MEMORANDUM
TO:
FROM:
DATE:
Scott A. Botcher, City Manager
Teresa J. Burgess, Public Works Direc.tor/City Engi~
March 26, 2001
SUB J:
Authorize Preparation of Feasibility Study for Quinn Road Street and
Utility Improvements; Approve Consultant Contract for Feasibility Study,
Project 01-02
City Council is recommended to authorize preparation of a feasibility study for Quinn
Road and approve a consultant contract in the amount of $5,430 with Bonestroo &
Associates conditioned upon receipt by the City of the required cash escrow and
agreement from the petitioning property owner for the preparation of the feasibility study.
The City has received a petition from a property owner on Quinn Road for extension of
sanitary sewer. The City has received three proposals from engineering firms to prepare
the feasibility study. The reason for the petition is a failing septic system at 8955 Quinn
Road.. The property owner who initiated the petition is aware of the City's policy to
require a security for the preparation of the feasibility study.
The following table represents the proposals received from the three engineering firms
that responded to the request for proposals (RFP):
Engineering Firm : ::i Preparationo~ :: GeotechniCaI ::TOial: :::
Bonestroo & Associates $3,930 $1,500 $5,430
WSB & Associates $4,200 $1,500 $5,700
HTPO $5,900 N/A $5,900
All of the engineering firms submitting proposals are qualified to prepare the feasibility
study.
Attachments: 1. RFP dated March 9, 2001.
2. Proposal from Bonestroo & Associates.
C:
Dan and Kari Kalkman, 8955 Quinn Road
Matt Saam, Project Engineer
Mahmoud Sweidan, Engineer
Phil Gravel, Bonestroo & Associates
Dave Hutton, WSB & Associates
Laurie Johnson, HTPO
g:\eng\public\01-02Xauthorize feas study.doc
CITYOF
Cemc~' Di'iz,e, PO t3o.v ]4-
612.93Z i900
612.93L5739
612. 93 L 9152
~L.9~ ~.~:_.
March 9,2001
<<Title>> <<FirstName>> <<LastName>>
<<JobTitle>>
<<Company>>
<<Addressl>>
<<Address2>>
<<City>>, <<State>> <<PostalCode>>
Re:
Request for Proposal for Preparation of Feasibility Study for Quinn Road
Sanitary Sewer, Watern-~ain and Street Improvements -Project No. 01-02
Dear <<Title>> <<LastName>>:
The City of Chanhassen has received a petition from a property owner on Quinn Road for
extension of sanitary sexver. Your firm is invited to submit a proposal to conduct a
feasibility study for the above-referenced project. The feasibility' study xvill cover:
· Feasibility of constructing sanitary sewer, watermain, and street imProvements.
· Determine options for the preliminary design of the utility and street
improvements, including obtaining any necessary soil investigations.
· Research the assessment history of the affected properties.
· Inventory private property easements to be acquired.
· Provide estimated project costs for any and all options, identify financial
alternatives and develop a preliminary assessment roll consistent with 429
statutes.
As-built construction plans and topographic maps of the project area are available for
review in the city engineer's office.
The consultant contract shall be a lump sum not to exceed amount for preparing the
feasibility study, ha addition to the work described above, the lump sum amount shall
include:
· Txvo (2) meetings with City staff (additional meetings requested by the
consultant shall be at no additional cost to the City).
· Weekly updates to City staff by e-mail.
· One (1) neighborhood meeting.
· One (1) City Council meeting at which the feasibility study will be presented.
· All work and incidental costs not herein listed, but necessary for completion of
the xvork listed, including supplying 8 copies of the final study to the City.
You are encouraged to make recommendations for add/deduct alternates to the work
listed. Please list these separately from the base proposal to ensure proper comparison of
costs.
March 9, 2001
Page 2
Proposals shall be ranked based on the following criteria:
· Understanding of the scope of the project.
· Completeness of the proposal.
· Cost.
Proposals are limited to three (3) pages in length and must be received by 4:00 PM on
March 19, 2001, in order to be considered. Faxed proposals will be accepted. The City
reserves the right to reject any proposal that does not include:
· A description of the scope of the project included in the lump sum.
· Names of the consultant personnel that will be assigned to the study if awarded
the consultant contract.
· A not to exceed proposal cost.
It is anticipated that notice to proceed with the preparation of the study will be given on
April 2, 2001. The feasibility study ~vill be required to be completed by April 30, 2001.
Please feel free to contact me at extension 156 xvith any questions or concerns you may
have regarding this proposal.
Sincerely,
CITY OF CHANHASSEN
Teresa J. Burgess, P.E.
