1a-1. Mission Hills Final Plat and RezoningCITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
TO: Don Ashworth, City Manager
FROM: Sharmin Al -Jaff, Planner H
DATE: October 4, 1994
SUBJ: 1) Rezoning of Property from RSF, Residential Single Family to PUD,
Planned Unit Development for low density (16 single family lots) and
medium and high density (194 units) residential units and neighborhood
commercial uses, second amid final reading.
2) Final Plat Approval for 2 " octal units/lots, located East of Highway
101, North and south Weft, 86th Street, Tandem Properties.
bi
3) Final Site Plan Approval, Mission Hills and Mission Hills Second
Addition, for 194 Unit Owner Occupied Multifamily Development
BACKGROUND F �:
Ril
On July 11, 1994, the City Council approved the rezoning I the property from RSF to PUD,
preliminary plat for Mission .,ills (93 -4 PUD) and Site Plar #94 -5 for the construction of the
following: ,
Block 1 138 multifamlynts ..A
Block 2 7 single family units
Block 3 9 single family" units '
Block 4 56 multi family units y.
}3/V •..
Outlot A Future neighborhood related coimgcial
4
This request is for final rezoning from RSF, l�.siclential Single Family to PUD, Planned Unit
Development, final plat approval, and site plan approval request to create a mixed use
(mixed density residential and future neighborhood related commercial) development. The
entire site is being final platted with the exception of the commercial portion. There has been
some revisions made to the plans since the preliminary plan approval. These changes include
the following:
MEMORANDUM
Mission Hills
October 4, 1994
Page 2
' The Park and Recreation Commission met on June 28, 1994, and recommended the
following conditions:
a. The tot park facility shall include typical park amenities such as landscaped ass
P grassy
areas, picnic tables, park benches, play apparatus and basketball courts, etc.
' b. Six foot wide concrete sidewalks be constructed on the south side of West 86th Street
from Highway 101 east to the project's terminus and a 5 foot wide core sidewalk on
' Mission Hills Lane from West 86th Street north to the street's terminus.
c. A bituminous trail shall be constructed encircling the wetland located south of West
' 86th Street, connecting the sidewalk system to the "park site." In consideration for the
construction of said trail, the applicant shall receive a lump sum payment equal to the
cost of construction. Said cost to be determined by the applicant for presentation to the
' city with documentation for verification.
' d. Full park and trail fees shall be collected at the time of building permit applications at
the rate then in force.
' There are some other changes that have taken place. These changes are as follows:
* The landscaping plan has been revised to reflect 3 trees on each single family lot within
Blocks 2 and 3. The plans failed to show berming along Highway 101 Right -of -way.
* The number of drainage ponds has been reduced to four from the original 7 ponds.
* Revised elevation plans have been submitted. These changes include the addition of
shutters, louvers, and variation in colors.
* The site is being final platted in two additions. This does not impact the plat in any
way.
* The commercial site has been excluded from the final plat. This site must be platted as
an outlot.
' Staff is recommending approval with conditions.
PUD DEVELOPMENT STANDARDS
The applicant has proposed development standards in their PUD plan. Staff has reviewed
these proposals, made comments or findings, and then given the staff proposal for language to
be incorporated into the final PUD plan document.
Mission Hills '►
October 4, 1994
Page 3
a. Intent '
The purpose of this zone is to create a PUD neighborhood commercial/mixed density '
housing zone. The use of the PUD zone is to allow for more flexible design standards
while creating a higher quality and more sensitive proposal. All utilities are required to '
be placed underground. Each structure proposed for development shall proceed through
site plan review based on the development standards outlined below.
b. Permitted Uses I
The permitted uses within the neighborhood commercial zone should be limited to '
appropriate commercial and service uses consistent with the neighborhood. The uses
shall be limited to those as defined herein. If there is a question as to whether or not a
use meets the definition, the Planning Director shall make that interpretation. The type '
of uses to be provided on this outlot shall be low intensity neighborhood oriented retail
and service establishments to meet daily needs of residents. Such uses may include
small to medium sized restaurant (no drive -thru windows), office, day care, ,
neighborhood scale commercial, convenience store, churches, or other similar type and
scale uses.
c. Setbacks
In the PUD standards, the building setback for commercial is 50 feet from any public '
right -of -way. The Parking setback shall be 35 feet from any Public Right -of -Way and/
or interior property line. There shall be a buffer separating the residential portion from
the commercial portion of the site. This buffer shall be in the form of a berm and '
landscaping.
The following setbacks shall be observed: ,
Residential Commercial
Street Commercial Residential Parking Parking
Building Setback Building Setback Setback Setback '
Hwy. 101 50' 50' 20' 35'
Hwy. 212 50' 50' 20' 35' '
West 86th Street 50'
30'
20' 35'
u
Mission Hills
October 4, 1994
Page 4
d. Development Standards Tabulation Box
BLOCK
USE
Net Lot
Density
Hard
Area
Surface
Coverage
Outlot
Commercial
7.72 acres
1
138 Multi - Family units
18.00 acres
7.66
37%
2 &3
16 Single- Family units
8.55 acres
2.24
4
56 Multi - Family units
8.92 acres
6.28
43.2%
ROW
Street and court
1.17 acres
West 86th St
Right -of -Way
2.23 acres
Hwy 212 and 101
Right -of -Way
18.68 acres
TOTAL AREA
61.67+
Lot
Lot
Home
Home
Area
Width
Depth
Setback
Ordinance
15,000
90'
125'
30' front/30' rear
10' sides
BLOCK 2
Lot 1
23,374
117.48
198.83
Lot 2
20,196
100.30
201.96
Lot 3
20,824
100.31
208.23
Lot 4
21,386
100.17
212.5
Lot 5
20,898
100.45
207
Lot 6
21,566
116
189
Lot 7
22,006
125
176.5
BLOCK 3
Lot 1
16,349
108
150
Lot 2
15,126
95.6
155
Mission Hills
October 4, 1994
Page 5
Lot 3
15,554
90
172
Lot 4
16,185
90
180
Lot 5
15,232
127
134.5
Lot 6
24,778
55.62*
189.06
Lot 7
25,092
78.30*
189
Lot 8
15,752
76.6*
135.25
Lot 9
17,026
112
147.5
* denotes lots located on a cul -de -sac
e. Building Materials and Design
RESIDENTIAL
Building's exterior material shall be a combination of a five inch aluminum siding and
brick. The architectural style is generally classic with details such as arched transoms
and soffit returns over the entries of the one story homes and horizontal transom
windows over the two -story windows. On a similar project elsewhere, exterior finishes
were soft gray and creamy white, featuring pearl gray siding, shell white soffit/facia, and
gray velour brick.
Finding The PUD requires that the development demonstrate a higher quality of
architectural standards and site design. The two story buildings located on block 1,
reflect some architectural variation which makes the units more appealing. The one
story units located on Block 4 will also reflect architectural variation through the use of
different elements such as transoms, half round windows, and shutters (Attachment #1).
COMMERCIAL
1. All materials shall be of high quality and durable. Masonry material shall be
used. Color shall be introduced through colored block or panels.
2. Brick may be used and must be approved to assure uniformity.
3. Block shall have a weathered face or be polished, fluted, or broken face.
li
I Mission Hills
I 3. Colors used shall be earth tones such as soft gray, creamy white, pearl gray,
shell white, etc.).
' 4. Each unit shall have a minimum of 1 overstory tree within its front yard.
5. All units shall have access onto an interior street and not 86th Street.
f. Site Landscaping and Screening
The planting plans prepared for the site are intended to create a strong sense of street
tree plantings using overstory deciduous trees such as Summit Ash, Linden, and Sugar
Maple. Highways 101 and 212 will be buffered with a combination of overstory
' evergreen trees and ornamental deciduous trees. The outdoor private living areas will be
buffered with the use of evergreen trees. The wetland will be highlighted with the
introduction of native wetland species.
October 4, 1994
'
Page 6
4.
Concrete may be poured in place, tilt -up or pre -cast, and shall be finished in
'
stone, textured or coated.
5.
Metal standing seam siding will not be approved except as support material to
'
one of the above materials or curtain wall on office components.
6.
All accessory structures shall be designed to be compatible with the primary
'
structure.
7.
All roof mounted equipment shall be screened by pitched roofs. Wood screen
'
fences are prohibited. Screening shall consist of compatible materials.
8.
All buildings on the commercial site shall have a pitched roof line.
9.
All mechanical equipment shall be screened with material compatible to the
building.
RESIDENTIAL
'
1.
Building exterior material shall be a combination of prepainted 5" aluminum
siding and brick.
'
2.
Arched transoms and soffit returns shall be used over the entries of the one
story units and horizontal transom windows over the 2 story windows.
Variation among the buildings is achieved through the shape of windows,
'
adding louvers, shifting entry ways, and adding dormers.
I 3. Colors used shall be earth tones such as soft gray, creamy white, pearl gray,
shell white, etc.).
' 4. Each unit shall have a minimum of 1 overstory tree within its front yard.
5. All units shall have access onto an interior street and not 86th Street.
f. Site Landscaping and Screening
The planting plans prepared for the site are intended to create a strong sense of street
tree plantings using overstory deciduous trees such as Summit Ash, Linden, and Sugar
Maple. Highways 101 and 212 will be buffered with a combination of overstory
' evergreen trees and ornamental deciduous trees. The outdoor private living areas will be
buffered with the use of evergreen trees. The wetland will be highlighted with the
introduction of native wetland species.
Mission Hills
October 4, 1994
Page 7 ,
In addition, to adhere to the higher quality of development as spelled out in the PUD
zone, all loading areas shall be screened. Each lot for development shall submit a '
separate landscaping plan as a part of the site plan review process. Berms of 2 to 3 feet
high shall be added along the Highway 101 and 212 right-of-way. These berms shall be
seeded and /or sodded and bushes and trees shall be planted on them. All disturbed ,
areas within the single family lots shall be seeded and/or sodded. Two trees with a
minimum of a Zi inch caliper shall be planted within the front yard setback and one
tree within the rear yard setback. These two trees shall consist of one overstory ,
evergreen tree and one ornamental deciduous tree.
1. All open spaces and non - parking lot surfaces (commercial site) shall be I
landscaped, or covered with plantings and/or lawn material.
