MEMORANDUM
CITY OF '
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
TO: Don Ashworth, City Manager
FROM: Charles Folch, Director of Public Works /City Engineer
DATE: March 8, 1994
SUBJ: Authorize Preparation of Plans and Specifications for Well No. 7
Project No. 94 -3
#Alidli R CIN AdhitltlStfW
rsirlow ✓1)i)A-
1GlodW
� 70 - X15°
Deb SuWtted to Commission
� pa ~ 'µ Eo Gouncll
During the staff presentation of the 1994 Public Works goals I had the opportunity to discuss with the
Council one of this year's imperative capital improvement projects which is the addition of Well No 7
to the City's water supply system. This improvement project was identified in the approved
comprehensive water supply plan and programmed funding was included in the 1994 budget.
The consulting engineering firm of Bonestroo, Rosene, Anderlik & Associates was commissioned during
the summer of 1990 to conduct the hydrogeologic study which will provide information on appropriate
well site regions which meet design flow requirements. This study is nearing its completion and, as such,
pertinent information will be incorporated into the preparation of plans and specifications and identifying
potential locations for the well site. Mr. Richard Foster of Bonestroo has provided a project cost estimate
along with an anticipated project timetable. The intent is to have this facility on line by the fall of this
year. Engineering fees for the project will be based on the previously approved standard engineering
services contract agreement with Bonestroo.
I also mentioned to the Council of the new state mandates requiring municipalities to develop water
conservation and emergency action plans for the water supply system. Bonestroo has estimated this
additional work will take aDnroximately 3.0 to 46:1miro to nnm hlptp
It is therefore recommended that the .City Council authorized Bonestroo, Rosene, 'Anderlik & Associates
to prepare the project plans and specifications for the construction of Well No. 7, Project No. 94 -3 and,
in concert, prepare the rr . r.'re ! , =pater conservation emergency action plans.
Attachments: 1. L•- cation map.
2. Letter from Dick Foster dated March 8, 1994.
c: Dave Hempel, A_. :�:..t City Engineer
' Jerry Boucher, Uti.ty Superintendent
Phil Gravel, BRI
Dick Foster, BRt:. .
gAeng\chada\cc \well? ,..
F
Existing
Booster Sto
Note: This well field will require a total of
seven wells at ultimate development.
Locations and spacing of future wells
should be determined as development
in this area occurs.
HIGH PRESSURE ZONE
a
c�
\\ HARMSON
l LAKE i
Future Well Field •
Connection 1250 GPM
to High Zone
Pressure Reducing Vale
25 —E91 -0010
e
FJ •
�I
V
42
LAKE LUCY RD.
Pressure Zone
Boundary
•
� I LOW PRESSURE ZONE
•
5-690-02
K. Existing
r
Well #3
Future Well
Field Connection
5,400 GPM to
Low Zone
25 -690 -0010 I
Possible Future
Treatment Plant Site
9
N
o 2W sO
p
swig In f*e
eY �
• 29 Pressure Node
25-- 010 --1220
I • Potential Well Site
255-691-0020 0 Existing Well Site
Sonestroo
Galpin Boulevard Well Meld Schematic 0 Rosene
N Anderlik b
Chanhassen, Minnesota FIGURE 4 M Associates
Water Supply and Distributic�a 5+ �
393\39303\39303F04 Feb. 1993 r.OMM. 39303
Bonestroo
Otto G. Bonestroo, P.E.
Robert W Rosene. PE'
Joseph C. Anderlik, P.E.
Rosene
Marvin L r PE.
Richard E. Turner. P.E.
T
mom
Anderlik &
A ssociates
Glenn Cook, RE.
ThomasE oyes,, RE.
Robert G. SChunicht. P.E.
Susan M. Eoerlin. C P.A.
Robert R. PfeHerle. P.E.
*Senior Consultant
Engineers & Architects
Richard W Foster. P.E.
March 8, 1994
Mr. Charles Folch
City of Chanhassen
690 Coulter Dr.
Chanhassen, 1V N 55317
Re: Well No. 7
Project No. 94 -3
Our File No. 39322
Dear Mr. Folch:
Howard A. Sanford. PE.
Michael P Rau. P.E.
Mark D. Wallis, P.E.
