Loading...
1b Quinn Road ImprovementsCITYOF 690 GO.' Ce,re;' Ddve PO Box147 3limmota 55317 Pholle 972. 93/. I900 General Fax 952.9325539 952.93Z9152 Buildi,g Department Fax 952.934.2524 lt3b Site 'w. ci. t3,mhasse,.,m.,s MEMORANDUM TO: FROM: DATE: Scott A. Botcher, City Manager Teresa J. Burgess, Public Works Direc.tor/City Engi~ March 26, 2001 SUB J: Authorize Preparation of Feasibility Study for Quinn Road Street and Utility Improvements; Approve Consultant Contract for Feasibility Study, Project 01-02 City Council is recommended to authorize preparation of a feasibility study for Quinn Road and approve a consultant contract in the amount of $5,430 with Bonestroo & Associates conditioned upon receipt by the City of the required cash escrow and agreement from the petitioning property owner for the preparation of the feasibility study. The City has received a petition from a property owner on Quinn Road for extension of sanitary sewer. The City has received three proposals from engineering firms to prepare the feasibility study. The reason for the petition is a failing septic system at 8955 Quinn Road.. The property owner who initiated the petition is aware of the City's policy to require a security for the preparation of the feasibility study. The following table represents the proposals received from the three engineering firms that responded to the request for proposals (RFP): Engineering Firm : ::i Preparationo~ :: GeotechniCaI ::TOial: ::: Bonestroo & Associates $3,930 $1,500 $5,430 WSB & Associates $4,200 $1,500 $5,700 HTPO $5,900 N/A $5,900 All of the engineering firms submitting proposals are qualified to prepare the feasibility study. Attachments: 1. RFP dated March 9, 2001. 2. Proposal from Bonestroo & Associates. C: Dan and Kari Kalkman, 8955 Quinn Road Matt Saam, Project Engineer Mahmoud Sweidan, Engineer Phil Gravel, Bonestroo & Associates Dave Hutton, WSB & Associates Laurie Johnson, HTPO g:\eng\public\01-02Xauthorize feas study.doc CITYOF Cemc~' Di'iz,e, PO t3o.v ]4- 612.93Z i900 612.93L5739 612. 93 L 9152 ~L.9~ ~.~:_. March 9,2001 <<Title>> <<FirstName>> <<LastName>> <<JobTitle>> <<Company>> <<Addressl>> <<Address2>> <<City>>, <<State>> <<PostalCode>> Re: Request for Proposal for Preparation of Feasibility Study for Quinn Road Sanitary Sewer, Watern-~ain and Street Improvements -Project No. 01-02 Dear <<Title>> <<LastName>>: The City of Chanhassen has received a petition from a property owner on Quinn Road for extension of sanitary sexver. Your firm is invited to submit a proposal to conduct a feasibility study for the above-referenced project. The feasibility' study xvill cover: · Feasibility of constructing sanitary sewer, watermain, and street imProvements. · Determine options for the preliminary design of the utility and street improvements, including obtaining any necessary soil investigations. · Research the assessment history of the affected properties. · Inventory private property easements to be acquired. · Provide estimated project costs for any and all options, identify financial alternatives and develop a preliminary assessment roll consistent with 429 statutes. As-built construction plans and topographic maps of the project area are available for review in the city engineer's office. The consultant contract shall be a lump sum not to exceed amount for preparing the feasibility study, ha addition to the work described above, the lump sum amount shall include: · Txvo (2) meetings with City staff (additional meetings requested by the consultant shall be at no additional cost to the City). · Weekly updates to City staff by e-mail. · One (1) neighborhood meeting. · One (1) City Council meeting at which the feasibility study will be presented. · All work and incidental costs not herein listed, but necessary for completion of the xvork listed, including supplying 8 copies of the final study to the City. You are encouraged to make recommendations for add/deduct alternates to the work listed. Please list these separately from the base proposal to ensure proper comparison of costs. March 9, 2001 Page 2 Proposals shall be ranked based on the following criteria: · Understanding of the scope of the project. · Completeness of the proposal. · Cost. Proposals are limited to