2. Outdoor storage is prohibited.
'
3. Loading areas shall be screened from public right -of -ways. Wing wall may be
required where deemed appropriate.
,
4. The Outlot shall be seeded and maintained in a weed free condition in all areas
proposed for future development.
,
g. Signage
'
COMMERCIAL
,
Staff is proposing one monument sign be permitted for the outlot and one monument
'
sign for the residential section of the PUD.
1. All businesses built within the outlot shall share one monument sign.
Monument signage shall be subject to the monument standards in the sign
ordinance.
,
2. Wall signs are permitted on no more that 2 street frontages. The total of each
wall mounted sign display areas shall not exceed (24 square feet).
,
3. All signs require a separate permit.
4. The signage will have consistency throughout the development and shall tie the
'
building materials to be consistent with the signs. Signs shall be an
architectural feature, they shall not be solely mounted on a pole of a
'
foundation.
' Mission Hills
October 4, 1994
Page 8
' 5. Consistency in signage shall relate to color, size, materials, and heights.
I 6. No illuminated signs within the outlot may be viewed from the residential
section of the PUD.
' 7. Only back -lit individual letter signs are permitted.
8. Individual letters may not exceed 3 feet in height.
' 9. Only the name and logo of the business occupying the unit will be permitted
on the sign.
RESIDENTIAL
' One monument identification sin shall be ernutted for the residential development. The
g P P
sign may not exceed 24 square feet in area and 5 feet in height.
h. Lighting
' Finding.
All light fixtures shall be shielded high pressure sodium fixtures. Light level
for site lighting shall be no more than ;6 candle at the property line. This does
not apply to street lighting. The maximum height of a residential street light
' shall not exceed 15 feet. Light fixtures within the outlot shall not exceed 25
feet.
I 2. Glare, whether direct or reflected, as differentiated from general illumination
shall not be visible beyond the limits of the site from which it originates.
I 3. Lights shall be on a photoelectric cell to turn them on and off automatically as
activated by yearly conditions.
' 4. The outlot light poles shall be corten, shoe box light standards.
GRADING & DRAINAGE
The City previously granted an Interim Use Permit (No. 94 -5) for site adin of this
�' g
development. The site grading is approximately 80% completed at this time. The financial
security and grading permit fees were received by the City. Staff has not received a final
grading plan back from the applicant's engineer in time to perform a quick overview to see if
i
Mission Hills
October 4, 1994
Page 9 ,
the grading plans have been completed in compliance with staffs' recommendations. Since
most of the items are relatively minor, staff recommends the City Council grant staff the ,
flexibility to administratively approve changes in the grading and construction plans that do
not substantially alter the plat.
The grading plans do not propose any grading on the commercial portion of the site at this '
time, however, drainage from the existing runoff patterns have been considered and address at
this time with this development. In the future when the development of the outlot occurs,
individual storm drainage plans will be required. '
The grading plan proposes large earth berms as shown between proposed the Trunk Highway '
212 corridor and the development. Berming has also been provided along proposed Trunk
Highway 101. The grading plan proposes four stormwater drainage basins designed to meet
the National Urban Runoff Program (NURP) standards. These NURP ponds are necessary to '
pretreat stormwater prior to discharging into the wetlands or downstream. Staff has still not
received back the final storm sewer runoff calculations and ponding data for this
development. Although we have received preliminary stormwater runoff, we are confident '
the site will be in conformance with the City's Surface Water Management Plan. Surface
Water Management fees (SWMP) have not been determined at this time as staff has not had a
chance to review the final storm water calculations. Upon receipt of these calculations, staff '
will prepare a breakdown of the surface water quality and quantity fees in accordance with
the SWMP plan. The applicant should be responsible for the appropriate surface water
management quality and quantity fees in accordance with the plan prior to the final plat being '
recorded at the County.
There are numerous drainageways in the rear yards that need to be protected with drainage '
and utility easements to maintain neighborhood drainage patterns. These areas are located as
follows:
1. Rear and areas of Block 2, Mission Hills development. Staff believes a drainage and ,
Y P
utility easement should be conveyed over the westerly 30 feet of the easterly 70 feet of
Block 2, Mission Hills. '
2. In addition, a storm sewer line is being proposed from Mission Hills Lane along the '
common property line between Lots 3 and 4, Block 2 to convey stormwater runoff.
Therefore, a 20 -foot wide drainage and utility easement centered upon the common lot
lines between Lots 3 and 4, Block 2 should be dedicated on the final plat. '
3. As mentioned, there are four stormwater ponds being created with this development.
The City should take over maintenance responsibilities in these ponding areas to ensure '
periodic cleaning and maintenance to ensure the proper function of these ponding areas.
' Mission Hills
October 4, 1994
Page 10
' Therefore, the final plat should dedicate drainage and utility easements overall
stormwater ponding areas and wetlands.
During the construction process of the new homes, the storm sewer lines and ponding areas
receive most of the erosion. Staff believes it should be the applicant's responsibility to
' maintain and clean the storm sewer lines and ponding areas until the site has been built out.
This typically occurs approximately two years the final plat has been recorded. Staff has
provided in the PUD/Development Contract a provision that requires the applicant be
' responsible for maintenance of the stormwater drainage system for two years after they are
constructed.
' UTILITIES
Preliminary construction drawings and specifications have been submitted to the City for
' review. The City has not received the final construction documents back with the changes in
time to confirm whether or not the necessary changes were made prior to preparing this
' report. Although most of these changes were relatively minor, staff does recommend the City
Council grant staff the flexibility to administratively approve any additional changes that are
needed on the construction plan documents.
' The City has authorized preparation of plans for the Lake Riley Area Improvement Project
(No. 93 -32) for extension of water service to this development. The City will receive an
' award of bids for this watermain project during the month of October, 1994. Therefore this
project's final plat should still be contingent upon the City authorizing and awarding the bids
for the Lake Riley Area Trunk Utility Improvement Project No. 93 -32.
In an effort to expedite the utility construction on the developer's property, the applicant has
modified the utility layout to incorporate the installation of the 12 -inch watermain along
' future West 86th Street consistent with the City's construction plan. If the developer
continues as planned to install the 12 -inch watermain proposed along West 86th Street, the
City will apply credits toward the applicant's overall assessments for said construction. The
' credit would be applied for the oversizing cost difference between the 8 -inch watermain and
the 12 -inch watermain.
The proposed utility lines located outside of West 86th Street and Mission Hills Lane and
Court shall be a private utility system and maintained by the homeowners association. Due to
the magnitude of this project, the City has required that all utilities be installed in accordance
' with the City's latest edition of Standard Specifications and Detail Plates. Fire hydrant
location has been reviewed and approved by the City's fire marshal.
The plans also include drain tile behind the curb to facilitate household sump pump discharge
and also to improve roadway subgrade drainage. On the streets that are proposed to be
Mission Hills
October 4, 1994
Page 11 r
private, staff is still recommending to the applicant that provisions be made to accommodate
for sump pump discharge. '
Sanitary sewer service for this development will be extended from the existing sanitary sewer
line located just outside the plat in the northwest corner of the site. The applicant will be ,
responsible for obtaining and conveying the necessary permanent drainage and utility
easement in order to connect to the sanitary sewer line and extend it to this development.
The sanitary sewer line is proposed to follow along the east side of Trunk Highway 101 along '
the easterly right -of -way line to proposed West 86th Street. The applicant should dedicate to
the City on the final plat the necessary drainage and utility easement for this installation and
maintenance. Staff recommends a 20 -foot wide drainage and utility easement outside the east '
right -of -way of Trunk Highway 101. The applicant will also be installing this segment of
trunk sanitary sewer line which was previously scheduled to be a part of the City's Lake
Riley Hills Improvement Project. Therefore, the applicant should receive credit against the '
assessment for the cost difference between an 8 -inch sanitary sewer line and the proposed 21-
inch sanitary sewer line.
STREETS '
The applicant's engineer has supplied the City with detailed construction drawings for the
,
streets within this development. The plans propose to realign West 86th Street which
currently exists today as a 20 -24' wide gravel street which eventually turns into Tigua Lane
which is upgraded to urban standards with blacktop and curb and gutter. The final plat will
r
dedicate the necessary right -of -way over West 86th Street; however, the final plat does not
provide necessary right -of -way through Outlot D, thus land locking this development from
TH 101. Staff recommends the final plat be revised to dedicate West 86th Street through
Outlot D to connect to TH 101. A portion of West 86th Street has been dedicated with 80'
wide right -of -ways to accommodate turn lanes for the future commercial site to the southwest
of the development and to provide adequate turning movements for the private townhomes.
'
Staff believes a right turn lane is also necessary at the first intersection of West 86th Street
into what is referred to as "Mission Hills Way West." The applicant's engineer is in
somewhat of a disagreement but has agreed to provide documentation with regards to traffic
,
counts and provide geometric designs that prohibit this turn lane to occur. Staff, however,
believes that a right turn lane into this location will be warranted in the future as traffic
counts meet the intended use of the area. Therefore, we believe that the right turn lane
'
should be required on West 86th Street to Mission Hills Way West and the plans revised
accordingly. With the exception of West 86th Street, Mission Hills Lane and Court, the
'
remaining streets will be private. Maintenance of these private streets will be the
homeowners' responsibilities. Over the southerly one -half of the development (south of West
86th Street), this type of development will require cross access easements to ensure access
'
rights for all individuals as well as spell out maintenance responsibilities. Therefore, the
applicant should prepare a cross access easement acceptable to the City for this area.
r
' Mission Hills
October 4, 1994
' Page 12
Along TH 101, a 66' wide right -of -way currently exists (33' on the Mission Hills side).
' Eventually TH 101 will be upgraded to a major four lane urban section and additional right -
of -way will be needed. The applicant has provided this corridor through platting of Outlot D
for future acquisition. At a minimum, the applicant is responsible for dedicating an additional
' 17 feet of right -of -way along the easterly side of TH 101 to provide a total of 50' from the
centerline of TH 101. The final plat should be modified to reflect this dedication. The final
plat denotes West 86th Street as 86th Street only. The final plat should be modified to
include the word "West" in front of 86th Street. Plans do provide for a 6' wide trail/sidewalk
along the south side of West 86th Street from TH 101 to the east plat boundary and a 5' wide
concrete sidewalk along the east side of Mission Hills Lane. In addition, the plans are
' providing for an 8' wide bituminous trail around the wetland located south of West 86th
Street which also connects to the proposed 6' wide sidewalk along West 86th Street. The
appropriate 20' wide trail easement should be conveyed to preserve the access maintenance of
' this trail corridor around the wetlands.
