9. Chanhassen Retail Second Addition Preliminary & Final Plat; Site Plan Review for Perkins Restaurant and Taco Belln I �. ' U �a a. Q J �Q �H Cn CITY OF CHANHASSEN STAFF REPORT PC DATE: 8/17/94 CC DATE: 9/26/94 ' CASE #: 92 -5 PUD, 94 -6 SPR PROPOSAL: City of Chanhassen requests Preliminary and final plat approval for Chanhassen Retail 2nd Addition to plat Outlots A and B. Ryan Companies is requesting preliminary and final plat approval for Chanhassen Retail 3rd Addition to plat Outlot B into Lots 1, 2, and 3, Block 1, as well as and site plan approval for Lot 1, Block 1 for a Perkins Restaurant and Lot 3, Block 1. for a Taco Bell Restaurant. LOCATION: Highway 5, Powers Boulevard, West 78th Street, and Target Lane APPLICANT: City of Chanhassen Ryan Companies of Minnesota 690 Coulter Drive 700 International Centre Chanhassen, MN 55317 900 Second Avenue South Minneapolis, MN 55402 PRESENT ZONING: Planned Unit Development PUD, BG ACREAGE: Current Outlot B: 4.62 ac Proposed Outlot B: 3.15 ac Perkins 1.37 ac Proposed Outlot A: 1.47 ac Taco Bell .84 ac Proposed Future Restaurant: 0.95 ac INTENSITY: 0.05 F.A.R., site coverage 68% ADJACENT ZONING AND LAND USE: N - General Business, BG, vacant, West 78th Street S - Highway 5 E - PUD, Target W - R12, ponding area, Powers Boulevard WATER AND SEWER: Available to the site PHYSICAL CHARACTER: The site is bordered by 3 major collectors, Hwy. 5, West 78th, and Powers Boulevard. 2000 LAND USE PLAN: Commercial '.'Psi' � I.. ' I ",: $I4' FWA F rjo � q 6 r� S PARK A Chanhassen Retail August 17, 199 Update 9/20/94 ' Page 2 PROPOSALS i MMARY I There are four ctions being considered with this proposal; two subdivisions and site plan approvals for a' ?erkins Restaurant and a Taco Bell Restaurant. The City will I platting Chanhassen Retail 2nd Addition. This subdivision is the replat of Chanhassen Ret it Addition Outlot B. Outlot B was created with the "Target" plat for future development. The city will be creating two outlots with the Chanhassen Retail 2nd Addition. Outlot A will be retained by the City for landscaping and gateway features. Outlot B will be sold t6 Ryan Companies. , Ryan Companies are proposing to plat Outlot B, as part of Chanhassen Retail 3rd Addition, into 3 lots for a Perkins, Taco Bell, and future restaurant. The Perkins on Lot 1, Block 1 is ' 1.37 acres and hicludes a 5,000 square foot building with 85 parking stalls and Taco Bell on Lot 3, Block 1 is 0.84 and includes a 1,800 square foot building with 34 parking stalls. Both sites are in for 911 t plan review concurrently with the subdivision review. ' The design of the Taco Bell is proposed to be double Roman concrete roof tiles. The color will be terra cotta. The building will be stucco, manor white and sandalwood beige trim. The roof is a mansards le. It is itched but flat on top. The height of the building is ' style. P P g g approximately 17 feet. The pitched roof '.element is 5 feet. The design of Perkins is stucco with a ceramic tile accent band. Columns are spaced 15 ' g P apart. The building is 17' 8" high with a 416 foot high standing seam side pitched roof ' element. Both designs arc consistent with the Highway 5 overlay district and the standards of the PUD. ' Staff is recommending preliminary and final plat approval for Chanhassen Retail Second Addition, preli 'nary and final plat approval for Chanhassen Retail Third Addition, and site ' plan approval for Lot 1, Block 1, Chanhassen Retail 3rd Addition (Perkins) and Lot 3, Block 1, Chanhassen Retail 3rd Addition, subject to the conditions contained in this staff report. BACKGROUND At the time of conceptual review for the Target PUD, Ryan Construction had proposed 3 alternatives for butlot B. Version IA of Outlot B included 4 buildings and 26,000 square feet. Outlot Version 1B included 5 buildings and 29,100 square feet of building. Oudot B Version 1C includes 6 buildings and 25,000 square feet. Numerous negotiations were held , between Ryan Companies and the city to review how Oudot B should be developed. The city always intended to have some form of gateway on the property. In addition the impervious .' Chanhassen Retail August 17, 1994 Update 9/20/94 ' Page 3 surface requirement was exceeded on the Target site and this would have to be balanced on ' the remaining portion of outlot. The city has decided to retain a larger portion of Outlot B and sell that portion that can be platted into three lots. Staff is pleased with the results considering where development of this parcel started. At one time there was under ' consideration six building sites on Outlot B. The three lots being proposed allows the city to landscape the perimeter of the development, lessen the intensity of development and meet the impervious surface requirements. ' The HRA has had Hoisin ton K 1 r g oeg a Group working to develop gateway treatments for three ' entrances areas in the city. The city council is currently reviewing some cost and maintenance considerations. When developed these plans will be reviewed by the Planning Commission. Since the approval of the PUD for Chanhassen Retail Center, the city has adopted the Highway 5 Overlay District. The standards of the overlay district include: 1. Parking and building orientation: The building setback needs to be 50 feet from Highway 5. Both sites meet this ' standard. The parking setback needs to be consistent with the overlay district which is a minimum of 20 feet. The site parking meets this requirement. 2. The architectural design is consistent with the overlay standards. Both buildings are stucco. The Taco Bell has a Roman barrel (tile) roof. The Perkins has a mansard style roof and standing seam siding. Staff's original concerns with roof top screening from the high point on Hwy. 5 to the roof of Perkins and from West 78th to the roof of Taco Bell have been allayed based on the cross section review provided. � 3. fl The materials and details of the buildings are consistent with the Hwy. 5 standards. The Taco Bell is proposed to be white with beige accents. The color of the Perkins building is unknown. Landscaping around the perimeter will be done by the city including the gateway. The interior landscaping needs to be revised per staff recommendations. SUBDIVISION Chanhassen Retail 2nd Addition The City will be platting Chanhassen Retail 2nd Addition. This subdivision is the replat of Outlot B, Chanhassen Retail Addition. Outlot B was created with the "Target" plat for future development. The city will be creating two outlots with the Chanhassen Retail 2nd r Chanhassen Rendl August 17, 199 Update 9/20/94 ' Page 4 Addition. Outl t A will be retained by the City for landscaping and gateway features. Outlot ' B will be sold tQ Ryan Companies. The platting of Outlot B establishes the development parameters for the site. Chanhassen Ret it 3rd Addition ' Ryan Companies is proposing to plat Outlot B, Chanhassen Retail 3rd Addition, into 3 lots for a Perkins, Taco Bell, and future restaurant. The Perkins on Lot 1, Block 1 is 1.37 acres ' and includes a 5,000 square foot building with 85 parking stalls and Taco Bell on Lot 3, Block 1 is 0.84 acres and includes a 1,800 square foot building with 34 parking stalls. Both sites are in for ite plan review concurrently with the subdivision review. The HRA is also , considering a gateway treatment on a portion of Outlot A, Chanhassen Retail Second Addition. I The grading plan dated September 6, 1994 indicates that the entire parcel is proposed to be ' graded. However, there is no information provided as to whether there will be excess material hauled ff the site and/or borrow material brought in if soil correction is needed. If ' there is excess material to leave the site, 'the developer shall indicate the quantity as such and define an appropriate haul route for approval. The plans do indicate locations for erosion control. A grav 1 construction entrance shall also be required at the site entrance. Site access ' shall be limited o Target Lane. A watershed permit will be required prior to commencing any site grading In terms of dr ' age design for the entire site, it appears that the drainage areas have changed ' to conform with the approved Target site plan. The original Target site plan indicated that the southerly half of Outlot B would drain via storm sewer to the Target pond while the ' northerly half o the site would drain northeasterly, eventually discharging into the new pond in the northwest quadrant of Trunk Highway 5 and County Road 17 (Powers Boulevard). The existing storm sewer systems for the! Target pond and the West 78th Street pond have , been sized consistent with the originally approved drainage plan for the Target site. The developers shall provide drainage calculations and a drainage sub -area district map verifying flow quantities and proper pipe capacities for the proposed internal storm sewer system which , will discharge into the existing Target site and West 78th Street systems. All storm sewer within the site i considered private and shall be maintained as such. A low point is proposed on Lot 2, Block 1 without storm drainage. The grades should be adjusted so it sheet drains off the site. With respect to the specific drainage from the Taco Bell site, the parking lot grade has been reconfigured to Jrain to the easterly lead lof the two storm sewer leads provided to this site J, Chanhassen Retail August 17, 1994 Update 9/20/94 ' Page 5 from West 78th Street. The westerly storm sewer lead provided is intended to serve the ' future restaurant site west of the proposed Taco Bell as shown. The Surface Water Management Plan (SWMP) would not apply with this plat since the ' Target site and the West 78th Street roadway improvements have provided the necessary downstream storm water treatment facilities. These parcels are being assessed for the West ' 78th Street improvements. UTELITIES ' Sanitary sewer and water is available to this overall development via existing public facilities. All proposed internal sewer and water service facilities associated with this development are ' considered private and shall be maintained as such. The developer shall denote on the utility plans which lines are private and which lines are public. The developer shall be responsible for all costs associated with protecting all existing public facilities including, but not limited ' to city sanitary sewer, water, phone cable and gas within the site as the proposed improvements are constructed. The developer should provide the city with a financial escrow of $5,000 to guarantee boulevard restoration and protection of the city's infrastructures. The ' financial guarantee shall be in the form of a letter of credit or cash escrow which would be released upon satisfactory completing site restoration. IEASEMENTS 1 The old West 78th Street right -of -way alignment runs through the northerly portion of this overall site. This right -of -way should be vacated in conjunction with this proposed development. However, in conjunction with this right -of -way vacation, utility easements will ' need to be obtained and /or maintained over the existing public utilities running through the site as follows: ' - A 30 -foot drainage and utility easement centered on the existing sanitary sewer alignment through the site. - The existing drainage and utility easement obtained with the underlying plat of the West Village Heights 2nd Addition shall be maintained in existence. - An additional 20 -foot wide drainage and utility easement shall be granted along the south line of the previously described West Village Heights 2nd Addition drainage and ' utility easement. C] Chanhassen Ret August 17, 199 Update 9/20/94 Page 6 From review of the site plan dated September 6, 1994, it is apparent that the proposed Taco Bell building would encroach upon the proposed 20 foot drainage and utility easement and the northwest building corner would be approximately five feet from an existing phone cable. If this is approved by the phone company, an encroachment agreement for this condition will need to be executed. This property is bordered by 3 major collectors; State Hwy. 5, County Road 17 (Powers Boulevard), and West 78th Street. West 78th Street has been realigned to the north as it approaches Powers Boulevard. All access to the site will be gained off of Target Lane. The site plan has been reconfigured to meet staff's recommendation to align with the existing curb cut. The comm n driveway aisles are proposed to be 25' feet wide. Staff recommends they be increased to , 6' feet face to face. Strgar, Roscoe, ausch has looked at the !traffic generation for this area and traffic issues. They have coml leted a future peak trip generation for the 78th and Powers area based on complete development of this area (both sides of west 78th) as commercial development. Even with total ievelopment the traffic as proposed will not exceed the design capacity. All internal stre 1. is within this development are considered private and shall be maintained as such. The main entrance to this development is approximately 250 feet south of the West 78th Street intersection. This access location was constructed as a part of the Target parking lot. Access to these lots shall be limited to the proposed common driveway from Target Lane. At the Planning Commission meeting, the commission requested staff and the applicant explore placement of a sidewalk through the sites to promote pedestrian traffic. Staff has recommended a meandering 5' wide concrete sidewalk along the easterly portion of Lots 1 and 3, Block 1. Subdivision 1. The subdivision is consistent with the zoning ordinance; The subdivision meets all the requirements of the PUD - BG, Unit Development - General Business District I- L 2. The proposed subdivision is consistent with all applicable city, county and regional I plans inc }uding but not limited to the city's comprehensive plan; •� Chanhassen Retail August 17, 1994 ' Update 9/20/94 Page 7 ' Finding: The proposed subdivision is consistent with applicable plans. 3. The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are suitable for the proposed development; ' Finding: The proposed site is suitable for development subject to the conditions specified in this report. ' 4. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by this chapter; Finding: The proposed subdivision is served by adequate urban infrastructure. 5. The proposed subdivision will not cause environmental damage; Finding: The proposed subdivision will not cause environmental damage subject to conditions if approved. 6. The proposed subdivision will not conflict with easements of record. ' Finding: The proposed subdivision will not conflict with existing easements, -� P P g ' but rather will expand and provide all necessary easements. 