1g. Approve Concurrence of Award of Contract for the Powers Boulevard Surcharging Improvement ContractI 1 MEMORANDUM CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 TO: Don Ashworth, City Manager FROM: Charles Folch, Director of Public Works/City Engineer DATE: September 20, 1994 SUBJ: Approve Concurrence of Award of Contract for the Powers Boulevard (County Road 17) Surcharging Improvement Contract (Carver County Project) Project No. 93 -29A At their regular meeting on Monday, August 2 1994, the City Council approved the plans and specifications for the Stage I (surcharging option for the Powers Boulevard (County Road 17) Improvement Project (Carver County Proj, No 3 -29A. On Tuesday, September 13, 1994, bids were received and opened by Carver tiunty fore above - referenced project. A total of two bids were received with the low bid .6eing submiged by Ryan Contracting, Inc. at a bid amount of $272,423.00. This is apprdidmately 230A,Uess than the Engineer's estimate of $355,000.00. The County Board has a girded this contras , t their regular meeting on September 20, 1994 conditioned upon receivin nDOT approval the plans and receiving concurrence with the award from the City of Lassen, as stipulated Section D (7) of the Joint Powers Agreement between Carver Co�nty and City of Chanhass or this improvement project. R Given that the low bxd received for the project is significantly mss than the normal estimated cost and the fact that the , vv - ii de Ry i of ri gt0 - performed satisfactorily on other projects within te',t,tsdieel,f�� ouncl�oncur with Carver ' County's award of lheXowers Boulevard (County Road 17) Surciarge Prod o. 93 -29A to Ryan Contracting, Inc. at X272,423.00£$ jms ' Attachment: Letter from Jon Horn dated Sember 14, 1994. c: Dave Hempel, Assistant City Engineer ' Bill Weckman, Carver County Jon Horn, BRW t ' t R 1 n 1 SWGkC__ September 14, 1994 B R W INC. Mr. Bill Weckman, PE Carver County Public Works 600 East 4th Street Chaska, MN 55318 Planning RE: CSAH 17 Surcharge Improvements Transportation SAP 10- 617 -11 Engineering Urban Design Dear Bill: Thresher Square 700 Third street So. On Tuesday, September 13, 1994, bids were received and opened for the Minneapolis, above- referenced project. Bids were received from two (2) contractors as `1" "413 follows: 612/370 -0700 Fax 612/370 -1378 Contractor Bid Amount DenDenc�er 1. Ryan Contracting, Inc. $272,423.00 �•er Minneapolis 2. J & K Grading and Trucking, Inc. $331,445.00 Orlando Engineers Estimate $355,000.00 Phoenix Portland Both bids were submitted with proper bid guarantees in the amount of ten San Diego percent (10 %) of the total amount of the bid as required by the Project Seattle Manual. A bid tabulation was performed to verify the total bid amounts and both bids were found to be correct. A bid tabulation is attached for your information. Since the project includes State Aid funding, the Project Manual included a Targeted Group Business goal of five percent (5 %) of the total amount of the contract as determined by the Mn /DOT Contract Management Office. J & K Grading and Trucking proposed to meet this goal while Ryan identified 0% Targeted Group Business participation as a part of their bid. This information will be submitted to the Mn /DOT Contract Management Office for their review. The low bid is approximately twenty -three percent (23 %) less than our Engineers Estimate, reflecting a competitive bid environment. Our Engineer's Estimate was prepared using unit bid prices for similar work performed in the Carver County area over the past few years. The overall size and schedule for the project were also considered in preparing the estimate. . Bill Weckman )tember 14, 1994 >e 2 ,pan Contracting has been a contractor for other past BRW projects and is our understanding that they are currently working on another County -oject. We have found them to be an adequate contractor capable of �rforming the work required by this project. We, therefore, recommend yard of the CSAH 17 Surcharge Improvements, SAP 10- 617 -11, to Ryan nntractinz. Inc. for the, low bid amount of $272,423.00. s and specifications for the project were submitted to Mn /DOT State on August 17, 1994, for their review and approval. Comments were ived from State Aid on September 7,1994, requiring a few minor plan .ifications. These modifications have been made and the plans have i resubmitted for final State Aid review and approval.. addition to Mn /DOT State Aid approval, the project requires a number other agency reviews and approvals as follows: City of Chanhassen Wetland Alteration Permit Minnesota DNR Permit Army Corps of Engineers Permit Riley- Purgatory-Bluff Creek Watershed District Permit Metropolitan Council Wastewater Services (formerly MWCC) Environmental Assessment Worksheet (EAW) 'he Army Corps of Engineers and Riley- Purgatory-Bluff Creek Watershed district approvals have been obtained and we are working to obtain all rther approvals prior to the scheduled construction start date. t is our understanding that the County Board will consider the award of i contract for this project at their meeting on September 20, 1994. If an sward is made, it is recommended that it be made contingent upon final ft /DOT approval of the plans and specifications and the Targeted Group Business participation as well as City of Chanhassen concurrence with the award. a contract award on September 20, 1994, and the receipt of all permits and approvals, the project schedule is as follows: County Board Awards Contract City of Chanhassen Concurrence with Contract Award Preconstruction Conference Start Construction Complete Construction September 20, 1994 September 26, 1994 October 6, 1994 October 10, 1994 November 18,1994 s r L Mr. Bill Weckman September 14, 1994 Page 3 Please call if you have any questions or we can provide any additional information. Sincerely, BRW, INC. rn B. � iorn, PE project Manager JBH /lab cc: Charles Folch /City of Chanhassen File 2396A10 S P 1 994 Fotia.g�yF ir.