Loading...
1g Wellhead Protection PlanCITYOF C HAS E 4 690 City Center Drive PO Box I47 ~hanhasse., Minnesota 55317 Phone 952.937.1900 General Fax 952.937.5739 ~ngineering Depamnent Fax 952.937.9152 Building Depamnent Fax 952.934.2524 Web Site wzmd. d]a,/]assen, m,.us MEMORANDUM TO: FROM: DATE: Teresa Burgess, Public Works Director/City Engineer Saam, Project Engineer ~-~ ~ Matt May 2, 2001 SUBJ: Approve Revision to Consultant Services Contract for WellheM Protection Plan (WPP) - PW379 City Council is requested to approve an increase to the consultant contract with SEH from $30,800.00 to $33,300.00. On September 26, 2000, the City Council approved a consultant agreement in the amount of $30,800.00 with SEH for: 1. Preparation of a Wellhead Protection Plan in accordance with Minnesota Statutes Chapter 4720. The original RFP for this project was written based off of the Minnesota Department ofHealth's (MDH) Initial Scoping Document. This document did not require that the aquifer which feeds Well No. 4 be modeled. However, upon reviewing the SEH prepared draft copy of the City's WPP, the MDH is now requiting that this aquifer be modeled. This constitutes a change in the scope of work outlined in the original RFP. SEH has submitted a request for a contract increase in the amount of $2,500.00. This will bring the total contract amount to $33,300.00. This amount of increase is less than 10% of the original contract amount. Attachments: 1. Letter from SEH. c: A1 Sunderman, SEH gSeng\weilhead protection planh:hange order.doc · ._',c,:.-,,,~.~ COPY R,sceiv~d - Revision h;o. A~roved by CitS, En,3inesr r>~ts. _~ -57'z1_~I ~43~ro,/.~d ~y C;.~. Council 3535 Vadnais' Center Drive, St. Paul, MN 55110-5196 architecture · engineering · 651.490.2000 environmental 651.490.2150 FAX transportation ^pri] 2s, 2ooi City of Chanhassen Wellhead Protection SEH No. A-CHANH0101.00 Teresa Burgess, P.E. City Engineer City of Chanhassen 690 City Center Drive Chanhassen, Minnesota 55317 Dear Teresa: As discussed in our recent telephOne conversation, the Minnesota Department of Health (MDH) has indicated that they will now require that Chanhassen delineate the capture zone in the Franconia- Ironton-Galesville aquifer at Municipal Well 4/4. This issue/requirement was not discussed in the MDH Initial Scoping Document dated November 10, 1999 nor in the MI)H pre-delineation meeting held on December 3, 2000. It is our opinion that this results in a change of scope from our original proposal. In addition, a second minor change in scope is the delineation of the Chanhassen "School Well" which was not in the original RFP or our proposed work scope. These two change orders will result in a total increase of approximately $2,500.00 from our original cost estimate. SEH is committed to providing superior client satisfaction on this and all of our projects. If for any reason you do not believe this is a justified change in scope, or if the additional costs do not seem reasonable please do not hesitate to contact me. If you have any questions or concerns, I can be reached at 651.490.2135. Sincerely, Short Elliott Hendri :kson Inc. Allen H. Sunde .rman, P.G. Project Manager AHS/ahs/CLK c: Matt Saam, Chanhassen CITY OF CHANHASSEN APR 2 7 2001 ENGiNEERiNG OEPT, Short Elliott Hendfickson Inc. · Your Trusted Resource · Equal Opportunity Employer