eliminating the flood potential. This condition therefore has been modified. 17. The outlet from the existing pond behind the nursery shall be re- routed and directed through Pond "B." This condition should be modified to read, "The existing ponds and Pond B shall be ! combined when Lot 10, Block 1 further subdivides." Due to elevation differences, this is not feasible at this time. However, when Lot 10, Block 1 subdivides, the two ponds ' should be consolidated into one. 18. Existing wells and septic systems on the site which are not to be utilized shall be properly abandoned in accordance with City or State codes. � i Halla's Great Plains Estates June 21, 1995 Page 6 This condition is still applicable. 19. The applicant shall be responsible for the appropriate storm water quality and quantity fees based in accordance to the City's Surface Water Management Plan. The requirement for cash fees in lieu of land or permanent pond construction shall be based upon the schedule in accordance with the prescribed land use zoning. This condition is still applicable. The SWMP connection fees will be calculated after review and approval of the construction plans. 20. The applicant shall report to the City Engineer the location of any drain tiles found during construction and shall relocate or abandon the drain tile as directed by the City Engineer. This condition is still applicable. 21. The developer shall convey to the City appropriate drainage and utility easements for future construction of storm drainage infrastructures over Outlot D, Great Plains Golf Estates. This condition has been met. 22. Ponding facilities on the east side of Trunk Highway 101 will be considered after the plat has been revised to accommodate staff changes in the plat's street and lot configuration. The developer's engineer should also provide the City Engineer with revised detailed storm sewer drainage calculations and discharge rates for the storm drainage system on the east side of Trunk Highway 101 as a result of revising the plat. This condition has been met. 23. The applicant shall modify the plans and incorporate the following safety improvements: a. The steep banks along the west side of Trunk Highway 101 lying south of the nursery entrance create visibility problems for northbound traffic. The applicant is also proposing to construct berms as required along Trunk Highway 101. Staff recommends that the existing banks along Trunk Highway 101 be pulled back to improve sight lines and berming be restricted to a minimum of 4 feet in height. This condition has been met. 1 Halla's Great Plains Estates June 21, 1995 t Page 7 ' This condition is still applicable. 24. The applicant shall be required to re- excavate all unacceptable materials in the ravine ' on Lot 3, Block 6 and backfill with engineered fill as well as replace the existing storm drainage pipe (24 -inch CMP) with concrete pipe. ' This condition should be modified as follows: " The applicant shall be required to re- excavate all unacceptable materials in the ravine on Lot 3, Block 6 and backfill with engineered fill. The applicant shall provide the city engineer documentation that the existing storm pipe (24" CMP) is structurally sound. If the city determines the pipe is not structurally sound the applicant shall replace it with either PVC OR RCP. I 25. The applicant's engineer should redesign the storm water basin (Pond "D ") to accommodate the existing significant trees that are alive yet. I This condition need to be modified to read " Pond D needs to be combined with Pond E and the area used as Pond D retained for 100 year flood control." 26. The applicant shall provide for the future looping of the two street systems through Outlot A from Golfview Circle or Golfview Court. Outlot A shall have no additional access granted for TH 101. ' The condition needs to be modified. The revised plans show two street stubs on the north and south of Lot 10, Block 2 (old Outlot A), to provide for the future connection of Delphinium and Daylilly Lane. Lot 10, Block 2, shall have no additional street access on to TH 101. ' 27. The plat shall be redesigned to provide full public street access to the properties south of this development via two stub streets extended south from Halla Nursery Vista b. The hill on Trunk Highway 101 just north of the intersection of Creekwood ' Drive shall be lowered to improve sight distances. The current situation does not meet MnDOT standards for sight distance at the posted speeds. This condition has been deleted. Staff believes the grading improvements proposed along TH 101 at Creekwood will improve sight lines. ' C. Roadway alignments for Halla Nursery Vista and Trunk Highway 101 may impose sight distance problems as well. This should be investigated and documented by the applicant's engineer that the intersection meets MnDOT's ' standards for the posted speeds. ' This condition is still applicable. 24. The applicant shall be required to re- excavate all unacceptable materials in the ravine ' on Lot 3, Block 6 and backfill with engineered fill as well as replace the existing storm drainage pipe (24 -inch CMP) with concrete pipe. ' This condition should be modified as follows: " The applicant shall be required to re- excavate all unacceptable materials in the ravine on Lot 3, Block 6 and backfill with engineered fill. The applicant shall provide the city engineer documentation that the existing storm pipe (24" CMP) is structurally sound. If the city determines the pipe is not structurally sound the applicant shall replace it with either PVC OR RCP. I 25. The applicant's engineer should redesign the storm water basin (Pond "D ") to accommodate the existing significant trees that are alive yet. I This condition need to be modified to read " Pond D needs to be combined with Pond E and the area used as Pond D retained for 100 year flood control." 26. The applicant shall provide for the future looping of the two street systems through Outlot A from Golfview Circle or Golfview Court. Outlot A shall have no additional access granted for TH 101. ' The condition needs to be modified. The revised plans show two street stubs on the north and south of Lot 10, Block 2 (old Outlot A), to provide for the future connection of Delphinium and Daylilly Lane. Lot 10, Block 2, shall have no additional street access on to TH 101. ' 27. The plat shall be redesigned to provide full public street access to the properties south of this development via two stub streets extended south from Halla Nursery Vista Halla's Great Plains Estates June 21, 1995 Page 8 between Lots 4 and 5, Block 4 and Lots 1 and 2, Block 4 or Lots 2 and 3, Block 4 or some other alternative acceptable to the city. This condition has been met. 28. The applicant should provide documentation to the City and Carver County that appropriate right -of -way has been dedicated with the final plat to achieve one -half of the minimum 100 -foot wide corridor for County Road 14. This condition is still applicable. 29. Access to the individual lots shall be limited to the interior streets and not from County Road 14 or Trunk Highway 101. This condition is still applicable. 