1b. Approve Change Order No. 3 for North Side West 78th Street Parking Lot /City Hall Improvement Project 87-171
11
MEMORANDUM
CITY OF -!�b
0
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739 Action by City Mmle *ft
TO: Don Ashworth, City Manager
Endorsed_, -
Modii e
Rejects
Date Submitted to Commisft
FROM: Charles Folch, Director of Public Works /City Engineer D <:— to CoJ"
DATE: March 8, 1994 Is / 14 -
SUBJ: Approve Change Order No. 3 for North Side West 78th Street Parking Lot/City Hall
Improvement Project No. 87 -17
As is evident from the project number, the North Side Parking Lot Improvement Project began a number
of years ago. It is my understanding that this project was substantially completed in 1990 prior to my
tenure with the City; however, over the past four year s'the project contract was not finaled out due to
difficulties with the contractor in completing punch list items and negotiating amounts to be paid for work
performed. Over the past few years the project engineer has expended many hours trying to tie up loose
ends with this contract. Part of the problem may have been that during 1990 through 1992 Shafer
Contracting had been concentrating their efforts on the Trunk Highway 5 improvement project with the
City. In any case, the engineer has successfully brought the project to a point where the project may now
be finaled out.
' The final payment for this project incorporates Change. Order No. 3 to this improvement contract, pending
approval. The project engineer has done an excellent job of detailing the specific additional work items
that were performed on the project; the corresponding need for Ae work and the associated additional
costs. The total change order ;amounts to $98,301.19 with approximately 60% of the cost related to soil
correction operations and aggregate base work. The remaining amount includes expansions to the
irrigation system, additional lighting and landscaping per'City request.
The project
that all
of this work has been completed to date: ' It is therefore
payment for the work associated with Change Order No. 3
amr — _ded and final contract amount of $777,807.17. Upon
its will be closed.
recommended that the City 'Council.approv
in the amount of $98,301.19 resulting in' ai
final payment, this project contract and fil
ktm
Attachments: 1. Letter from Jon Hom n! ;-.:; February 14, 1994.
2. Change Order No. 3
c: Dave Hempel, Assistant City Enginee.
Jon Horn, BRW
George Mattson, Shafer Contracting
g: \eng\chadea \oc\noitWot
1
B R W INC.
February 14, 1994
Mr. Charles Folch
City Engineer
City of Chanhassen
690 Coulter Drive
Chanhassen, MN 55317
RE: North Side Parking Lot /City Offices
City Project 87 -17
Dear Mr. Folch:
CITY OF CkANDAsSE
FEB 2 S� '1994
ENGINEERING DEPT.
Please find enclosed for your approval six (6) copies of Contract Amendment
No. 3 and the final Application for Payment for the above - referenced project.
We are recommending final payment to Shafer Contracting Company, Inc. in
the amount of $98,301.19 as shown on the application. To the best of our
knowledge, all work is complete and all monies shown are payable.
Work for this project was substantially completed in 1990; however, until
recently, the Contractor did not cooperate with efforts to final the project. As
a result of the lack of cooperation from the Contractor, final payment
documents could not be prepared until now.
We have notified the Contractor to provide the City with all necessary lien
waivers and IC 134 forms.
Please call if you have any questions or we can provide any additional
information.
Sincerely,
_r
d
BRW, INC. ,
B. orn, PE
jest Manager
JBH /lab
Enclosures
cc: File 7 -8915
Planning
'
Transportation
Engineering
'
Urban Design
Thresher Square
'
700 Third Street So.
Minneapolis,
MN 55115
'
612/370 -0700
'
Fax 612/370 -1378
February 14, 1994
Mr. Charles Folch
City Engineer
City of Chanhassen
690 Coulter Drive
Chanhassen, MN 55317
RE: North Side Parking Lot /City Offices
City Project 87 -17
Dear Mr. Folch:
CITY OF CkANDAsSE
FEB 2 S� '1994
ENGINEERING DEPT.
Please find enclosed for your approval six (6) copies of Contract Amendment
No. 3 and the final Application for Payment for the above - referenced project.
