1d. 2012 Sanitary Sewer Rehabilitation: Award Construction Contract0 0 CITY OF CgANBASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us 1� MEMORANDUM TO: Paul Oehme, Director of Public Works /City Engineer 1' a FROM: Joseph Shamla, Project Engineer DATE: February 27, 2012 Qtl<16111' SUBJ: 2012 Sanitary Sewer Rehabilitation (I/I) Project No. 12 -05: Award Construction Contract PROPOSED MOTION "The City Council awards a construction contract for the 2012 Sanitary Sewer Rehabilitation (VI) Project No. 12 -05 to Minger Construction Inc. in the amount of $41,932.00." City Council approval requires a simple majority vote of the City Council present. DISCUSSION The Metropolitan Council is currently monitoring the flow of sanitary sewer from each city to determine the amount of Infiltration and Inflow (I & I) to the Met Council treatment plant. If the city exceeds the allowance set by the Met Council, the City will be surcharged a fee based on the amount flow above the allowed amount. This project will help prevent I & I from entering the sanitary sewer system. The 2012 Sanitary Sewer Rehabilitation Project will consist of raising the height of the castings in low areas to prevent clear water from entering the sanitary sewer system. The areas being addressed are east of the Chanhassen High School and north of Lake Susan (see attached map). Two of the manholes which will be raised are completely submerged. The other manholes which are being raised are submerged during the spring snow melt or large rain events. Staff feels that this area is a large contributor of I & I to the sanitary sewer system. A picture of one of the manholes to be raised. Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Paul Oehme 2012 Sanitary Sewer Rehabilitation (I /I) Project February 27, 2012 Page 2 An additional I & I project is also being considered. It would involve the installation of short liners and grouting of manholes and joints. The project location would be east of the Chanhassen High School and north of Lake Susan. The reason the projects were bid out separately is due to the work being completed by different contractors. In the past when we bid the projects together the unit prices were higher due to one contractor having to find a sub for half of the work. This project would also be eligible for partial funding from the Met Council grant. On February 17, 2012, quotes were received and opened. The quotes and engineer's opinion of cost are shown below: Timing of construction helped keep the costs down. The work will be completed in the month of March which is a slow time for contractors. The low bidder for this project was Minger Construction, Inc. This contractor has completed work in Chanhassen in the past and their work was acceptable. Funding for this project has been budgeted for in the 2012 CIP, Project SS -012, and will be paid for by the Sewer Utility fund. The amount budgeted for 2012 is $75,000. We are also expecting 50% of this project to be funded with a grant we received from the Met Council. Attachments: 1. 2012 Sanitary Sewer Rehabilitation Project Location Map 2. CIP Page SS -12 3. Grant from Met Council 4. Resolution g: \eng \public \_2012 projects \12 -05 2012 i&i \award const. contracts 021312.doe * Notes recommended items to be awarded. PAGE 4 PAGE 2 PAGE 3 � ti\ry l � 1. Susan l� City of Chanhassen 2012 Sanitary Sewer Rehabilitation Project City Project 12 -05 Project Location 0 500 1,000 2,000 Feet Legend 2012 Repair Area N � February 8, 2012 Sheet I of 5 1 1 1 1 1 Y 1 1 1 1 1 1 1 1 1 1 1 1 1 Capital Improvement Program 2012 thru 2016 City of Chanhassen, MN Project # SS -012 Project Name Inflow and Infiltration Abatement Department Sanitary Sewer Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Utilities Account #1 701 -70xx 4751 Account #3 Priority n/a Account #2 Account #4 Description Total Project Cost: $975,000 this annual project includes televising, repairs and rehabilitation of existing sanitary sewer. The program also detects and eliminates points of ;ntry of ground water and surface water into the City sanitary sewer system. Projects have been identified from the 2006 Inflow and Infiltration teport. The projects were reviewed by Metropolitan Council and approved in lieu of surcharge fees. . I Justification I City staff has identified numerous older sewer lines that are in need of repair. The City of Chanhassen pays the Metropolitan Council for sewage treatment. Those payments are based on the amount of flow generated by the City of Chanhassen. Surface water and ground water that makes its way into the system either through breaks, displaced joints, manhole covers, or private connections to the system increase the amount charged to the City for sewage disposal and increasing the load on the City's lift stations. Prior Expenditures 600,000 J Maintenance Total Prior Funding Sources 600,000 Sewer Utility Fund Total Total 75,000 75,000 75,000 75,000 75,000 375,000 tdget Impact/Other efforts may.decrease operational costs, MCES fees and emergency call outs. It is also the City's intent to use connection charges to help fund those costs. It is the City's belief that as new customers come on line those connection fees should help fund future infiltration problems. 89 2012 2013 2014 20 2016 Total 75,000 75,000 75,000 75,000 75,000 375,000 Total. 75,000 75,000 75,000 75,000 75,000 375,000 2012 2013 2014 2015 2016 Total 75,000 75,000 75,000 75,000 75,00 375,000 Shamla, Joe From: Mulcahy, Joe goe.mulcahy @metc.state.mn.us] Sent: Tuesday, March 01, 2011 1:41 PM To: Oehme, Paul Cc: Shamla, Joe Subject: Municipal I &I Grant Attachments: II_opt_out_Form.docx Mr. Oehme, The City of Chanhassen's final municipal I &I grant amount is $78,760. After all the appeals, $349,899 remained un- allocated. We received requests for $721,357 in additional eligible work. $349,899 : $721,357 = 0.485057. So, additional grants were funded at 48.5057% of additional eligible costs. Original Total Project Amount Original Eligible Amount 50% of eligible amount $209,600 $104,800 $52,400 Additional (NEW)Total Project Amount Additional Eligible Amount 48.5057 % of Additional Eligible Amount $159,144 $54,344 (159,144- 104,800) $26,360 Total Grant Amount $78,760 If you do not wish to participate in the program please let me know by March 7, 2011. Otherwise, I will send an agreement for signature in the next few weeks. The city may need to add some information for Attachment 1A (the certification) and Attachment 4 (project description and completion schedule). If you decide to opt -out (either fully or partially), please fill out the attached form, have it signed by the authorized representative, and return a hard copy to me. Thanks. Joe Mulcahy Grant Coordinator (651) 602 -1104 Fax: 602 -1130 ioe.mulcahy @metc.state.mn.us CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: February 27, 2012 RESOLUTION NO: 2012- MOTION BY: SECONDED BY: A RESOLUTION APPROVING A QUOTE FOR THE 2012 SANITARY SEWER REHABILITATION (I/I) PROJECT NO. 12-05 WHEREAS, quotes were received for the 2012 Sanitary Sewer Rehabilitation (U1) Project No. 12 -05; and WHEREAS, it appears the quote from Minger Construction in the amount of $41,932.00 is the lowest responsible quote. NOW THEREFORE, BE IT RESOLVED by the Chanhassen City Council: 1. The mayor and clerk are hereby authorized and directed to enter into a contract with Minger Construction in the name of the City of Chanhassen for the 2012 Sanitary Sewer Rehabilitation (1/1) Project No. 12 -05, according to the plans and specifications therefore approved by the City Council and on file in the office of the city clerk. Passed and adopted by the Chanhassen City Council this 27 day of February, 2012. ATTEST: Todd Gerhardt, City Manager Thomas A. Furlong, Mayor YES NO ABSENT