1d. Approve Change Order No. 5. to West 78th Street Improvement Project 92-3fl I MEMORANDUM CITY OF /-t CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 ' TO: Don Ashworth, City Manager FROM: Charles Folch, Director of Public Works /City Engineer ' DATE: June 21 1995 Action by City Administrator Endorsed p Modifie a te 00 Submitted to Commission an 00 Submitted to C j 6 -,; &, %a ' SUBJ: Approve Change Order No. 5 to West 78th Street and Downtown Improvement Project No. 92 -3 i The Project Engineer from Strgar- Roscoe- Fausch has prepared Change Order No. 5 to the West 78th Street and Downtown Improvement Project No; 92 -3 (see attached). The first two items on the change order, muck excavation and select granular borrow, represent nearly 75% of the costs associated with this contract amendment. These two work items were associated with building a portion of the embankment for the future extension of West 78th Street west of Powers Boulevard. This roadway embankment needed to be constructed in order to facilitate the wetland restoration and storm ponding facility; however, some underlying poor soils were encountered ' and needed to be removed and replaced so that this ,embankment would not have to be reconstructed at a later date when this future roadway project proceeds. In effect, the money spent now to correct the soils and build the embankment properly is money that will not have ' to be spent on this portion of the future the cost for this work is $83,559.52. The third item on the change order is associated with the widening and overlaying of the existing 5 -foot wide traiut to Lake Ann Park. , The 5-foot width is not consistent with the City's 8 -foot ., . standard corridorlltttiil width; therefore, additional costs were incurred for the #hinor widening operation. You will note`that the last item on the change order is a decrease for the original bid ' quantity to just overlay the trail with a 5 -foot wide L mat. The cost for this item is $15,368; however, the net cost addition is $8,608 after the 5 -foot trail credit. ' The fourth item involves costs for the installation'` and maintenance of traffic control barriers and barrels which were implemented during the winter of 1993/1994 along the stretch of Powers Boulevard north of West 78th Street where soil corrective work was taking place and permanent curbing and guard rail was not in place. Cost for this item is $4,000. The fifth item in the change order involves providing for an additional westbound traffic lane in Don Ashworth June 21, 1995 Page 2 front of the Riviera and retail shopping area. These road widening requests originated from the Public Safety and Fire personnel and were further supported by the HRA. The completion of this work provides two westbound lanes on West 78th Street from Great Plains Boulevard to Powers Boulevard. The last four items represent modifications and improvements to the overall signal and lighting system. Four pedestrian pedestal poles have been installed which were inadvertently omitted from the original bid package. An additional loop detector was installed for the north entrance leg to the West 78th Street/Target Lane signal. Two additional signal pole luminaires are proposed to be added to the intersection of West 78th Street and Powers Boulevard. There are currently two luminaires present; however, due to the large and expansive size of this intersection, the two additional luminaires are needed in order to provide better illumination in all four quadrants of the intersection. An additional luminaire and extension has been installed at the intersection of West 78th Street and Great Plains Boulevard to improve illumination at the intersection. The last signal item involves replacing two red arrow signal lenses at the intersection of Trunk Highway 5 and Powers Boulevard with red ball lenses as directed by MnDOT. The total cost for the lighting and signal additions is $9,967.29. The final item on the change order is a contract decrease for the 5 -foot wide bituminous overlay of the trail to Lake Ann Park as bid. As mentioned previously, this trail was