Loading...
1d Century Blvd. Improvements ITYO CHANHASSEN 690 City Center Drive PO Box 147 Cha,hasse,. Mi,,esota 55317 P/}oll~ 952.937.1900 General Fax 952.937.5739 Engineering Department Fax 952.937.9152 Building Department Fax 952.934.2524 IVeb Site www. ci. cha,hasse,.m,.,s MEMORANDUM TO: Scott A. Botcher, City Manager FROM: DATE: Teresa J. Burgess, Public Works Director/City Engine,9~ May 3, 2001 SUBJ: Receive Feasibility Report and Call for Public Hearing for Addendum # 1 to Century Boulevard Feasibility Report City Project 97-1C It is recommended that the City Council receive the feasibility report and call a public hearing for the above-referenced project on May 29th, 2001. The feasibility report is on file in the City Engineering Department and will be attached to the May 29th, 2001 Staff Report. On March 12, 2001, the Chanhassen City Council approved the feasibility study for the construction of street and utilities to extend the existing Century Boulevard to intersect with State Trunk Highway 5 (City Project No. 97-1C). This addendum is intended to 'add the 2001 Sealcoat Project to that feasibility study. The original feasibility study is not changed except for this addition. The City desires to let the 2001 Sealcoat Project as part of the Century Boulevard bid package. This addendum is required by Minnesota State Statute in order to combine the two projects. Failure to receive the report and call the public hearing will restrict the City's ability to award one contract for the combined Century Boulevard and Sealcoating project. Attachments: Public Hearing Notice. CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA NOTICE OF PUBLIC HEARING FOR ADDENDUM NO. 1 FEASIBILITY REPORT FOR CENTURY BOULEVARD AND CITY SEALCOAT PROJECT PROJECT NO. 97-1C NOTICE IS HEREBY GIVEN that the Chanhassen City Council will meet in the City Hall Council Chambers located at 690 City Center Drive on Tuesday, May 29th, 2001 at 7:00 p.m. or as soon thereafter as possible for public heating on an addendum to the feasibility study for the construction of Century Boulevard street and utilities north of Coulter Boulevard and south of Trunk Highway 5 to add the City Sealcoat Project to the feasibility report. This project will include sanitary sewer, trunk water main, storm sewer, street and trail and sealcoatingo Proposed financing for the combined project is local funds and special assessments. All persons interested may appear and be heard at said time and place. Teresa J. Burgess, P.E. Director of Public Works/City Engineer (Publish in the Chanhassen Villager on May 17 and May 24, 2001) G:XengXpuB LIC\97-1 C~taff report-5-14-01 .doc