Public Works Director/City Engineer
Attachment: 1. Location map.
Scott Botcher, City Manager
Matt Saam, Project Engineer
Steve Torell, Building Official
Dan and Kari Kalkman, 8955 Quinn Road
g:\eng\public\01-02~rfp letter_.doc
BONESTRO0 ROSENE ANDERLIK R ~6516361311 03/18/01 14'06 ~ '01/03 N0'846
~ .~ .... ~ .L~ ....... IIIII . lilt .... II!__
Fax Transmission
From' ~_.__~
Our File Nc'):
Pages to Follow:
Original V¢III Follow Itl Mail'
Yes~ No ~
Note to Addressee:
If you did not recetve all of the pages In good condition, please advise sender at your
earliest convenience. Thank You.
Bonestroo, Rosene, Anclerilk ancl Associates
· .... ,' ,' ..................... ' ' · . ,,. I,; q
2.33g \Uest Hidhway 36 · St. Paul, MN $5113 · 651 ~63~-4'~00 i~ Fax':"~51-636., 1311 · wvcw.bonestroo,com
f'a~ then mail: Yes
Make ~opies for' File
Fa~ copras fo I~nore than
Other:
For Office Use Only
No. ',~ .... Urg~'~r. fax Immedlar. cly:Yes No ~'~
Y¢,s ..... NO .~.._ F,~ and return orlglrlal to sender: Y~s ..~¢)_..
Others
No
~ONESTRO0 ROSENE ANDERLIK R ~'6516361311 03/18/01 14'06 ~ '02/03 N0'846
Bonestroo
Rosene
Anderlik &
Associates
Engineers & Architects
~ofle;ll~o, Ro.~e, A'RdeHlk ~ ~Dl~oclafe~, Inc. I~ an Affirmative Acliof~/Equa/ Oppo.q~Ify Employer
Prfn~tj~ela: C~o ~orml(roo, P.E. ~ Marvin L. So,ale. P.E. · Glenn R. Cook, P.E. ·
Robert G. 8GhunloM, P.E,. Jir~ A. ~ourdon, P.E.
~enlor C~ull~nl~: ~A W. Roeene, P,E., Joeeph C Anderllk, P.E.. Richard E. Turner. P.E. ·
8ulan M. Ebadln, C.P,A.
A,~oel, te Pr/n~e/a: Hqwara A, 8~nrord, P.E., Kollh A. Gordon, P.E., Robea R. PM~1~rl., P.E.,
Richard W. F~I~F, P,~,, David 0., LQnkola, P.E, · Raben C. Rusaek, A.I.A., Mark A, HenQon, P.E..
M~chael T. Ra~ll~lrlll, P,E, · Tea K, Field. P.E., Kannmh P. Anderson, P.E., Matt R. Rolt~, P.E. ·
David A, aot~troQ, M.B.A, · ~ldrtey P. WIIJiamaon, P.E... L.$. · Agn~s{I M- Ring, M B.A.,,
~Jlln Rick ~!'~111~i, P,~,
Offieea: BI. Paul, I~oghelter, WIIImer and St. Cloud, MN · Milwaukee. Wt
March 19, 2001
Ms. 'l'ercsa J. Burgess, P,E.
Public Works Director/City Engineer
City of C:hanhassea
690 C.'.ity Center Drive/P.O. Box 147
Chanhassen, MN 55317
Re: Proposal for Engineering Services
Quinn Road Feasibility Study
Project No. 01-02
Dear Teresa:
To produce a good feasibility study at the best price, you need a team
thut already has good knowledge of local infrastructure and a cordial
working relationship with city staff. The team we propose for the
Quinn Road Sanitary Sewer, Water Main and Street Improvements
Study has thosc qualifications. You can depend on us to give you the
accurate information you need, when you need it, in order to make
the be.qt decision for the City of Chanhassen. We've outlined our
understanding and ,pproach to the project below,
SlaIement of Understartdlrlt,
The Quinn Road Feasibility Study will follow the requirements of
Minnesota law, Chapter 429. This includes preparing uost estimates
and a preliminary assessment roll. ~e project area consists of
several rural residential lots adjacent to Lyman Boulevard. Sanita~
,, , sewer and wat~ main are
available
from
L~an
· .,~¢2~; · ....,
Boulevard.
~e
existing
' 'i~.~i ..'~..? ~.~.. ,.':/,'~..'
~ '~2¢'-~.~'...': ~,.,. ~ 1~ ~:,~, ~ ''~ Quinn Road ~urhce i~
· ,g v~ ..... , .' ~I~
., . ~. · .~ L ...~ ~ ...~
~- ~;~}..., ~, ~ i ~,,~m, mostly gravel.