Staff has reviewed the street layout and has designated 8 street lights to be installed along
' West 86th Street and Mission Hills Lane and Court. Staff also recommends the applicant
provide to the City for review and approval, an interior street lighting layout on the private
streets as well.
Pending MnDOT approval, turn lanes and bypass lanes along TH 101 are anticipated. Since
MnDOT has not approved of the layout as of the preparation of this report, the street
construction plans do not include construction of these interim acceleration and deceleration
lanes along TH 101. Staff believes a condition should be added to require the applicant to
include the construction of these turn lanes and bypass lanes along TH 101 in accordance
' with MnDOT's standards or recommendations.
The applicant has indicated that due to weather constraints, a phasing approach to this
' development will occur. Currently, the residents of Tigua Lane gain access through the site
via the existing gravel road. So far access through this development during the site grading
phase, construction has been bearable. It is very important that the applicant concentrate on
completing West 86th Street completely from TH 101 to Tigua Lane prior to concentrating on
the private streets. Staff believes that this should be a goal of this development in order to
' maintain safe access to the existing homes on Tigua Lane as well as for emergency vehicles.
RECOMMENDATION
Staff recommends the City Council adopt the following motion:
' "The City Council approves the rezoning second reading from RSF to PUD (#93 -4); final plat
of Mission Hills, Block 1 with 19 multifamily lots to contain 138 units and 2 outlots, Block 2
for 7 single family lots, Block 3 for 9 single family lots; final plat of Mission Hills Second
r
1. All utility and street improvements (public and private) shall be constructed in '
accordance with the City's latest edition of Standard Specifications and Detail Plates.
The applicant will be required to supply detailed construction plans for all utility and
street improvements for the City to review and formally approve. Street grades '
throughout the subdivision should be between 0.75% and 7.0 %. 86th Street shall be
constructed with a 36' wide urban street section from existing TH 101 to Mission Hills
Lane. The remaining street may be reduced to 31' wide. Private streets shall be '
constructed in accordance with Sec. 18 -57 (o) of the Chanhassen Subdivision Ordinance.
2.
The applicant shall be responsible for obtaining and complying with all necessary
Mission Hills
�.
October 4, 1994
'
Page 13
,
Addition (#94 -5 SUB) Block 4 for 56 multifamily lots to contain 56 units and one outlot; and
3.
Site Plan #94 -5 as shown on the plans received September 30, 1994, subject to the following
'
conditions:
'
1. All utility and street improvements (public and private) shall be constructed in '
accordance with the City's latest edition of Standard Specifications and Detail Plates.
The applicant will be required to supply detailed construction plans for all utility and
street improvements for the City to review and formally approve. Street grades '
throughout the subdivision should be between 0.75% and 7.0 %. 86th Street shall be
constructed with a 36' wide urban street section from existing TH 101 to Mission Hills
Lane. The remaining street may be reduced to 31' wide. Private streets shall be '
constructed in accordance with Sec. 18 -57 (o) of the Chanhassen Subdivision Ordinance.
2.
The applicant shall be responsible for obtaining and complying with all necessary
permits such as the DNR, MWCC, Health Department, Watershed Districts, PCA and
'
MnDOT.
3.
If the applicant installs the oversized (12 inch) watermain, the City shall credit the
'
applicant by means of reduction in their assessments for the oversizing costs. The
oversizing costs shall be the difference between an 8 inch watermain and a 12 inch
watermain. Placement of all fire hydrants shall be in accordance with the Fire
Marshal's recommendations.
4.
The applicant should provide a buffer area between the development and proposed
Trunk Highway 212 as well as Trunk Highway 101. The buffer area should consist of
both landscaping materials and bem
'
5.
The applicant shall include a drain tile system in all public streets where the adjacent
dwellings have no other acceptable means of discharging such a pond, wetland or storm
'
sewer.
6.
An additional 17 feet of right -of -way lying easterly of the existing highway shall be
'
dedicated with the final plat for a total of 50 feet from the center line of T.H.101. The
remaining property shall be platted as an outlot for future road right -of -way acquisition.
'
7•
During construction of the site improvements, the applicant shall provisions for provide
un g P � AA P P
maintaining ingress and egress at all times for the homes on Tigua Lane as well as
emergency vehicles.
'
8.
Allowed uses in the commercial site shall be restricted to the uses described in the staff
report.
'
1
D
Mission Hills
October 4, 1994
Page 14
' 9. The applicant shall provide density/hard surface coverage calculations for each lot within
Blocks 1 and 4. These figures shall exclude the right -of -way and wetland areas.
' 10. The landscaping plan shall be revised to add more trees along West 86th Street, along
Highway 212 and Highway 101 right -of -ways and between the area separating
' commercial and residential lots.
11. Meet the following conditions of the Park and Recreation Commission:
' a. The tot park facility shall include typical park amenities such as landscaped
grassy areas, picnic tables, park benches, play apparatus and basketball courts,
etc.
b. Six foot wide concrete sidewalks be constructed on the south side of West 86th
Street from Highway 101 east to the project's terminus and a 5 foot wide core
sidewalk on Mission Hills Lane from West 86th Street north to the street's
terminus.
'
C. A bituminous trail shall be constructed encirclin g the wetland located south of
86th Street, connecting the sidewalk system to the "park site." In consideration
for the construction of said trail, the applicant shall receive a lump sum
payment equal to the cost of construction. Said cost to be determined by the
applicant for presentation to the city with documentation for verification.
d. Full park and trail fees shall be collected at the time of building permit
' applications at the rate then in force.
12. Final plat approval shall be contingent upon the city authorizing and awarding the bid
for the Lake Riley Area Trunk Utility Improvement Project No. 93 -32.
13. The commercial portion of the PUD shall be consistent with the Highway 5 Corridor
' Study design standards. Setbacks shall comply with standards set forth in the PUD
agreement.
' 14. Chanhassen Fire Department's policy on Premise Identification must be followed.
Additional monument signs for address location will be required. Contact the
Chanhassen Fire Marshal for requirements and details. Pursuant to Chanhassen Fire
Department Fire Prevention Policy #29 -1992. Policy enclosed.
15. There will be no parking allowed on private streets or the south side of 86th Street.
' Signage must be installed in compliance to Fire Prevention Policy #06 -1991. Pursuant
to 1991 Chanhassen Uniform Fire Code Sec. 10.207(a).
Mission Hills �-
October 4, 1994
Page 15 '
17. A ten foot clear space must be maintained around fire hydrants, i.e. street lamps, trees,
shrubs, bushes, NSP, NW Bell, Cable TV, transform boxes. This is to ensure that fire '
hydrants can be quickly located and safely operated. Pursuant to Chanhassen City
Ordinance Sec. 9 -1.
18. Dead Ends: Dead end fire apparatus access roads in excess of 150 feet in length shall ,
be provided with approved provisions for the turning around of fire apparatus. When
buildings are completely protected with an approved automatic fire sprinkler system, '
the provisions of this section may be modified by the Chief. Pursuant to 1991
Chanhassen Uniform Fire Code Sec. 10.204(d) and 10.203 exc. #1.
19. Street lights shall be provided along West 86th Street, Mission Hills Lane and Court,
and all interior private streets. The city shall determine type and placement.
20. The applicant shall verify that the landscaping plan meets the city tree preservation
ordinance for canopy coverage.
21. The applicant shall provide diversity in the color schemes used in the buildings. '
22. The applicant shall deposit with the city an escrow for the future upgrading if TH 101 ,
north of 86th Street. The escrow may be in the form of a letter of credit or cash
deposit. The amount of the escrow will have to be determined after a feasibility study
for the upgrading TH 101. '
23. All areas disturbed as a result of construction activities shall be immediately restored
with seed and disc - mulched or wood -fiber blanket or sod within two weeks of '
completion of each activity in accordance with the City's Best Management Practice
Handbook.
24. Wetland buffer areas shall be surveyed and staked in accordance with the City's '
wetland ordinance. The City will install wetland buffer edge signs before construction
begins and will charge the applicant $20 per sign. '
25. The applicant shall provide detailed storm sewer calculations for 10 -year and 100 -year
storm events and provide ponding calculations for stormwater quality /quantity ponds in '
accordance with the City's Surface Water Management Plan for the City Engineer to
review and approve. The applicant shall provide detailed predeveloped and post
developed stormwater calculations for 100 -year storm events and normal water level
and high water level calculations in existing basins and individual storm sewer
calculations between each catch basin segment will also be required to determine if
sufficient catch basins are being utilized. In addition, water quality ponding design
calculations shall be based on Walker's Pondnet model.
Mission Hills
October 4, 1994
Page 16
26. The applicant shall enter into a PUD development contract with the City and provide
the necessary financial security to guarantee compliance with the terms of the
' development contract.
27. The appropriate drainage and utility easements should be dedicated on the final plat
for all utilities and ponding areas lying outside the right -of -way. The easement width
shall be a minimum of 20 feet wide. Consideration should also be given for access
for maintenance of the ponding areas.
' 28. The lowest exposed floor or opening elevation of all buildings should be a minimum
of 3 feet above the 100 -year high water level of all wetlands and ponding basins.
29. Water uantit fees will be based in accordance with the City's SWMP. Storm sewer
q Y t3'
' trunk fees will be evaluated based on the applicant's contribution to the SWMP design
requirements.
' 30. The applicant shall report to the City Engineer the location of any drain tiles found
during construction and shall re- locate or abandon the drain tile as directed by the City
Engineer.
' 31. All erosion control measures shall be installed prior to commencement of grading
operations and be maintained until all disturbed areas have been fully restored. The
' applicant shall also be responsible for removal of all erosion control measures upon
completion of site grading. The city engineer will determine the appropriate time and
authorize the applicant to remove the erosion control measures.
