1d Century Blvd. Improvements ITYO
CHANHASSEN
690 City Center Drive
PO Box 147
Cha,hasse,. Mi,,esota 55317
P/}oll~
952.937.1900
General Fax
952.937.5739
Engineering Department Fax
952.937.9152
Building Department Fax
952.934.2524
IVeb Site
www. ci. cha,hasse,.m,.,s
MEMORANDUM
TO:
Scott A. Botcher, City Manager
FROM:
DATE:
Teresa J. Burgess, Public Works Director/City Engine,9~
May 3, 2001
SUBJ:
Receive Feasibility Report and Call for Public Hearing for
Addendum # 1 to Century Boulevard Feasibility Report
City Project 97-1C
It is recommended that the City Council receive the feasibility report and call a
public hearing for the above-referenced project on May 29th, 2001.
The feasibility report is on file in the City Engineering Department and will be
attached to the May 29th, 2001 Staff Report.
On March 12, 2001, the Chanhassen City Council approved the feasibility study
for the construction of street and utilities to extend the existing Century Boulevard
to intersect with State Trunk Highway 5 (City Project No. 97-1C). This
addendum is intended to 'add the 2001 Sealcoat Project to that feasibility study.
The original feasibility study is not changed except for this addition.
The City desires to let the 2001 Sealcoat Project as part of the Century Boulevard
bid package. This addendum is required by Minnesota State Statute in order to
combine the two projects.
Failure to receive the report and call the public hearing will restrict the City's
ability to award one contract for the combined Century Boulevard and
Sealcoating project.
Attachments: Public Hearing Notice.
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
NOTICE OF PUBLIC HEARING FOR
ADDENDUM NO. 1
FEASIBILITY REPORT FOR CENTURY BOULEVARD
AND
CITY SEALCOAT PROJECT
PROJECT NO. 97-1C
NOTICE IS HEREBY GIVEN that the Chanhassen City Council will meet in the City Hall
Council Chambers located at 690 City Center Drive on Tuesday, May 29th, 2001 at 7:00 p.m. or as
soon thereafter as possible for public heating on an addendum to the feasibility study for the
construction of Century Boulevard street and utilities north of Coulter Boulevard and south of
Trunk Highway 5 to add the City Sealcoat Project to the feasibility report. This project will include
sanitary sewer, trunk water main, storm sewer, street and trail and sealcoatingo Proposed financing
for the combined project is local funds and special assessments.
All persons interested may appear and be heard at said time and place.
Teresa J. Burgess, P.E.
Director of Public Works/City Engineer
(Publish in the Chanhassen Villager on May 17 and May 24, 2001)
G:XengXpuB LIC\97-1 C~taff report-5-14-01 .doc