widened to 8 feet and then overlaid. As such, a revised quantity and bid price was derived. In total, Change Order No. 5 represents a cost increase in the contract amount of $109,469.81. Adding this to the current contract yields a revised contract amount of $2,879,482.12. At this point the project is substantially completed and punch list items are expected to be completed in the very near future. It is therefore recommended that the City Council approved Contract Change Order No. 5 in the amount of $109,469.81 to the West 78th Street and Downtown Improvement Project No. 92 -3 yielding a revised contract amount of $2,879,482.12 ktm Attachment: Contract Change Order No. 5 c: Dave Hempel, Assistant City Engineer David Juliff, SRF g 3eng \charles\cc \92 -3.co5 June 9 1995 ' City of Chanhassen 690 Coulter Drive P.O. Box 147 Chanhassen, Minnesota 55317 CHANGE ORDER NO.5 PROJECT: West 78th Street ' Chanhassen Project No. 92 -3 S.A.P. No. 10- 617 -10 I CONTRACTOR: C.S. McCrossan Construction, Inc. Maple Grove, Minnesota SRF No. 0921635 WHEREAS: Due to the poor soils encountered during construction of West 78th Street, it is necessary to perform muck excavation for portions of West 78th Street, west of Powers Boulevard. The excavated areas shall be backfilled with select granular material, and; WHEREAS: Because the existing trail between Powers Boulevard and Lake Anne is only 5 feet wide, it is necessary to widen it to a full 8 -foot width and then overlaid with 1 -1/2 inch bituminous wear course, instead of simply overlaying the existing trail as indicated in the original contract, and; WHEREAS: Because of a poor construction season, it is necessary to have traffic control devices installed on Powers Boulevard until such time that the medians can be constructed, and; WHEREAS: In order to maintain two lanes of westbound traffic, the segment of westbound West 78th Street (between Laredo Drive and the entrance to the Riviera Restaurant), shall be widened to 24 feet from face of curb to face of curb. The typical section shall be as shown for the remainder of the downtown area widening, and; WHEREAS: Due to insufficient illumination at the intersection of West 78th Street and Powers Boulevard, two additional street light luminaires shall be installed and; WHEREAS: In order to optimize the operation of the signal system, the Contractor shall furnish and install four pedestal poles, install an additional loop detector at the Byerly's entrance, furnish and install an additional signal mast arm pole luminaire extension and a luminaire at the intersection of West 78th Street and Great Plains Boulevard, and replace two red arrow signal lenses at the intersection of T.H. 5 and Powers Boulevard with red ball signal lenses (as directed by Mn /DOT). THEREFORE: In accordance with the terms of the Contract, you are hereby authorized and instructed to complete the work as directed and itemized below: CHANGE ORDER NO.5 Item No. Increase 2105.505 2105.522 2521.511 0563.601 2531.501 0565.602 0565.602 0565.602 0565.602 Item Page 2 Unit QtL.. Unit Price Total Price Muck Excavation (EV) Cu. Yd. Select Granular Borrow (LV) Cu. Yd. 1 -1/2" Bituminous Walk Sq. Ft. (Overlay) 10.12 Traffic Control Devices Lump Sum Concrete Curb and Gutter Lin. Ft. Design B618 Special $ Furnish Pedestal Pole Each Loop Detector (6'x 12') Each F & I Luminaire & Extension Each Replace Signal Lenses Each 4,730 $ 3.50 $ 16,555.00 6,621 $ 10.12 $ 67,004.52 18,080 $ 0.85 $ 15,368.00 1 $ 4,000.00 $ 4,000.00 500 $ 6.59 $ 3,295.00 4 $ 381.94 $ 1,527.76 1 $ 2,939.94 $ 2,939.94 3 $ 1,753.53 $ 5,260.59 2 $ 119.50 $ 239.00 TOTAL INCREASE IN CONTRACT (CHANGE ORDER NO. 5) Decrease 2521.511 1 -1/2" Bituminous Walk Sq. Ft. 10,400 $ (Overlay) NET INCREASE IN CONTRACT AMOUNT (CHANGE ORDER NO. 5� PREVIOUS INCREASES IN CONTRACT AMOUNT ORIGINAL CONTRACT AMOUNT REVISED CONTRACT AMOUNT $ 116,229.81 0.65 $ 6,760.00 $ 109,469.81 $ 146,863.83 $ 2,623,148.48 $ 2,879,482.12 CHANGE ORDER NO. 5 Page 3 ISSUED: RTRGAR -R S O -F AU INC. DATE ACCEPTED: C S McCROSSAN CONSTRUCTION, INC. DATE APPROVED: CITY OF CHANHASSEN DATE CITY OF CHANHASSEN DATE