7. The proposed subdivision is not premature. A subdivision is premature if any of the ' following exists: a. Lack of adequate storm water drainage. b. Lack of adequate roads. C. Lack of adequate sanitary sewer systems. d. Lack of adequate off -site public improvements or support systems. Finding: The proposed subdivision is provided with adequate urban infrastructure. GENERAL SITE PLAN /ARCHITECTURE ' Ryan Companies are proposing to plat Outlot B, Chanhassen Retail 3rd Addition, into 3 lots for a Perkins, Taco Bell, and future restaurant. The Perkins on Lot 1, Block 1 is 1.37 acres and includes a 5,000 square foot building with 85 parking stalls and Taco Bell on Lot 3, Chanhassen Retail- August 17, 1994 Update 9/20/94 , Page 8 Block 1 is 0.84 acres and includes a 1,800 square foot building with 34 parking stalls. Both ' sites are in for i, ite plan review concurrently with the subdivision review. Perkins ' The applicant is proposing a 5,000 square foot Perkins Restaurant on Lot 1, Block 1, Chanhassen Retail Third Addition. The design of Perkins is stucco with a ceramic tile accent , band. Columns are spaced 15 apart. The building is 17' 8" high with a 411 foot high standing seam side pitched roof element. Window canopy awnings are provided on two sides of the building. An accent band runs above and below the ceramic tile accent panels and ' approximately 1/2 feet above grand around the entire building. Taco Bell The design of the Taco Bell is proposed to be double Roman concrete roof tiles. The color will be terra cotta. The building will be stucco, manor white and sandalwood beige trim. ' The roof is a mansard style. It is pitched but flat on top. The height of the building is approximately 1(7 feet. The pitched roof ,element is 5 feet. Arched elements are included at all entrances to he building. ' DEVELOPMENT STANDARDS The Following Development standards were approved with the first phase of the Chanhassen , Retail Center. These standards are to be used for the entire PUD or any additional phases. a. Intent ' The purpose of this zone is to create a PUD commercial/retail zone. The use of the , PUD zone is to allow for more flexible design standards while creating a higher quality and more sensitive proposal. All utilities are required to be placed undergro I and. Each lot proposed for development shall proceed through site plan ' review based on the development tandards outlined below. b. Permitted Uses , The pem 'tted uses in this zone should be limited to appropriate commercial and ' service u es consistent with the City's CBD development goals. The uses shall be limited to those as defined herein., If there is a question as to the whether or not a use meets thI definition, the City Council shall make that interpretation. I 1. D y Care Center Chanhassen Retail August 17, 1994 Update 9/20/94 Page 9 2. Standard Restaurants 3. Health and recreation clubs 4. Retail 5. Financial Institutions, including drive -in service 6. Newspaper and small printing offices 7. Veterinary Clinic 8. Animal Hospital 9. Offices 10. Health Care Facility 11. Garden Center (completely enclosed) 12. Bars and Taverns 13. Fast Food Restaurants (Maximum of 2) * Drive thru's should be buffered from all public views FINDING: The uses are permitted in the PUD district. c. Setbacks In the PUD standards, the building setback for commercial is 50 feet from any public right -of -way, parking along right -of -ways shall be set back 20 feet. Street Building Parking Setback Setback West 78th Target 55 feet 20 feet Outlot B 50 feet 20 feet Powers Boulevard 50 feet 20 feet Hwy. 5 Target 120 feet 20 feet Outlot B 50 feet 15 feet FINDING: The location of Perkins and Taco Bell meet these standards. 0 Chanhassen Rei August 17, 199 Update 9/20/94 Page 10 d. Develovmt USE Standards Tabulation Box Lot Area Bldgs Bldg Sq Ft Parking Coverage % Target 10.29 ac 1 117,165 585 76.3 Outlot B 2nd Add 4.62 ac. 0 0 0 0 Outlot A Landscaping 1.46 ac. 0 0 0 0 Perkins 1.37 ac. 1 5,000 85 Taco Bell 0.84 AC. 1 1,800 34 undeveloped 1 0.95 1 1 3,400 57 TOTAL 16.31 4 127,365 761 66 * Cumul five Lots 1, Z, and 3, Block 1 is ws percent impervious FINDING: Co plies with the development standards established as part of the PUD. e. Building The standE comp 1. 2. 3. 4. !j and Design :) requires that the development demonstrate a higher quality of architectural and site design. All mechanical equipment shall be screened with material e to the building. 1 materials shall be of high quality and durable. Masonry material shall be �d. Color shall be introduced through colored block or panels. Painted rfaces shall be allowed on the Target store only. ick may be used and must be approved to assure uniformity. , ock shall have a weathered face or be polished, fluted, or broken face. ►ncrete may be poured in place, tilt -up or pre -cast, and shall be finished in ►ne, textured or coated. -tal standing seam siding will not be approved except as support material to e of the above materials or curtain wall on office components. L ' Chanhassen Retail August 17, 1994 Update 9/20/94 ' Page 11 ' 6. All accessory structures shall be designed to be compatible with the primary structure. ' 7. All roof mounted equipment shall be screened by pitched roofs, except for the Target store shall have a parapet wall for screening. Wood screen fences are prohibited. Screening shall consist of compatible materials. ' 8. All outlots shall be designed with similar material and colors as Target. (Target will be the first store to build and they will establish or set the theme.) ' 9. All buildings on Oudot B shall have a pitched roof line. ' FINDING: The development meets the building materials and design criteria established as part of the PUD. The applicant has provided a cross section from Highway 5 and West 78th ' Street which shows that the pitched roof screens rooftop equipment from the roadways. Trash enclosures shall be architecturally compatible with and of the same materials as the principal structure. Trash enclosures shall also be vegetatively screened from all right -of -ways. L Site Landscaping and Screening ' In addition, to adhere to the higher quality of development as spelled out in the PUD zone, all loading areas shall be screened. Each lot for development shall submit a separate landscaping plan as a part of the site plan review process. ' 1. All opens aces and non-parking lot surfaces outlot shall be landscaped, or P P g ( ) P covered with plantings and/or lawn material. 2. Outdoor storage is prohibited. 3. The master landscape plan for the Target PUD shall be the design guide for all of the specific site landscape developments. Each lot must present a landscape plan for approval with the site plan review process. 5. Loading areas shall be screened from public right -of -ways. Wing wall may be ' required where deemed appropriate. 6. Outlot B shall be seeded and maintained in a weed free condition in all areas proposed for future development. Chanhassen Re�ail I. August 17, 1994 Update 9/20/94 ' Page 12 FINDING: The applicant has prepared a landscaping plan for the development. Such plan , exceeds the minimum landscaping requirement for tree quantities. However, to make the plan meet the higher PUD standards some minor revisions are necessary. The applicant shall revise the landscaping plan to replace the pin oak with red oak (Quercus rubra) and provide one bur oak (Quercus macrocarpa) in the landscape area on the south side of the site entrance. ' The applicant stall install an aeration /irrigation tubing, see figures 11 -2, if separate irrigation is provided, or 11 -3, if separate irrigation is not provided, attached, in each peninsular or ' island type landscape area less than 10 feet in width. g. Signage , One freestanding pole sign be permitted for Target and one for the other buildings in Outlot B. All buildings in Outlot! B should be limited to monument signs. ' 1. Each property shall be allowed one monument sign located near the driveway into the private site. Monument signage shall be subject to the monument ' standards in the sign ordinance. 2. all signs are permitted on no more that 2 street frontages. The total of all ' all mounted sign display areas shall not exceed fifteen (15) percent of the total area of the building wall upon which the signs are mounted. 3. All signs require a separate permit. , 4. The signage will have consistency throughout the development and shall tie the ' building materials to be consistent with the signs. This includes the eestanding wall and monument signs. Signs shall be an architecture feature, they shall not be solely mounted on a pole of a foundation. ' 5. consistency in signage shall relate to color, size, materials, and heights. ' FINDING: The applicant has met the intent of the PUD standards for the site. However, the applicant is permitted wall signs on only two walls per building up to a maximum of 15 ' percent of the �jall area. Taco Bell and Perkins elevations shall be revised to comply with this condition. In addition, only one pylon side is permitted for the three lots. Each parcel may have an individual monument sign on their lot. The applicant shall incorporate individual dimensioned letiers within the development. Monument and pylon signs shall be a minimum of 10 feet from the property line. .' Chanhassen Retail August 17, 1994 Update 9/20/94 Page 13 h. Lighting 1. All light fixtures shall be shielded pressure high sodium fixtures. Light level g P g for site lighting shall be no more than iiz candle at the property line. This does not apply to street lighting. ' 2. Glare, whether direct or reflected, as differentiated from general illumination shall not be visible beyond the limits of the site from which it originates. ' 3. Lights shall be on a photoelectric cell to turn them on and off automatically as activated by yearly conditions. I4. Light poles shall be Cortex, shoe box light standards. FINDING: The development complies with the lighting requirements established in the PUD. Lights shall incorporate photoelectric cells for automatic activation. PLANNING COMMISSION UPDATE ' The Planning Commission met on August 17, 1994 to hold the public hearing for Subdivision #94 -9 for Chanhassen Retail Center 2nd and 3rd Additions and voted for preliminary approval subject to staff conditions by a vote of 5 to 0. The Commission also held the public hearing ' for the site plan review of the Perkins and Taco Bell sites and voted for approval subject to staff conditions and additional conditions added by Commissioners by a vote of 3 for and 2 against. The 2 votes against approval were due to the fact that the required revisions to the ' site access would cause a change to the parking lot layout and traffic circulation that could not be evaluated at that time. The majority of the Planning Commission felt that staff would adequately address any revisions and that if significant changes were proposed, the issue would be brought back before the Planning Commission. 1 The applicant has revised their site plan to incorporate the southern access since the Planning Commission reviewed the plans. Chanhassen Re August 17, 199 Update 9/20/94 Page 14 Staff recoi conditions Subdivision s that the City Council adopt the following motions (revisions to the on staff review of the revised plan are in bold): of approval "The City Cou 'cil approves 92 -5 PUD for the preliminary and final plat for Chanhassen Retail 2nd Addition and Chanhassen Retail 3rd Addition as shown on the plans dated July 25, 1994 and subject to the following conditions: 1. 2. 3. 4. 5. r shall petition the City to vacate the old West 78th Street right -of -way which the overall site. The foil¢ wing easements shall be' dedicated on the final plat: A 30 -foot drainage and utility easement centered on the existing sanitary sewer alignment through the site. e existing drainage and utility easement obtained with the underlying plat of e West Village Heights 2nd Addition shall be maintained. These easements cover the City's existing watermain and one of the telephone cables. An additional 20 -foot wide drainage and utility easement shall be granted along e south line of the previously described West Village Heights 2nd Addition drainage and utility easement. It appe s that the northwest corner of the Taco Bell building would encroach into the propose 20 -foot drainage and utility easement and be approximately 5 -feet south of the existr►g buried phone cable. The developer shall obtain approval from the phone company for this condition and if obtained, a subsequent encroachment agreement shall be bxecuted for this condition. Provide a permanent landscape ,easement over the northern 8 feet of the eastern 170 feet of Lot 3, Block 1, Chanhassen Retail 3rd Addition. The dE $5,000 cash oper shall supply the city with a financial escrow in the amount of guarantee boulevard restoration and protection of the city's tures. The financial escrow shall be in the form of a letter of credit or ►w." Fil 7 L F-ill t Chanhassen Retail August 17, 1994 Update 9/20/94 Page 15 Site Plan Conditions of Approval "The City Council approves site plan #94-6 as shown on the plans dated September 6 , 1994 ' subject to the following conditions: 1. Developer shall be responsible for obtaining all necessary agency permits associated ' with the development of this site including but not limited to watershed district, PCA, MWCC, Health Department. ' 2. All proposed storm sewer and sanitary sewer and water services within the site are considered private and shall be maintained as such. The sizes and types of lines shall be labeled on the plans. 3. Developer shall submit to the City Engineer drainage calculations and a drainage map for the entire site showing areas and quantity of flow to the Target pond and to the 1 County Road 17 pond that are consistent with capacities of the existing storm sewer system. ' 4. Developer shall indicate any quantities of borrow material and/or material to be hauled off site including a proposed haul route. 5. Developer shall be responsible for all costs associated with protection of the existing public utility facilities within the overall site. Developer shall also differentiate on the final site plans which lines are public and which are private. 6. All internal streets and dries within the overall development are considered private ' and shall be maintained as such. The developer shall provide cross access easements for the use of the common driveways. 7. The developers shall enter into a site development contract with the City and provide the necessary financial security to guarantee compliance with the terms of approval. 8. Construction access to the parcel shall be from the existing Target driveway and not West 78th Street or Powers Boulevard. The applicant and/or contractor shall install and maintain a gravel construction entrance until the access driveway is paved with a bituminous surface. 9. Trash enclosures shall be architecturally compatible with and of the same materials as the principal structure. Trash enclosures shall also be vegetatively screened from all right -of -ways. Chanhassen Retail '. August 17, 1994 Update 9/20/94 Page 16 10. A Linde a, either greenspire or lttleleaf, shall be planted within the permanent landscape easement to replace the two ornamental trees being removed along ' West 78th Street. 11. The applicant shall revise the landscaping plan replacing the pin oak with red , oak (Qu rcus rubra) and providing one bur oak (Quercus macrocarpa) in the landscal a area on the south side of the site entrance. ' 12. The m peninsular 1 island width is 8 feet. One tree r each 250 u pe su ar andscape s d pe square feet minimum or fraction thereof of landscaping area. Each landscaping island must be a of 200 square feet and must contain at least one tree. The applicant shall install an aeration/irrigation tubing, see figures 11 -2, if separate irrigation is provided, or 11 -3, if separate irrigation is not provided, attached, in each peninsular i or island type landscape area less;'than 10 feet in width. 13. The applicant is permitted wall signs on only two walls per building up to a maximum , of 15 percent of the wall area. Taco Bell and Perkins elevations shall be revised to comply with this condition. Only one pylon side is permit for the three lots. Each parcel may have an individual monument sign on their lot. The applicant shall ' incorporate individual dimensioned letters within the development. Monument and pylon signs shall be a minimum of 10 feet from the property line. 14. Fire M shal recommendations: a A. additional fire hydrants will be required. Contact the Chanhassen Fire Marshal for exact locations. Relocate the fire hydrant from the perimeter landscape a ea north of Perkins to the landscape island east of Perkins. Add an additional hydrant on Lot 2, Block 1, north of the proposed future b. histall "No Parking Fire Lane" signs and paint curb yellow in designated fire lanes. Contact Chanhassen Fire Marshal for exact locations of signage and , curb painting. (See attached schematic.) C. Ate n f oo t clears ace must be maintained around fire hydrants, i.e. street r larnps, trees, shrubs, bushes, NSP, NW Bell, cable television transformer boxes. This is to ensure that fire hydrants can be quickly located and safely operated. Pursuant to Chanhassen City Ordinance Sec. 9 -1 15. The landscaping plan for Taco Bell, Perkins, and Lot 2, Block 1 shall be compatible , with the final landscaping plans that the City implements for Outlot A. 1 .1 1 L i LJ Chanhassen Retail August 17, 1994 Update 9/20/94 Page 17 16. Staff and the applicant will develop a pedestrian walkway system within the development and from West 78th Street. A 5' wide concrete sidewalk shall be provided along the eastern property line from West 78th Street to Outlot A. The sidewalk shall meander around the landscape being provided on site. The planting bed being displaced in the northeast corner of the site shall be improved to provide an entrance feature for the sidewalk. The final design shall be subject to staff review and approval. 