32. Grading shall be prohibited within 10 feet of all wetlands. Erosion control fence shall
be installed outside the 10 -foot buffer as well.
33. The following easements shall be shown on the final plat:
' a. Extension of West 86th Street right -of -way through Outlot D to TH 101.
b. Standard 10 -foot wide drainage and utility easements surrounding the perimeter
' of the plat and adjacent to all streets.
C. A drainage and utility easement over the westerly 30 feet of the easterly 70
feet of Block 2, Mission Hills.
d. Drainage and utility easements over backyard drainage swales through Outlot
' A, Mission Hills.
Mission Hills
'
October 4, 1994
Page 17
,
e. Drainage and utility easements over all ponding and wetland basins and storm
outlet pipes. The minimum drainage and utility easement shall be 20 feet
wide.
'
f. The applicant's declaration of covenants shall allow the City access to these
water quality basins to perform routine maintenance at all reasonable times.
g. A 20 -foot wide drainage and utility easement centered on the common lot line
between Lots 3 and 4, Block 2, Mission Hills should be shown on the final
'
plat.
h. A 20 -foot wide drainage and utility easement should be conveyed on the final
'
plat along the west 20 feet of Outlot D, Mission Hills.
L The 10 -foot wide drainage and utility easement proposed along the easterly
'
side of Lot 14, Block 1, Mission Hills should be increased to 20 feet wide to
provide enough room for installation and maintenance of the City's water main.
'
j. Add "West" in front of 86th Street.
1
34. The bypass and turn lanes at the intersection of TH 101 and West 86th Street shall be
constructed prior to the City issuance of any building permits.
'
35. A 20 -foot wide trail easement shall be conveyed to the City over the proposed 8 foot
wide bituminous trail which surrounds the wetland located south of West 86th Street.
'
36. The applicant shall include in the construction drawings a right turn lane on eastbound
West 86th Street at the intersection of Mission Hills Way West and West 86th Street.
'
37. The City will calculate the appropriate surface water management fees for water
quality and quantity based on final drainage calculations to be supplied by the
applicant's engineer. These fees shall be paid to the City prior to the final plat being
,
recorded at the county.
38. Final construction drawings shall be approved by City staff prior to the final plat being '
signed by the City.
39. The applicant shall be responsible for obtaining and conveying the necessary
permanent drainage and utility easements outside the plat to extend sanitary sewer
service to the development. The final plat shall not be recorded without the '
appropriate easement.
' Mission Hills
October 4, 1994
' Page 18
40. The City Council grants staff the flexibility to administratively approve changes on the
construction documents /plans.
41. The applicant shall provide cross - access easements over the development lying south
' of West 86th Street to provide access to the utility ponds. On both the north and
south sides of West 86th Street the homeowners association shall permit the City
access to the storm water drainage system (ponds /wetland) to perform routine
' maintenance at all reasonable times.
42. The construction plans shall include a right turn lane on eastbound West 86th Street at
' Mission Hills Way West.
43. The construction plans shall be amended to include construction of the auxiliary turn
lanes along TH 101 at West 86th Street. The turn lanes shall be constructed as a part
of the utility and street improvements and prior to issuance of any building permits.
' 44. The applicant agrees, in writing, that the plat shall be assessed for the extension of
trunk and lateral sanitary sewer and watermains over the property in accordance with
the feasibility study for Project No. 93 -32. Said assessments shall be deemed adopted
' on the date this contract is signed by the City. The applicant/developer waives any
and all procedural and substantive objections to the special assessment, including but
not limited to hearing requirements and any claim that the assessment exceeds the
' benefit to the property. The applicant/developer waives any appeal rights otherwise
available pursuant to M.S.A. §429.081.
' 45. The commercial site located southwest of the site, must be incorporated into the final
plat and be shown as an outlot. Outlot E shall be incorporated into the commercial
site to prevent the creation of a remnant lot.
' PUD DEVELOPMENT STANDARDS
' Approval of the final PUD development plan with the following standards:
' a. Intent
The purpose of this zone is to create a PUD neighborhood commercial/mixed density
housing zone. The use of the PUD zone is to allow for more flexible design standards
while creating a higher quality and more sensitive proposal. All utilities are required
to be placed underground. Each structure proposed for development shall proceed
through site plan review based on the development standards outlined below.
Mission Hills
October 4, 1994
Page 19
b. Permitted Uses
The permitted uses within the neighborhood commercial zone should be limited to
appropriate commercial and service uses consistent with the neighborhood. The uses
shall be limited to those as defined herein. If there is a question as to whether or not
a use meets the definition, the Planning Director shall make that interpretation. The
type of uses to be provided on this outlot shall be low intensity neighborhood oriented
retail and service establishments to meet daily needs of residents. Such uses may
include small to medium sized restaurant (no drive -thru windows), office, day care,
neighborhood scale commercial, convenience store, churches, or other similar type and
scale uses.
C. Setbacks
In the PUD standards, the building setback for commercial is 50 feet from any public
right -of -way. The Parking setback shall be 35 feet from any Public Right -of -Way and/
or interior property line. There shall be a buffer separating the residential portion
from the commercial portion of the site. This buffer shall be in the form of a berm
and landscaping.
The following setbacks shall be observed:
Residential Commercial
Street Commercial Residential Parking Parking
Building Setback Building Setback Setback Setback
Hwy. 101
50'
50'
20'
35'
Hwy. 212
50'
50'
20'
35'
West 86th Street
50'
30'
20'
35'
d. Development Standards Tabulation Box
BLOCK USE Net Lot Density Hard
Area Surface
Coverage
Outlot
Commercial
7.72 acres
1
138 Multi- Family units
18.00 acres 7.66 37%
2 &3
16 Single- Family units
8.55 acres 2.24
4
56 Multi- Family units
8.92 acres 6.28 43.2%
Mission Hills
October 4, 1994
Page 20
ROW Street and court
West 86th St Right -of -Way
Hwy. 212 and 101 Right -of -Way
TOTAL AREA
Ordinance
BLOCK 2
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
BLOCK 3
Lot 1
Lot 2
Lot 3
Lot 4
Lot 5
Lot 6
Lot 7
Lot
Area
15,000
23,374
20,196
20,824
21,386
20,898
21,566
22,006
16,349
15,126
15,554
16,185
15,232
24,778
25,092
1.17 acres
2.23 acres
18.68 acres
61.67+
Lot
Width
M
117.48
100.30
100.31
100.17
100.45
116
125
108
95.6
90
90
127
55.62*
78.30*
Home
Depth
125'
198.83
201.96
208.23
212.5
207
189
176.5
150
155
172
180
134.5
189.06
189
Home
Setback
30' front/30' rear
10' sides
Mission Hills
October 4, 1994
Page 21
Lot 8 15,752 76.6* 135.25
Lot 9 17,026 112 147.5
* denotes lots located on a cul -de -sac ,
e. Building Materials and Design '
RESIDENTIAL
Building's exterior material shall be a combination of a five inch aluminum siding and '
brick. The architectural style is generally classic with details such as arched transoms
and soffit returns over the entries of the one story homes and horizontal transom
windows over the two -story windows. On a similar project elsewhere, exterior
finishes were soft gray and creamy white, featuring pearl gray siding, shell white
soffit/facia, and gray velour brick. '
Finding The PUD requires that the development demonstrate a higher quality of
architectural standards and site design. The two story buildings located on block 1, t
reflect some architectural variation which makes the units more appealing. The one
story units located on Block 4 have limited architectural variation. New elements
should be added to give the units some variation. This could be in the form of '
changing the shape of windows, adding louvers, shifting entry ways, and adding
dormers.
R
COMME IAL C
1. All materials shall be of high quality and durable. Masonry material shall be
used. Color shall be introduced through colored block or panels.
2. Brick may be used and must be approved to assure uniformity. ,
3. Block shall have a weathered face or be polished, fluted, or broken face. I
4. Concrete may be poured in place, tilt -up or pre -cast, and shall be finished in
stone, textured or coated. '
5. Metal standing seam siding will not be approved except as support material to
one of the above materials or curtain wall on office components. I
1
' Mission Hills
October 4, 1994
Page 22
' 6. All accessory structures shall be designed to be compatible with the primary
structure.
7. All roof mounted equipment shall be screened by pitched roofs. Wood screen
fences are prohibited. Screening shall consist of compatible materials.
8. All buildings on the Outlot shall have a pitched roof line.
' 9. All mechanical equipment shall be screened with material compatible to the
building.
' RESIDENTIAL
1. Building exterior material shall be a combination of prepainted 5" aluminum
' siding and brick.
' 2. Arched transoms and soffit returns shall be used over the entries of the one
story units and horizontal transom windows over the 2 story windows.
Introduce some variation among the buildings through the shape of windows,
adding louvers, shifting entry ways, and adding dormers.
3. Colors used shall be earth tones such as soft gray, creamy white, pearl gray,
' shell white, etc.).
4. Each unit shall have a minimum of 1 overstory tree within its front yard.
' 5. All units shall have access onto an interior street and not 86th Street.
' f. Site Landscaping and Screening
The planting plans prepared for the site are intended to create a strong sense of street
' tree plantings using overstory deciduous trees such as Summit Ash, Linden, and Sugar
Maple. Highways 101 and 212 will be buffered with a combination of overstory
evergreen trees and ornamental deciduous trees. The outdoor private living areas will
' be buffered with the use of evergreen trees. The wetland will be highlighted with the
introduction of native wetland species.
' In addition, to adhere to the higher quality of development as spelled out in the PUD
zone, all loading areas shall be screened. Each lot for development shall submit a
separate landscaping plan as a part of the site plan review process. Berms of 2 to 3
feet high shall be added along the Highway 101 and 212 right -of -way. These berms
shall be seeded and/or sodded and bushes and trees shall be planted on them. All
I
Mission Hills
October 4, 1994
Page 23 '
disturbed areas within the single family lots shall be seeded and/or sodded. Two trees
with a minimum of a 2 inch caliper shall be planted within the front yard setback. ,
These two trees shall consist of one overstory evergreen tree and one ornamental
deciduous tree.
1. All open spaces and non- parking lot surfaces (outlot) shall be landscaped, or ,
covered with plantings and/or lawn material.