30. The applicant shall revise the plat to align Birch Drive to be continuous with Foxford Road at the intersection of County Road 14. This condition has been met. 31. The final plat should show the new dedicated Trunk Highway 101 right -of -way. This condition has been met. 32. Outlot A is currently used as the nursery business and should be platted into a lot and block. The final plat should also rename Town Road to Creekwood Drive and show Lot 1, Block 1 and Lot 1, Block 2 as a replat of Lots 2 and 3, Block 1, Great Plains Golfview Estates. This condition has been met. 33. Staff and applicant work together to make sure that the future road in the southeast corner of the plat not infringe on the bluff and that it adheres to the new bluff ordinance. This condition has been met. The applicant has revised the plans and moved the road , further west, locating it at a distance that exceeds 200 feet from the bluff. 34. The plat shall maintain an average overall density of 2 1/2 acres, including the nursery , property, for Halla's Great Plains Golf Estates preliminary plat. 1 Halla's Great Plains Estates June 21, 1995 ' Page 9 34. The plat shall maintain an average overall density of 2 1/2 acres, including the nursery ' property, for Halla's Great Plains Golf Estates preliminary plat. u r_j This condition is still applicable. 35. The total number of lots shall not exceed 36 lots. This number includes the parcel owned by Mark Halla, the nursery site, and all lots proposed for single family development. This condition is still applicable. 36. The applicant must report back to the City Council by December 1, 1994 showing that substantial progress is being made towards final plat approval, and the final plat must be completed by March 1, 1995 or the preliminary plat will be void and the applicant will have to comply with the 1 unit per 10 acre density requirement. This condition is being addressed with this submittal. 37. Park and trail dedication fees shall be paid in lieu of parkland or trail construction at the time of building permit application. This condition still applies. 38. The final plat shall exclude David Halla's property. The revised plan has excluded David Halla's property. The applicant is proposing to subdivide 102.7 acres into 33 single family lots. The property is zoned A2, Agricultural Estate District. This plat was originally filed in December, 1986. The density at that time was 1 unit per 2.5 acres. Since that time, city ordinances have changed to permit 1 unit per 10 acres, although the minimum lot size may be as small as 15,000 square feet as long as septic and wells are accommodated on the lot. This subdivision is being reviewed under the 1 unit per 2.5 acres based on extensions of the preliminary plat by the City Council. The average lot size is 94,320 square feet with a resulting gross density of 1 unit per 2.8 acres. The site is located north of Creekwood Drive, east and west of Highway 101, and south of County Road 14 (Pioneer Trail). Access to the subdivision will be provided via Highway 101, Creekwood Drive, and Pioneer Trail. All of the proposed lots meet the minimum area, width, and depth requirements of the Zoning Ordinance. 0 Halla's Great Plains Estates June 21, 1995 Page 10 The site has a dense concentration of mature trees on the north and northwest corner of the site. The plans indicate that the majority of those trees will be saved. A 60 foot preservation easement running parallel to Pioneer Trail. This easement will prevent any construction from taking place and subsequently preserving the trees. There are trees scattered throughout the site. The majority of these trees are nursery stock trees, hence, staff did not require the applicant to show these trees on the plans. Only natural growth was required to be shown and saved. In summary, staff believes that the proposed subdivision will require revisions. We are recommending that it be approved with conditions outlined in the staff report. SURFACE WATER MANAGEMENT PLAN (SWMP)/DRAINAGE The City has adopted a Surface Water Management Plan (SWMP) that serves as a tool to protect, preserve and enhance water resources. The plan identifies, from a regional perspective, the storm water quantity and quality improvements necessary to allow future development to take place and minimize its impact to downstream water bodies. In general, the water quantity portion of the plan uses a 100 -year design storm interval for ponding and a 10 -year design storm interval for storm sewer piping. The water quality portion of the plan uses William Walker, Jr.'s Pondnet model for predicting phosphorus concentrations in shallow water bodies. An ultimate conditions model has been developed at each drainage area based on the projected future land use, and therefore, different sets of improvements under full development were analyzed to determine the optimum phosphorus reduction in priority water bodies. The development will be required to be constructed in accordance with the City's Surface Water Management Plan. The proposed grading and drainage plans show several drainage areas discharging at various outlets around the plat. Staff would like to reduce the areas of ponding in order to reduce pond maintenance in the future. Pond A The design for Pond A needs to be reconfigured so that the inlet is on the opposite end of the outlet allowing for maximum pretreatment before discharge downstream. The pond should be a design standard of 65 to 75 percent phosphorus retention. Ponds B and C Stormwater runoff from predeveloped areas E and F would be pretreated at Pond B and stormwater runoff from H would be treated at Pond C. Staff recommends that Pond C be eliminated as a water quality pond. This area should be set for a dry pond where it would be used as an emergency storage area for 100 -year storm events. The drainage from Raspberry Hill could be routed back toward Pond B with some extra cutting and filling of 2 to 4 feet. Most of the drainage from Delphinium Lane, except for the cul -de -sac, could also be routed back toward Pond B. The area draining from the cul -de -sac will most likely 1 Halla's Great Plains Estates June 21, 1995 ' Page 11 building near Highway 101. This pond has a tributary drainage area of approximately 40 ' acres. The storage volume is estimated at 2.1 acre feet with a normal water level of 919.0 and a high water level of 924.5. Pond BC -P7.1 will then drain through an open channel to pond BC -P7.5 which is designed as a sediment/nutrient trap. ' Existing Pond The existing pond at the nursery (Lot 10, Block 1) should be analyzed for its efficiency to treat the rest of the 40 acres coming from the golf course and the site, but not treated at Pond B. The City will credit the applicant's SWMP fees for the additional wet volume necessary to provide treatment from off -site areas. Because this pond is a part of the ' overall drainage system, the final plat shall dedicate a drainage and utility easement over the pond. ' Northern Drainage The SWMP shows the northern portion of the site (postdeveloped drainage areas I, O, G, and P) draining to an existing wetland, BC -P5.13 located north of County Highway 14. According to the SWMP, the normal water level for this wetland is 876 and the high water level is 878.5. This basin is an existing ag/urban wetland, and therefore, runoff from impervious areas should be pre - treated before it is discharged into the basin. Since drainage areas I and G have a minimal amount of impervious area, they do not need ' pretreatment. However, areas from O and P have street and roof top area that must be pretreated. The City would prefer to pretreat this drainage in the proposed ponding area north of CSAH 14, however, the area is so minimal the applicant may prefer to pretreat the runoff on -site. The pretreatment for this area is less than that of the other ponding areas. The City's SWMP calls for 35 percent retention of phosphorus. ' Pond E The area east of Highway 101 should be designed to drain into Pond E for pretreatment. This pond will have to be expanded to also retain the 100 -year storm event since the runoff is directed straight into the ravine which is highly susceptible to erosion. ' Staff recommends that Pond D be combined with Pond E and the area should be set for a dry pond where it would be used as an emergency storage area for 100 -year storm events. 