17. The sign package must come back to the Planning Commission for approval. The applicant is permitted wall signs on only two walls per building up to a maximum of 15 percent of the wall area. Taco Bell and Perkins elevations shall be revised to comply with this condition. In addition, only one pylon side is permitted for the three lots. Each parcel may have an individual monument sign on their lot. The applicant shall incorporate individual dimensioned letters within the development. Monument and pylon signs shall be a minimum of 10 feet from the property line. 18. Either provide stormwater pass- through openings in the bottom of the Perkin's trash enclosure, reduce the size of the enclosure, or move the enclosure west to permit stormwater to flow unimpeded into the storm sewer /catch basin located in the corner of the parking area. 19. Increase common driveway aisle from 25 feet wide to 26 feet wide face to face and align the access onto Target Lane with the existing curb line in the Target parking lot." ATTACHMENTS 1. Development review application. 2. Target PUD agreement. 3. Memo from Bill Weckman, Carver County dated August 8, 1994. 4. Memo from Dave Hempel and Diane Desotelle dated August 10, 1994. 5. Notice of hearing and property owners. 6. Preliminary plat and site plan. 7. Planning Commission Minutes of 8/17/94. 8. Fire Signing Schematic 9. Figure 11 -2 10. Figure 11 -3 11. Tree Guide, from A Guide to Field Identification: Trees of North America, C. Frank Brockman, Western Publishing Company, Inc., 1986. 12. Reduction of original site plan. 13. Revised site plan dated September 6, 1994. CITY OF CHAHHASSEN r 690 COULTER DRIVE CHAN"ASSEN, MN 55317 (612) 937 -1900 DEVELOPMENT REVIEW APPLICATION APPLICANT: Rya Co anies of Minnesota OWNER: City of ChanhaGGPn ADDRESS: ADDRESS:6An Cnnitar nri�rc 900 Second Ave. S. Mi P . Box 147 �, r`Y,�� ;, a j _ _ � � % TELEPHONE (Daytime) 336-1200 TELEPHONE: 937-1900 ' es A list of all pro perty owners within 500 feet of the boundaries of the property must ' Included with t is application. Twenty -six full size folded copies of the plans must be submitted. SIR' X 11" Red iced copy of transparency for each plan sheet. ' • NOTE - When multipl applications are processed,,'i, a appropriate fee shall be charged for each application. '• Escrow will be required for other applications through the development contract Plan Amendment 11. of ROW/Easements 1. Comprehensive Permit Permit 12. _ Variance 13. Wetland Alteration Permit 2. Conditional Use 3. Grading/Excavation 14. Zoning Appeal 4. Interim Use Permit 5. Planned Unit Development 15. ____ Zoning Ordinance Amendment 6. Rezoning 16. X Preliminary and Final Plat " -1 7. Sign Permits 8. Sign Plan Review Notification Signs 9. X Site Plan Red iew '~� �� X Escrow for Filing Fees/Attomey Cost" _ $100- CUP /SP"AC/VAR/WAP $400 Minor SUB/Metes & Bounds 10. Subdivision TOTAL FEE $ A list of all pro perty owners within 500 feet of the boundaries of the property must ' Included with t is application. Twenty -six full size folded copies of the plans must be submitted. SIR' X 11" Red iced copy of transparency for each plan sheet. ' • NOTE - When multipl applications are processed,,'i, a appropriate fee shall be charged for each application. '• Escrow will be required for other applications through the development contract A 1 RCV B`' :R"AN COMPANIES + 7 -18 -94 ; 1 -137FM : 612 933 1150 3 4 MANEAPOLIS, MN. ;it 3, LOCATION Po-,,mr LEGAL DESCRIP7IQN s .� PRESENT ZONING PUD REQUESTED ZONING - PRESENT LAND USE DESIGNATION ' Vaffant W- REOUESTEdy LAND USE DESIGNA710N -W REASON FOR THIS REOUEST -thgk W-4- stancarcis in place on this parcel. ThW aR 1kation must bb doff ieti 1n luU and be VDow�rxten or Clearly printed and must ts8 aoCotYtpani8tf by a trnation and ptons ro Ifed by appkable City OrdinaftO prtyvlsbns. Befors filing IM 3pptioaltion, you should 10 your order �on,the Pl anning Depaptment to detanWne the S mllc ordinance sM prmdural MWiremants 111PP ,n* is to c &y thm I am matt golkatwn for the desrxibed o0on by the VV send that I am tsil+,pon,tlble for COt�Yin9 v tt alt City mquirQrnerds with r%gard to this request. Thi$ appticatiott $tnouid tm P=o"rod in my name U4 t aM th# patty whom the City should aontad regarding any matter 09ftainind to this Wpl��+. I have atttached a �Y of proof of owneethip (94hor copy of Ownefrs ovoicato Ceacste of Title. Abstract Of Trio or p+.nchase agreernartt }, of i am the authorized porson to make this apple Mbn and the tae owner has also MONO this roow*n- I will keep myteff infamwd of the deadlines for subtrAsion of material and the pWess of this $Pt cft. I further underetand that additional fees may be char�p+d for rY.tnsultlnp tees, feilalb1lfty tllvdi9$, ft vvittn estimate poor m any authorization to procsed with the ett.dy. This documents and irtfernMen I have st,lbrt W-!d are true and oorteat to the best of my knowledge. I also undwatdMd that altar the approval or granting of the peiYrnll, suds parmRs Shall be invalid unless they are rewtMd against the tree to tho ropony r hich tt�e atpprovsVpom t io granted within 18Q days with ttN Carver County Recorder's Ofti a aM the rig; Cu mad tb City Hall R400rd9. Signature Of iow atp Signature of Pee Owner Date AppftAon Arrived on Pee Paid _�� - -� ROSipt No• the atpplioant sFtvuld *OhUot stbif %r a copy 91 1h stets mport which Mll be 0#1121519 on t~dday prior to the meeting. If not contacted, a copy of the report will be mailed to IM apPIUM'a addnw- TOTAL P.03 Outlot B: Chanhassen Retail Narrative Document APPLICATION FOR APPROVALS OF PRELIMINARY PLAT AND SITE PLAN July 18,1994 Prepared for City -of,Chanhassen, Minnesota Developer: Ryan Construction 7W International Centre 900 Second Avenue South Minneapolis, MN 55402 (612)336 -1200 Prepared By: RLK Associates, Ltd. 922 Mainstreet Hopkins, MN 55343 (612)933 -0972 Outlot B: Chanhassen Retail Narrative for Preliminary Plat and Site Plan Approvals July 18, 1994 1 SUMMARY The site currently forms OUTLOT B of PUD #92 -5. This PUD includes the Target site and Outlot B. The proposal is for the replatting of Outlot B into four lots; three buildable lots and an outlot to remain under City control. The remaining outlot essentially surrounds the building lots along Hwy. 5, Powers Blvd., and West 78th St. Two of the 1 three building lots are proposed as sites for new restaurants. The third building lot is reserved for future development. ' This submittal package comprises the applications for preliminary plat and site plan approvals. SITE DESCRIPTION ' The site includes approximately 4.62 acres of undeveloped land surrounded on three sides by existing roads: Hwy. 5 on the south, West 78th St. on the north, and Powers Blvd. on the west. The Site Plan, supporting plans, and Preliminary Plat included in this submittal packet show the site location, site layout, and design details necessary for site plan approval. The respective areas of the proposed lots are as follows: Lot 1 (Perkins) 1.37 acres Lot 2 (future) 0.95 acres Lot 3 (Taco Bell) 0.84 acres ' Outlot B 1.46 acres TOTAL 4.62 acres DEVELOPMENT STANDARDS ' Intent The intent of the PUD is to promote high - quality commercial development. Specific guidelines and standards for the development of Outlot B are listed in the existing PUD. For example, all utilities are to be underground, building materials shall be high quality and durable masonry, and pitched roof lines are required on Outlot B. These and all other requirements of the PUD will be met by the proposed development. The future development on Lot 2 will be required to undergo individual site plan review when an appropriate restaurant is found for that lot. These and other intents and purposes of the PUD are met by the current proposal. 11 r! Outlot B: Chanhassen Retail page 2 Permitted Uses Uses rec mmended for and allowed in the PUD include standard restaurants and fast food restaurants. Not more than two fast food restaurants are to be permitted in Outlot B. The current proposal is for one fast food restaurant and one standard restaurant. The fast food restaura drive through will be buffered from public views as required. Uses included in the proposal are permitted in the PUD. i The foll6ving setbacks are required: Building Setback Parking Setback N est 78th St. 50 feet �20 feet Powers Blvd. 50 feet 20 feet Hwy. 5 50 feet 20 feet These setbacks will be met. The proposal falls within the PUD maximum for impervious of 70 %. The overall F.A.R. is a low 0,05. , Building Materials and Design All buildi g facades will include an assortment of rockface concrete block, Dryvit, and tinted glazing using colors which are cohesive with the existing Target building. The roof lines will be sloped in accordance with the City of Chanhassen requirements using either standing seam metal or asphaltic shingles. The Taco Bell building will use concrete tile Lot Area (acres) No. of Bidas. Bid -. Area (sf) . F.A.R Parking Stalls ImpenT. Surface Lot ] (Perkins) 1.37 l 5000 0.08 97 Lot 2 (futu e) 0.95 1 3100 0.08 57 Lot 3 (Tac¢ Bell) 0.81 1 1800 0A5 3- Outlot B 1.46 AM na na na TOTAL 4.62 3 10.200 0.05 188 68% The proposal falls within the PUD maximum for impervious of 70 %. The overall F.A.R. is a low 0,05. , Building Materials and Design All buildi g facades will include an assortment of rockface concrete block, Dryvit, and tinted glazing using colors which are cohesive with the existing Target building. The roof lines will be sloped in accordance with the City of Chanhassen requirements using either standing seam metal or asphaltic shingles. The Taco Bell building will use concrete tile Outlot B: Chanhassen Retail page 3 rather than asphaltic shingles. Details can be seen on the building elevation sheets included in this submittal packet. Landscaping and Screening A preliminary landscaping plan is part of this submittal packet. The plant materials specified are consistent with the quantity and type of materials currently existing within the Target parcel to the east. The landscape plan will unite these two parcels with a uniform plant material palette. ' Si nn e ' Each lot will have one monument sian. One freestanding pylon sign for all three lots is included in the proposal. These sins comply with the PUD signage requirements. All PUD and applicable sign ordinance requirements will be met. Refer to the site plan for ' signage locations. Refer to the building elevations for signage proposed on the individual buildings. Lighting A preliminary lighting plan is included as part of this submittal packet. Lighting intensity at the property lines will be 1/2 foot candle as required in the PUD. At locations where ' the property abuts with West 78th St. and Target Lane, the light levels will match the existing light level at the property line. ' STRF.F,TS AND ACCESS ' The site is surrounded by three major collectors: Hwy. 5, West 78th St., and Powers Blvd. Access to the site will be from Target Lane only. Traffic will access Target Lane from 78th St. No other access is proposed. Traffic lights exist at Target Lane/78th, Powers /78th, and Powers/Hwy. 5. The traffic J J J study prepared for the area by a City consultant was based on complete development of the area for commercial uses. Projected traffic would not exceed the design capacity of the roads. Pedestrian access to Powers Blvd. and downtown will be provided via a sidewalk located on the south side of West 78th St. Outlot B: Chanhassen Retail oas-ze 4 GRADING AND Dl:A1VAGE A preliminary grading plan is included in the submittal packet. The grading plan was designed with the site balancing foricut and fill. A final take off for quantities of earth to be moved is not yet known. Drainage will be southeast to the existing stormwater pond constructed for the Target store located on Outlot A. This pond was designed to handle and treat to NURP standards the runoff from the Outl &t B site as well as the Target site. The current p- Oposal ir:., rewire additional re.v eW by the Riley Purgatory Bluff Creek Watershed District. Zi T ILITrES F'relini� ldn' t' i' = +`y' fly ^nc err ' t i :,T il- -,', ,mittal paci:et. W ate" 2 ^d setter are a`rallabl- to ... the sites. o. re:Vcaiicn of the sewer line or water trunk line wiil be necessary, as conten:p'-n-ted in ea -tier reviews of this site. 1� fg i A z ■o■ I R. NEI TsN O • t z A J. -i 9 S a C WSC7 " °z YT I Y -r -- I' I � • c i a >t S B LVDi �_ � xpyn ,E / All a / z � I � C AX -JOCIcm= n • � I I( T I� 3� � a� � � � i�i��cgoN� �'� Z r :tzV'4 ' €xg&Rd YY 3 �jr II gg:O 3 / ;= =S I Z m $ _ 3 / r T // / ' - -w 017tVt• [ - tti�� fg i A z ■o■ I R. NEI TsN O • t z A J. -i 9 S a C WSC7 " °z YT I Y -r -- I' I � • c i a >t S B LVDi �_ � xpyn ,E / All a / z � I � I C AX -JOCIcm= n • � I I( T I� 3� � a� � � � i�i��cgoN� �'� Z r :tzV'4 ' €xg&Rd YY 3 �jr II gg:O 3 ;= =S I Z m $ _ 3 --4 r T I limllff�' loll SEE 19- m 0 z x Z 0 C X C) 0 z V) C) ---4 0 z A Dig pa V !g_4 s Z + rr' Be -4 Art POI$r go' ---------- 67- ------ CA v -74 1 7=7 C.) Jill IA a Rz I;A 77 cn m r7 Ito N Is lip P11,; it IFIllif I m U) 0 (A I 1 i i 1 1 � I 1 1 f J� w i� i a a• o z ■■■ I r i� .r [m y a r 'i 1 s x C rn fit + to {it' ►mod �` ��� �� ° :i X00000000000• . oy O 4 c � s � cz mmmimma y a r 'i 1 s x C rn fit + to {it' ►mod �` ��� �� ° :i X00000000000• . oy O 4 c � s � cz � e3r ;L l� I I b Z i 0-Up ! r s i � Rg � e3r ;L l� I I b Z i 0-Up ! r s i • w� re co wi ap the s wit Ag the : Bu aPF add I y E 4 rI y -!:to the . 5. Additional Approvals. Prior to development, the following tAgnal approvals are required. This list is not inclusive and does 'd 287 Soa<h kietAhr:I Raid, SUP -0 G.5 r11/09/�2 Shekapee. 6'Gn m'i 55� 612.�,�19 �� ��.�v05 •T NW d0 SHI 3�lIl Lb :2T 26, ZT A0W PLZIMD DNIT DEVELOPMENT AGU MENT 4M dated October 26 , 1992, by, between, and among the - t or 7oa BEEN, a Minnesota municipal; corporation (hereinafter' erred the "City"),-and DAYTON HUDSON CORPORATION# a Minnesota option, nd B.C. „JZMe1 BII$DICK and DRIGITTE DURDICK, husband and hereina ter collectively referred to as the "Developer "). ' �r Regn st for Approval., The Developer has asked the City to ' otp 'a pla :xhibit ned unit development for the land legally described or4 attached "A" ( "PUD.") . , 2. Conditions of ,Approval. The City hereby grants PUD approval ett'to the conditions set forth in-this Agreement. ' 3. Dovo opmeat Plans. The PUD shall be developed in accordance to this , the following plans. The plans shall not be attached e*ent. If the plans vary from the written terms of this Agreeme*, ' vtitten terms t shall control. The plans lans are: A. Conditions listed in Staff report dated — Seotemb r 2% 1992, attached hereto as Exhibit "B ". B. Site plan dated November 4. • 1992, prepared by RLi ' Associates Ltd. C. Landscape plan dated November 6 , 1992, prepared.by PJZ Associates Ltd. ' D. Plat of Chanhassen Retail Addition. 4. Zoni q. Except as modified by this Agreement, BG, GenerAl n4ss District zoning, a. *ay be amended from time to time, shall I y -!:to the . 5. Additional Approvals. Prior to development, the following tAgnal approvals are required. This list is not inclusive and does 'd 287 Soa<h kietAhr:I Raid, SUP -0 G.5 r11/09/�2 Shekapee. 6'Gn m'i 55� 612.�,�19 �� ��.�v05 •T NW d0 SHI 3�lIl Lb :2T 26, ZT A0W not exempt the Developer from any -other requirements imposed by statutes, rules, or ordinances. Required approvals include: A. PUD requirements in the City's zoning ordinance. B. Preliminary and final plat approval for Outlot B, Chanhassen Retail Addition. C. Site plan approval for each lot, except Lot 1, Block 1, Chanhassen Retail Addition which has been approved. 