2. Outdoor storage is prohibited. '
3. Loading areas shall be screened from public right -of -ways. Wing wall may be '
required where deemed appropriate.
4. The Oudot shall be seeded and maintained in a weed free condition in all areas ,
proposed for future development.
g. Signage '
COMMERCIAL
Staff is proposing one monument
sin sign be permitted for the outlot and one monument
g
sign for the residential section of the PUD. I
1. All businesses built within the oudot shall share one monument sign.
Monument signage shall be subject to the monument standards in the sign I
ordinance.
2. Wall signs are permitted on no more that 2 street frontages. The total of each I
wall mounted sign display areas shall not exceed (24 square feet).
3. All signs require a separate permit. '
4. The signage will have consistency throughout the development and shall tie the
building materials to be consistent with the signs. Signs shall be an '
architectural feature, they shall not be solely mounted on a pole of a
foundation.
5. Consistency in signage shall relate to color, size, materials, and heights. '
6. No illuminated signs within the outlot may be viewed from the residential
section of the PUD.
Mission Hills
October 4, 1994
Page 24
7. Only back -lit individual letter signs are permitted.
8. Individual letters may not exceed 3 feet in height.
9. Only the name and logo of the business occupying the unit will be permitted
on the sign.
RESIDENTIAL
One monument identification sign shall be permitted for the residential development.
The sign may not exceed 24 square feet in area and 5 feet in height.
h. Lighting
Finding
1. All light fixtures shall be shielded high pressure sodium fixtures. Light level
for site lighting shall be no more than ;6 candle at the property line. This does
not apply to street lighting. The maximum height of a residential street light
shall not exceed 15 feet. Light fixtures within the outlot shall not exceed 25
feet.
2. Glare, whether direct or reflected, as differentiated from general illumination
shall not be visible beyond the limits of the site from which it originates.
3. Lights shall be on a photoelectric cell to turn them on and off automatically as
activated by yearly conditions.
4. The outlot light poles shall be corten, shoe box light standards."
ATTACHMENTS
1. Plans reflecting variation in design.
2. Sample of street light.
3. City Council minutes dated July 11, 1994.
4. Plans received September 30, 1994.
F con dA Acr -rt!�i
- . it ■r �f 7 �n
n VA n / �! �• �)vlv _-
Ltd Im
t� s•� s/
■t mo t' � �� Illllli ����� illlll� • �.�.- .�' -/ � . -
No ■■■n 1 Al
tit ! t titer
0
� w __ • c� � � � � =777
� AAC
Rr]
,i
■ ■ ' � , ,tr
w ,
tt�
• , itl
♦ •`' �FA
WA
IN
dil
F J-810cl
► �A AMP
r d kit
r
ROTTLUND HOME TM . -,
A DIVISION OF THE ROTTLUND COMPANY. INC.
COVER SHEET
Date: 7l/ Al y
Pages Sent (Including Cover):
TO:
' Name:
Sxbq Z/` l )
�� " �✓
Company: car T'y
Telephone:
Fax
'
Name:
Company:
Telephone:
Fax:
Noma•
Company:_
' Telephone:
Name:
' Company:
Telephone: Fax:
' MESSAGE:
FROM:
Name: BOB PORTER
Company: THE ROTTLUND COMPANY
Fax Phone: (612) 638 -0502
Telephone: (612) 638 -0500
14 Vp— i� /
7
' The information contained in this facsimile message is privileged and confidential information intended only for the use of the
individual of entity named above. If the reader of this message is not the intended recipient, or the employee or agent responsible to
' deliver it to the intended recipient, you are hereby notified that any dissemination, distribution or copying of this communication is
strictly prohibited. If you have received this communication in error, please immediately notify us by telephone, and return the
original message to us at the above address via the U.S. Postal Scrvice. We will be happy to reimburse your for the postage.
Please Reply Original Will Follow �—
' Please Reply Immediately Original Will NOT Follow
No Reply Necessary FAX.doc `
FOUAL NODS
' OIPORTUNIiY
2681 LONG LAKE ROAD ROSEVILLE. ESN 55113 (612) 638 -0500 FAX (612) 63 -0501
4G
51
50 52
j�
THE ROTTLUND COMPANY INC. 6IN BUTLER LICENSE #1335
ARTIST'S CONCEPT ONLY, SUBIECT TO CHANGE WITTIOUT NOTICE. SEE
MILLAR REPRESENTATIVE FOR AM)AI. LANDSCAPING AND PLANS. ®1994
IIIE 110111UND COMPANY, INC. EQUAL HOUSING
19 OPPORTUNITY
Misgiz N HILLS � T
GARDEN HOMES
OF CHANHASSEN
•-r'.� •-rr
V Your
uilder for Life
•
.1
I
I
I
I
I
I
I
WHITTEN
ASSOCIATE INC.
Z
Side Elevation
1Z
Garden Homes
Elevations
4 Unit Building
7
Unit A Unit A
Front Elevation
4 Unit Building
J
Garden Homes •
Al
I
I
I
I
I
I
WHITTEN
ASSOCI.ATES,INC.
.% NETONi.1,.0.1,``Yf CE .
Unit A Unit A
— "—
Side Elevation
Carden Homes
8 unit Building
• ,,,,,,,,
CI.I c
I
'
J c�C
_ . CCII
te rrr�
—
Unit A i
w
Unit B Unit B
Unit A
Front Elevation
I
f
Garden Homes
A
A3
i
Unit A Unit B Unit B Unit A _
i
k
BeJroom Muter Ba U _ K..hen '' L °�naY t n FaanerB�� ' Kiahm L.:d, . D �
Bemoan Dwq I
Den nmg DW.
Bemoom Bah Bolreom
i
Living Wage Puio Living Wnge
,
P. Porch'— Porch
Unit B Unit A 1
s
\ Unit A Unit B
Main Level Plan
Unit
Carden Carden Homes ! III A41 I
1
1
1
1
i
I
I
I
11
I
I
I
I
i
C
11
i
I
I
WHITTENJ
ASSOC[ ri.s.lNc,j
Side Elevation
Front Elevation
8 Unit Building
7�
II Villas --
8 Unit Building
A7
I
I
I
I
F
1
=� NSP Street Lighting Service
F
At; t - 40 `w
WC �, • s _er 3 fYL '/ R ° Y�
,
V 4 SSS
.d . `
•,`�
..e w
1� f �
fit
A _ f.�e �i
Al
YA
Ff
pr
•f�_ �'► s' -. t iA t sue• >+ < .' 'r
gt
r . � "'� .+ ° `*s '�'-'� `•,.�„ "'mom_
� ��' ' rte e � .: � :_ � "6, e�E'�� ��^ �•.
Maximum Spacing Recommendations Colonial Style
Area of Use
Wattage/Pole Height Recreation
Residential
Commercial
10OW1181717 190FT
175FT
140FT
100W /20FT 21OFT
170FT
120FT
150W/18FT 230FT.
21 OFT
200FT*
150W /20FT 21 OFT*
190FT*
185FT
'
*Use different wattage /Pole combinations or fixture types for better lighting
Denotes best recommendation
,
O
'
Price List
Light Cost
Traditional
100 Watt $700.00
,
150 Watt 720.00
Pole
15 FT. Fiberglass 1,354.00
18 FT. Fiberglass 273.00
15 FT. Aluminum 1,300.00
20 FT. Aluminum 685.00
'
Base
Pre -cast Concrete 550.00
Screw -in 6" 332.00
Northern States Power Company
6/93 2M
4W Printed on recycled paper
10% consumer waste
414 Nicollet Mall
post-
Minneapolis, MN 55401
City Council Meeting - July 11, 1994
Don Ashworth: Dave, is there any question as it deals with the 25th? Should we advise people to watch the
paper as to the 25th or August 8th or can you make a commitment to the 25th?
' David Mitchell: I can make a commitment to the 25th. We're-Address those issues. I think in that time frame
we can look at some possible alternatives for the east end and be prepared to do that I guess as I sit here and
think of one of the options that has been presented is the density issue out there and the additional impact that
' Charles has given on the lift station as a possible ... I think we can address some of those impacts and proceed
with the project at that point...
Don Ashworth: Thank you.
' Councilman Mason: Will this private versus public thing enter into this at all? I mean what was mentioned. I
mean for their credit towards what's going on. I believe it was Mr. Putnam brought that up. Is that an option to
' be looked at all here? I mean would that facilitate things at all or we don't care about that?
Charles Folch: At this point, as long as there's still hope in doing at least that portion of the work this year, I
' think we should probably leave that issue, that alternative...
Councilman Mason: Okay. Okay.
Mayor Chmiel: Alright. Any other discussion?
Mayor Chmiel moved, Councilman Wing seconded to table the Lyman Boulevard and Lake Riley Trunk
Utility Project No. 93 -32 and authorizing plans and specifications until the next City Council meeting on
July 25, 1994. All voted in favor and the motion carried.
' PLANNED UNIT DEVELOPMENT REQUEST, PRELIMINARY PLAT FOR 74 LOTS OF MIXED
HIGH DEN_ SITY (186 DWELLING UNITS), 15 SINGLE FAMILY LOTS AND AN OUTLOT WHICH
CONTAIN FUTURE NEIGHBORHOOD COMMERCIAL USE(S); SITE PLAN REVIEW FOR MIXED
HIGH DENSITY UNITS LOCATED EAST OF HIGHWAY 101 AT WEST 86TH STREET; MISSION
' - HILLS, TANDEM PROPERTIES.
Public Present:
Name Address
Dick Putnam: Mr. Mayor, my name is Dick Putnam, Tandem PrWerdes. Jim Ostenson is here, who's my
partner. Don Jensen, Director of Development for Rottlund Corporation is here to answer any questions... on the
units themselves and Ed Hasek from Westwood Engineering who will present to you the changes that we made
on the plans since the last meeting—went back to the Park and Rec Commission to take a look at the site plan.
18
Dick Putnam
Tandem Properties
Jim Ostenson
Tandem Properties
Don Jensen
Rottlund Homes
Al Klingelhutz
8600 Great Plains Blvd.
Ed Hasek
Westwood Engineering
Dick Putnam: Mr. Mayor, my name is Dick Putnam, Tandem PrWerdes. Jim Ostenson is here, who's my
partner. Don Jensen, Director of Development for Rottlund Corporation is here to answer any questions... on the
units themselves and Ed Hasek from Westwood Engineering who will present to you the changes that we made
on the plans since the last meeting—went back to the Park and Rec Commission to take a look at the site plan.