three (3) pages in length and must be received by 4:00 PM on March 19, 2001, in order to be considered. Faxed proposals will be accepted. The City reserves the right to reject any proposal that does not include: · A description of the scope of the project included in the lump sum. · Names of the consultant personnel that will be assigned to the study if awarded the consultant contract. · A not to exceed proposal cost. It is anticipated that notice to proceed with the preparation of the study will be given on April 2, 2001. The feasibility study ~vill be required to be completed by April 30, 2001. Please feel free to contact me at extension 156 xvith any questions or concerns you may have regarding this proposal. Sincerely, CITY OF CHANHASSEN Teresa J. Burgess, P.E. Public Works Director/City Engineer Attachment: 1. Location map. Scott Botcher, City Manager Matt Saam, Project Engineer Steve Torell, Building Official Dan and Kari Kalkman, 8955 Quinn Road g:\eng\public\01-02~rfp letter_.doc BONESTRO0 ROSENE ANDERLIK R ~6516361311 03/18/01 14'06 ~ '01/03 N0'846 ~ .~ .... ~ .L~ ....... IIIII . lilt .... II!__ Fax Transmission From' ~_.__~ Our File Nc'): Pages to Follow: Original V¢III Follow Itl Mail' Yes~ No ~ Note to Addressee: If you did not recetve all of the pages In good condition, please advise sender at your earliest convenience. Thank You. Bonestroo, Rosene, Anclerilk ancl Associates · .... ,' ,' ..................... ' ' · . ,,. I,; q 2.33g \Uest Hidhway 36 · St. Paul, MN $5113 · 651 ~63~-4'~00 i~ Fax':"~51-636., 1311 · wvcw.bonestroo,com f'a~ then mail: Yes Make ~opies for' File Fa~ copras fo I~nore than Other: For Office Use Only No. ',~ .... Urg~'~r. fax Immedlar. cly:Yes No ~'~ Y¢,s ..... NO .~.._ F,~ and return orlglrlal to sender: Y~s ..~¢)_.. Others No ~ONESTRO0 ROSENE ANDERLIK R ~'6516361311 03/18/01 14'06 ~ '02/03 N0'846 Bonestroo Rosene Anderlik & Associates Engineers & Architects ~ofle;ll~o, Ro.~e, A'RdeHlk ~ ~Dl~oclafe~, Inc. I~ an Affirmative Acliof~/Equa/ Oppo.q~Ify Employer Prfn~tj~ela: C~o ~orml(roo, P.E. ~ Marvin L. So,ale. P.E. · Glenn R. Cook, P.E. · Robert G. 8GhunloM, P.E,. Jir~ A. ~ourdon, P.E. ~enlor C~ull~nl~: ~A W. Roeene, P,E., Joeeph C Anderllk, P.E.. Richard E. Turner. P.E. · 8ulan M. Ebadln, C.P,A. A,~oel, te Pr/n~e/a: Hqwara A, 8~nrord, P.E., Kollh A. Gordon, P.E., Robea R. PM~1~rl., P.E., Richard W. F~I~F, P,~,, David 0., LQnkola, P.E, · Raben C. Rusaek, A.I.A., Mark A, HenQon, P.E.. M~chael T. Ra~ll~lrlll, P,E, · Tea K, Field. P.E., Kannmh P. Anderson, P.E., Matt R. Rolt~, P.E. · David A, aot~troQ, M.B.A, · ~ldrtey P. WIIJiamaon, P.E... L.$. · Agn~s{I M- Ring, M B.A.,, ~Jlln Rick ~!'~111~i, P,~, Offieea: BI. Paul, I~oghelter, WIIImer and St. Cloud, MN · Milwaukee. Wt March 19, 2001 Ms. 'l'ercsa J. Burgess, P,E. Public Works Director/City Engineer City of C:hanhassea 690 C.'.ity Center Drive/P.O. Box 147 Chanhassen, MN 55317 Re: Proposal for Engineering Services Quinn Road Feasibility Study Project No. 01-02 Dear Teresa: To produce a good feasibility study at the best price, you need a team thut already has good knowledge of local infrastructure and a cordial working relationship with city staff. The team we propose for the Quinn Road Sanitary Sewer, Water Main and Street Improvements Study has thosc qualifications. You can depend on us to give you the accurate information you need, when you need it, in order to make the be.qt decision for the City of Chanhassen. We've outlined our understanding and ,pproach to the project below, SlaIement of Understartdlrlt, The Quinn Road Feasibility Study will follow the requirements of Minnesota law, Chapter 429. This includes preparing uost estimates and a preliminary assessment roll. ~e project area consists of several rural residential lots adjacent to Lyman Boulevard. Sanita~ ,, , sewer and wat~ main are available from L~an · .,~¢2~; · ...., Boulevard. ~e existing ' 'i~.~i ..'~..? ~.~.. ,.':/,'~..' ~ '~2¢'-~.~'...': ~,.,. ~ 1~ ~:,~, ~ ''~ Quinn Road ~urhce i~ · ,g v~ ..... , .' ~I~ ., . ~. · .~ L ...~ ~ ...~ ~- ~;~}..., ~, ~ i ~,,~m, mostly gravel. ~.. ~ ~ ~le. · . .,ll[~:.~,..,::.. ... ..,~" This view looking toward Lyman Boulevard clear& s/tows' some of the trees reside,Ix may be concerned with preserving. Quhm Road. as seen fi'om ,tear the inter.