~.. ~ ~ ~le. · .
.,ll[~:.~,..,::.. ... ..,~"
This view looking toward Lyman
Boulevard clear& s/tows' some of the
trees reside,Ix may be concerned with
preserving.
Quhm Road. as seen fi'om ,tear the
inter.~'ection of Ly,nan Boulevard.
In preparing the study
report, Bonestroo will
evaluate service options for sanitary sewer and water main, as well
as street improvements. Street improvement options will address
street width, saving existing trees, available right-of-way/easements,
and drainage, We are assuming the Quinn Road utility extension
project will require two meetings with city staff' to review work in
progress, and preparation of weekly e-mail project status updates.
2335 West Highway 36 · St, Paul, MN ~f13 · 65f.636-4600 · Fax: 651-638-131~
BONESTRO0 ROSENE ANDERLIK R ~'6516361311 03/18/01 14'06 ~ '03/03 N0'846
3,1,'. Teresa J. B~rgess
City of (.'hanhaxsen
March 19
Page 2
Soil borings will be needed for the project. The boringa should be completed as part of the report phase, but
could be delayed until the design phase if necessary, We will work with a geotechnical consultant to obtain
borings for the city. Thc study report will also include research of the assessment history for the affected
property as wall as an inventory of temporary and permanent easements required.
We will supply 8 to 1:2 copies of the Final Report to th~ city, attend a neighborhood meeting to outline our
findings and answer questions, and make a formal public hearing presentation at a City Council meeting.
phil Gravel will be project manager, In his 14-year career at Bonestroo Phil has designed utility and roadway
projects for numerous communities. }lis feasibility repons for Chanhassen alone include'
BC-7 Trunk Utility Improvements
· Upper BluffCreek'lYunk Utilities
, Johnson-Dolesji-Turner Area Trunk Utilities
Upper BluffCreek Trunk Utilities Phase II
· Coulter Boulevard
, Arboretum Business Park Area Utilities
Coulter Boulevard East of Century
,, Coulter Boulevard West of Century
,, Century Boulevard
,, Lake Drive Wes~
,' Stone Creek Drive
Project engineer Dan Boyum will assist Phil. Dan ha~ been a member of the firm's Municipal Group for the
past 11 years, where he designs streets and utilities, reviews new developments, investigates drainage issues,
and participates in public information meetings and public hearings, A resident ofC. hanhassen, Dan has
worked on several recent local projects, and brings good knowledge of the city and its infrastructure to his
work on this .~tudy.
S~hcdule
Assuming notice to proceed is given by APril 2, we can complete the report preparation by April 30t~,
We propose to complete the Feasibility Report as outlined ho'rein and in your March 9, 2001 Request for
Proposals for the lump sum amount of $3,930. In addition, we will assist in arranging soil borings From.
geotechnical consultant. Thc estimated cost for the geotechnical borings is $1,500. The lump sum amount
$3,930 assumes that thc City will provide base map information for the project area for use in preparing report
drawings.
you have any questions on our proposal please don't hesitate to call mc at 651-604-4885,
Sincerely,
BONESTRO0, ROSENE, ANDERLIK AND ASSOCIATES, INC.
Phil Gravel, P.E.
Project Manager
2335 West Highway 36. St, Paul, MN ~113 ~ 652.$36-4600 . Fax:612-636-1311
Bonestroo
Rosene
Anderlik &
Associates
Engineers & Architects
Bonestroo, Rosene, Anderlik and Associates, Inc. is an Affirmative Action/Equal Opportunity Employer
and Employee Owned
Principals: Otto Bonestroo, P.E. · Marvin L. Sorvala, P.E. · Glenn R. Cook, P.E..
Robert G. Schunicht, P.E. · Jerry A. Bourdon, P.E.
Senior Consultants: Robert W. Rosene, P.E. · Joseph C. Anderlik, P.E. · Richard E. Turner, P.E. ·
Susan M. Eberlin, C.P.A.
Associate Principals: Howard A. Sanford, P.E. · Keith A. Gordon, P.E. · Robert R. Pfefferle, P.E. ·
Richard W. Foster, P.E. · David O. Loskota, P.E. · Robert C. Russek, A.I.A. · Mark A. Hanson, P.E. ·
Michael T. Rautmann, P.E. · Ted K. Field, P.E. · Kenneth P. Anderson, P.E. · Mark R. Rolfs, P.E. °
David A. Bonestroo, M.B.A. · Sidney P. Williamson, P.E., L.S. · Agnes M. Ring, M.B.A., °
Allan Rick Schmidt, P.E.