18
City Council Meeting - July 11, 1994 1
We won't go through the project any more since you've been through it a couple times but I would like to ask r
Ed to ... and then any of us would be available to answer any questions on the units or...
Mayor Chmiel: Thank you. Sharmin, I'll let you start this first. '
Sharmin Al -Jaffa Thank you. The ... You tabled it mainly because of the park issue. The applicant had not '
appeared before the Park and Recreation Commission yet for preliminary PUD application. One of the issues
was staff was requesting a 1.5 acre area for a park. The applicant was providing a .23 acre and this issue has
been resolved. The Park and Rec Commission recommended the 1.5 acre and the applicant's revised the plans
to show that park. This morning I was speaking to Mr. Mayer. He had some concerns regarding the location of ,
the totlot in relationship to the wetlands. This wetland has standing water. It's within close proximity to the
totlot is in close proximity to the wetland. Assuming that the children were supervised, would that be a concern
and we looked at other situations that we have in this city. One of them was in Lake Susan. However, and it's '
along the beach there is a totlot next to, Lake Susan has a totlot. However there's a distance between it and the
lake. Lake Ann has a totlot next to the beach but there's usually a lifeguard out there. We looked at fencing but
rather not doing the fencing around the wetland. One possibility would be to put it around the totlot itself. So
these are options before you. The second issue that was raised was the grading and the ponding on this site. ,
This remains an issue that hasn't been resolved and the engineering department and the applicant are working on
this still. Elevations was the third issue and staff feels that we have reached an agreement with the applicant.
He has revised the elevation plans and there are materials as well as renderings that he has brought with him that '
he could share with you so.
Councilman Wing: This is the new one? These are not up to date? ,
Councilwoman Dockendorf. These don't look compatible with what you've got up there.
Sharmin Al -Jaffa Those are the old ones. Okay, what's here is the new one.
Ed Hasek: This one's the new one too.
Sharmin Al -Jaffa Correct. One other difference between the old and the new is the new plans show two
additional units but they are still within the permitted density. They meet the comprehensive plan guidelines as
well as the zoning ordinance. The previous plan showed a higher density than was permitted under the '
comprehensive plan within this quarter of the parcel. However, because they added this open space here, we no
longer need to transfer density and they are within the guidelines. And also comprehensive plan and zoning
ordinance. So we are recommending approval with conditions outlined in the staff report and if you have any
questions, I'll be more than glad to answer them. '
Mayor Chmiel: Okay. Thank you Shannin. Gentlemen.
Ed Hasek: Your Honor, members of the Council, my name is Ed Hasek. I'm with Westwood Professional
Services. Again, our offices are located just down the highway here in Eden Prairie. I think to expedite things
just a little bit this evening I'm going to be as brief as I possibly can. I think Sharmin has done a good job of
outlining the changes between what I'm going to show you as the plan that we had presented for conceptual
approval. Basically the plan that was put together and that's why I had this one flipped up before. We went
through that concept with you I believe last time about the similarities and the project, the changes that have
occurred on this particular project. That we have reduced density in the southeastern quarter of the project while ,
19 1
City Council Meeting - July 11, 1994
obtaining two additional units. We're actually under 8 units per acre in both the medium and the high density
areas of this project as it stands right now. One thing that did occur, we have reduced the number of ponds by
one at this point and as Sharmin had pointed out, we are working diligently with the engineering staff to work
' out the issues related to ponding for this property. They basically relate to what the ultimate plan is for water
and how that's going to impact this particular development. What will or will not be temporary in... Again, 1.5+
acres of parkland is suggested for this plan. We're going to install the same facilities, the same todot, the same
hard surface and ball court area. That will be located in the area that I just pointed to on the map. And the
other thing that did occur on this is we had originally intended that the road that's just to the south of the pond,
this one right here, be extended across on a temporary basis with some sort of sub - surface hard cover and for
those times that emergency vehicles may want to use it. In working with the city staff and the fire marshal,
we've included a hammerhead. The details of that have not been worked out yet at this time. We're still talking
to him ... provided one that we know is in excess of what he's going to want and we're hoping that we can cut
that back to further expand the open space in the park. At that I think I'll let it go. If you've got any questions
of Don Jensen, related to the specific units, he can deal with that at this time.
Don Jensen: Mr. Mayor, members of the Council. Don Jensen with the Rottlund Company. We brought all our
boards with describing the various building components that are going into this. We would like to share with
you our screens with private parks, which is ... this is not a public parks. It's being asked of the developers to
create. Our insurance carriers, which then would insure for the homeowners association asked that we provide
signage. We're not real excited about fencing off amenities that are in fact.-desirable about Minnesota,
' Chanhassen and the western suburbs. Totlot is key in that it is for tots. The question unsupervised lots is an
interesting thing... supervision in Minnesota and ... that's always important regardless. Whether that's a pond or a
lake. We've been asked to provide fencing and signage. That's for the insurance carriers so that they know that
' these areas do have at least an awareness posted. At what point the awareness goes, that's always subject to
debate. We have worked with staff on changing the facade of our garden home product. That subdivision as
planned in the north of 86th has not changed and we've also submitted our building materials, which I have next
to Charlie here. And I'll just hold in front of the podium there, I think the camera picks those up as well. But
' we'd be looking at aluminum or vinyl siding. It depends on the manufacturers. Accent colors which are carried
around the garden home also on shudders which are on the end of the buildings that we were looking at. We
worked with staff on deviating on the standards. There's the transom windows. The detail as well as an arched
' window detail that we'd put on this end elevation. The previous plans had an idea for a fairly simply end
treatment. The current plans that we re- submitted back to staff deal with the change on the 8 unit buildings in
the center as well as beefing up the amount of window or perceived window volume on the end elevation.
When you look at the building, in reality outside of the architectural elevations and we have some photographs
that we shared with staff, virtually those whole end elevations are either doors or windows. There's not a whole
lot of wall space on those units. In fact they have a whole lot of added insulation for instance so we feel pretty
comfortable that we have a rather elegant looking building. Again, there's two sectors of the marketplace that
' we feel Chanhassen has created through the jobs market. It in Chaska and there's a lot of people that are really
needing housing under $100,000.00 in categories both starting out in a job and people winding down on their
jobs and that's what these two products are aimed squarely at with their building line and the garden home line.
I'd be happy to have me go through in a little bit greater detail the building plans that are all in your packets. I
would describe them at some length with some market research that we've been able to go through and we
believe that the people that are going to be living here are going to be either working within about 5 miles to 7
miles of this area or they're already living within 5 to 7 miles of this area. Thank you very much.
Mayor Chmiel: Thank you. Does anyone have any questions?
20
City Council Meeting - July 11, 1994 1
Councilman Wing: Are you looking at us? I
Mayor Chmiel: No, I'm looking at the audience who may be in and adjacent to that particular property. I don't
see any so I'll bring it back to Council. Richard.
Councilman Wing: Kate or Sharmin can you, my daughter just bought a house. She didn't qualify for much so
I want to talk about affordable housing. At some point in the discussion of this project we talked affordable
housing. And as I'm understanding, affordable housing that the city's looked at, we're looking at $60,000.00 to
$70,000.00 is affordable housing. I mean anything over that you've got to have a $30,000.00, $40,000.00,
$50,000.00 income. $100,000.00 mortgage doesn't come out of a $20,000.00 - $30,000.00 income. So what I'm '
getting at is, was this project supposedly going to enhance our affordable housing situation?
Sharmin Al -Jaffa Initially when we started working on it we suggested that maybe we could create a housing
district out there. That would be our only option basically to guarantee affordable prices on those units.
Kate Aanenson: They've indicated that they want to make it some affordable housing ... make it clear that we
have no way of guaranteeing what those prices are going to be. We can indicate a certain price range but there 's
no way that we can guarantee that that's what they're selling.
Councilman Wing: But I need to define affordable housing, and is affordable housing under $80,000.00? 1
Kate Aanenson: Yes.
Councilman Wing: Are any of these units going to sell?
Kate Aanenson: They had indicated that they had some at $69- $70,000.00. That's what we have in your report.
What I'm saying is there's no guarantee. '
Councilman Wing: Is that true? Is that true that a percentage of these are affordable housing?
Don Jensen: That's correct. I could show which ones are. Our standard villa, which is a one bathroom product '
which helps maintain the affordability, which is the center of the lower subdivision. It's next to 212. The
buildings that are cut in half that look at the wetland areas, have a 2 bathroom standard. Because of the extra ,
building materials, people are looking for that because that will tend to go in the 80's. These that are the back
to back configuration will come on the market and our pricing ... in the high 60's, low 70's. Obviously an
influence to that is whether or not the utility infrastructure gets in this year or next year because none of that
does get any cheaper.
Kate Aanenson: We just want to make it clear that that's all preferenced on their good faith that that's what...
Councilman Wing: Yeah, I'll get to that.
Kate Aanenson: There's no guarantee that...
Councilman Wing: Yeah, I want to ask about that. Out of your 100 and, I don't know how much are in these?
Out of these, out of the all level housing units, how many of that number, because I can't see here. Do you
know the number that would be in the $60,000.00 to $70,000.00 range? I
21 1
.1
I City Council Meeting - July 11, 1994
' Don Jensen: Certainly those would be all of the back to back dwelling units in through here that we'd be
targeting and those are about 84 -88 units of the project as it is presently configured
' Councilman Wing: And how about the ones that might go into the 80's? Approximately how many.
Don Jensen: The center units in the garden home areas are targeted and slotted so we can try to reach that
$80,000.00 category. As well as some of the interior units through here on this half buildings.
' Councilman Wing: So a good percentage.
' Don Jensen: Approximately 65% is trying to maintain underneath that $85,000.00 number and compared under
the villas under $80,000.00.