~'ection of Ly,nan Boulevard. In preparing the study report, Bonestroo will evaluate service options for sanitary sewer and water main, as well as street improvements. Street improvement options will address street width, saving existing trees, available right-of-way/easements, and drainage, We are assuming the Quinn Road utility extension project will require two meetings with city staff' to review work in progress, and preparation of weekly e-mail project status updates. 2335 West Highway 36 · St, Paul, MN ~f13 · 65f.636-4600 · Fax: 651-638-131~ BONESTRO0 ROSENE ANDERLIK R ~'6516361311 03/18/01 14'06 ~ '03/03 N0'846 3,1,'. Teresa J. B~rgess City of (.'hanhaxsen March 19 Page 2 Soil borings will be needed for the project. The boringa should be completed as part of the report phase, but could be delayed until the design phase if necessary, We will work with a geotechnical consultant to obtain borings for the city. Thc study report will also include research of the assessment history for the affected property as wall as an inventory of temporary and permanent easements required. We will supply 8 to 1:2 copies of the Final Report to th~ city, attend a neighborhood meeting to outline our findings and answer questions, and make a formal public hearing presentation at a City Council meeting. phil Gravel will be project manager, In his 14-year career at Bonestroo Phil has designed utility and roadway projects for numerous communities. }lis feasibility repons for Chanhassen alone include' BC-7 Trunk Utility Improvements · Upper BluffCreek'lYunk Utilities , Johnson-Dolesji-Turner Area Trunk Utilities Upper BluffCreek Trunk Utilities Phase II · Coulter Boulevard , Arboretum Business Park Area Utilities Coulter Boulevard East of Century ,, Coulter Boulevard West of Century ,, Century Boulevard ,, Lake Drive Wes~ ,' Stone Creek Drive Project engineer Dan Boyum will assist Phil. Dan ha~ been a member of the firm's Municipal Group for the past 11 years, where he designs streets and utilities, reviews new developments, investigates drainage issues, and participates in public information meetings and public hearings, A resident ofC. hanhassen, Dan has worked on several recent local projects, and brings good knowledge of the city and its infrastructure to his work on this .~tudy. S~hcdule Assuming notice to proceed is given by APril 2, we can complete the report preparation by April 30t~, We propose to complete the Feasibility Report as outlined ho'rein and in your March 9, 2001 Request for Proposals for the lump sum amount of $3,930. In addition, we will assist in arranging soil borings From. geotechnical consultant. Thc estimated cost for the geotechnical borings is $1,500. The lump sum amount $3,930 assumes that thc City will provide base map information for the project area for use in preparing report drawings. you have any questions on our proposal please don't hesitate to call mc at 651-604-4885, Sincerely, BONESTRO0, ROSENE, ANDERLIK AND ASSOCIATES, INC. Phil Gravel, P.E. Project Manager 2335 West Highway 36. St, Paul, MN ~113 ~ 652.$36-4600 . Fax:612-636-1311 Bonestroo Rosene Anderlik & Associates Engineers & Architects Bonestroo, Rosene, Anderlik and Associates, Inc. is an Affirmative Action/Equal Opportunity Employer and Employee Owned Principals: Otto Bonestroo, P.E. · Marvin L. Sorvala, P.E. · Glenn R. Cook, P.E.. Robert G. Schunicht, P.E. · Jerry A. Bourdon, P.E. Senior Consultants: Robert W. Rosene, P.E. · Joseph C. Anderlik, P.E. · Richard E. Turner, P.E. · Susan M. Eberlin, C.P.A. Associate Principals: Howard A. Sanford, P.E. · Keith A. Gordon, P.E. · Robert R. Pfefferle, P.E. · Richard W. Foster, P.E. · David O. Loskota, P.E. · Robert C. Russek, A.I.A. · Mark A. Hanson, P.E. · Michael T. Rautmann, P.E. · Ted K. Field, P.E. · Kenneth P. Anderson, P.E. · Mark R. Rolfs, P.E. ° David A. Bonestroo, M.B.A. · Sidney P. Williamson, P.E., L.S. · Agnes M. Ring, M.B.A., ° Allan Rick Schmidt, P.E. Offices: St. Paul, Rochester, Willmar and St. Cloud, MN · Milwaukee, WI Website : www.bonestroo.com March 19. 