6. Allowed Uses. The following uses are permitted within the PUD: r� * Day Care Center * Standard Restaurants ' * Retail * Financial Institutions, including Drive -in Service * Newspaper and Small Printing Offices ' * Veterinary Clinic * Offices * Health Care Facility ' * Garden Center (completely enclosed) * Bars and Taverns, if not more than 40% of gross revenue is derived from the sale of intoxicating liquor * Fast Food Restaurants on Outlot B, Chanhassen Retail Addition (a maximum of two) Except as provided above, all other permitted, conditional, and interim uses are prohibited. ' 7. Building Materials and Design. All buildings within the PUD ' shall conform to the following requirements: A. All materials shall be of high quality and durable. Masonry material shall be used. Color shall be introduced through brick or colored block or panels. Painted surfaces shall be allowed only on Lot 1, Block 1, Chanhassen Retail Addition. ' B. Block shall have a weathered face or be polished, fluted, or broken face. C. Concrete may be poured in place, tilt -up or pre -cast, and shall be finished in stone, textured, or coated. D. Metal standing seam siding may only be used as support material to one of the above materials, curtain wall on office components, or as a roofing material. ' 626 2 rii/09/92 r� E. F. G. H. 8. Land conform to th A. B. C. D. E. F. G. 626 All accessory structures shall be designed to be compatible with';,the primary structure. All ground mounted equipment, trash storage, etc. must be fully screened by compatible masonry walls. All roof mounted equipment shall be screened by pitched roofs, except for Lot 1, Block 1, Chanhassen Retail Addition,'shall have a parapet wall for screening. Wood screen fences are prohibited. Screening shall consist of compatible materials. All outlots shall be designed with similar material and colors as the building on Lot 1, Block 1, Chanhassen Retail Addition. r All buildings on Outlot B, Chanhassen Retail Addition, shall have a pitched roof line and use architectural themes consistent with each other, the building on Lot 1, Block 1, Chanhassen Retail Addition, and representative of the Chanhassen CBD. :aping and screening. Development within the PUD shall following requirements: Each lot within the PUD must have a landscaping plan approved by the City as.part of the site plan review process. All open spaces 'and non - parking lot surfaces shall be landscaped, or covered with plantings and /or lawn material. Outdoor storage is prohibited. The master landscape plan for Lot 1, Block 1, Chanhassen Retail Addition, shall be the design guide for all of the specific site landscape developments. Each lot must present a landscape plan for approval with the site plan review process. Loading areas shall be screened from public right -of -ways. Wing wall may be required where deemed appropriate. Outlot B, Chanhassen Retail Addition, shall be seeded and maintained in a weed free condition in all areas proposed for future development. Tree preservation areas shall be clearly staked and marked by snow fence. Prior to the start of grading, City staff may require minor revisions to grading including the potential use of retaining walls, if it appears that tree preservation will benefit. Protected trees lost due to development activity shall be 3 rli/o9/92 77 1 1 1 replaced on a caliper inchsbasis in accordance with plans approved by City staff. 9. Signage. Exterior signage in the PUD is limited to the following: A. Lot 1, Block 1, and Outlot B, Chanhassen Retail Addition, are each allowed one pylon sign. ' B. Each lot shall be allowed one monument sign located near the driveway into the lot. Monument.signage shall be subject to the monument standards in the sign ' ordinance. C. Wall signs are permitted on no more than two (2) street frontages. The total of all wall mounted sign display ' areas shall not exceed fifteen percent (15 %) of the total area of the building wall upon which the signs are mounted. ' D. The signage must have consistency throughout the PUD and shall tie the building materials to be consistent with the signs. This includes freestanding wall and ' monument signs. Signs shall be an architecture feature, they shall not be solely mounted on a pole of a foundation. E. Consistency in signage shall relate to color, size, materials, and heights. F. Sign permits from the City are required for each sign. G. Temporary signs are allowed if consistent with the City sign code. 10. Lighting. The following exterior lighting standards in the PUD shall apply: ' A. All light fixtures shall be shielded high pressure sodium shoe box fixtures. Light level for site lighting shall be no more than 1/2 candle at the property line. This does not apply to street lighting. B. Glare, whether direct or reflected, as differentiated from general illumination shall not be visible beyond the limits of the site from which it originates. C. Lights shall be on a photoelectric cell to turn them on ' and off automatically as activated by yearly conditions. D. Light poles shall use shoe box light standards. 626 4 =11/09/92 11. special Provisions. PUD development shall also comply with the following special provisions: A. All buildings on'outlot B, Chanhassen Retail Addition, i shall have a pitched roof. B. The City may require a revised concept plan for Outlot B, Chanhassen Retail Addition, depending upon the alignment for West 78th Street. not ' C. The impervious surface for the entire PUD shall exceed seventy percent (70 %). All site plans and development shall be consistent with this requirement. , 12. Representations by Developer. The Developer represents to the City that the PUD and its development will comply with all city, ' county, metropolitan, state, and federal laws and regulations, including but not limited to: subdivision ordinances, zoning ' ordinances, environmental regulations, the Federal Clean Water Act, ' and the applicable Minnesota statutes and regulations regulating wetlands. If the City determines that the PUD does not comply, the ' City may, at its option, refuse to allow construction or development work in the PUD until the Developer does comply. Upon the City's demand, the D veloper shall cease work until there is compliance. 13. Changes in Official Controls. Unless the Developer has ' materially breached the terms of this PUD permit, for two (2) years from the date of this Agreement, no amendments to the City's ent Comprehensive Plan, except an amendment placing the PUD in the current ' metropolitan urban service area, or official controls shall apply to or affect the use, development density, lot size, lot layout or dedications oE the approved PUD unless required by state or federal law or agreed to in writing b the City and the Developer. Thereafter, , notwithstanding anything in-this Contract to the contrary, to the full extent-permitted by state law the City may require compliance with any rl 09/92 i 5 / 626 A amendments to the City's Comprehensive Plan, official controls, platting or dedication requirements enacted after the date of this Agreement. 14. Responsibility for Costs. ' A. The Developer shall hold the City and its officers, employees, and agents harmless from claims made by itself and third parties for damages sustained or costs incurred resulting from PUD tapproval and development. The Developer shall indemnify the City and its officers, employees, and agents for all costs, damages, or ' expenses which the City may pay or incur in consequence of such claims, including attorneys' fees. ' B. The Developer shall reimburse the City for costs incurred ' in the enforcement of this Agreement, including reasonable engineering and reasonable attorneys' fees if the City prevails. ' C. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under this Agreement within ' forty -five (45) days after receipt. If the bills are not paid on time, the City may halt PUD development and construction until the bills are paid in full. Bills not paid within forty -five (45) days shall accrue ' interest at the rate of eight percent (8 %) per year. 7 u I( SEAL) J 1 626 CITY OF- CHANHASSEN Donald J.-Chmiel, Mayor BY: A/ 0 � Don i�shworth!City Manager 6 r11/09/92 PUBLIC WORKS DEPARTMENT (612) 361 -1010 FAX (612) 361 -1025 COUNTY OF CAQVEQ August 9, 1994 TO: Robert Generous, Planner II FROM: Bill Weckman, Assistant County Engineer SUBJ: hanhassen Retail Center - Taco Bell Planning Case: 94 -9 SUB and 94 -6 SPR We have revil Chanhassen Blvd). The 1 development The develope be permitted. Thank you for red the information submitted by your memo dated July 20, 1994 for the 1 ;tail Center proposal located north of TH5 and east of CSAH 17 (Powers oposed development ;will not impact the County Road system. The 1 xurring as part of this proposal does abut the County Road right of way. should be advised that no direct access to CSAH 17 (Powers Blvd) will ' :he opportunity to review this proposal. ' Affirmative Action /Equal Opportunity Employer Printed on Recycled Paper Contains Minimum 10% Post Consumer Waste CARVER COUNTY COURTHOUSE 600 EAST 4TH STREET, BOX 6 CHASKA MINNESOTA 55318 Cp 1 1 1 1 red the information submitted by your memo dated July 20, 1994 for the 1 ;tail Center proposal located north of TH5 and east of CSAH 17 (Powers oposed development ;will not impact the County Road system. The 1 xurring as part of this proposal does abut the County Road right of way. should be advised that no direct access to CSAH 17 (Powers Blvd) will ' :he opportunity to review this proposal. ' Affirmative Action /Equal Opportunity Employer Printed on Recycled Paper Contains Minimum 10% Post Consumer Waste i [l IMEMORANDUM 1 CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 10 FAX (612) 937 -5739 TO: Bob Generous, Planner II FROM: Dave Hempel, Assistant City Engineer Diane Desotelle, Water Resources Coordinator DATE: August 10, 1994 SUBJ: Site Plan Review and Preliminary Plat to Replat Outlot B of the Chanhassen Retail Center (Target Site) - Land�pse Review File No. 94 -9 GRADING/DRAINAGE The grading plan dated July 18, 1994 indicates that t However, there is no information provided.as to whetl the site and /or borrow material brought iqA soil corre to leave the site, the developer shall indicate the quani route for approval. The plans also dog riot indicate lc r :; permit will be required prior to commencing any site entire parcel is proposed to be graded. there will be excess material hauled off in is needed. If there is excess material !as such and define an appropriate haul imis for erosion control. A watershed In terms of drainage design ,for the entire site, it appears thale drainage subdistrict areas have changed from that which„was shown with the approved Targetlite plan. The original Target site plan indicated that the. southolly11alf Cf ! tiat_A ` traatn storm sewer to the Target pond while the northerly. half +of the ate would drain northeasterly, eventually discharging into the new pond in the northwest .quadrant of Trunk Highway 5 and County °woad Yl" (Powers Boulevard). The existing storm sewerwsystems for the Target pond and the West 78th Street pond have been sized consistent with the origina ly``vppr� drama c plan for �e'Tft& site. The developers shall provide drainage calculations and a drainage s^ y area district map verifying flow quantities and proper pipe capacities for the proposed mteinal storm sewer system which will discharge into the existing Target site and West 78th Streatystems. All storm sewer within the site is considered private and shall be maintained as such. With respect to the specific drainage from the Taco Bell site, the parking lot shall be reconfigured to drain to the easterly lead of the two storm sewer leads provided to this site from I Bob Generous August 10, 1994 Page 2 ' West 78th Street. The westerly storm' sewer lead provided is intended to serve the future restaurant site ,vest of the proposed Taco Bell. The Surface W6er Management Plan (SWMP) would not apply with this plat since the Target , site and the West 78th Street roadway improvements have provided the necessary downstream storm water tr atment facilities. These! parcels are being assessed for the West 78th Street improvements. , STREETS ' All internal streets within this development are considered private and shall be maintained as such. The main entrance to this development is approximately 150 feet south of the West 78th Street intersects Dn. In fact, this access location was constructed as a part of the Target parking lot! The previo access to the Target sly approved Target site plan showed the access to this outlot lining up with the parking lot which is approximately 250 feet south of the West 78th Street ' intersection. The currently proposed main access to the development is too close to West 78th Street and presents difficulties for customers egressing the site during busy times of the day. This primary access should be moved south as previously approved. In addition, access to the ' Taco Bell site aid Perkins parking lot are'iproposed to be approximately 50 feet east of the Target Lane. This woi ild likely present a problem with vehicles egressing from the Taco Bell site. The developer should consider limiting access out to only the drive - through traffic at this easterly ' access; howeve , relocating the main entrance to the site farther south may eliminate this Taco Bell access issue. I UTILITIES I Sanitary sewer water is available to this overall development via existing public facilities. All proposed internal sewer and water service facilities associated with this development area ' considered private and shall be maintained as such. The developer shall denote on the utility plans which lin s are private and which lines are public. The developer shall be responsible for all costs associated with protecting all existing public facilities including, but not limited to, city sanitary sewer, water, phone cable and gas within the site as the proposed improvements are constructed. EASEMENTS The old West 7 lth Street right-of-way alignment runs through the northerly portion of this overall site. This rig t -of -way should be vacated in conjunction with this proposed development. Bob Generous August 10, 1994 Page 3 However, in conjunction with this right -of -way vacation, utility easements will need to be obtained and/or maintained over the existing public utilities running through the site as follows: A 30 -foot drainage and utility easement centered on the existing sanitary sewer alignment ' through the site. - The existing drainage and utility easement obtained with the underlying plat of the West Village Heights 2nd Addition shall be maintained in existence. - An additional 20 -foot wide drainage and utility easement shall be granted along the south line of the previously described West Village Heights 2nd Addition drainage and utility easement. From review of the site plan dated July 18, 1994, it is apparent that the proposed Taco Bell building would encroach upon the proposed 20 foot drainage and utility easement and the ' northwest building corner would be approximately five feet from an existing phone cable. If this is approved by the phone company, an encroachment agreement for this condition will need to be executed. Target Lane is currently platted as public right -of -way. It may be more appropriate to vacate this 250 -foot segment and have cross - access easements between the Target site and the development of Outlot B. RECOMMENDED CONDITIONS OF APPROVAL FOR SITE PLAN 1. Developer shall be responsible for obtaining all necessary agency permits associated with ' the development of this site including but not limited to watershed district, PCA, MWCC, Health Department. ' 2. All proposed storm sewer and sanitary sewer and water services within the site are considered private and shall be maintained as such. 3. Developer shall submit to the City Engineer drainage calculations and a drainage map for the entire site showing areas and quantity of flow to the Target pond and to the County ' Road 17 pond that are consistent with capacities of the existing storm sewer system. 