We are recommending final payment to Shafer Contracting Company, Inc. in
the amount of $98,301.19 as shown on the application. To the best of our
knowledge, all work is complete and all monies shown are payable.
Work for this project was substantially completed in 1990; however, until
recently, the Contractor did not cooperate with efforts to final the project. As
a result of the lack of cooperation from the Contractor, final payment
documents could not be prepared until now.
We have notified the Contractor to provide the City with all necessary lien
waivers and IC 134 forms.
Please call if you have any questions or we can provide any additional
information.
Sincerely,
_r
d
BRW, INC. ,
B. orn, PE
jest Manager
JBH /lab
Enclosures
cc: File 7 -8915
Den% er
Milwaukee
Minneapolis
Orlando
Phoenix
'
Portland
San Diego
'
Seattle
Donald W. Ringrose
'
Richard P. Wolsfeld
Thomas F. Carroll
Craig A. Amundsen
'
Donald E. Hunt
John B. McNamara
Richard D. Pilgrim
Dale N. Beckmann
Jeffery L. Benson
Ralph C. Blum
Gary J. Erickson
John C. Lvnch
Paul N. Bay
Sabri Avaz
Gary A. Ehret
Anthon Heppelmann
Arijs Pakalns
Martha McPhee
Howard P. Preston
Dennis P. Probst
February 14, 1994
Mr. Charles Folch
City Engineer
City of Chanhassen
690 Coulter Drive
Chanhassen, MN 55317
RE: North Side Parking Lot /City Offices
City Project 87 -17
Dear Mr. Folch:
CITY OF CkANDAsSE
FEB 2 S� '1994
ENGINEERING DEPT.
Please find enclosed for your approval six (6) copies of Contract Amendment
No. 3 and the final Application for Payment for the above - referenced project.
We are recommending final payment to Shafer Contracting Company, Inc. in
the amount of $98,301.19 as shown on the application. To the best of our
knowledge, all work is complete and all monies shown are payable.
Work for this project was substantially completed in 1990; however, until
recently, the Contractor did not cooperate with efforts to final the project. As
a result of the lack of cooperation from the Contractor, final payment
documents could not be prepared until now.
We have notified the Contractor to provide the City with all necessary lien
waivers and IC 134 forms.
Please call if you have any questions or we can provide any additional
information.
Sincerely,
_r
d
BRW, INC. ,
B. orn, PE
jest Manager
JBH /lab
Enclosures
cc: File 7 -8915
CITY OF CHANHASSEN
CONTRACT AMENDMENT
PROJECT: West 78th Street North Side Public Parking Lot
Phase I
CITY PROJECT NO.: 87 -17
AMENDMENT NO.: (3) Three
DATE: December 2, 1992
CONTRACTOR: Shafer Contracting Co., Inc.
y✓
nor Copy
,.. Copy
The additions, revisions and corrections contained herein shall be made to the Contract
Documents for the project and shall become part of the Scope of Work.
DESCRIPTION OF CHANGES:
A. The Contractor has provided additional materials and labor resulting from an increase
in the contract quantities of a number of existing bid items. These contract quantity
increases are detailed below:
1. At the request of City staff, the Contractor has performed approximately 2,616
cubic yards of additional common excavation along the south side of the
Heritage Park Apartments and on the east side of the Phase I Medical Arts
Building.
2. As directed by the soils engineer, the Contractor has performed extensive soils
correction in the area north and northeast of the Riviera Restaurant. The soils
correction work included approximately 4,037 cubic yards of additional subgrade
excavation work.
3. The common excavation and subgrade excavation work performed on the site
encountered unforseen materials not suitable for re -use as embankment material.
As a result of the presence of the unsuitable material, the Contractor was
required to import approximately 5,288 cubic yards of common borrow material
to construct the project parking lots to the plan elevations.
4. As directed by the soils engineer, the Contractor placed approximately 844 cubic
yards of additional select granular borrow material in areas of subgrade
excavation where groundwater was encountered, specifically, the drive lane area
-northwest of Kenny's Market.
