2.5 Stage I Trunk Utility Improvements for the Lyman Blvd./Lake Riley Area Trunk Utility ProjectC?'.5
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
MEMORANDUM
TO: Don Ashworth, City Manager
FROM: Charles Folch, City Engineer nj
DATE: October 6, 1994 `"'��►►
SUBJ: Award of Bids for the Stage I Truk
g � .
Boulevard/Lake Riley Area Trunk
Utility Improvements for the Lyman
dity Project No. 93 -32a
On Thursday, October 6, at 10:00 a.m., bids ire sche
Stage I (trunk water main) improvements to a overa
Project No. 93 -32a. Unfortunately, there will not be 4
tabulations, check references and provide =i; recommen
Council packets. Staff, prior to the meting on Mond
received for accuracy, check referenc6s� and provide a
meeting on Monday, October 10, A94.
c:
Dave F
Jerry B
Dave N
.ed to be received and opened for the
Lyman Boulevard/Lake Riley area,
Hugh time to confirm the bid
4ion of award in a staff report for the
eight, will tabulate all of the bids
tnmended contract award at the
I i
77�& W
/Gr
BID TABULATION 1 r
FOR
LAKE RILEY AREA TRUNK UTILITY IMPROVEMENTS '
PHASE 1
CITY PROJECT NO. 93 -32
10:00 A.M.
OCTOBER 6, 1994
ORR- SCHELEN- MAYERON I
& ASSOCIATES, INC.
i
0 —
I ENGINEER'S ESTIMATE
I HEREBY CERTIFY THAT THIS ' `UE AND CORRECT TABULATION OF
THE BIDS AS RECEIVED rl"
DATE: October 6. ' - `)o
BY:
"l
OSM Project No. 5183.00 *Denotes Corrected Figure
il:\S137.00 \C7V L \ML%C\B(DTAB
SECURITY
INU
6Tl t.tneS 5 6
S° o
0
3 00T a 95
Z Z 4 yo, o0
N
cw D
c90
' c l5o,00
o
2 2131.0
$ 36 9 o
00.00
5'm - -A mfir4 m s
Z S 37Z,So
1 - 1 2-, SO
&0 IS0.00
3 4 5
419. .
O, co
- s
5
323 801.5
o (00,60
7-1 9 Co. 00
0 �o
3 1 .9 1(0.50
i
0 —
I ENGINEER'S ESTIMATE
I HEREBY CERTIFY THAT THIS ' `UE AND CORRECT TABULATION OF
THE BIDS AS RECEIVED rl"
DATE: October 6. ' - `)o
BY:
"l
OSM Project No. 5183.00 *Denotes Corrected Figure
il:\S137.00 \C7V L \ML%C\B(DTAB