4. Stormwater drainage from the Taco Bell site to the West 78th Street storm sewer shall be directed into the easterly storm sewer lead from West 78th Street immediately north of the parking lot. Bob Generous August 10, 199 Page 4 5. Developer shall indicate any quantities of borrow material and/or material to be hauled off site including a proposed haul route. 6. The applicant shall develop an erosion control plan in accordance to the City's Best Management Practice Handbook and the Surface Water Management Plan requirements for development. 7. Developer shall be responsible for all costs associated with protection of the existing public utility facilities within the overall site. Developer shall also differentiate on the final site plans which lines are public and which are private. 8. All rote al streets and drives within the overall development are considered private and shall be maintained as such. The, main entrance to the site shall be located farther south to align with the existing curb cut across from the entrance to the Target parking lot. 9. Fire hydrants shall be incorporated as per the Fire Marshal's recommendation. 10. The developers shall enter into a site development contract with the City and provide the necessary financial security to guarantee compliance with the terms of approval. 11. Construction access to the parcel shall be from the existing Target driveway and not West 78th Street or Powers Boulevard. The applicant and/or contractor shall install and maintain�}} a gravel construction entrance until the access driveway is paved with a bitumindus surface. 1. Developer shall petition the City to vacate the old West 78th Street right -of -way which traverses the overall site. 2. The follpwing easements shall ba dedicated on the final plat. 30 -foot drainage and utility easement centered on the existing sanitary sewer ' ailignment through the site: The existing drainage and utility easement obtained with the underlying plat of the , West Village Heights 2nd Addition shall be maintained. These easements cover the City's existing watermain and one of the telephone cables. I � I � Bob Generous August 10, 1994 Page 5 An additional 20 -foot wide drainage and utility easement shall be granted along the south line of the previously described West Village Heights 2nd Addition drainage and utility easement. 3. It appears that the northwest corner of the Taco Bell building would encroach into the proposed 20 -foot drainage and utility easement and be approximately 5 -feet south of the existing buried phone cable. The developer shall obtain approval from the phone company for this condition and if obtained, a subsequent encroachment agreement shall be executed for this condition. ems gAeng\charles\m em os\outloth.spr C NOTICE OF PUBLIC HEARING PLANNING COMMISSION MEETING Wednesday, AUGUST'.17, 1994 at 7:30 p.m. City Hall Council Chambers 690 Coulter Drive Proje t: Chan Retail 2nd and 3rd Perkins and Taco Bell Restaurants Ryan Companies and RLK Associates ion: Comer of Hwy. 5, Powers Blvd. and West 78th Street Notice: You are invited to attend a public hearing about a development proposed in your area. The applicant is proposing preliminary plat and final plat for Chanhassen Retail 2nd , Additi n creating 2 outlots and Chanhassen Retail 3rd Addition platting Outlot B into 3 lots and one o tlot, site plan review of a 5,000 square foot building for Perkins Restaurant, a site plan review for a 1,800 square foot building for Taco Bell, located on the corner of Hwy. 5, Powers ' Blvd. and West 78th Street, Chanhassen Retail Center (Target site), Ryan Companies and RLK What Happens at the Meeting: The purpose of this public hearing is to inform you ' about the developer's request and to obtain input from the neighborhood about this project. During the meeting, the Commission Chair will lead the public hearing through the following steps: , 1. Staff will give an over view of the proposed project. , 2. The Developer will, present plans on the project. 3. Comments are received from the public. 4. Public hearing is closed and the Commission discusses project. The Commission will then make a recommendation to the City Council. Questions or Comments: If you want to see the plans before the meeting, please'stop by City Hall during office hours, 8:00 a.m to 4:30 p.m., Monday through Friday. If you wish , to talk to someone about this project, please contact Bob at 937 -1900 ext. 141. If you choose to sub 't written comments, it is helpful to have one copy to the department in advance of the meeting. Staff will provide copies to the Commission. The P of this public hearing has been published in the Chanhassen Villager on August 3, 1994. irk and Recreation Commissi& will review this item on 1 Tuesday, August 9, 1994 at 7:30 poir ;man R. Johnson Const. 8984 Zachary Lane Maple Grove, MN 55369 -0028 Vankar P. O. Box 27300 I*w Hope, MN 55427 Wayton Hudson Corp. T -862 operty Tax Dept. 777 Nicollet Mall rinneapolis, MN 55402 Roberts Automatic Products 880 Lake Drive Chanhassen; MN 55317: T. F. James Company Suite 500 6640 Shady Oak Road Eden Prairie, MN 55344 Lutheran Church of Living Christ Box 340 Chanhassen, MN 55317 Beddor Enterprises/E. J. Carlson 6950 Galpin Road Excelsior, MN 55331 Planning Commission Meeting - August 17, 1994 Scott: Okay, thok you all for coming. PRELIMINARIY PLAT ADDITION C EATINI PLATTING O TLOT OF A 5,000 S IUARE F PLAN REVIEW FOR LOCATED O THE C WEST 78TH STREET, COMPANIES XND RL Public Present: Danny Chadwicl Tom Palmquist Daryl Kighton John Dietrich Marc Kruger Maleah Miller Bob Generous i Mancino: Now Generous: No, Memphis, TN Ryan Companies, Mpls. Ryan Companies, Mpls. RLK Associates, 922 Mainstreet, Hopkins 4700 IDS Center, Mpls. DJR, 1121 E. Franklin, Mpls. sented the staff report on this item. b, these are brick. This Taco Bell is brick? v'll be stucco. Mancino: Okay. So it will be different than this? Generous: Yes. The tile on the roof will be the same. The stucco is sort of a tannish. It's something the applicant has some better photos ... to show that. The color band, the canopies will be the same. The signage will be the same. They're actually using two tones and the rest of the development-so they'll have the arches will be an accent band and then they have the other colors on the rest of the stucco. Mancino: And is the band around it the corporate colors? Scott: It looks l it, yeah. 38 I� Planning Commission Meeting - August 17, 1994 Generous: ...I don't know if it's a registered trademark. 1 Mancino: Does this take—at all with the Highway 5 design guidelines about using corporate identity colors as an architectural element? ' Scott: Or brick. ' Aanenson: I'm not sure. We'll get back on that. As far as the materials, we did look at that—The brick that you see on the photos there, we have met... Again, this is a PUD so we're trying to make this part relate, not to the Byerly's but more to the Target PUD so we're trying to blend. We're trying to pick up elements of the same. You have this green ... which is also an element on the Target so we're trying to pick up all those things. 1 Mancino: Okay. But I know that we had concern on the Highway 5 Task Force on the design committee task force, part of that about on Highway 5, that commercial property and the design and architecture of their buildings have to be comprised of...corporate colors so I would like to look into that. Ledvina: Colors though? Mancino: Well some of them have like ... big bands that actually have a great deal to do with the architecture. That becomes a design element in the architecture and that we were concerned about that. So I just wanted to make sure that this did not fall into that. Ledvina: Well they have tile bands. You know bands of tile around ... Does that represent a negative thing? Mancino: I think we felt that if it became a major part of the architecture it could. So I just want to check it. I'm not saying no but I just would like to have staff review that and make sure. Scott: Any other questions for staff? Would the applicant like to make a presentation? If yes, please give us your name and your address. Tom Palmquist: My name is Tom Palmquist. I'm with Ryan Companies. Mr. Chairman, members of the commission. Staff members. We are in concurrence with all the items of the staff report and the items of staff that you have had this evening. Yes, we do acknowledge that we do have an access issue as it relates to the site plan. However, we've met with Charles Folch on numerous occasions and we've been unable to resolve the issue prior to this meeting. We are confident that we can resolve the issue to the satisfaction of staff and I 39 Planning Comrriission Meeting - August '17, 1994 guess we pledga to continue to work diligently with staff... agreement with the city. Redevelopment iere on the same side. Ii guess we respectfully request that the commission recommend pre] 'minary approval of the platting for the Chanhassen Retail 3rd Addition as well as the site )Ian approval for the Perkins Restaurant and Taco Bell subject to the conditions of th staff report and the...conversations which we intend to have with staff to satisfactorily reTolve those issues. Scott: Any que�tions or comments for the applicant? No? Good. Thank you very much. Tom Palmquist: I We do have a perspective from, that does show the view of the site from a location on Powers Boulevard just south ;of Highway 5... Scott: Powers last with Target in the middle. So it's kind of It's Highway 5 on the right and then there's Target's pylon sign. John Dietrich: Highway 5 is down. You're approximately halfway, maybe if you can. Scott: There's the West 78th Street alignment and it bends to the north. Mancino: Where is West 78th? Scott: West 78th Street. Mancino: It to s like... Scott: Well this, is distorted. You see it looking straight down 78th. John Dietrich: No, we have Taco Bell on the left. Perkins on the right. So that would be approximately at the elevation if you were along Powers Boulevard. We've anticipated some landscape treatment would be occurring within the gateway elements yet to be defined. We're interested and to continue working with the city on the development of that but we anticipate with a gateway and the greenery, that that will be ... element. And the third restaurant addedl would be back up in this area here and that has yet to be defined as a. Mancino: So John Dietrich: again, that wo Tom Palmquist: at's open space there behind the trees will be a restaurant? es. The site plans do identify... where that third restaurant would go but require site plan approval and go through the process until... If I might correct one item on that third outlot. The contract for private f P, it 40 1 n Planning Commission Meeting - August 17, 1994 redevelopment that we have executed with the HRA provides that it could be something other than a restaurant. It could be a... ' Mancino: I have one question from the staff report. The drive thru should be buffered from all public views. Where's the drive thru and how is that being addressed? ' John Dietrich: In terms of the drive thru, the drive thru with Taco Bell facin g West 78th Street is on the south side of the building and you would access it either into the lots or coming back up and around and then progressing out. So the buffer area or green space between the drive thru and this central entry drive would be green and these trees that are identified as ornamental would be going to canopy trees according to the staff report. That any trees we put in here should be, have like a canopy of tree versus an ornamental. The intent is that this green space and the trees would be the buffering to the Highway 5 to the south. Mancino: It says from all public views. How is that buffered from Powers? John Dietrich: From Powers we have a row of shrubs that are coming within this band space here and ... future building structure. We only have to go within this area. There are utility lines and watermain, sanitary sewer and buried telephone cables that these sites have been worked around so that those utility trunk line utilities do not have to be relocated so the building location's pretty well set. Mancino: So you will have a buffer on that side? John Dietrich: Yes. Mancino: Would you go over the traffic flow? I mean like where are the stop points going ' to be into that drive thru on Taco Bell. If you're coming in one, from the south side or the north side coming around. How do the two come together to go through the drive thru? Are there stop signs? How does that work? ' John Dietrich: The intent would be as traffic would come in. Aanenson: Let me just make a clarification before you respond. That's, there's an issue there that that's.. just so they don't misunderstand that. That's where the issue lies is the ' access to Target is further to the south and that was designed as a T access to service this property and that is an issue that we think we can work out internally. Staff and the applicant. But it's the engineering department's feeling that that entrance is too close to West 78th and needs to be moved. 41 Planning Commission Meeting - August 117, 1994 Mancino: For Aanenson: Ex tly. Where it was originally shown, which cuts into the Perkins site ... they have a concern ut we think we can work that out. Just so you're not misled when they show you that t ecause... Scott: How wo ld you propose to gain access to the third parcel? That is as an outlot. How would that happen? Is that just drive straight through and in or? John Dietrich: At this time, yes. It would be driving straight through and then we would anticipate some type of circulation into the center. Aanenson: Typically it'd be a common drive with cross access agreements is what we would require. All p cels have easements across each other... Scott: Okay, Mancino: Can you go ahead with the internal? John Dietrich: Certainly. The intent would be to allow the traffic flow to come in from the Target lane and access the two sites. In terms of exiting the site, the drive thru would be coming through on the south side and we would anticipate a stop sign so that the traffic flows through the par ling lot and would be able to move out and they would be just yielding. Mancino: But Ou have two lanes that go into the drive thru, right? John Dietrich: I would like to have Maleah Miller, who represents Taco Bell to respond to the number of lanes. Maleah Miller: Good evening Planning Commission. My name is Maleah Miller and I represent Taco Bell tonight. Typically we only have one lane going through our drive thru. Mancino: Maleah Miller: it's 12 feet wi( window at this Mancino: I'm 's two coming into it. We have the one. One is coming in. Entering into the drive thru lane and and it wraps around the', south side of the building. This is our pick up Dint. They pick up their food and then they continue on and can exit out. )rry, I'm not being very clear. 