Loading...
5 Century Blvd. ImprovementsCVFYOF ~20 Cig Center Drive, PO Box 147 Chanhasse,, Minnesota 55317 Phone 612.93Z 1900 General Fax 612.93Z5739 E, gineering Fax 612.937.9152 Public Safety Fax' 612.934.2524 Web www. ci. dmnhasse,, m,.us MEMORANDUM TO: FROM: DATE: SUB J: Teresa J. Burgess, Public Works Director/City Engineer Matt Saam, Project Engineer/,qfi~ May 23, 2001 Public Hearing - Approve Addendum No. 1 to Feasibility Study for Century Boulevard Improvement Project 97-1C (2001 Sealcoat Project No. 01-05) Staff recommends approval of the Feasibility Study for the 2001 City Sealcoat Project. Staff has received no feedback from property owners following the published notification of this project. The City is adding the 2001 Sealcoat Project as part of the Century Boulevard project. In order to combine the two projects and bond for the sealcoat project, a public heating is required. Failure to accept the Feasibility Study will delay the project. Attachment: Feasibility Report c~ Bill Bement, Engineering Technician IV Project File No. 01-05 g:\eng\public\97-1 c~approve feasibility study addendum memo.doc Clef of Chanhassen. A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, and beautiful t~arks~A ~eat. dace,~ CITY 0 F CHA NHA $SEN ADDENDUM No. 1 . , FEASIBILITY REPORT FOR CENTURY BOULEVARD CITY SEALCOAT PROJECT CITY PROJECT NUMBERS 97-1C (Century Boulevard) 1-05 (2001 Seal¢oat Project) I do hereby certify that this report was prepared by me or under my direct supervision and that I am a duly re~stered professional en~neer under the laws of the State of Minnesota. Teresa J. Burgess, P.E.* Reg. No. 25315 Date: I. INTRODUCTION On March 12, 2001, the Chanhassen City Council approved the feasibility study for the construction of street and utilities to extend the existing Century Boulevard to intersect with State Trunk Highway 5 (City Project No. 97-1C). This addendum is intended to add the 2001 Sealcoat Project to that feasibility study. The orig-inal feasibility study is not changed except for this addition. The City desires to let the 2001 Sealcoat Project as part of the Century Boulevard bid package. This addendum is required by Minnesota State Statute in order to combine the two projects. II. 2001 SEALCOATING PROJECT (NO. 01-05~ The 2001 Sealcoating Project includes the following streets within the City: Arlin~on Court Ashton Court Basswood Circle Brenden Court Bret-ton Way Briarwood Court Bmle Circle Chart View Cheynne Choctaw Circle Dakota Devonshire Drive Erie Avenue Frontier Frontier Court I-Ii,over Court North Hi,over Court South Hi,over Drive Highover Trail Hi,over Way Horseshoe Curve Horseshoe Lane Indian Hill Road Ithilien Knob Hill Kurvers Point Road Lake Lucy Road Lakeview Road East Lyman Boulevard Manchester Drive Merry Place Pleasant View Road Pointe Lake Lucy Prairie Flower Boulevard Sandy Hook Circle Sandy Hook Road Shadow Lane Steller Court Stratton Court Teton Lane Twin Maple Lane West 77th Street Walnut Curve Welsley Court Willow View Cove Attached location maps (Exhibit #1) illustrate the project locations. Proper sealcoating extends the life of asphalt pavement by providing protection from sun damage and sealing minute and hairline cracks in the pavement. In addition, sealcoating improves the traction characteristics of pavement that may have de~aded with wear and provides aesthetic improvements. The City maintenance crews repair potholes and crackseal prior to the sealcoat work being performed. lTL RIGHT-OF-WAY, EASEMENTS AND PERMITS All proposed work is within existing City rift-of-way. No rift-of-way permits, easements or utility permits are needed from the State or Carver County. IV. ESTh-MATED COSTS The estimated cost of the 2001 sealcoat project in 2001 dollars is $157,400.00. V. FINANCING AND SPECIAL ASSESSMENT Proposed funding for the sealcoat project is 100% City funds. No assessments are proposed for the sealcoat project. Assessments for the Century Boulevard Project are shown in the orig-inal feasibility, study. VIE. SCHEDULE No revisions are proposed to the original feasibility schedule. IX. CONCLUSION This project is feasible and cost-effective for the city of Chanhassen. Packaging of the sealcoat project with the Century Boulevard Project will provide budget flexibility and also reduce staff costs related to bidding and project management. .,1~1 0 ...i.ii · Q) ~ 14) 0 0 O4--] 0  ~,~,;,~,