1 Storm Water Quality Fees The SWMP has established a water quality connection charge for each new subdivision based on land use. Dedication shall be equal to the cost of land and pond volume needed for treatment of the phosphorus load leaving the site. The requirement for cash in lieu of land and pond construction shall be based upon a schedule in accordance with the prescribed land use zoning. Values are calculated using market values of land in the City of Chanhassen plus ' a value of $2.50 per cubic yard for excavation of the pond. The City has had discussions with the applicant's engineer on the water quality ponding. The proposed SWMP water quality charge of $800 /acre for single- family residential developments may be waived if the ' applicant provides water quality treatment according to the City's SWMP standards. Staff will determine the applicant's SWMP fees after final review of the construction documents. The final plans have not been submitted to staff for review and calculate the SWMP fees at time Halla's Great Plains Estates June 21, 1995 Page 12 of writing this report. Staff will be working with the applicant's engineer to bring the construction plans and specifications and development contract for final approval at the July 10, 1995 City Council meeting. Storm Water Quantity Fees The SWMP has established a connection charge for the different land uses based on an average city -wide rate for the installation of water quantity systems. This cost includes land acquisition, proposed SWMP culverts, open channels and storm water ponding areas for runoff storage. Single family residential developments will have a connection charge of $1,980 per developable acre. The total gross area of the property is 102.74 acres; however, 12.03 acres is existing nursery and does not require SWMP fees. Therefore, 90.71 acres results in a water quantity connection charge of $179,606. This fee will be due payable to the City at time of final plat recording. It appears that the pond north of the steep gully ravine on Outlot A is not wetland, but rather a pond that was created for stormwater runoff. The area is to be excavated for additional stormwater ponding. The Army Corps of Engineers should still be contacted to make sure this excavation is exempt from their permit process. The individual lots will be constructed with on -site septic systems in conjunction with the individual home construction. The City's Building Department has performed the necessary plan and specification review as well as inspections for each of these systems. The applicant will be responsible for complying with the City standards as permitted through the City's Building Department. The plans show existing irrigation water lines through Lots 6, 7, 8 and 13, Block 1. All irrigation lines will need to be abandoned or relocated along the common property lines to avoid conflicts with home building. Water service for the site is proposed to come from individual wells as the homes are constructed. The applicant will be responsible for applying for and obtaining the necessary permits through the City's Building Department. In addition, the applicant will need to maintain the standards required by the State Health Department including on -going monitoring and maintenance. Final detail street construction plans and specifications have not been submitted to include with this approval process. The development contract and street construction plans and specifications approval is scheduled for the July 10, 1995 City Council agenda. The construction plans and specifications shall be prepared in accordance to the latest edition of city standards for rural streets. Final plat approval should be contingent upon I� ' Halla's Great Plains Estates June 21, 1995 ' Page 13 formal approval of the street construction plans. The applicant shall also be required to enter ' into a development contract with the City and provide the necessary financial security to guarantee construction of the site improvements and conditions of final plat approval. ' STREETS/ACCE SS The streets will have to be designed and constructed to meet the City's rural street standards. ' In the future when Lot 10, Block 1 further subdivides, Delphinium Lane should be extended southerly to eventually connect to Daylilly Lane. A provision should be placed in the chain ' of title for all lots and development contract that Delphinium Lane and Daylilly Lane will be extended in the future along with barricades and a sign indicating "THIS STREET SHALL BE EXTENDED IN THE FUTURE ". The plans propose accessing the southwesterly portion of the plat from Creekwood. The plans propose construction of right turn lanes along TH 101 at the intersections of Halla Nursery Drive and Creekwood. Staff believes that a right turn lane should also be included along Pioneer Trail (County Road 14) at proposed Halla Nursery Drive. In addition, the County has requested a 100 -foot wide street corridor along Pioneer Trail. The plat has not provided documentation that the necessary right -of -way is being dedicated. A condition has been added to insure the applicant dedicates one -half (50 feet) of the necessary 100 -foot wide corridor. ' GRADING The plans propose a berm within TH 101 right -of -way adjacent to Lot 2, Block 1. This berm will need to be relocated onto Lot 2, Block 1. Site grading will be limited to the streets and storm ponds. EROSION CONTROL An erosion control plan has been drafted and submitted to the City for review and approval prior to construction commencement. Erosion control measures such as silt fence and/or hay bales should be employed around culverts and ponding areas. The applicant's engineer should ' work with staff in modifying the erosion control plan to provide erosion control measures. All construction access points shall be required to provide and maintain a rock construction entrance until the streets are pave. Staff recommends the applicant use the City's Best ' Management Practice Handbook for erosion control measures. All disturbed areas are to be seeded and mulched or sodded immediately after grading to prevent erosion and sedimentation. Protection around ditch culverts such as hay bales or silt fence is also required until the pavement is installed. If at all possible, construction of the site in stages is highly recommended to help reduce erosion potential. Halla's Great Plains Estates June 21, 1995 Page 14 MISCELLANEOUS A remnant parcel lies just west of the future TH 101 right -of -way on Lot 1, Block 3. This parcel needs to be platted as an outlot. The landscape plan needs to be revised. All landscaping shall be planted outside of all right - of -ways. PARK DEDICATION Full park and trail fees will be collected per city ordinance in lieu of land acquisition and/or trail construction. COMPLIANCE WITH ORDINANCE - RSF DISTRICT Lot Lot Lot Home Area Width Depth Setback Ordinance 15,000 90' 125' 30' front/rear 10' sides BLOCK 1 Lot 1 61,899 239.14' 231.42' Lot 2 165,677 200' 269.25' Lot 3 108.907 200' 400' Lot 4 74,591 199.6' 193' Lot 5 83,323 110.64' 280' Lot 6 94,978 116.25' 322.62' Lot 7 59,040 137.31' 257.68' Lot 8 64,593 263.90' 257.31' Lot 9 56,477 400' 162' Lot 10 523,970 860' 750' t Halla's Great Plains Estates June 21, 1995 Page 15 Nursery Site Lot 11 48,227 150.07' 253.83' Lot 12 67,385 56.46' 240.66' on curve Lot 13 68,475 330' 290' Lot 14 64,637 320' 290' Lot 15 70,076 236.08' 290.21' Lot 16 64,145 212.60' 230' Lot 17 60,510 270.24' 220' Lot 18 77,337 229.78' 290' BLOCK 2 Lot 1 82,355 350' 286.67' Lot 2 68,927 260' 267' Lot 3 70,831 263.48' 274' Lot 4 99,935 581.23' 300' Lot 5 88,231 318.03' 271' Lot 6 84,439 317.87' 266.82' Lot 7 91,287 97.81' 254.46' Lot 8 130,978 291' 293.99' Lot 9 122,004 340' 375' Block 3 Lot 1 122,360 255.73' 306.14' Block 4 Lot 1 84,560 280' 310' Halla's Great Plains Estates June 21, 1995 Page 16 Lot 2 67,383 260' 260' Outlot C 69,725 Block 5 Lot 1 72,152 73.01' 350' on curve Lot 2 89,310 292' 367' Lot 3 126,204 300' 430' Right of Way 376,745 Total site area 102.74 acres RECOMMENDATION Staff recommends the City Council adopt the following motion: "The City Council approves the final plat for Halla's Great Plains Addition as shown on the plans dated June 21, 1995 and subject to the following conditions: 1. All areas disturbed during site grading shall be immediately restored with seed and disc - mulched or wood fiber blanket within two weeks of completing site grading unless the city's (BMPH) planting dates dictate otherwise. All areas disturbed with slopes of 3:1 or greater shall be restored with sod or seed and wood fiber blanket. 2. The applicant must proved additional three trees per lot from the city's approved tree selection list. 3. Lot 2, 3, 5, and 6 Block 1, shall be custom graded and shall provide a tree preservation plan for staff approval prior to issuance of a building permit. Staff shall have the right to require a change in house pad and location if it will result in saving significant vegetation. A snow fence shall be placed along the edge of the tree preservation easement prior to grading. 4. Building Department conditions: a. Submit boring logs of borings done on each proposed ISTS site with a unique identification for each to Inspections Division and indicate boring numbers for each site on the Site Grading, Drainage and Soil Erosion Plan. 1 1 I Halla's Great Plains Estates June 21, 1995 Page 17 b. Evaluate existing ISTS on lot 10, Block 1 and repair or replace the ISTS if it is a failing or noncomplying system. Repair or replacement, if necessary, must be done on a acceptable ISTS site other than the site currently labelled as the (SECONDARY) site. C. Revise the preliminary grading plan to show standard dwelling type designations for proposed house pads. d. Discontinue nursery operations on all ISTS sites. e. Protect ISTS sites as detailed in the June 12, 1995 letter to the applicant. f. Relocate well on Lot 4, Block 2; Lot 9, Block 2 and Lot 2, Block 4. 5. The streets shall be constructed to the City's rural street section. Detailed construction plans and specifications shall be submitted for review and formal approval by the City Council in conjunction with final plat approval. The construction plans shall be designed in accordance to the City's latest edition of standard specifications and detail plates. 6. The applicant shall enter into a development contract with the City and provide the necessary financial security to guarantee installation of the public improvements and compliance with final plat conditions of approval. 7. The applicant shall meet wetland fill and wetland mitigation conditions as stated in the Corps of Engineers Section 404 Permit. Mitigation work shall be implemented prior to or concurrent with wetland fill activity or excavation in future phases of the project. 8. The applicant shall apply for and obtain permits from the appropriate regulatory agencies, i.e. Watershed District, MWCC, Health Department, PCA, DNR, Army Corps of Engineers, Carver County Highway Department and MnDOT and comply with their conditions of approval. 9. The appropriate drainage and utility easements shall be dedicated on the final plat for all storm water drainageways and ponding areas lying outside the street right -of -ways. The minimum easement width shall be 20 feet wide. Consideration should also be given for access for maintenance of the storm water ponding areas. Drainage and utility easements shall be dedicated on the final plat over Outlots A and B from the 910 contour on Outlot A and the 908 contour on Outlot B. 10. The lowest floor elevation of all buildings except Lot 15, Block 1, adjacent to storm water ponds or wetlands shall be a minimum of three feet above the 100 -year high Halla's Great Plains Estates June 21, 1995 Page 18 water level. All storm water ponds shall have side slopes of 10:1 for the first ten feet at the normal water level and no more than 3:1 slopes thereafter or 4:1 slopes throughout for safety purposes. 11. The existing ponds and Pond B shall be combined when Lot 10, Block 1 further subdivides." Due to elevation differences, this is not feasible at this time. However, when Lot 10, Block 1 subdivides, the two ponds should be consolidated into one. 12. Existing wells and septic systems on the site which are not to be utilized shall be properly abandoned in accordance with City or State codes. 13. The applicant shall be responsible for the appropriate storm water quality and quantity fees based in accordance to the City's Surface Water Management Plan. The requirement for cash fees in lieu of land or permanent pond construction shall be based upon the schedule in accordance with the prescribed land use zoning. The SWMP connection fees for water quantity and quality have been estimated at $179,606 and will be due to the City prior to recording the final plat. The final SWMP fees shall be calculated after review of the construction plans. 14. The applicant shall report to the City Engineer the location of any drain tiles found during construction and shall relocate or abandon the drain tile as directed by the City Engineer. 15. The applicant shall modify the plans and incorporate the following safety improvements: a. Roadway alignments for Halla Nursery Vista and Trunk Highway 101 may impose sight distance problems as well. This should be investigated and documented by the applicant's engineer that the intersection meets MnDOT's standards for the posted speeds. 16. The applicant shall be required to re- excavate all unacceptable materials in the ravine on Lot 3, Block 6 and backfill with engineered fill. The applicant shall provide the city engineer documentation that the existing storm pipe (24" CMP) is structurally sound. If the city determines the pipe is not structurally sound the applicant shall replace it with either PVC OR RCP. 17. Lot 10, Block 2, shall have no additional street access on to TH 101. 