Loading...
1c Lake Lucy Ridge ExtensionCITYOF 690 City Center Drive PO Box Phone 952. 9321900 General Fax 952.93~5~39 6~gineering Deparn~ent 952.93Z9152 Building Deparnnent Fax 952.934.2524 II3b Site MEMORANDUM TO: Scott A. Botcher, City Manager FROM' DATE: Teresa J. Burgess, Public Works Directo. r/City Engin~~ March 26, 2001 SUB J: Authorize Preparation of Feasibility Study for Lake Lucy Ridge Utility Extension, Project 01-03 City Council is recommended to authorize preparation of a feasibility study for extension of water and sanitary sewer utilities to a development known as Lake Lucy Ridge conditioned upon receipt by the City of the required cash escrow and agreement from the petitioning property owner for the preparation of the feasibility study. The City has received a petition from the property owner of the Parcel shown below for extension of water and sanitary sewer utilities through Phase 2 of the Ashling Meadows Development and the petitioning property. The property owner has been made aware of the following: · The City has not requested proposals for consultant services for this project pending clarification by the property owner of the development proposal for his property. · It is the City's policy to require a security for the preparation of the feasibility study. · The feasibility study cannot be finalized until a formal'application from the developer has been reviewed by the Planning Dept. and a public hearing before the Planning Commission for the application has been held. · The City Council will make the final determination if the utility project will be initiated or not pending the recommendation of the feasibility study and the outcome of the public hearing. c: Randy Noecker, Noecker Development David Hinners, Lundgren Bros. Construction Matt Saam, Project Engineer Mahmoud Sxveidan, Engineer G:\ENG\PUBLIC\01-0Y~kuth prep of feas study.doc