Offices: St. Paul, Rochester, Willmar and St. Cloud, MN · Milwaukee, WI
Website : www.bonestroo.com
March 19. 2001
Ms. Teresa J. Burgess, P.E.
Public Works Director/City Engineer
City of Chanhassen
690 City Center Drive/P.O. Box 147
Chanhassen. MN 55317
Re: Proposal for Engineering Services
Quinn Road Feasibility Study
Project No. 01-02
Deal' Teresa:
To produce a good feasibility study at the best price, you need a team
that already has good knowledge of local infrastructure and a cordial
working relationship with city staff. The team we propose for the
Quinn Road Sanitary Sewer, Water Main and Street Improvements
Study has those qualifications. You can depend on us to give you the
accurate inlbrmation you need, when you need it, in order to make
the best decision tot' the City of Chanhassen. We've outlined our
understanding and approach to the project below.
Statement of Understandinjz
The Quinn Road Feasibility Study will follow the requirements of
Minnesota law, Chapter 429. This includes preparing cost estimates
and a preliminary assessment roll. The project area consists of
several rural residential lots adjacent to Lyman Boulevard. Sanitary
sewer and water main are
available from Lyman
Boulevard. The existing
Quinn Road surface is
mostly gravel.
This view looking toward Lyman
Boulevard clearly shows some re'the
tree.¥ residentx may be concerned with
l) re.s'erving.
_ -.,
Quinn Roa& as seen fi'om near the
intersection of Lyman Boulevard.
In preparing the study
report, Bonestroo will
evaluate service options for sanitary sewer and water main, as well
as street improvements. Street improvement options will address
street ~,idth, saving existing trees, available right-of-way/easements,
and drainage. We are assuming the Quinn Road utility extension
project will require two meetings with city staff to review work in
progress, and preparation of weekly e-mail project status updates.
2335 West Highway 36 · St. Paul, MN 55113. 651-636-4600 · Fax: 651-636-1311
M.v. Tc~t'e.va J. Btt~'ge.vx
City ri/' Cha~ha.v.ve~
Ma~'cti 19
Page 2
Soil borings will be needed for the project. The borings should be completed as part of the report phase, but
could be delayed until tile design phase if necessary. We will work with a geotechnical consultant to obtain
borings roi' tile city. Tile study report will also include research of the assessment history roi' tile affected
property as well as an inventory of temporary and permanent easements required.
Vv'e will supply 8 to 12 copies of the Final Report to the city. attend a neighborhood meeting to outline our
findings and answer questions, and make a formal public hearing presentation at a City Council meeting.
Kev Project Personnel
Phil Gravel will be project manager. In his 14-year career at Bonestroo Phil has designed utility and roadway
projects roi' ilt. llllerotls comnqunities. His feasibility reports roi' Chanhassen alone include'
BC-7 Trunk Utility Impl'ovemexats
Upper Bluff Creek Trunk Utilities
Johnson-Dolesji-Turner Area Trunk Utilities
Upper Bluff Creek Tl'uiak Utilities Phase II
Coulter Boulevard
Arboretum Business Park Area Utilities
Coulter Boulevard East of Century
Coulter Boulevard West of Century
Century Boulevard
Lake Drive West
Stone Creek Drive
Project engineer Dan Boyum will assist Phil. Dan has been a member of the firm's Municipal Group for tile
past 11 years, where he designs streets and utilities, reviews new developments, investigates drainage issues.
and participates ill public information meetings and public hea,'ings. A resident of Chanhassen, Dan has
worked on several recent local projects, and brings good knowledge of the city and its infrastructure to his
work on this study.
Schedule
Assuming notice to proceed is given by April 2. we Call complete the report preparation by April 30m.
Compensation
We propose to complete the Feasibility Report as outlined herein and in your March 9. 2001 Nequest rOI'
Proposals roi' the lump Stltll amount of $3.930. Ill addition, we will assist in arranging soil borings fl'om a
geotechnical consultant. Tile estimated cost for the geotechnical borings is $1,500. Tile lump sum amount of
$3,930 assumes that the City will provide base map information roi' the project area for use ill preparing report
drawings.
If you have ally questions on OLlr proposal please don't hesitate to call me at 651-604-4885.
Sincerely.
BONESTROO, ROSENE, ANDERLIK AND ASSOCIATES, INC.
Phil Gravel, P.E.
Project Manaoer=
2335 West Highway 36 · St. Paul, MN 55113 · 612-636-4600 · Fax: 612-636-1311