18. The applicant should provide documentation to the City and Carver County that appropriate right -of -way has been dedicated with the final plat to achieve one -half of the minimum 100 -foot wide corridor for County Road 14. 1 Halla's Great Plains Estates June 21, 1995 Page 19 Li 1 19. Access to the individual lots shall be limited to the interior streets and not from County ' Road 14 or Trunk Highway 101. 20. The plat shall maintain an average overall density of 2 1/2 acres, including the nursery property, for Halla's Great Plains Golf Estates preliminary plat. ' 21. The total number of lots shall not exceed 36 lots. This number includes the parcel owned by Mark Halla, the nursery site, and all lots proposed for single family development. 22. Park and trail dedication fees shall be paid in lieu of parkland or trail construction at the time of building permit application. 23. The streets and storm drainage system shall be constructed in accordance to the city's rural street and utility standards. Detailed construction plans and specifications shall be submitted for review and formal approval by the city council in conjunction with final plat approval. The plans shall be designed in accordance with the latest edition of the city's standard specifications and detail plates. Final plat approval is contingent upon ' approval of the construction plans by the Chanhassen City Council. 24. No berming or landscaping will be allowed within any right -of -way. The proposed berm along TH 101 adjacent to Lot 2, Block 1 shall be relocated onto the lot. 25. Grading Plan changes: a. Pond A needs to be reconfigured so that the inlet is on the opposite end of the outlet. The pond shall be designed to retain between 65% to 75% phosphorus 1 retention. b. Pond C shall be revised from a water quality pond to a dry pond where it will ' be used as an emergency storage area for a 100 -year storm events. C. The drainage from Raspberry Hill and Delphinium Lane should be routed back ' toward Pond B. This pond should also be designed to retain 65% to 75% phosphorus retention. ' d. The existing pond (Lot 10, Block 1) needs to be analyzed for its water quality abilities. The applicant may receive credit towards their SWMP fees for any additional wet volume necessary to provide treatment from the off -site areas ' (golf course). Li 1 Halla's Great Plains Estates June 21, 1995 Page 20 e. Pond D shall be combined with Pond E to reduce the number of ponding areas. Pond E will have to be expanded to also retain a 100 -year storm event since the runoff from this pond is directed straight into the ravine which is highly susceptible to erosion. f. The final site grading, drainage and soil erosion control plan needs to be signed by a professional engineer registered in the state of Minnesota. g. All stormwater quantity ponds must have a stormwater outlet control structure. h. The grading plan shall be revised to relate to the final plat lot and block numbers. i. Erosion control measures such as rock filter dikes shall be placed at drainage swales prior to discharging off -site to maintain erosion. In addition, rock construction entrances shall be employed and maintained at all access points until the streets are paved. j. Condition No. 3 on the erosion control notes should be modified to require the site be fully revegetated and authorization by the City prior to the removal of the erosion control fence. 26. All existing irrigation water lines need to be relocated or abandoned in areas where the line encroaches through the platted lots with the exception of Lot 10, Block 1. 27. Final plat approval shall be contingent upon the City formally approving the street construction plans and development contract. 28. Right turn lanes shall also be constructed on eastbound Pioneer Trail (County Road 14) at Halla Nursery Drive. 29. The remnant parcel which lies west of the future TH 101 right -of -way (Lot 1, Block 3) shall be platted as an outlot. 30. Future subdivision of Lot 10, Block 1 will require the extension of Delphinium Lane South to connect eventually up with Daylilly Lane. ATTACHMENTS 1. Memo from Steve Kirchman dated June 17, 1995. 2. Letter from Steve Kirchman dated June 12, 1995. 3. Memo from Dave Hempel and Diane Desotelle dated June 22, 1995. 4. Final plat dated June 21, 1995. CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 0 CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: Sharmin Al -Jaff Planner II FROM: Steve A. Kirchman, Building Official.��� DATE: June 17, 1995 SUBJECT: #86 -31 SUB (Grate Plains Golf Estates, Don Halla) I will be gone during most of the day on Monday through Thrursday of this week. I will be in the office from 4:00 to 6:00 each day. These are my suggested revisions to the recemmended conditions for Great Plains Golf Estates. This document is saved as: G: \SAFETY \SAK \MEMOS \PLAN \HLA- GLF.SA5 6. Street names are acceptable as shown on Site Grading, Drainage and Soil Erosion Plan dated may 26, 1995. tee. 7. 1 0 . ♦.. - Gl1LVA1[i W V aiNi..V Building Department conditions: U se C C oun t y 1' d ptir •r 1 t� �'7� 1T�i'r GVUTTCT7ICG1T7�GC[ c — TG�7� LT�,�iiv ai��Qiuuc yr. Via. Submit boring logs of borings ' done on each proposed ISTS site with a unique identification for each to Inspections Division and indicate boring numbers for each site on the Site Grading, Drainage and Soil Erosion Plan. Reason: Future indh dualISTS designs are permitted, in most cases, to use existing borings in their designs. Accordingly, City staff must be able to accurately determine which borings Sharmin Al -Jaff June 19, 1995 Page 2 staff must be able to accurately determine which borings were done at which locations regardless of future conditions. Eb. St ake a nd identify propos pf l ines, pr ed 1STC s ites and pefe was berg- te Evaluate existing ISTS on lot 10, Block 1 and repair or replace the ISTS if it is a failing or noncomplying system. Repair or replacement, if necessary, must be done on a acceptable ISTS site other than the site currently labelled as the (SECONDARY) site. Reason: Chanhassen City Code requires each lot have two ISTS sites. Individual Sewage Treatment Systems Standards, Chapter 7080, which is adopted by the City, requires treatment of all sewage. Chanhassen City Code defines a system not treating sewage as a failing system and requires its repair or replacement. 4-.c. D.- ,,vide a .-ol;.Y.; a ..,7 Lien FOP O R t 18TS sires f em R Engine°rifrt Plat Lot 1 Block 4 and Lot 1 Block 5 as outlots. Reason: Evaluators were unable to locate acceptable ISTS sites on Lot 1, Block 4, and ISTS sites on Lot 1. Block S were destroyed. d. Discontinue nursery operations on all ISTS sites. Reason: Continued operations will destroy sites, creating unbuildable lots. e. Protect ISTS sites as detailed in the June 12, 1995 letter to the applicant. Reason: Protection is required by Chanhassen City Code. Protection as outlined in the letter offers a greater chance of preventing damage during road construction and expected continued nursery operations on permitted areas of the property. f. Relocate well on Lot 4, Block 2; Lot 9, Block 2 and Lot 2, Block 4. Reason: Wells are located too close to proposed ISTS sites. g.\safeq�ak'vm.