411901 CA3 1+�S,J,� - ; .
C :
F1
0
11
5. At the recommendation of the soils engineer, the Contractor placed 2,195
additional cubic yards of aggregate base course to provide greater sability in
areas of the parking lot where poor soils were encountered. A majority of the
extra aggregate base course was placed in the drive lane running east/west along
the north edge of the parking lot.
6. At the request of City staff, the Contractor placed 19 additional Marshall's Ash
trees on Pauly Drive east of Market Boulevard and on Market Boulevard north
of West 78th Street.
7. At the request of City staff, the Contractor placed 13 additional Norway Maple
trees on Pauly Drive east of Market Boulevard and on Market Boulevard north
of West 78th Street.
These changes have resulted in an increase in the contract quantities for a number of existing
bid items as follows:
NORTH SIDE PUBLIC PARKING LOT
ORIGINAL
QUANTM
BID SCHEDULE A - GENERAL WORK
SEQ. NOJ
UNIT
CONTRACT
INCREASE/
ADD/
ORIGINAL
QUANTITY
AMOUNT
SEQ. NO./
UNIT
CONTRACT
INCREASE/
ADD/
Mn/DOT No. ITEM UNIT
PRICE
OUANTITY
(DECREASE)
E(D DUCT)
30/ Common Excavation CY
$4.50
11,106
2,616
11,772.00
2105.501
Norway Maple/3" Cal
TREE 350.00
8
13
31/ Subgrade Excavation CY
4.50
4,560
4,037
18,166.50
2105.501
32/ Common Borrow (CV) CY
1.00
1,000
5,288
5,288.00
2105.523
ITEM A NET ADDIY .�" `
$ 65409.50
X11901
34/ Select Granular Borrow CY
4.50
250
844
3.798.00
2105.522 (LV)
Net Addition
$39,024.50
NORTH SIDE PUBLIC PARKING LOT
BID SCHEDULE B - ROADWAY/PARKING
ORIGINAL
QUANTITY
AMOUNT
SEQ. NO./
UNIT
CONTRACT
INCREASE/
ADD/
Mn/DOT No. ITEM UNIT
PRICE
OUANTTTY
(DECREASE)
(DEDU
7/ Aggreate Base Placed/ CY
$8.00
5,025
2,195
$ 17.560.00
2211.503 Class 5
Net Addition
$17,560.00
NORTH SIDE PUBLIC PARKING LOT
BID SCHEDULE F - LANDSCAPING
ORIGINAL
QUANTM
AMOUNT
SEQ. NOJ
UNIT
CONTRACT
INCREASE/
ADD/
Mn/DOT No.
ITEM
UNIT PRICE
QUANTITY
( DECREAS
EDU
1/
Marshall's Ash/3" Cal
TREE $225.00
27
19
$ 4,275.00
2571.502
(B &B)
17/
Norway Maple/3" Cal
TREE 350.00
8
13
4.550.00
2571.502
(B &B)
Net Addi• :c; e.
$ 8,825.00
ITEM A NET ADDIY .�" `
$ 65409.50
X11901
CA3 -2
B. The Contractor has provided additional materials and labor for electrical removals,
modifications, repairs and additions as identified by the following described and
tabulated items of work.
1. At the request of City staff, the Contractor has repaired and refinished eight (8)
existing wooden bollard lighting units. The lighting units were previously
vandalized (lights are located in the area of Old Town Hall, Pauly's and
Poney's).
2. At the request of City staff, the Contractor has provided electrical power to and
installed the irrigation controller in the irrigation water distribution cabinet. The
irrigation controller was originally specified to be located in the parking lot
lighting cabinet (irrigation cabinet is located on the west side of the parking lot
in front of Kenny's).
3. At the request of City staff, the Contractor has modified each of the post
mounted heater outlets located in the west parking lot of City Hall. The outlets
were originally specified at the bottom of the power feed box and were switched
to the side of the box.