Councilman Wing: Okay. I'm getting increasingly down on these densities and the number of homes coming in
and the amount of traffic we're bringing in and the lack of infrastructure. It just seems like the cart's ahead of
the horse. And so I'm having a harder and harder time with these developments because all we do is keep
stamping them and all I look to see is that the silt fencing is in place and there's nothing more to be said They
meet our ordinances and I'm really concerned that we need an emergency review of our comprehensive plan.
But I'll go after this a little differently now that if we're going to meet some affordable housing needs, which is
with a good location and a good project, it alters my opinion on this. Can we, as a condition, lock in affordable
' housing of this project. Is there any way that we can assure that this goal is going to be met? If I was to
approve this, is there any condition, any wording we can put in this to insure that that goal is met or that that in
fact happens? Because once we approve it, like Kate said, there's nothing to say they can't go sell these for
' $125,000.00. If the market was there.
Tom Scott: Mr. Mayor, I'm not aware of any conditions imposed on this plat that would require the developer
to sell the units at a certain price.
' Mayor Chmiel: Unless the city were to come in with maybe having HRA or the County HRA subsidize a
particular project.
' Tom Scott: If there was some sort of involvement of that nature, there certainly may be a different set of rules
involved, yes.
1 Don Jensen: Mr. Mayor, Councilman Wing. What we have found is that one of the ways that you maintain
affordability, and quite often we're chased out of the room for bringing in housing under $80,000.00, is when
you take a look at the square footage of the dwelling units that's going in and all of that is part of the ... and you
' try to build value into each and every square foot. When you increase the square footage, no matter what
condition you put on, the building's fixed cost of creating whether it's a single family home or apartment
structure, you're right around that $45.00, $50.00, $55.00 a square foot range. When you can get market rate
' housing, a for profit builder trying to meet the needs of the market place and you look at that square footage,
that's how you're going to allow to have the city affordability goals be maintained And we believe we can do
an awful good job trying to meet those needs of the city outlines and one of the ways we can do it is speed If
we can move through a project and not have delays, we're able to maintain that pricing where we target it rather
than having to have increases because of delays and because of what Kate mentioned... asphalt and other elements
that we don't have any control over.
1
City Council Meeting - July 11, 1994 t
Councilman Wing: I don't want to belabor this and I don't want to bore my colleagues here but let me ask one
more question of Kate. Give me an option or another way that we can approach this. Maybe we can't do it
now but how can we obtain this goal ?. Would we have to rezone? Would we have to start out with city '
involvement right from scratch on a project like this? If we're going to go these high density projects, then I
want to attain some goals. How can we make sure we attain those goals?
Kate Aanenson: Well this property is under the ... zoning in the comprehensive plan. Okay, so it meets that 1
criteria. Now they've gone beyond that and made a good faith effort and we're assuming that they're going to
try to attain that as far as providing some affordable housing. That's one of the objectives of the PUD which
was one of the reasons why we supported the project. Again, you can take it a little bit differently but we
certainly feel that those are two objectives. As far as whether or not this ... city or some other agency would have
had to get involved prior to this to make it happen.
Councilman Wing: Okay.
Mayor Chmiel: Okay, Colleen. I
Councilwoman Dockendorf. So this condition 14, I mean is that still a valid point? Are we still going to
continue to explore options of putting a housing district over it?
Sharmin Al -Jaffa I believe it's getting at a point where it's...
Councilwoman Dockendorf: It's too late. That's what I just heard, okay. I think the developer's come a really ,
long ways since what we fast saw and I'm very impressed with what the project looks like. I really am. I'm
ready to go ahead with the preliminary plat. We do need to discuss however, as staff has pointed out, what goes
in the commercial part of it, although it's not up tonight for any specific buildings. We should discuss what we
want there. We've got some pretty nebulous definitions of what neighborhood community is, or maybe I just '
can't find it. I'm looking on page 7 and we're saying medium sized restaurant, office, daycare, neighborhood
scale commercial, which I don't know what that is, convenient store, churches, etc. Do we need to pin down
more specifically what we want here? Is that the direction you're looking for? ,
Sharmin Al -Jaffa If there are certain uses that you believe should.
Councilwoman Dockendorf: Well yeah.
Kate Aanenson: Square footage is one...
Councilwoman Dockendorf. Is the developer pretty much looking until TH 212 and TH 101 gets finished there
before they determine what they want?
Sharmin Al -Jaffa That's what they've told us.
Councilwoman Dockendorf. Okay. And do we have to hold them, I mean when it comes in as a PUD we like
to look at the whole package so.
23
City Council Meeting - July 11, 1994
Kate Aanenson: Right. And we also wanted to look at some criteria if...understanding of this is the framework.
This is what you're allowing. This is pretty significant to the understanding of—and also we want it to be a
compatible design.
' Councilwoman Dockendorf. Do we have a definition of neighborhood commercial or is it pretty much what I
just stated before?
' Sharmin Al -Jaffa This is pretty much the definition that we have. There is also in there a sentence that says, if
there was some confusion about any of this, the Planning Director will make the determination of that use.
Councilwoman Dockendorf. Okay. I'm fine with the definitions that are provided here. I think 20 and 26, the
conditions in here are repetitive. Other than that I have no problem with the conditions. There's some work to
be done but this has really gone a long way and this is only preliminary plat. From now on out it's just detail.
t Mayor Chmiel: Okay, Michael.
1 Councilman Mason: I basically agree with what's been said. All along here Councilman Wing and I have
disagreed on density issues and I suspect we will continue to. However, I do agree with him about infrastructure
issues and I think as these kinds of developments start coming into Chanhassen with the hopes of allowing more
affordable housing in this community, that infrastructure issue is something I really think we need to take a look
at. I think that's a really good point. I do also agree with his comments about, and I'm not sure whether it's
obtainable or attainable goals for affordable housing. I do commend Rottlund, and I think they've been in this
city enough and I think hope to be in this city enough that I'm pretty comfortable with what they're trying to do
' here in terms of $60,000.00 to $80,000.00. That's a far cry from what is the average single family home now in
Chan, $120,000.00?
Mayor Chmiel: Yep.
Councilman Mason: So that's good. I'm really glad to see that. I agree with what Colleen has said about the
work that's gone into this. Yeah, it looks good. I'm also, well believe me with children of my own, I do
' understand the Mayor's concern about safety. I also hear what Mr. Jensen is saying. And quite honestly I guess
I do pretty strongly believe that while the city, safety obviously is a paramount issue, it's even more important
for the family to practice that safety. Those safety issues than it is for the city. I guess I'm just throwing my
two cents in on that but it looks good. Looks okay.
Mayor Chmiel: Okay, thank you Mike. The only concern we have an awful lot of ndin throughout the city
Y Y Y Y lro g gh h'
and no fences in and adjacent to those. But only because of the close proximity to that one particular area, I
became a little concerned with it. Looking at it from a safety aspect. And even looking at it from the standpoint
if they were to just take fencing and just cover from one end down to the other and make a corner, which is
close to that play lot, it would probably have tendencies to alleviate some given problems. It's not a whole lot
' of fencing. It's just minor but because of that close proximity I guess that's where I really got my feeling from
that. And watching my own grandkids, you can keep your eye on them. Turn your back for one second and
they're gone. Just that quick. And I had a situation happen in a motel, and I won't give the name of the motel.
' No plugs. But one of my own children, who just moves fast and quick. I turned my head for no more than I'll
bet you 5 seconds and he was on the diving board at 2 1/2 years old and in the water. And that's where my
concerns come from. If an obstruction is there, it could just give that parent a little more time. But because, as
I said and I'll reiterate it one more time. The close proximity, I have that concern. And I would like to even
24
City Council Meeting - July 11, 1994 1
25 1
make that as an additional condition that they look at that and put fencing on that one specific area with that.
But other than that, I think it does look good. I think density is there and they're still a little bit under density
and maybe we need to improve our density aspects when we look at something but for what's there and what we
have on the books, it's compatible. So with that, any other discussion?
,
Councilman Wing: Do you want one more comment? Will you accept one more comment?
Mayor Chmiel: You have it.
Councilman Wing: I don't find any problem with the project. I think it meets some needs but for 4 years since
we moved the MUSA line we've gotten into an identical routine that's starting to bother me because I've lived
here 30 years and I moved here for some amenities and a lifestyle that's starting to get choked out. Everything
coming before us is high density, maximum use. And all I'm seeing coming out of these are stop lights, traffic,
and choking up a lifestyle. So everytime one of these high density projects comes in, and I'm glad this one isn't
'
in my neighborhood, this is only one and there's another one tonight, and there was another one last week.
We're just approving one right after another and the net result is I think we're really starting to affect a lifestyle
and the future of this community and I'm not so sure it's in a positive way. But we're doing it without an awful
lot of discussion. That's why I'm concerned about the comp plan and why I make these statements. Good
project but what are we really doing visionary wise here. That's, I threw my two cents worth in here and I
apologize humbly to.
Councilwoman Dockendorf: Well, let me throw in one more comment. Tonight we're approving over 200 acres
in the city. Just tonight. That's so scary.
Mayor Chmiel: That's right. That's right. Which will be done by '97.
Councilman Wing: Anyway with that I'll move approval. Wait a minute, what am I moving?
Mayor Chmiel: Well there's 3 different motions that we'll have.
Councilman Wing: Here, I'm going to let Mike do it because he's better at putting 3 together.
'
Councilman Mason: It's that third grade teaching experience Councilman.
Mayor Chmiel: If you look on page 2. It's under the comments.
Councilman Mason: Alright. I'll move approval of Preliminary Plat for Subdivision #94 -5 and Site Plan #94 -5
as shown on plans dated April 15, 1994 and revised plans received July 5, 1994 as subject to the conditions as
stated in the staff report.
Mayor Chmiel: Okay. And in addition to that, does it also have the rezoning of the property? From RSF,
'
residential single family to PUD.
Councilman Mason: Yep, I'll move that also. Are we going to do them all three at once here?
'
Mayor Chmiel: Yes.
25 1
i City Council Meeting - July 11, 1994
Councilman Mason: Okay. I'll move the preliminary site plan for the PUD.
Mayor Chmiel: Is that what you're looking for Sharmin?
Sharmin Al -Jaffa No. Actually the rezoning is done with the final plat.
' Mayor Chmiel: Okay. Alright, then we'll just sit with that and pull that back. I thought I'd best ask that
question before we proceed.