-\plm\Ida- glf.m5 1 1 1 -, 1 I June 12, 1995 I F 7 u Mr. Don Halla Halla Nursery Inc. 10000 Great Plains Blvd. Chaska, MN Re: ISTS site protection Dear Mr. Halla: CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 I have received all the data necessary to review the ' Estates, and I am in the process of writing a memi A copy of the memo will be available from the F �I U 'l d ISTS sites for the proposed Great Plains Golf to the Planning Department with my findings. Department by June 20, 1995. ISTS sites are required to be fenced off to prevent possible destruction.. A number of sites were destroyed between April 17, 1995 and May 17, 1995, during the: removal of nursery stock. Consequently, all remaining ISTS sites should be fenced off as soon as possible, and no later than City Council consideration of the proposed subdivision on June 26, 1995. .1 will schedule an inspection of the sites on June 26, 1995 at 9:00 AM to confirm all sites are fenced: undisturbed and located as shown on the proposed final plat. The results of this inspection will be available immediately and will be relayed to the City Council on the same evening. I have enclosed a copy of the City policy ( #10 -1991) on fencing ISIS sites. Should you choose to protect the sites with steel posts and rope as specified in item #6b, additional protection will be required. The additional protection should. consist of snow fencing placed as shown on the enclosed copies of portions of the 5/26/95 Site Grading, Drainage and Soil Erosion Plan. Approved signs should be installed on the additional protection at 50 feet�on center _. Sincerely," , Steve A. Kirchman Building Official PC: Sharmin Al -Jaff, Planner II Roger Anderson, Civil Engineer PSD/ID file, #86 -1i (Great Plains Golf Estates) enclosures: City Policy #10 -1991. Copies of portions of 5/26/95 Site Grading, Drainage and Soil Erosion Plan (five sheets). g.16a -glf3 CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 INSPECTIONS DIVISION POLICY SEPTIC SYSTEMS The following items are Inspections Division policies in regard to septic systems within the City of Chanhassen. 1) Two sets of the design are required upon application for building permit. Design sites must be drawn to scale on registered survey. Designs must include the name, address, telephone number and certification number of the designer on the first page. 2) Systems must be designed b a designer licensed in Carver County and must be approved I the Building Official prior to issuance of building or septi=c permits. 3) Support Staff is responsible far confirming current licensing of installer before issu=ing septic permit. Carver County license required. 4) The permittee must perform the actual installation of each septic system for which they were - .'issued a permit. 5) Primary and alternate septic sites must be individually protected. Protection must remarxi around alternate site during constructi=on on primary site's Protection must be re- erected on primary site daily. 6) Protectlon- must cons -st. -o on.e -of the3 following: a h'srro fenc2ngp- rauneir tex o -f.- _ sites ' w:.th approved signs securely attached.. apt 50' o. c. x b. 42 ni.gtr see -LA, fence pasts = ~at ` °50' 0. c. around entire perimeter of 68th rtes with 2 horizontal rows of 1/4" synthe=tic rope attached to each fence post. Approved sxyns must be securely attached to ropes at 50' o. c; Inspections Division Septic Policy #10 -1991 Date: 01/24/91 4V Revised: 04/28/92 %0 PRINTED ON RECYCLED PAPERage 1 of 2 I - - - -- «,• 60 WIDE TREE - ._ PRESERVA:IaON 932 F32 1r,NI1ANi1 (P Y) 50'R t \ — -- — _ �, o J . -- - - - --� // i S 00 1r_- --� \ 1 r I 94011_ ui � _�- I IL ca (SECONDARY) RB MpUN�, II +r pETAIL /+Tl{f (SECONDARY) I I a C + ; Avg Y2 , l 1� SEWO I . I 1 r /. SEW BLDG x 928.10 ' T NRpP a QATA yypp��,UME .18 AR£ll 0 AC EX. FENCE DETENTION VOLUME - .77 Ai�' AROUN T PER POND 'ELEVS Q ( 100 YEAR 925.4 1 NORM4 923.0 t + / N .,1 BOTTOM i/9.0 A4NG ANp _ s ' zs.7o OUTLE�f 8" ORIFICE WMIN rAg1�INC EA fN' G � 12" RCP � L fftt, •, \ ' O I V 70 Q J ` EX. BINS AREA o*'00 Sj (WI Q-1), P QH 4 "."' mf A!4 A ��5,k r A SMLNTI I YF V.jI A;N I I ,�' _� 1414 I • ' CIA f) P a f DI 1 1 N11 1', VOLUML ;- A I I ja���.. FIONO I I I '."i F I � I )!I it Ak 4" NORMAL- 915 1) HO r I 9210 OL, OM T , ;,,, 1 If V- / 9 94 0 4 ` — `. - — .— 1 4 I X 1 41.9 — — — — 6 00 - -- -------- --- MOUND PAD4..' (SECOND 922 cb MOM - PRI�AIJY .2 -7 f MOOD- PAD R — 7 7 I I L--j I IFF 930 1 (P!%RY) (SEC 21 R 928 FF 92a 919 09 1 8 2 ' 92 4 eon \ � 1 _ x .70 I PAD qc I — 7 QNS 1 50:1 L J `� .7511 •'�'1.`7 om .- ._...... _ ------ iOI:S 43 N.H 1 lJ'1f 2 ri 1 of 1��:11 PAD FF 919 I I- IM,1f• 0 914 50 I � l + r► � t' `y J% 6 �WLE TRA - - - � " °I 1AI a; I f a r - -- x 914 — ' r j 1 PAD T" I P - - G%/ \ ' "�l — — — J x 917, ,1. � 1 ��, �` I I 1 / �' ,�; ' �' O FF •. ARY) ; �,.'\ �� — ; UTILITY `• x a 1�+ IAND DRAINAG _ PONDS xu' IESMT(TYP) I �� I P.. ? (SECONDARY) t � CL ,l _ ED SECONDItRIV I , �� 1V ; 1 ! 1 q 11 s i 1 \' / I (SECONDARY) __.. •••• •• --� rQ r0i c`� i O v` 51GN E:ASMENI(I (WI II I 1.X15 N) f SIIG O i +�` ! rr le t� 90 � 6• I AD A. 9A p� R 90918 - I l r 92 0 - -- _ 1 917. , ~l ) 6c�92S.50 MOUND (SECONDARY) PRI�1 'k a ed 916 T 9 1.4 " WO FEN OUNDV, i 4x gig. 10 t 1 , r .r I . t • ) 1 9 1 0 MaON CONTRt�t� � Grodinj Cdntroclpr` shod l ty",00gth r undehgrourid dtillUes prior` t� coneln F ,;. ,1,1 .i �- i comp0►1it0 All erosion conkrd lneaeurb9� oiigN.d;a ►pIwcificatlons, whlch trios� �nctlude )*in 4 t ' 1 :� ,��► l c ix teiitporory sedirper►t (w • ' , in the'tago*lnq order Rock construcllon enlro»k�u p :r ) I b. Silt fence. +` a. Straw bale barrlers at n6-z 6tiI/ 1 1 1 1 1 1 1 1 1 I IFO G I LX- SIGN-/ • ; EX. ENTRANCE Gs TO REMAIN EX. PUMP HOUSE D )23 20 gjl �o I, X43 I - [X 24' CMP OU TFA I I EX. ENTRANCE TO REMAIN FUTURE LLJ sob ,z k" 934.901 1 01 L dt Fl R/W LOCATION TO BE S8.40 TION - TF. • CO DETERMINED WHEN LO 0 ON IS ;SUBDIVIDED I \• EX. g2s.90 ' BLDG - BLDG 932.1 X x 931.60 X 931.20 / / \� � /� � I� ir 90 11 N As x 9 L '16 1 9 AIO 4 All FF838 92 Q �� �� /�/ i 1 S RI 1 I If t < I z CWH Al POND A j 291 SEWO 11 s FIF 938 36 34 2 1 SIGN ASM T7�W ' XIS (PRIMARY) Ft A7. El 1L.LA ' I A A !r 11 A4 POND A j 291 SEWO 11 s FIF 938 36 34 2 1 SIGN ASM T7�W ' XIS (PRIMARY) Ft A7. CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: Sharmin Al -Jaff, Planner II FROM: Diane Desotelle, Water Resources Coordinator ..�.w �.., Dave Hempel, Assistant City Engineer DATE: June 22, 1995 SUBJ: Halla Great Plains Addition - Final Plat Project No. 95 -13 Upon review of the final plat drawings prepared by Egan, Field & Nowak, Inc. and the site grading drainage and erosion control plan dated May 26, 1995 prepared by Roger A. Anderson & Associates, Inc., we offer the following comments and recommendations: The City has adopted a Surface Water Management Plan (SWMP) that serves as a tool to protect, preserve and enhance water resources. The plan identifies, from a regional perspective, the storm water quantity and quality improvements necessary to allow future development to take place and minimize its impact to downstream water bodies. In general, the water quantity portion of the plan uses a 100 -year design storm interval for ponding and a 10 -year design storm interval for storm sewer piping. The water ;quality portion of the plan uses William Walker, Jr.'s Pondnet model for predicting phosphorus concentrations in shallow water bodies. An ultimate conditions model has been developed at each drainage area based on the projected future' land use, and therefore, different sets of improvements under full development were analyzed to determine the optimum phosphorus reduction in priority water bodies. The development will be required to be constructed in accordance with the City's Surface Water Management Plan. The proposed grading and drainage plans show several drainage areas discharging at various ' outlets around the plat. Staff would like to reduce the areas of ponding in order to reduce pond maintenance in the future. 