42 t Planning Commission Meeting - August 17, 1994 John Dietrich: I think I see your point now. In terms of you have the opportunity to access coming from the west side and also an opportunity to access coming from the east side. Mancino: Okay. So how do those two merge into one lane that oes through the drive thru g g and how do they ... is my question. John Dietrich: In terms of the traffic coming through, since this would be on the right hand side, we would anticipate any traffic coming through this way would have the right -of -way. ' Perhaps we need a sign that would say yield to traffic coming through. ■ Maleah Miller: There is quite a few stacks coming back to this point. Now in your drawing it has 7? ■ John Dietrich: I believe 7. Maleah Miller: 7 stacks. Mancino: Can a car with a ... on the back get through there. Can I get your opinion? I've never seen a drive thru having. ■ Hempel: The turning movement from that direction, the outside, may be somewhat tight for a vehicle... opportunity to go the other way to more easily negotiate that turn. ■ Aanenson: I guess my understanding is it was always cued to go the other way. I mean if you come in, you would go into the restaurant. You would exit that way, not through the ■ drive thru ... so in other words you can't go towards West 78th. We'd only be exiting on there. ■ Mancino: How does the applicant feel about that? Just limiting it to access through the drive thru one way? ■ Maleah Miller: We would probably just put our signs for the drive thru at this point hoping they'll, encourage the people to come through. I think it's very important for the whole circulation of the site that people, once they enter in here, they can exit out ... so there's still the circulation of the site that people once they enter in here, they can exit out so there's still the circulation. Mancino: So there'd be a one way sign. ■ Scott: Could make it one way? fl 43 Planning Meeting - August 17, 1994 Maleah Miller: lYes. So we'll put the sign here saying drive through this way so a majority of the people will know to come in this way. This movement is hard to make... Scott: See a sign for one way, do not enter. Mancino: Yeah,, or something. Maleah Miller: Or even this, when they get to that point, just drive thru with arrows that way. So people know to get to the drive thru when they first enter the site, it is coming in and going towards... encourage them to go this way. Tell them to go, this is the drive thru. Mancino: Mancino: It Scott: Any Mancino: Bob, landscaping. W On the parking Board is asking of rock because was to have son on the actual lai John Dietrich: islands be a mi to be 8 foot in variety of mate we'd like to ha snow loading s down complete material versus Mancino: Or a John Dietrich: Mancino: V Thank you. to make a lot of sense. questions or comments? know that you said that we're asking for a revised internal parking lot it's being planted, and I'm sorry I haven't opened it up to the right page. .ands, one of the thingsthat we've talked about conceptually as a Tree ►r vegetation on the islands as far as something like daylillies, hosta, instead ie rock just carries the asphalt feeling more and what we were trying to do green space inside of our internal parking lots. Not overstory trees but also scape islands. And is the applicant doing that? ►s part of the revision the code, landscape code requires that the landscape mal of 8 feet in width. And this plan-for example, those islands would have idth where that is one of my... In terms of the ground planting, again a als that could be utilizedl so that we could look at a lower plant material so something that would be hardy. That would take salt. That would take if it was not going to be; a perennial like a daylily that would die down—die It would be something like spirea that could be ... grassier, softer type plant woody type plant material like a lilac. a juniper. rock, yeah. Just putting in rock into a parking lot. Okay. LJ f i� i� L_J 44 1 iPlanning Commission Meeting - August 17, 1994 . Scott: Any other questions or comments? This is a public hearing so if I could have a motion please. Ledvma moved, Conrad seconded to open the public hearing. All voted in favor and the motion carried. The public hearing was opened. Scott: Would anyone like to speak at the public hearing about this item? Let the record ' show that no one wishes to speak at the public hearing. May I have a motion to close please? u Mancino moved, Conrad seconded to close the public hearing. All voted in favor and the motion carried. The public hearing was closed. Scott: Ron. Nutting: I don't have much more to add. It sounds like the applicant is in agreement with staff's recommendations as in the discussion earlier. I think I'm ready to move forward with this. Scott: Okay, Nancy. Mancino: I feel pretty comfortable too. One of the things that I'd like to bring up is I'd like to make sure that Taco Bell and Perkins knows that when they do come in that they will, I would ask that they follow the new sign ordinance that will be passed when we pass it and that they abide by that and that for now obviously we follow the old one and when the new one comes into effect. Aanenson: We do have PUD standards that were spelled out for this project. When we put it together we said there could be one free standing sign and each individual tenant's limited to ... and that it be architecturally compatible. That was already spelled out in the PUD agreement. I think that would be consistent with the sign. The one they showed you... Nutting: Did I see a pylon sign for Perkins on that earlier drawing that you had put up? Generous: Those, I gave you a revised plan that I put on your desk tonight. That should have a black and white picture and the pylon sign ... the 34 foot height would not be permitted. They'd get a maximum of 20 feet on the pylon. Aanenson: And that one again, that was spelled out in the PUD for the entire Target and Outlot B. One pylon sign ... for all three tenants. That was up to their choice and then 45 Planning Commission Meeting - August 17, 1994 each ... would jut be given an extra monument sign. Nutting: How is that planned to be used? Is it just Perkins? Tom Palmquist: The intent at this point is that this pylon will be divided into three panels with each of the three users represented on some ... basis. Conrad: Horizontal? Vertical panels? Tom Palmquist: It will be horizontal. Aanenson: I th nk we may want to see that again. We had some concerns with that as far as ... Maybe the igns can come back as a'separate. Nutting: It's 1 d out in the PUD in terms of the. 7 Mancino: But that can come back separately. Aanenson: Cer 'nly. That's something ;we haven't had a chance to review specifically except for what you've seen there ... I guess we want to stay as uniform as far as if there's different logos n it... However, if they all their own corporate logos on it with unique colors and all that ... we'd like an opportunity to review that. Again, it does tie in architecturally... Mancino: I'd akree with that. Are you done? Nutting: Yeah. Mancino: One thing about one sign per ; street frontage. Where is that in our staff report? I remember reading that. Generous: It's under the PUD standards.: The development standards. They're only permitted two wall signs. Two elevations per building to get a sign. Mancino: Is this the sign we're talking about? Generous: That s the Taco Bell. Mancino: But don't I see four? Generous: You see it on the drawing but they're only getting two. 46 iPlanning Commission Meeting - August 17, 1994 Mancino: Oh! Is the applicant aware of that? Tom Palmquist: As we mentioned earlier, we are in concurrence with the recommendations of staff in the staff report. Mancino: Thank you. Thanks for going over that... g g rAanenson: Can I just clarify ... as far as the banding. We did go through these conditions when we wrote the report and what it says as far as, it says colors shall be harmonious and bright or sharply contrasting colors may be used for accent purposes and that's how we interpreted it ... as long as it's an accent. It doesn't address what it's supposed to provide and that's how we interpreted this... Mancino: Thanks. Well I appreciate your checking. I don't have anything else. I think if we can work out the internal working and the flow of traffic. I'd leave it to staff to make 1 sure that the interior parking lot landscaping is quality. Quality, quality, quality being this is a PUD and that's it. Scott: Good, Matt. Ledvina: I guess the only thing I would ask or maybe question relates to the landscaping and how it fits in with our proposed planting on this corner and you know essentially the Outlot A is reserved for our. Aanenson: The city retained ownership of that. The City Council and the HRA are working to do, this is one area they looked at gateway treatments. They have Hoisington - Koegler working on those gateway treatments. They may not go anywhere but we are keeping ownership and we are under obligation to landscape that... Ledvina: Well I guess what I'm wondering is, is there a chance to coordinate the landscaping ' of these buildings with what's ever done on the outlot or the gateway treatment if you will. I mean does it. , Aanenson: You mean coordinating or signing? Ledvina: Coordinating it. Aanenson: Are you talking terracing? 47 Planning Commission Meeting - August 17, 1994 Ledvina: Well yeah. Whatever. I don't'. know what that means necessarily but other than making it all kind of fit together. If you've got a row of shrubs and then something else that goes in in front of it that doesn't work on our chunk of land, you know. That we want to try to avoid that situation obviously. Mancino: Like ompatibility of architecture. Ledvina: Right. Mancino: It's die compatibility of the landscape. Ledvina: Right, so how can we do that? Aanenson: I thi nk we can work that out.', As we've indicated, they need to look at those species and we an coordinate that with what Hoisington - Koegler is looking at as far as that..., we can c I rtainly look at that before it goes to City Council. Ledvina: Okay. Tom Palmquist: If I may add. The intent is to begin grading this fall. The landscaping would not physi ally go in until next spring so there would be an opportunity to make adjustments or modifications to the approved landscape plan is that Hoisington- Koegler plan was not complete or you know to the exact level ... this time. Aanenson: And you may want to make that a condition. Ledvina: Right, I was just thinking can we tack that on somewhere? Maybe condition number 20 I suppose. On the site plan? Scott: Ladd. Conrad: I; surface. Aanenson: Conrad: 76. Aanenson: surface ratio has to be 70 or under? Is that what it is for impervious the entire site. What we did is started with over. l obviously we picked it up... 48 i iPlanning Commission Meeting - August 17, 1994 Conrad: And this site says 68. So 68 and 76, I don't know how it, I haven't been sold that we have the final numbers here. Generous: Well I think we're pretty close. I estimated that they were at 66% and with these two developments they needed like .05 acres onto the third site and that will be easy to make on that. Conrad: Okay. It seems like if we change the access point, and I don't know how much we're changing it but you're saying we're changing it. It changes the whole plan quite a bit. The access point, you know if you change it 2 feet, no big deal. If you line it up with the Target, it is a big deal so I guess I'm not sure. How much is this going to change when you start negotiating with the folks. Generous: Well that's—the Perkins parking lot doesn't change. I tried three different alignments for the eastern half. It's feasible. One of them you have an island that runs along the east. It's like, almost a boulevard type that would parallel the Target and then basically turning back up and then incorporate that middle boulevard area again for access to the third site. It would be changing the orientation. There is one alignment that Charles Folch would like that you'd sort of diagonally go through that property. Conrad: Well, you know we've spent some time talking. I probably should have talked first. Really if we change the road access we really don't have a site plan. Everything changes. I'm not, I guess I'm not saying I'm against what I see. Staff has some standards that they want to implement. Given the staff standards that they want to implement, I don't think I see a plan that is something I can react to. Second thing, when Target came in I really pushed for sidewalks and I don't think anybody, at least dividing the Target parking lot with a sidewalk down the middle and Target persuaded us not to do it, or somebody else not to do it. We don't, Vision 2002 talks about sidewalk access and we made Wendy's connect a sidewalk. I'm curious staff, we don't have sidewalks coming into here. What's our posture on that? Hempel: We do have sidewalks running along the south side of West 78th Street. Could easily be adapted to connect into the site plan requiring Taco Bell to open as a train of traffic there. Conrad: I guess I'd be interested. I'm not sure what we want to do with it but if Brad Johnson were here and said people don't walk, and that's kind of true. I really feel badly that we didn't do something in the Target parking lot so like it's been compromised there and so do I really care. But a lot of people are giving a lot of lip service to pedestrian traffic and here's a case where we got a chance to do that. I don't know that people are really going to 49 f Planning Commission Meeting - August 17, 1994 1 walk but on the other hand, I don't think we considered sidewalks coming in or going out and I don't know how I'd do it here but. Aanenson: I guess we've got the sidewalk on Powers too. Conrad: But that doesn't get you in. Aanenson: No. But ... somehow get to the Perkins over there and up and around, I guess that's. Conrad: It's no � like I'm going to make 'a case. I'm not going to make a case for this. If somebody else wants to make a case or are concerned, then we should take a look and see if we really do want pedestrian foot traffic coming in here. I always get uncomfortable when, you know when we put out 3 restaurants together. It just looks like a lot of stuff. You know it looks like we ve got roads all over and no real pockets. You know if I, I wouldn't design it this way. It to oks, it doesn't look like what you get out of a PUD but I don't know how I'd redesign it. Make it three restaurants': We have a lot of car traffic going in there. But it's, I guess my biggest concern is going aback. We have an access to, we have an access point that's not Teally where it is on this plan and I think it's going to change it quite a bit. That's all my comments. Mancino: I want right on that we to respond to your sidewalk... Going to those Vision 2002 meetings, you're certainly don't want to deter or say that we're against obviously car traffic , because everyb dy's going to drive to the center of the city but we also said we want to balance it with pedestrian traffic. And maybe someone would come and say well people aren't going to walk through here but we never created a space, a welcoming space for , people, for pedestrians to walk and maybe they actually would take advantage of that if we do that. i I Scott: Well thi about the outlot and having that as a landscaped amenity. Benches and stuff and I can see taking my fajitas over to the outlot. I mean something like that. I mean this is an element that it should be tied in with this and if we're talking about pedestrian walkways, I think topographically the outlot's pretty flat isn't it? Or will be. So that might be conducive to I mean although it's going to be on a major intersection or something like that. And they' a talking about some sort of a gateway treatment but from what I understand, we're reluctant I o be investing any significant sums in a sign that says we're Chanhassen, you're not, or something like that, right? ' But yeah, I would have to agree with your comments on th walkway area. And once again the whole idea about planning is that we're talking decades ere and 20 -30 years, maybe the automobile is not going to be the method of getting around at it is today. I don't know but we can't forget that the idea of planning, 50 1 Planning Commission Meeting - August 17, 1994 we're thinking decades, not just years. Mancino: So you'd like to see them investigate more of a pedestrian friendly walkway between the restaurants? Conrad: At least getting into them. I'd like to see the trade offs. If you put a sidewalk in, you take out vegetation. Ledvina: Yeah, and if it's just a couple of rows of sod. Conrad: Yeah. If we're moving sod then it's not a big deal. Scott: Is there a motion somewhere? Mancino: I'd like to move that the Planning Commission approve... Scott: Well there's two of them. Tom Palmquist: Point of clarification? Scott: Ah no. Mancino: That we approve, or recommend approval of #92 -5 PUD for the preliminary plat for Chanhassen Retail 2nd Addition and Chanhassen Retail 3rd Addition as shown on the plans dated July 25, 1994 and subject to the following conditions. Conditions number 1 as is. Number 2 as is and number 3 as is. That's it. Scott: Okay. Is there a second? So at least in my mind you're willing to move along the PUD but not the site plan review. Mancino: Yeah. Because I want to add conditions to the site plan. Scott: Okay. Is there a second? Ledvina: I'll second that. Scott: It's been moved and seconded that we approve Case #92 -5 PUD. Is there any discussion? 