4. At the request of City staff, the Contractor has repaired and modified the power
feed to perimeter parking lot and building lighting damaged by others as a result
of the City Hall building addition.
it
5. At the request of City staff, the Contractor removed existing uplighting,
modified and repaired inplace wiring and furnished and installed new uplighting
at the face of St. Huberts Church (original lighting was previously vandalized).
6. At the request of City staff, the Contractor furnished and installed lighting
circuits and uplighting at the Clocktower.
NORTH SIDE PUBLIC PARKING LOT
627.37
0.00
1.00
CONTRACT AMENDMENT NO. 3 - SCHEDULE A
LS
1,799.62
0.00
ORIGINAL
QUANTITY
AMOUNT
SEQ. NOJ UNIT
CONTRACT
INCREASE/
ADD/
Mn/DOT No. ITEM UNIT PRICE
QUANTITY
(DECREASE)
(DEDU
1 Repair Wood Bollards LS $636.90
0.00
1.00
$ 636.90
2 Modify Power Source to LS 250.05
0.00
1.00
250.05
Irrigation Cabinet
3 Modify Heater Outlets
4 Repair Power Feed
5 Lighting Unit/Special
(Complete -St. Huberts)
6 Lighting Unit/Special
(Complete- Clocktower)
LS
627.37
0.00
1.00
627.37
LS
1,799.62
0.00
1.00
1,799.62
EA
1,424.50
0.00
2.00
2,849.00
EA
1,067.00
0.00
4.00
4.268.00
ITEM B NET ADDITION $� 10 494
011901
CA3 -3
u
I
J
C. The Contractor has provided additional materials: and labor for the redesign, expansion,
modification, repairs and additions to extsttng' and proposed irrigation systems as
identified by the following described and tabulated items of work.
1. At the request of City staff, the Contractor redesigned the contract irrigation
system more than doubling the size of the system originally bid. Work included
changing the location, type and size of the water feed for the system, increases
in sizes of water supply pipes, increased piping, heads, control valves, control
wiring and a larger controller to operate system resulting from the increased
number of zones. Existing irrigation system removals, modifications and
additions occurred as a result of the remodeling of the Riviera Restaurant. Also,
existing irrigation system removals, repairs, modifications and additions occurred
as a result of the construction of the Medical Arts Building and the demolition
of the Pauly Building.
2. At the request of City staff, the Contractor has furnished and installed an above-
ground steel cabinet on a concrete slab and relocated irrigation water supply
piping from below - ground up into the above - ground steel cabinet (cabinet is
located on the south side of Chanhassen Bank).
3. At the request of City staff, the Contractor removed small trees, brush and
weeds, graded, placed topsoil and otherwise prepared the area north of the
parking lot on t he north side of the Riviera Restaurant as a planting bed.
NORTH SIDE PUBLIC PARKING LOT
CONTRACT AMENDMENT NO. 3 - SCHEDULE B
r
«11901
CA3-4
ORIGINAL
QUANTITY
AMOUNT
SEQ. NOJ
UNIT
CONTRACT
INCREASE/
ADD/
Mn/DOT No.
ITEM
UNIT PRICE
OUANTITY
(DECREASE)
EDU
1
Expand Irrigation
LS $18,285.08
0.00
1.00
$18,285.08
System
2
Modify Irrigation
LS 1,320.00
0.00
1.00
1,320.00
Feed Point
3
Planting Area
LS 825.00
0.00
1.00
825.00
Preparation
ITEM C NET ADDITION
$ 20�g
r
«11901
CA3-4
V
SUMMARY
Current Contract Amount $681,536.65
Item A Net Add $65,409.50
Item B Net Add 10,430.94
Item C Net Add 20,430.08
Contract Amendment No. 3 Add 96_
AMENDED CONTRACT AMOUNT $777,807.17
APPROVALS:
RECOMMENDED BY: BRW, Inc.
B Title: Proiect Manager Date: zho/qy__
ACCEPTED BY: Shafer Contracting Company, Inc.
By:
��kw —�-_ Title: S a . Date: -*- /' -T /
ACCEPTED BY: City of Chanhassen
B Title: Date:
9
*11901 CA3 -5