2001 Ms. Teresa J. Burgess, P.E. Public Works Director/City Engineer City of Chanhassen 690 City Center Drive/P.O. Box 147 Chanhassen. MN 55317 Re: Proposal for Engineering Services Quinn Road Feasibility Study Project No. 01-02 Deal' Teresa: To produce a good feasibility study at the best price, you need a team that already has good knowledge of local infrastructure and a cordial working relationship with city staff. The team we propose for the Quinn Road Sanitary Sewer, Water Main and Street Improvements Study has those qualifications. You can depend on us to give you the accurate inlbrmation you need, when you need it, in order to make the best decision tot' the City of Chanhassen. We've outlined our understanding and approach to the project below. Statement of Understandinjz The Quinn Road Feasibility Study will follow the requirements of Minnesota law, Chapter 429. This includes preparing cost estimates and a preliminary assessment roll. The project area consists of several rural residential lots adjacent to Lyman Boulevard. Sanitary sewer and water main are available from Lyman Boulevard. The existing Quinn Road surface is mostly gravel. This view looking toward Lyman Boulevard clearly shows some re'the tree.¥ residentx may be concerned with l) re.s'erving. _ -., Quinn Roa& as seen fi'om near the intersection of Lyman Boulevard. In preparing the study report, Bonestroo will evaluate service options for sanitary sewer and water main, as well as street improvements. Street improvement options will address street ~,idth, saving existing trees, available right-of-way/easements, and drainage. We are assuming the Quinn Road utility extension project will require two meetings with city staff to review work in progress, and preparation of weekly e-mail project status updates. 2335 West Highway 36 · St. Paul, MN 55113. 651-636-4600 · Fax: 651-636-1311 M.v. Tc~t'e.va J. Btt~'ge.vx City ri/' Cha~ha.v.ve~ Ma~'cti 19 Page 2 Soil borings will be needed for the project. The borings should be completed as part of the report phase, but could be delayed until tile design phase if necessary. We will work with a geotechnical consultant to obtain borings roi' tile city. Tile study report will also include research of the assessment history roi' tile affected property as well as an inventory of temporary and permanent easements required. Vv'e will supply 8 to 12 copies of the Final Report to the city. attend a neighborhood meeting to outline our findings and answer questions, and make a formal public hearing presentation at a City Council meeting. Kev Project Personnel Phil Gravel will be project manager. In his 14-year career at Bonestroo Phil has designed utility and roadway projects roi' ilt. llllerotls comnqunities. His feasibility reports roi' Chanhassen alone include' BC-7 Trunk Utility Impl'ovemexats Upper Bluff Creek Trunk Utilities Johnson-Dolesji-Turner Area Trunk Utilities Upper Bluff Creek Tl'uiak Utilities Phase II Coulter Boulevard Arboretum Business Park Area Utilities Coulter Boulevard East of Century Coulter Boulevard West of Century Century Boulevard Lake Drive West Stone Creek Drive Project engineer Dan Boyum will assist Phil. Dan has been a member of the firm's Municipal Group for tile past 11 years, where he designs streets and utilities, reviews new developments, investigates drainage issues. and participates ill public information meetings and public hea,'ings. A resident of Chanhassen, Dan has worked on several recent local projects, and brings good knowledge of the city and its infrastructure to his work on this study. Schedule Assuming notice to proceed is given by April 2. we Call complete the report preparation by April 30m. Compensation We propose to complete the Feasibility Report as outlined herein and in your March 9. 2001 Nequest rOI' Proposals roi' the lump Stltll amount of $3.930. Ill addition, we will assist in arranging soil borings fl'om a geotechnical consultant. Tile estimated cost for the geotechnical borings is $1,500. Tile lump sum amount of $3,930 assumes that the City will provide base map information roi' the project area for use ill preparing report drawings. If you have ally questions on OLlr proposal please don't hesitate to call me at 651-604-4885. Sincerely. BONESTROO, ROSENE, ANDERLIK AND ASSOCIATES, INC. Phil Gravel, P.E. Project Manaoer= 2335 West Highway 36 · St. Paul, MN 55113 · 612-636-4600 · Fax: 612-636-1311