51 Planning Commission Meeting - August '17, 1994 Nutting: Can I have the ability to hear what he was just going to say? ' Scott: No. Public hearing's closed. Ledvina: Now is is the PUD. Aanenson: What you're looking at is the subdivision for Chanhassen Retail 2nd Addition which creates Outlot A, the city is going to maintain and then the Chanhassen Retail 3rd splits Outlot B into 3 parcels. Ledvina: Okay.I Alright, just to make sure. , Mancino moved Ledvina seconded that the Planning Commission recommend approval g of #92 -5 PUD for ,� the preliminary plat for Chanhassen Retail 2nd Addition and Chanhassen Retail 3rd Addition as shown on the plans dated July 25, 1994 and subject to the following conditions: 1. Developers all petition the city to vacate the old West 78th Street right -of -way which I traverses the overall site. 2. The followir. g easements shall be dedicated on the final plat: a. A 30 foot drainage and utility easement centered on the existing sanitary sewer through the , alignment site. b. The exis 'ng drainage and utility easement obtained with the underlying plat of the West Village Heights 2nd Addition shall be maintained. These easements cover the City's existing watermain and one of the telephone cables. c. An addi onal 20 foot wide drainage and utility easement shall be granted along the , south U4 of the previously described West Village Heights 2nd Addition drainage and utility easement. , 3. It appears that the northwest corner of the Taco Bell building would encroach into the proposed 20 foot drainage and utility 'easement and be approximately 5 feet south of the existing buri phone cable. The developer shall obtain approval from the phone company for this condition and if obtained, a subsequent encroachment agreement shall be executed for this condition. All voted in favor and the motion carried. 52 iPlanning Commission Meeting - August 17, 1994 Scott: Do you want to make a motion on the 94 -6? Mancino: I recommend we approve Site Plan #94 -6 as shown on the plans dated Jul 19 PP P Y 1994 and subject to the following conditions. Conditions 1 through 19, a, b, c, d and I'd like to add number 20. That the landscaping plan for the Taco Bell site, the Perkins site and actually the future restaurant site, be compatible with the final plans that the city implements for Outlot A. 21. That the applicant and staff work through the parking lot realignment as it states in which condition Bob? Aanenson: 8. Mancino: Okay. And if there are big differences. If the sites become. Aanenson: Significant changes. Mancino: Changes that come again for the Planning Commission to okay. And 22. That the staff and the applicant work through the internal traffic flow of the Taco Bell parking lot in regards to one way in and one way exit. Especially a one way entrance into the drive thru. And number 23. That the applicant investigate a pedestrian friendly walkway that would tie the restaurants together. Or that would access the restaurants. Scott: Maybe just have the staff and then the applicant develop a pedestrian walkway system connecting the Perkins and Taco Bell? Mancino: And the future restaurant. Scott: With the existing what? West 78th sidewalk on the south side of West 78th? That was rough but is that. Mancino: ...my words. And the last one, I think it's number 24 and I guess I don't have to say anything about the new sign ordinance, do I? Aanenson: Well I think what we would like is to bring the signs back. The sign package. 1 Mancino: h O yeah. 24. We would like to see. Aanenson: We haven't seen what's going on it yet. If they're putting 3 logos on it or 3 name plates. 53 Planning Commission Meeting - August ',17, 1994 Mancino: Okay. So we would like to see the sign, all the signs for this property. And approve them. Scott: Okay. Is there a second? Ledvina: I'll s and that. Scott: It's been moved and seconded that we approve 94 -6. Site Plan review subject to the additional conditions. Is there discussion? Conrad: So that means you don't want to see it back? Aanenson: Unless there's significant change. Mancino: Unle s there's significant changes when they do the parking lot realignment. Conrad: And tl a drive will swing how many feet south? Generous: Abo t 100 maybe. Mancino: Now if you'd like to do a friendly amendment as to what constitutes significant changes, I'd be Dpen to that. Generous: No, I don't know. Ledvina: Well perhaps if the staff feels that they can't come to resolution with it, considering the optimum tra fic circulation, you know then maybe bring it back to us and say, what do you think? Wh tever. We can't keep... ' Conrad: They'll be able to handle it. Ledvina: I think so too but in the event. Generous: And there will be significant changes. Conrad: But th rest will go to City Council. It may come back. Aanenson: ... tf. ere is some design constraints on the two northerly pieces as far as the footprints and maybe you can correct me!, if I'm wrong but we've got a lot of utilities running through there and there isn't a lot of movement for the Taco Bell and the other use. The 54 i Planning Commission Meeting - August 17, 1994 only flexibility is the location of Perkins and obviously they want to put it on that corner but not the parking, which we also want for Highway 5. We prefer to have the Perkins there as far as the visibility giving that a nicer look. And it screens the parking so, obviously ... so we've been giving them some options that they're not happy with but you have to realize too that they need to split this property to make it easier for cross easements. The less crossing you do makes it easier for them so they're trying to make it as clean as possible to sell off the three lots... Conrad: Just out of curiosity, why didn't we push the Perkins and the future restaurant footprint to the outside of the property so the parking's internal? Aanenson: We can go way back when we originally looked at the Target. When they came in, we did the design charette when we had Barton - Aschman sit down when we learned 1 Target was looking at coming into Chanhassen. So we did some designs as far as the Target in there. What would be the configuration of the remaining portion and that was one of the options that you looked at. A row of buildings screened and as you recall, originally we looked at this whole package. There was probably 6 outlots on the development and I think we threw 6 out right away when we were looking at it and then we came down to 5 or 4 and through negotiations with the city ... But then you really start getting in again to some of those design things that we talked about with the utilities that run through there. There's some fiber optic cable and some of the issues that makes it really tough to try to locate some of those... and obviously Target has agreements as far as making sure them maximize views to their building and some of those issues all came into play as far as how they're laying this out. But that was a consideration as far as lining those up as far as visibility. That was originally looked at. Mancino: Because you could pull the Perkins building closer to Highway 5. ' Generous: 20 feet. Aanenson: As far as the Highway 5 setback was 50 feet. Conrad: So you accomplish splitting up the parking. Aanenson: Again, you have three separate tenants and that's what it comes down to. That market force of having 3 separate tenants having their own property ownership. Conrad: What's the potential. So we've got an exit from Taco Bell on the west. Or an entrance. And then the future restaurant is, is that roadway going to be a common roadway? 55 Planning Commission Meeting - August 17, 1994 Aanenson: Yes. Conrad: So we I on't have an island and another roadway there. Aanenson: It will more than likely be a continuation of the... Mancino: What do you mean... Conrad: Well me have entrance /exit for Taco Bell on the left hand side and then we have another restaurant. But potentially they should be using the same street to come out or enter. I just don't want two side by side roadways there. Not logical to do. Aanenson: Ladd, maybe this will make it clearer. This is a... Mancino: It wil go back. It will go west and go into that future restaurant so there will be one common driveway. Aanenson: Yes. But we're saying it needs to be down here where the curb cut was shown and it needs to curve up and then go over. Ledvina: Is tha curb cut actually there for a new Target site? Aanenson: Y Generous: Yes. It shows up on your subdivision plan. Conrad: The outlots always worry me because when they come in, we sort of dictated how they're, based on what we just saw, we dictated how they're going to develop and that's too bad because them will be no leverage to make the road. You know the opportunity here is to ' minimize the nu nber of roadways and cross traffic and again, I'm not a designer but I'd sure like to cut off s Mme of the, if I were designing three restaurants in a group, I'd have one entrance to each one of them rather than multi entrances coming in and it makes it clear and I less pedestrian, lewer pedestrian problems. So I guess I'm going to stop talking but you know, that's pro ably not my design that';I'd want if I had three restaurants sitting on a semi circle or a squar . I think there's a lot of benefits. There's a lot of good things. They're both good tenani s that we're looking at and I think but it's, I don't think we've improved, other than space I think we've got some, green space down there but I don't know that we've really dor a anything in terms of sinking them together. There's a road coming in and we've got acces es off the road but anyway, those are my comments. The comment section was before. This is discussion. It's not coming back more than likely. 56 f Planning Commission Meeting - August 17, 1994 Mancino: ...the question and to see some sketch plans along that ...and see how it would try P g work. Conrad: I wouldn't brin g it back for that. Scott: And you wouldn't bring it back for the change in the entrance? Conrad: Yeah. Scott: You would? Conrad: Oh yeah. I think it's major. I don't, you've got stuff flinging around and I don't know how they're going to do it so. Mancino: So you would like to see if there is a change, it back? Conrad: Again, I think your motion is valid. If it's a major change it should come back but it's all, in my perspective, it's got to be a major change. It's going in a road down here. You're changing some, I don't know how the traffic patterns go through Perkins lot and gets you up to Taco Bell and then swings out to the future restaurant. I don't get that. Mancino: Is staff comfortable enough with that so we get it back if there are major changes? Generous: Yes. Scott: Should we vote on the motion and see how it goes and then. Ledvina: Yes. Mancino moved, Ledvina seconded that the Planning Commission recommend approval of Site Plan #94 -6 as shown on the plans dated July 19, 1994 and subject to the following conditions: 1. Developer shall be responsible for obtaining all necessary agency permits associated with the development of this site including but not limited to watershed district, PCA, MWCC, Health Department. 2. All proposed storm sewer and sanitary sewer and water services within the site are considered private and shall be maintained as such. 57 d Planning Commission Meeting - August ,17, 1994 3. Developer s all submit to the City Engineer drainage calculations and a drainage map for the entire si showing areas and quantity of flow to the Target pond and to the County Road 17 po (d that are consistent with capacities of the existing storm sewer system. 4. Stormwater ainage from the Taco Bell site to the West 78th Street storm sewer shall be directed into the easterly storm sewer', lead from West 78th Street immediately north of the parking lot. 5. Developer sll indicate any quantities of borrow material and/or material to be hauled off site including a proposed haul route. 6. The applic t shall develop an erosion control plan in accordance to the City's Best Management Practice Handbook and the Surface Water Management Plan requirements for developinent. 7. Developer staall be responsible for all costs associated with protection of the existing public utilit)II facilities within the overall site. Developer shall also differentiate on the final site plans which lines are public and which are private. 8. All internal streets and drives within the overall development are considered private and shall be maintained as such. The main entrance to the site shall be located farther south to align witli the existing curb cut across from the entrance to the Target parking lot. 9. Fire hydrant shall be incorporated as per the Fire Marshal's recommendation. 10. The developers shall enter into a site development contract with the City and provide the necessary financial security to' guarantee compliance with the terms of approval. 11. Construc ion access to the parcel shall be from the existing Target driveway and not West 78 Street or Powers Boulevard. The applicant and/or contractor shall install and mair tain a gravel construction entrance until the access driveway is paved with a bitumino s surface. 12. but the parking lot for Taco Bell does not meet the required 20 foot setback for parking lots from West 78th Street and must be revised. 13. The the rc West ;ant must also verify that the height of the pitched roof element will screen equipment from the high point of Highway 5 and from the high point on Street. t 58 1 i Planning Commission Meeting - August 17, 1994 14. The developer must provide a trash enclosure location for the Perkins site. Trash P enclosures shall be architecturally compatible with and of the same materials as the principal structure. Trash enclosures shall also be vegetatively screened from all right - of -ways. 15. The applicant must revise the landscaping plan to replace all ornamentals and evergreen within the vehicular area with overstory type trees. 16. The developer shall screen the trash enclosure for Taco Bell with evergreen plantings. 17. The minimum peninsular landscape island width is 8 feet. One tree per each 250 square feet or fraction thereof of landscaping area. Each landscaping island must be a minimum of 200 square feet and must contain at least one tree. The applicant shall install an aeration/irrigation tubing, see figure 11 -3 attached, in each peninsular island. At least one peninsular landscape area shall be provided along the northern parking lot stalls for Taco Bell. 18. The applicant is permitted wall signs on only two walls per building up to a maximum of 15 percent of the wall area. Taco Bell and Perkins elevations shall be revised to comply with this condition. In addition, one pylon side is permit for the three lots. Each parcel may have an individual monument sign on their lot. 19. Fire Marshal recommendations: a Additional fire hydrants will be required. Contact the Chanhassen Fire Marshal for exact locations. b. Install "No Parking Fire Lane" signs and paint curb yellow in designated fire lanes. Contact Chanhassen Fire Marshal for exact locations of signage and curb painting. c. Submit turning radius to City Engineer and Chanhassen Fire Marshal for review and approval. d. A ten foot clear space must be maintained around fire hydrants, i.e. street lamps, trees, shrubs, bushes, NSP, NW Bell, cable television transformer boxes. This is to ensure that fire hydrants can be quickly located and safely operated. Pursuant to Chanhassen City Ordinance Sec. 9 -1. 