1 Mr. Don Halla June 22, 1995 Page 2 ' Pond A The design for Pond A needs to be reconfigured so that the inlet is on the opposite end of the outlet allowing for maximum pretreatment before discharge downstream. The pond should be a design standard of 65 to 75 percent phosphorus retention. Ponds B and C Stormwater runoff from predeveloped areas E and F would be pretreated at Pond B and stormwater runoff from H would be treated at Pond C. Staff recommends that Pond C be eliminated as a water quality pond. This area should be set for a dry pond where it would be used as an emergency storage area for 100 -year storm events. The drainage from Raspberry Hill ' could be routed back toward Pond B with some extra cutting and filling of 2 to 4 feet. Most of the drainage from Delphinium Lane, except for the cul -de -sac, could also be routed back toward Pond B. The area draining from the cul -de -sac will most likely receive efficient treatment as it ' flows toward CSAH 14. Pond B shall be a design standard of 65 to 75 percent phosphorus retention. The City's Surface Water Management Plan shows predeveloped drainage areas E, F, and G draining to a future stormwater /sediment pond, BC -P7.1 located just east of the existing building near Highway 101. This pond has a tributary drainage area of approximately 40 acres. The storage volume is estimated at 2.1 acre feet with a normal water level of 919.0 and a high water level of 924.5. Pond BC -P7.1 will then drain through an open channel to pond BC -P7.5 which is designed as a sediment /nutrient trap. Existing Pond The existing pond at the nursery (Lot 10, Block 1) should be analyzed for its efficiency to treat the rest of the 40 acres coming from the golf course and the site, but not treated at Pond B. The City will credit the applicant's SWMP fees for the additional wet volume necessary to provide treatment from off -site areas. Because this pond is a part of the overall drainage system, the final plat shall dedicate a drainage and utility easement over the pond. Northern Drainage The SWMP shows the northern portion of the site (postdeveloped drainage areas I, O, G, and P) draining to an existing wetland, BC -P5.13 located north of County Highway ' 14. According to the SWMP, the normal water level for this wetland is 876 and the high water level is 878.5. This basin is an existing ag /urban wetland, and therefore, runoff from impervious areas should be pre- treated before it is discharged into the basin. Since drainage areas I and G t have a minimal amount of impervious area, they do not need pretreatment. However, areas from O and P have street and roof top area that must be pretreated. The City would prefer to pretreat this drainage in the proposed ponding area north of CSAH 14, however, the area is so minimal ' the applicant may prefer to pretreat the runoff on -site. The pretreatment for this area is less than that of the other ponding areas. The City's SWMP calls for 35 percent retention of phosphorus. Pond E The area east of Highway 101 should be designed to drain into Pond E for pretreatment. This pond will have to be expanded to also retain the 100 -year storm event since the runoff is ' directed straight into the ravine which is highly susceptible to erosion. Staff recommends that Mr. Don Halla June 22, 1995 Page 3 Pond D be combined with Pond E and the area should be set for a dry pond where it would be used as an emergency storage area for 100 -year storm events. Storm Water Quality Fees The SWMP has established a water quality connection charge for each new subdivision based on land use. Dedication shall be equal to the cost of land and pond volume needed for treatment of the phosphorus load leaving the site. The requirement for cash in lieu of land and pond construction shall be based upon a schedule in accordance with the prescribed land use zoning. Values are calculated using market values of land in the City of Chanhassen plus a value of $2.50 per cubic yard for excavation of the pond. The City has had discussions with the applicant's engineer on the water quality ponding. The proposed SWMP water quality charge of $800 /acre for single - family residential developments may be waived if the applicant provides water quality treatment according to the City's SWMP standards. Staff will determine the applicant's SWMP fees after final review of the construction documents. The final plans have not been submitted to staff for review and calculate the SWMP fees at time of writing this report. Staff will be working with the applicant's engineer to bring the construction plans and specifications and development contract for final approval at the July 10, 1995 City Council meeting. Storm Water Quantity Fees The SWMP has established a connection charge for the different land uses based on an average city -wide rate for the installation of water quantity systems. This cost includes land acquisition, proposed SWMP culverts, open channels and storm water ponding areas for runoff storage. Single family residential developments will have a connection charge of $1,980 per developable acre. The total gross area of the property is 102.74 acres; however, 12.03 acres is existing nursery and does not require SWMP fees. Therefore, 90.71 acres results in a water quantity connection charge of $179,606. This fee will be due payable to the City at time of final plat recording. WETLANDS It appears that the pond north of the steep gully ravine on Outlot A is not wetland, but rather a pond that was created for stormwater runoff. The area is to be excavated for additional stormwater ponding. The Army Corps of Engineers should still be contacted to make sure this excavation is exempt from their permit process. UTILITIES The individual lots will be constructed with on -site septic systems in conjunction with the individual home construction. The City's Building Department has performed the necessary plan and specification review as well as inspections for each of these systems. The applicant will be 11 Mr. Don Halla June 22, 1995 Page 4 ' responsible for complying with the City standards as permitted through the City's Building Department. The plans show existing irrigation water lines through Lots 6, 7, 8 and 13, Block 1. All irrigation lines will need to be abandoned or relocated along the common property lines to avoid conflicts with home building. ' Water service for the site is ro osed to come from individual wells as the homes are p p constructed. The applicant will be responsible for applying for and obtaining the necessary permits through the City's Building Department. In addition, the applicant will need to maintain the standards required by the State Health Department including on -going