Keith A. Gordon, P.E.
Philip J. Pyne. P.E.
Miles B. Jensen, P.E.
Robert R. PfeHerle. P.E.
Agnes M. Ring, A.I.C.P
L. Phillip Gravel Ill. P.E.
Richard W Foster. P.E.
Thomas W Peterson. PE,
Karen L. Wiemeri, P.E.
David O. Loskota. P.E.
Michael C. Lynch. PE.
Gary D. Kristofitz. P.E.
Robert C. Russek. A.I.A.
James R. Maland. P.E.
F Todd Foster. PE.
Jerry A. Bourdon, P.E.
Jerry D. Pertzsch, P.E.
Keith R. Yapp. P.E.
Mark A. Hanson, P.E.
Kenneth P. Anderson. P.E.
Douglas J. Benoit. P.E.
Michael T. Rautmann. PE.
Mark R. Rolfs, PE.
Shawn D. Gustafson. PE.
Ted K. Field. P.E.
Mark A. Seip. P.E.
Cecilio Olivier, PE,
Thomas R. Anderson. A.I.A.
Gary W Morien, P.E.
Charles A. Erickson
Donald C. Burgardt, P.E.
Daniel J. Edgerton, P.E.
Leo M. Pawelsky
Thomas E. Angus, P.E.
Allan Rick Schmidt, P.E.
Harlan M. Olson
Ismael Martinez, P.E.
Philip J. Caswell. P.E.
James F. Engelhardt
The City of Chanhassen's Water Supply and Distribution Plan projected that Well No. 7 will be
required in 1994 to meet increasing water demands. The report also recommended that the well be
located in the Galpin Lake Well Field to balance supply between the City's two well fields. Because
of the timing and desired location, Well No. 7 is expected to be a Jordan sandstone well similar to
existing Well No. 3.
The first step of the design process will be to identify an approvable site for the well and to prepare
the water conservation and emergency action plans recently required for all new wells. We assume
that most of the information for these plans has already been completed by the City in the form of
sprinkling bans and plumbing codes.
Identification of a well site will be assisted by the City's Well Field Study just being completed. It is
anticipated that the well will be located in the High Pressure 7.one (north of Highway 5 and west of
Galpin Boulevard). Depending on the precise well location, we may be able to eliminate the existing
high service booster station on Galpin Boulevard. This would save some costs, since the booster .
station is in need of repair at this time.
The estimated cost for the well, pumping facility, and connecting water main is as follows:
Iteth B
Well
Well Pump
Pumrhouse
Water Niain
jr, :.)total
+ 25% Indirect Costs
E €i` _ated Project Costs
Cost Estimate
160,000
40,000
150,000
20.000
$370,000
92.000
$462,000
5 West Mighe►vay i." : , i. i'aul, MN SS113 0 612- 636 -4600
Mr. Charles Folch March 8, 1994
City of Chanhassen
I Page -2-
We will complete the well and pumphouse design on a fee basis according to the terms of our
standard contract with the City. We will also prepare the required water conservation and emergency
action plans on a per diem basis. This work should take 30 -40 hours.
Yours very truly,
BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC
Ri and W. Lster
Phil Gravel
RWFlPG:pr
As the well site has not been selected, costs relating to well depth and water main length could be
affected. The proposed total project cost does not include the costs for land acquisition. A
'
minimum of a 100 foot by 100 foot square parcel will be
effective to locate the well on City owned land if possible.
required. It would be most cost
If the well house is located on park
property, the structure could be incorporated into a picnic shelter.
'
The proposed schedule for the project is as follows:
'
Event
Timetable
Authorize project plans and specifications
March 14, 1994
'
Approve well specifications
April 11, 1994
Award well contract
May 9, 1994
Start well construction
May 1994
'
Approve pumphouse plans and specifications
July 18, 1994
Award pumphouse contract
August 22, 1994
Complete well construction
October 1994
1
Start pumphouse construction
October 1994
Complete pumphouse construction
April 1995
We will complete the well and pumphouse design on a fee basis according to the terms of our
standard contract with the City. We will also prepare the required water conservation and emergency
action plans on a per diem basis. This work should take 30 -40 hours.
Yours very truly,
BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC
Ri and W. Lster
Phil Gravel
RWFlPG:pr