20. That the landscaping plan for the Taco Bell site, the Perkins site and the future restaurant site, be compatible with the final plans that the city implements for 1 59 a Planning Commission Meeting - August 17, 1994 Outlot 21. That the applicant and staff work through the parking lot realignment as it states in condition 8 and if there are significant changes made, that it come back to the Plannini Commission for review. 22. That the staff and the applicant, work through the internal traffic flow of the Taco Be 1 parking lot in regards to one way traffic flow through the site and into the drive., thru. 23. That the applicant investigate a pedestrian friendly walkway that would tie the restaurants together or would access the restaurants. 24. The sign package shall come back to the Planning Commission for approval. Mancino, Ledv na and Nutting voted in favor. Conrad and Scott voted in opposition and the motion and the motion carried' with a vote of 3 to 2. Scott: Reasons for voting nay Ladd has expressed. I would agree. That's it. APPROVAL O MINUTES: Mancino,moved, Ledvina seconded to approve the Minutes of the Planning Commission meeting dated August 3, 1994 as presented. All voted in favor, except Ladd Conrad who abstained, and the motion carried. Kate Aanenson 'eviewed the Report from the Director dated August 11, 1994. Ledvina moved Conrad seconded to adjourn the meeting. All voted in favor and the motion carried. The meeting was adjourned at 11:00 p.m. Submitted by Kate Aanenson Planning Director Prepared by Nar n Opheim •1 6. Lake Susan Park to Chanhassen Hills. 7. The Meadows at Longacres. 8. Trotters Ridge. 9. North Lotus Lake Park/Pleasant View. b. Restoration of degraded wetland located southwest of Lake Susan in City Parkland. 9. Commission Member Presentations 10. Approval of July 26, August 9 and August 23, 1994 Park and Recreation Commission Minutes. M 0 Z 4 m 1'� PTITL- i q I Lo E Jr >b r i-n Cl Ln z 0 -4C L4 140 M. 7 ,38'—Cr 00 Ul ------------ M 0 Z 4 m 1'� lu, rl7 Co xw 7� rr, Nt 4� `1 �.�Z % 1 I I I i q r Cl -4C 140 M. lu, rl7 Co xw 7� rr, Nt 4� `1 �.�Z % 1 I I I truck. Rock up to the bottom of the covers reduces debris collecting in the planter. Hardware cloth (coarse metal screening) under the covers has been used to keep rats out; but the wire must be inspected frequently to prevent girdling. Perforated PVC pipe (100- to 125-mm, 4- to 5 -in. diameter and 0.6- to 1 -m, 2- to 3 -ft long) is commonly put in two or four corners of a planter opening for aeration and irrigation. As the people in Europe learned, dead -end aeration holes in the soil are seldom adequate. Connecting the bottoms of two or more of the vertical aeration pipes, however, allows air flow through the tubes, greatly inereas= ing the oxygen concentration and aeration effectiveness (Kopinga 1985) (Fig. 11 -2)•; -z, `�,� `: ;.,::. };� ;a: l:• :. _ •— ..=;\tic. v;.:r" :;•�1�:�ti���:::,,;• rl '• � � „�: :. r (�: • 1 ..A its ::.• s.:•;e::��:,��: ♦ ♦`� Figure 11 -2 Aeration in pavement plantings can be increased by joining two vertical aeration pipes across the bottom of the planting hole, one pair each near opposite sides of the planting hole. ,Oxygen concentration in `i the pipes will be ten times greater than in vertical pipes alone (Kopinga 1985). Aeration could be further increased by having aeration risers as shown in Fig. 11 -3 also serve as protective stanchions for the tree. If the soil is compacted around the planter opening and under the pavemen aeration may also be increased and roots directed downward by drilling or wa jetting sloping irrigation and aeration holes under and out from the root ball under the pavement. Within a year or two the holes are filled with roots. is Another pavement - planting scheme is also being used in the Netherlands..:. sentially, a planting hole is established within a planting hole (Kopinga 1985, m .. S-' - fied b Urban's 1989 survey) (Fig. I1 -3 Excavate a hole a roximatel 0. Y [ Y) ( g• )• pp Y - -.`:�” ! (2 ft) deep to a volume `of 3.5 m3 (120 ft') or more. The shape of the hole will d , on the space available. All but the finished planter opening (1 to 1.2 -m, 3 to a" diameter or square) will be paved over. The outer portion of the hole is filled. M:: a mixture of coarse lava slag (80 -150 mm, [3-6 in.] diameter) and `tree soil' - ,•'•'��:,. ..:!: ratio of about 2:1 (volume:volume, v /v)" (Kopinga 1985). A tree is planted in - , . ?: 248 Chap. 11 Special Planting Situs 0 , ' *; T. U a, X es to S- 3. id li- m Id -ft th a tie " ns Igure 11 -3 Favorable soil conditions for pavement plantings can be ob- �ined by replacing 3.5 m3 (1201ft') of soil 0.6 m (2 ft) deep with coarse ,va slag and soil mix before installing pavement. The shape of an excava- on depends on the space available. Aeration can be further enhanced by lacing an aeration system as shown; the horizontal portion can be either VC pipe or flexible tubing. The risers are of heavy metal pipe with addi- onal support (not shown) to protect the tree and to withstand abuse. center 01 give a so] installed and bec t of oxyg I grow ou though t Ur rounded is that " term tre� benefici priorities stalled. Clt center -ci space an some ph channel: pipe in This is t Planting where the planter will be. The rock -soil mixture is lightly compacted to id surface of lava with soil:filling the voids. The pavement can then be This provides a firm base for the pavement with no further compaction ise of the porosity of the lava (about 48 -50 percent v /v) an optimal supply i for tree roots (Kopinga 1985, citing Terlouw 1981). Tree roots should into the soil among the lava. Rocks other than lava could also be used to aeration would not be as good. an (1989) examined thirteen, l l- to 27- year -old plantings in tree pits sur- by pavement in locations frost Boston to Virginia. One of his conclusions my planting site with less than 100 cubic feet (3 m') cannot sustain long - growth." Beyond a depth of 0.6 m (2 ft), increase in surface area is more I than increase in soil depth for all but large- growing trees. Depending on and adequacy of summer rain, an irrigation system may need to be in- ster and linear tree and shrub plantings are becoming more common along y streets and in plazas (Fig. 11-4). These provide more shared rooting exposed surface for aeration and rain deposition. In Europe and America, inters are joined with channels of quality soil under the paving. For the soil to be successful, it would be; wise to have at least one perforated aeration ach channel which is connected to vertical risers in each of the planters. L extension of aeration system shown in Fig. 11 -3. <. a 249 Treesin Paved Areas I v •3 � 4 .`• C C d o •a •o .c n 0 C W t v « = E M V V O Y Q O 1 .w� N L o N 0 V O >0 - ` .0 o 00 >0 .9 C 3�" N ° y c v > N c E O S o a O O a N c •N N IZ 0 E` 0 0- a 'c, c==d'a� „dam «3ru° N a E Q`Ndo °0°ea°, ~o Z. a .0 « y i .a p y c •a C. - °Na0Z0 - ao =Noc„ co O e > o °o co ” °c °mss o ° °u OIY °u ` rn> S c N E° Y -0 a4, 3v.r_ar g o ps E:5-a „ N - -0 `o d 8'a N C 3C1 uYpp .c ' °-a o « N° O— CL C O•Na o 3 ad C N >-cr} y-0 - o c .c - ° 3 !'`•� = �•m v� y c O•p M ti� O v v c ol-OG C c u ` d° v4 cs•ao °Yoa�•°- � „aa c ac ° n N C.` L p C O a p `.�0 p•pl�•c y M ac „vyuEE� =Z `„ O U' N N N CL a E N w E° hO• d I'M—; = � !J C '�I C I I ao 3 dLA) 'a; a ~dal�3 IL d�o�Nm 2 a•- >•- O ; •C ° ~ a W mg d „ 3'E N a E t9 ����,00 —>'v 6 c a �— � u c Y• .� O�"O• C�o d N 0 � a V H � -0 a d 0.-.0 c _ °v c°O C ° ° C N y` c Y2- :52 d0 Q N O E O> 6 W c y d O ° e E v ° 3p0— "TYCO° O a_ _� G �r p� d � d d NO•°u0 O aE C; C w E �� 0-0 •c 1O p c a Q o a`rm� c a-0 u > u c >. 0 M u c u 4! c O 5 .; a p a 'a N EO�,$drY O�•� o`O0 V c y v- u =y~ ° >m`� C ^ a O ^ocNo�o t � w O .c oOn 0 >.� N d; OL > -C 0 s O m 0 C C / V S r, d � 00 d 0 '2 V � u � 3 •� N O 6 a`N Cr 41 'a O y o e= F )` 0.0 0 a Of W G 0 O 0= E O u N 0— a c = O a d ag- pEi 'NOD d r • d'a NL N•° N'°' V a C —.a M a w�L a � �L � � E :a "6 a1 > N L pwa N L '; n uC °•a ai dE dN° � $d'C D d , N N« ._x ; � Y r rN 0. .Q Nr 0 � v °x° a dL o•O - ; .aQ o0 c E- 'o12! Z 0InN 0 o O� E :5 x o aovi- E V N 8 ma d O �c O 0 -0 1- O aC ?_a , ° d . yQ .` O a 0 d-a *L 0 `6 C N— Oi0 o O C a c— V D IL Dd d ^ V O °.c; o ° Y W Q OW _r- m v a°, Lrdw . `c N • L ^ ° d N o = dYY �[ ' LM - a a+ N° � 6 0-7 N C > O y O V O a a O d o y .a a 'O `� ` U 6 ` " � a, � U » � � >S p ` 000, c N CI d c w g— h , L h - o E a w > v o c V 1 c E d 41 .« 0 OD « C d -s a L O � r '° -0 3 6p p N 4 E V -0 -a =M C° O; Q a ' ~ 6 a D aE c y d .a a. »co o Od VO ca�d3 O ooaa pa og ao N > -0 O• O ° E.2 X L �O a° e ° e Z d O ex _6 =v .10 O _» 0 - -cc d O c mw; c « O .,E > c COL o D c o a E a N d cx 'a O 5 C.= d —° ° m Ol z o a d L d C OL : M 3 N E � ul i ^` C O c O O 4,.D-0 > a 1- a cc d y-a � o. O = > O' dy o � a p9 > 0 �• V ` v �L ad M e h w-0-0 ` Oo c'o Oa c c . V o> ` O c E _ QZ� .c ud ms o > -o aEa._ »v- -airo3°�°.0 m-0 o° + �1 Z— ^ , , I o. r. x W m I I I I P� , J 1 I � Lam• '�r i -�Z�� .' � %� �'- 'NOD d r • d'a NL N•° N'°' V a C —.a M a w�L a � �L � � E :a "6 a1 > N L pwa N L '; n uC °•a ai dE dN° � $d'C D d , N N« ._x ; � Y r rN 0. .Q Nr 0 � v °x° a dL o•O - ; .aQ o0 c E- 'o12! Z 0InN 0 o O� E :5 x o aovi- E V N 8 ma d O �c O 0 -0 1- O aC ?_a , ° d . yQ .` O a 0 d-a *L 0 `6 C N— Oi0 o O C a c— V D IL Dd d ^ V O °.c; o ° Y W Q OW _r- m v a°, Lrdw . `c N • L ^ ° d N o = dYY �[ ' LM - a a+ N° � 6 0-7 N C > O y O V O a a O d o y .a a 'O `� ` U 6 ` " � a, � U » � � >S p ` 000, c N CI d c w g— h , L h - o E a w > v o c V 1 c E d 41 .« 0 OD « C d -s a L O � r '° -0 3 6p p N 4 E V -0 -a =M C° O; Q a ' ~ 6 a D aE c y d .a a. »co o Od VO ca�d3 O ooaa pa og ao N > -0 O• O ° E.2 X L �O a° e ° e Z d O ex _6 =v .10 O _» 0 - -cc d O c mw; c « O .,E > c COL o D c o a E a N d cx 'a O 5 C.= d —° ° m Ol z o a d L d C OL : M 3 N E � ul i ^` C O c O O 4,.D-0 > a 1- a cc d y-a � o. O = > O' dy o � a p9 > 0 �• V ` v �L ad M e h w-0-0 ` Oo c'o Oa c c . V o> ` O c E _ QZ� .c ud ms o > -o aEa._ »v- -airo3°�°.0 m-0 o° + �1 Z— ^ , , I o. r. x W m I I I I P� , J 1 I � e» E o ° Mc 1 a N t S 3 ILI, M t R N c m 0.0- c ° p i i i 5 O m r 6 ca � : aN • L i-N - hG « s .2-O 0, O � O T E 0 c � o C aO p O :d C O` 'D =0 m - O N c y y r L — m- ^ �1N = k o � • �-m .mpm c. w•"m - cy m ' „ o E ? .� •c No° � .a eap C yl T L 0 m :3 C C Z Q 3 N ; .2 -- y E c L EL L � C . C E um „-0•p -a N C -0 N.2 al m m m N 0, A a N O •a» -a p O..0 2 C > Z o >Io •e c y° �o u O - oo,o ?c0Qoa oE 0 C K °a D ° 00 v 10 O 'Q Oo m V a ; ^ 0 m0 f 0 a C W .a °coo;G O` E —0 cc a o .- c C - e „woN3 e a« 0 ; o E�a o o E o p oN • « d o „ L - ayo=` „o -2 0.2 E a � ,°m c ; c � ° ° ° o 0 o m - EN--5 : a d - E d-' c d iE c p ; �ao � a « o o m o •a rn of ° m V O •a- m ° N 3 .- d �sm ° o � E L O •C ON ;;3 2'°m a.3 - �> O 0 6 `, d X _ ` m ` V C o :2-0= =.s a 0L r m -wa a • c- �a.E C E c LC . U u h N 2a 41 0 d o0 0 � Im2 Lm .2 0'6 d y C v c »� N mL11m E.2 u ca -0 -0 ca = > <oLpLm a=a 41: o� y EL 0, EmmmoL 0 a C -a Ea „Z .= 0O . a O ' Qs m c o m E m Q c W- � o « -p Z a c o� d Oa oN rUT >— p L= cL� m —a E aC°� � c d- ° c E L ma -r ° c a- »O oy� c o o m f >, - a o 0 c 3 o o a N C c a :d N'a0 W ` c p d E•Ni -° y m C N C-0 O p 0 E c a ao Z.� wi O L o! Q'vi LN m u N s oo 0 mo : a U. N ai _ us 0 h i 7 ) �i I t I N 8 h dt a° cL c d C $' 3 dV IS 0-0 C c N EL E v! CL IL E �7 o oi.E : �V rn 0. rn c c-a d 6 y •- d d ,� N -o O N G 6,, O F O C O a. T E O •C v C y 0 -p N V 6 E C a p c« NO�� pc�> ws6Ne�w — v L• -` CQ c > ` ° Eh o•o O O.3 —r °I'` O C`O c � N rn a �I.00. y E d 0 --°a ` N W 6 d L w = 3 d N �.�,; � C-0 C y = N 0 10 a d �1�rn r�v� ?• t� ; ° aC�, : '..• ' O 3 aa ` oo E c '- -5. «.rd� Nl W '° $ EEoN621 o =E�t y d ou d Na _ p E IOL -p ;Nd do aE2OrNyNOIca0 c y O a- 06--l., C C.. E 4G . tC V m r 0 d a.- O p• O O a y� d O m °.- IL r a E -:: a° - E N N� E O O E u a`, c - u � :r d'M e a „C 0 c C c E u c'p' a o c c o a` a o N d d a a s °e U. u°- „'S0�'i=o «Iv 3 N C o d•"'oa��c3 �s d O d-0 C d j •a O -p m � y• O c GG - a,� 6 C C . ° .2 c = J:2o =s •'� d' N 6 .8 -6 T 41 N -2 -c � 6 = = a 2 c CL N .a O ' N 7 C N d w > v Y �0 «vho> Q C r C !, a C.� , E ► E a u 1p1 0. 49 IE W N a M � N t, d N -:E E�'pNcti dd �ofl, � a rn6 w O — c d E �� m � °er Na u rn 2 a u lu — L E C N C -2 -t 'o E N 4D a 0 ` h O 1� i� f i r: r 1 i IE O � O - a N V Y O r O/ c m. �i I t I N 8 h dt a° cL c d C $' 3 dV IS 0-0 C c N EL E v! CL IL E �7 o oi.E : �V rn 0. rn c c-a d 6 y •- d d ,� N -o O N G 6,, O F O C O a. T E O •C v C y 0 -p N V 6 E C a p c« NO�� pc�> ws6Ne�w — v L• -` CQ c > ` ° Eh o•o O O.3 —r °I'` O C`O c � N rn a �I.00. y E d 0 --°a ` N W 6 d L w = 3 d N �.�,; � C-0 C y = N 0 10 a d �1�rn r�v� ?• t� ; ° aC�, : '..• ' O 3 aa ` oo E c '- -5. «.rd� Nl W '° $ EEoN621 o =E�t y d ou d Na _ p E IOL -p ;Nd do aE2OrNyNOIca0 c y O a- 06--l., C C.. E 4G . tC V m r 0 d a.- O p• O O a y� d O m °.- IL r a E -:: a° - E N N� E O O E u a`, c - u � :r d'M e a „C 0 c C c E u c'p' a o c c o a` a o N d d a a s °e U. u°- „'S0�'i=o «Iv 3 N C o d•"'oa��c3 �s d O d-0 C d j •a O -p m � y• O c GG - a,� 6 C C . ° .2 c = J:2o =s •'� d' N 6 .8 -6 T 41 N -2 -c � 6 = = a 2 c CL N .a O ' N 7 C N d w > v Y �0 «vho> Q C r C !, a C.� , E ► E a u 1p1 0. 49 IE W N a M � N t, d N -:E E�'pNcti dd �ofl, � a rn6 w O — c d E �� m � °er Na u rn 2 a u lu — L E C N C -2 -t 'o E N 4D a 0 ` h O 1� i� f i J O N N =O S 0 m h n rt 7 a� �r r- M 7 3 t N c .°� °c Ms a „ c 3 u ° E.o u o x o-° a� 3 E fm ac >."si" � E e = o O'cl,s ° o c u �a �� a � o °; or ° ono d a O„ °� O Ci Al � C c° C A y C C d C9 E V �: a T O1 V N L u !• N E N p C` 01 N.1 tp 0 � 0 E a�► 0 --2 1 ° o a "a=" v 0, 0 0— 0 � e� r d a o o o° o u °1 -_� -.u- m E N ° x= E « a- « a �--a E a e E c c o ` N.Y ° ° 2 °b_� +d N �;! —y l°yj E cseh" a� er a$ w -'- d 0 d C O C° Q° c C o= ` O p Y` �° O `� US . C ar pp d c C d%= C �°, �, _� o° N` Q w^N O O� N�,«th O)9i w0 NS 41.5 Z•p� y 6C °�';Y— M !•y 3 Or G ON �+ £ ma vO�N O 4 `� d�� Cs C= d p p d 6 N 6COf~ ah 3 .` C c C � �C401 Nw O�°C'O —G� „0.14 0 Oca��Oe�^ w�f$ "meo °��N� r~�.aN3�d�noi wgyNaooc� �aCAO °u„ m �s °•�- c ENM -$._ v„ p u c -0 Z� a u ��° ao���N .E'go voNNT - °�-a - a$lot-0a -�� »pI ee `°E °r��-oo --p"I EN p C c 0- 0` 41 d u a»i p a c 0,": 0 ayN C` � � w¢y e c D o� Ew' ;N mu — !•a °E c.m —', NaG «uc a`r.� Eo`cm `o NE �n o� c E� c o �c W c� v a c erg•° °° 'rte -a a c.:' B E•` O a 3 LM �u s- 3 °am o. a -p �°rQ�= -e•«3 ° ;?3 do c !. m C O� r w Oy y > a- p « O ° « pr: ° v1 m �1 a V 2 ° 3 y ` _ ° ° O` 10 ¢ CL e « d1 N + E «« os`oYac�'� ... ° °Nye v - :'cwL;a'��``1: <`o`- °'or` -'sd ��o °- ps"ocBN $. y « °�agaoo o{Yes�c°�coaC! �N_w-'aa°'o «N W C O m N'o•° m m 0 u N NN o F u° c m 3�Y ��; p� E t'UM 2 a— °« cy N t Y O. E « 8 X.0 a 2 C '° «^ ` C 1 a- 6 v� v 0`; W` C y p T p L So «c« a :; N E.�m°�� r~ m3 v ° o. °c+ = 3Go1. os� e ° a °�._ N -� °eo —•a °ium� P C4 n r� i i '09 .d. N 0 > tn -ccu vv « a-0 .c C 4x, w O O c ,� -c •b 6 O O u N C � � acr - a a O tM o ll d o �. -0 C', c S N M c N` z N O; of u �yy O C O. N-0 a 4 u Q c u 7 N CL c OM•�� O O i= a c N EL ` a,d`a O °-' Uds' »`��pc 'al--x o .2 a ;� 6 ee �v o N c m o 3 rn-o ds °uQ a �= U =•`-pp (D N Q c u o c d c s = G C « O` -p O :C a m W d T• I cWc f � l W � 0 w 3S v 600CLt E ar •� c t > -r, a 'ar �»'��c�.r: E L L a u N •D > O` `p a d u o CCU M �N = V` 6 O a1 Y O c ov, c r0.. C ` c •CN p O� N•� Y .r of v� o ?r °o= c n o�o�v > > 1 %0« Orni.3Z a O 1! a� ^ 0 d =� a E= trC C !pW � • 6 L`o V ` p EE - > E N o O 02 r o O 5^ 112.2 ` : 0 c O u u 0 "' c c a y V �.2 1 N Y— v.'s N W Ow t h a! 0 x N S a y c« °d E�•a �0- $ N O .`G N O o« O) c >° c a 0 uY ;OCR >o`o$a- .2 "Ea �n a1 a N •r IM �0 N O c sOco ono °tea N X01 ` C.c O x «- v c 0« O c y 0` c thou �e E a s oar _aea « p O L� ?o c 3 u c d _ p N IM -0 d° O Q U O "-Z S S.X c.?-.c o E e •.- a N W O M 'Y O M« O OWC�3ircx�-a•oo O, c V C W p .0 61 r' t` 0 N 'O p ;_ O u IL '00 c d 6� N .`C CL T• �g O t. NOY y .3 > c> a'- a ° -axmcNC M N E C V d C; N •N p>p d a a= a; a Cr u � ai= � `O= C S =,:;N �. z12. ate'; �N dK M °-0 0 y -o —a r.c o d O O 6~ O E E c N O e =` u'C 4; -0 E L yO Y ,0 w C a a; c c N N; 3E u N N O G 0 «° 0 s a 0 p C M o'a 0 a0_ e e 0'00 d y 0. O �. « 2 O�I cosNeh al0 O.; i�0 ;JE cc 7 a X s� t ) l lu N r r ) l lu N r ORIGINAL SITE PLAN Powe OU��q�O TARGET LANE E-o ' d 6ELSL26 Ol �ro I ....Q11' `S31kiI00SSd A-ld WMU 20:ZZ b66Z- ET-onu