' Councilman Wing: Item 14, can that be deleted?
Mayor Chmiel: And item 14 being deleted.
Councilman Wing: I'm asking. Should it be deleted? We're not going to put a housing district overlay on
this.
Mayor Chmiel: Yeah, okay.
Councilwoman Dockendorf: Well as long as you're cleaning it up, I think 20 and 26 is repetitive.
' Kate Aanenson: Right.
Councilman Mason: Well one of them should stay in. That motion includes deleting item number 14 and item
number 26. And all we want is preliminary plat tonight, right?
Mayor Chmiel: That's all we're looking for. Strictly that as shown. Motion on the floor with a second.
Councilman Mason moved, Councilman Wing seconded to approve the preliminary plat for Subdivision
#94 -5 and Site Plan #94 -5 as shown on the plans dated April 15, 1994 and revised plans received July 5,
1994, subject to the following conditions:
' 1. All utility and street improvements (public and private) shall be constructed in accordance with the City's
latest edition of Standard Specifications and Detail Plates. The applicant will be required to supply detailed
construction plans for all utility and street improvements for the City to review and formally approve.
Street grades throughout the subdivision should be between 0.75% and 7.0 %. 86th Street shall be
constructed with a 36' wide urban street section from existing TH 101 to "A" Street. The remaining street
may be reduced to 31' wide.
' 2. The applicant shall be responsible for obtaining and complying with all necessary permits such as the
DNR, MWCC, Health Department, Watershed Districts, PCA and MnDOT.
' 3. If the applicant installs the oversized (12 inch) watermain, the City shall credit the applicant by means of
reduction in their assessments for the oversizing costs. The oversizing costs shall be the difference
between an 8 inch watermain and a 12 inch watermain. Placement of all fire hydrants shall be in
accordance with the Fire Marshal's recommendations.
26
City Council Meeting - July 11, 1994 1
4. The homeowners association declaration of covenants and restrictions shall be submitted to staff for
review and approval as it pertains to site maintenance prior to final plat approval.
5. The applicant should provide a buffer area between the development and proposed Trunk Highway 212 as
well as Trunk Highway 101. The buffer area should consist of both landscaping materials and berming.
6. The applicant shall include a drain tile system in all public streets where the adjacent dwellings have no
other acceptable means of discharging such a pond, wetland or storm sewer.
7. An additional 17 feet of right -of -way lying easterly of the existing highway shall be dedicated with the '
final plat. The remaining property shall be platted as an oudot for future road right -of -way acquisition.
8. During construction of the site improvements, the applicant shall provide provisions for maintaining
ingress and egress at all times for the homes on Tigua Lane as well as emergency vehicles.
9. Allowed uses in the commercial site (outlot) shall be restricted to the uses described in the staff report.
10. The applicant shall provide density/hard surface coverage calculations for each lot within Blocks 1 and 4.
These figures shall exclude the right -of -way and wetland areas.
11. The landscaping plan shall be revised to add more trees along West 86th Street, along Highway 212 and '
Highway 101 right -of -ways and between the area separating commercial and residential lots.
12. Meet the following conditions of the Park and Recreation Commission: ,
A. The tot park facility shall include typical park amenities such as landscaped grassy areas, picnic
tables, park benches, play apparatus and basketball courts, etc.
B. Six foot wide concrete sidewalks be constructed on the south side of West 86th Street from
Highway 101 east to the project's terminus and a 5 foot wide core sidewalk on "A" Street from '
West 86th Street north to the street's terminus.
C. A bituminous trail shall be constructed encircling the wetland located south of 86th Street,
connecting the sidewalk system to the "park site." In consideration for the construction of said trail,
the applicant shall receive trail fee credit equal to the cost of construction. Said cost to be
determined by the applicant for presentation to the city with documentation for verification.
D. Full park fees shall be collected at the time of building permit applications at the rate then in force.
13. Plans outlining general layouts (with alternatives) building massings, square footage limitations, grading, '
building materials, architectural designs, pedestrian access, and development intent need to be developed
for the commercial area. We realize that the developer, Tandem Properties, will not be owning or
developing this area. Ownership is being retained by Al Klingelhutz. Still, both parcels are located within '
the PUD and we believe that the city would be remiss if we did not exercise our ability to ensure that the
ultimate development of the parcel is compatible with the best interests of the community. We had
suggested what we believe to be acceptable in this report and would appreciate the City Council's input.
27 1
City Council Meeting - July 11, 1994
14. Preliminary and final plat approval shall be contingent upon the city authorizing and awarding the bid for
the Lake Riley Area Trunk Utility Improvement Project No. 93 -32.
15. An additional trail easement along the south side of 86th Street may have to be dedicated to the city for
' the sidewalk construction. This will be determined during construction plan review and approval process.
A 5' wide concrete sidewalk shall also be extended along the west side of "A" Street.
' 27. All areas disturbed as a result of construction activities shall be immediately restored with seed and disc -
mulched or wood -fiber blanket or sod within two weeks of completion of each activity in accordance with
the City's Best Management Practice Handbook.
t
28
16.
The commercial portion of the PUD shall be consistent with the Highway 5 Corridor Study design
'
standards.
'
17.
Submit street names for both public and private streets to the Chanhassen Fire Marshal for approval.
18.
Chanhassen Fire Department's policy on Premise Identification must be followed. Additional monument
signs for address location will be required. Contact the Chanhassen Fire Marshal for requirements and
details. Pursuant to Chanhassen Fire Department Fire Prevention Policy #29 -1992. Policy enclosed.
19.
There will be no parking allowed on private streets or the south side of 86th Street. Signage must be
installed in compliance to Fire Prevention Policy #06 -1991. Pursuant to 1991 Chanhassen Uniform Fire
'
Code Sec. 10.207(a).
20.
A ten foot clear space must be maintained around fine hydrants, i.e. street lamps, trees, shrubs, bushes,
'
NSP, NW Bell, Cable TV, transform boxes. This is to ensure that fire hydrants can be quickly located
and safely operated. Pursuant to Chanhassen City Ordinance Sec. 9 -1.
21.
Submit turning radius to City Engineer and Fire Marshal for approval. Pursuant to 1991 Chanhassen Fire
Code Sec. 10.204(c).
22.
Dead Ends: Dead end fire apparatus access roads in excess of 150 feet in length shall be provided with
approved provisions for the turning around of fire apparatus. When buildings are completely protected
with an approved automatic fire sprinkler system, the provisions of this section may be modified by the
Chief. Pursuant to 1991 Chanhassen Uniform Fire Code Sec. 10.204(d) and 10.203 exc. #1.
"A"
23.
Street lights shall be provided along West 86th Street and Street/Court. The city shall determine type
and placement.
24.
The applicant shall verify that the landscaping plan meets the city tree preservation ordinance for canopy
coverage.
'
25.
The applicant shall provide diversity in the color schemes used in the buildings.
26.
The applicant shall deposit with the city an escrow for the future upgrading if TH 101 north of 86th
'
Street. The escrow may be in the form of a letter of credit or cash deposit. The amount of the escrow
will have to be determined after a feasibility study for the upgrading TH 101.
' 27. All areas disturbed as a result of construction activities shall be immediately restored with seed and disc -
mulched or wood -fiber blanket or sod within two weeks of completion of each activity in accordance with
the City's Best Management Practice Handbook.
t
28
City Council Meeting - July 11, 1994 1
36. All erosion control measures shall be installed prior to commencement of grading operations and be '
maintained until all disturbed areas have been fully restored. The applicant shall also be responsible for
removal of all erosion control measures upon completion of site grading. The city engineer will determine
the appropriate time and authorize the applicant to remove the erosion control measures.
37. Grading shall be prohibited within 10 feet of all wetlands. Erosion control fence shall be installed outside '
the 10 -foot buffer as well.
38. The street turnaround located southeast of the wetland shall be redesigned as shown in attachment #2. t
All voted in favor and the motion carried. I
29 1
1
28.
Wetland buffer areas shall be surveyed and staked in accordance with the City's wetland ordinance. The
Y Y
City will install wetland buffer edge signs before construction begins and will charge the applicant $20 per
sign.
'
29.
The applicant will need to develop a sediment and erosion control plan in accordance with the City's Best
Management Practice Handbook and the Surface Water Management Plan requirements for new
developments. The plan shall be submitted to the City for review and formal approval
30.
The applicant shall provide detailed storm sewer calculations for 10 -year and 100 -year storm events and
provide ponding calculations for stormwater quality/quantity ponds in accordance with the City's Surface
'
Water Management Plan for the City Engineer to review and approve. The applicant shall provide
detailed predeveloped and post developed stormwater calculations for 100 -year storm events and normal
water level and high water level calculations in existing basins and individual storm sewer calculations
between each catch basin segment will also be required to determine if sufficient catch basins are being
utilized. In addition, water quality ponding design calculations shall be based on Walker's Pondnet model.
31.
The applicant shall enter into a development contract with the City and provide the necessary financial
1
security to guarantee compliance with the terms of the development contract.
32.
The appropriate drainage and utility easements should be dedicated on the final plat for all utilities and
'
ponding areas lying outside the right -of -way. The easement width shall be a minimum of 20 feet wide.
Consideration should also be given for access for maintenance of the ponding areas.
33.
The lowest exposed floor or opening elevation of all buildings should be a minimum of 3 feet above the
100 -year high water level of all wetlands and ponding basins.
34.
Water quantity fees will be based in accordance with the City's SWMP. Storm sewer trunk fees will be
evaluated based on the applicant's contribution to the SWMP design requirements.
35.
The applicant shall report to the City Engineer the location of any drain tiles found during construction
'
and shall re- locate or abandon the drain tile as directed by the City Engineer.
36. All erosion control measures shall be installed prior to commencement of grading operations and be '
maintained until all disturbed areas have been fully restored. The applicant shall also be responsible for
removal of all erosion control measures upon completion of site grading. The city engineer will determine
the appropriate time and authorize the applicant to remove the erosion control measures.
37. Grading shall be prohibited within 10 feet of all wetlands. Erosion control fence shall be installed outside '
the 10 -foot buffer as well.
38. The street turnaround located southeast of the wetland shall be redesigned as shown in attachment #2. t
All voted in favor and the motion carried. I