monitoring and ' maintenance. Final detail street construction plans and specifications have not been submitted to include with this approval process. The development contract and street construction plans and specifications approval is scheduled for the July 10, 1995 City Council agenda. The ' construction plans and specifications shall be prepared in accordance to the latest edition of city standards for rural streets. Final plat approval should be contingent upon formal approval of the street construction plans. The applicant shall also be required to enter into a development contract with the City and provide the necessary financial security to guarantee construction of the site improvements and conditions of final plat approval. ' STREETS /ACCESS The streets will have to be designed and constructed to meet the City's rural street standards. In the future when Lot 10, Block 1 further subdivides, Delphinium Lane should be extended southerly to eventually connect to Daylilly Lane. A provision should be placed in the chain of title for all lots and development contract that Delphinium Lane and Daylilly Lane will be ' extended in the future along with barricades and a sign indicating "THIS STREET SHALL BE EXTENDED IN THE FUTURE ". ' The plans propose accessing the southwesterly portion of the plat from Creekwood. The plans propose construction of right turn lanes along TH 101 at the intersections of Halla Nursery Drive and Creekwood. Staff believes that a right turn lane should also be included along Pioneer Trail (County Road 14) at proposed Halla Nursery Drive. In addition, the County has requested a 100 - foot wide street corridor along Pioneer Trail. The plat has not provided documentation that the necessary right -of -way is being dedicated. A condition has been added to insure the applicant ' dedicates one -half (50 feet) of the necessary 100 -foot wide corridor. H Mr. Don Halla June 22, 1995 Page 5 GRADING The plans propose a berm within TH 101 right -of -way adjacent to Lot 2, Block 1. This berm will need to be relocated onto Lot 2, Block 1. Site grading will be limited to the streets and storm ponds. EROSION CONTROL An erosion control plan has been drafted and submitted to the City for review and approval prior to construction commencement. Erosion control measures such as silt fence and /or hay bales should be employed around culverts and ponding areas. The applicant's engineer should work with staff in modifying the erosion control plan to provide erosion control measures. All construction access points shall be required to provide and maintain a rock construction entrance until the streets are pave. Staff recommends the applicant use the City's Best Management Practice Handbook for erosion control measures. All disturbed areas are to be seeded and mulched or sodded immediately after grading to prevent erosion and sedimentation. Protection around ditch culverts such as hay bales or silt fence is also required until the pavement is installed. If at all possible, construction of the site in stages is highly recommended to help reduce erosion potential. MISCELLANEOUS A remnant parcel lies just west of the future TH 101 right -of -way on Lot 1, Block 3. This parcel needs to be platted as an outlot. The landscape plan needs to be revised. All landscaping shall be planted outside of all right -of- ways. RECOMMENDED CONDITIONS OF APPROVAL Staff has listed below additional conditions of approval that should be incorporated into the final plat approval process. 1. The applicant shall be responsible for surface water management connection fees (SWMP) The SWMP connection fees for water quantity and quality have been estimated at $179,606 and will be due to the City prior to recording the final plat. The final SWMP fees shall be calculated after review of the construction plans. 2. The streets and storm drainage system shall be constructed in accordance to the city's rural street and utility standards. Detailed construction plans and specifications shall be 1 r L ` i L rl Mr. Don Halla June 22, 1995 Page 6 submitted for review and formal approval by the city council in conjunction with final plat approval. The plans shall be designed in accordance with the latest edition of the city's standard specifications and detail plates. Final plat approval is contingent upon approval of the construction plans by the Chanhassen City Council. 3. No berming or landscaping will be allowed within any right -of -way. The proposed berm along TH 101 adjacent to Lot 2, Block 1 shall be relocated onto the lot. 4. Grading Plan changes: a. Pond A needs to be reconfigured so that the inlet is on the opposite end of the outlet. The pond shall be designed to retain between 65% to 75% phosphorus retention. b. Pond C shall be revised from a water quality pond to a dry pond where it will be used as an emergency storage area for a 100 -year storm events. C. The drainage from Raspberry Hill and Delphinium Lane should be routed back toward Pond B. This pond should also be designed to retain 65% to 75% phosphorus retention. d. The existing pond (Lot 10, Block 1) needs to be analyzed for its water quality abilities. The applicant may receive credit towards their SWMP fees for any additional wet volume necessary to provide treatment from the off -site areas (golf course). e. Pond D shall be combined with Pond E to reduce the number of ponding areas. Pond E will have to be expanded to also retain a 100 -year storm event since the runoff from this pond is directed straight into the ravine which is highly susceptible to erosion. f. The final site grading, drainage and soil erosion control plan needs to be signed by a professional engineer registered in the state of Minnesota. g. All stormwater quantity ponds must have a stormwater outlet control structure. h. The grading plan shall be revised to relate to the final plat lot and block numbers. Erosion control measures such as rock filter dikes shall be placed at drainage swales prior to discharging off -site to maintain erosion. In addition, rock Mr. Don Halla June 22, 1995 Page 7 construction entrances shall be employed and maintained at all access points until the streets are paved. j. Condition No. 3 on the erosion control notes should be modified to require the site be fully revegetated and authorization by the City prior to the removal of the erosion control fence. 5. All existing irrigation water lines need to be relocated or abandoned in areas where the line encroaches through the platted lots with the exception of Lot 10, Block 1. 6. The applicant shall contact the Army Corps of Engineers to verify that excavation of Pond E is exempt from their permit process. Documentation from the Army Corps of Engineers shall be supplied to the City prior to any construction activities commencing. 7. Final plat approval shall be contingent upon the City formally approving the street construction plans and development contract. 8. Right turn lanes shall also be constructed on eastbound Pioneer Trail (County Road 14) at Halla Nursery Drive. 9. The remnant parcel which lies west of the future TH 101 right -of -way (Lot 1, Block 3) shall be platted as an outlot. 10. Future subdivision of Lot 10, Block 1 will require the extension of Delphinium Lane South to connect eventually up with Daylilly Lane. g : \eng \d iane\planning \halla2. cc