1b1 Arboretum Village Outlot DCITYOF
CHANHASSEN
7700 Market Boulevard
PO Box 147
Chanhassen MN 55317
Administration
PI;one: 9522271100
Fax 952 227 1110
Building Inspections
Phone; 952 2271180
Faxz 952227 1190
Engineering
Pi]one: 9522271160
Fax: 9522271170
Finance
Phone: 9522271140
Fax: 9522271110
Park & Recreation
Phone 9522271120
Fax: 952.2271110
Recreation Center
2310 Coulter Boulevard
Phoqe: 952 2271400
Fax: 9522271404
Planning &
Natural Resources
Phane 952 2271!30
Fax: 952227 11!0
Public Works
!591 Park Road
Phone 952 227 1300
Fax; 952 227 1310
Senior Center
Phor, e: 9522271125
Fax: 9522271110
Web Site
~,'WW CI cnanhassen ~Tn US
MEMORANDUM
TO: Todd Gerhardt, City Manager
FROM: Sharmeen Al-Jaff, Senior Planner
DATE: August 25, 2003
SUB J:
Executive Summary for Final Plat to Replat Outlot D, Arboretum Village
(2.84 acres), into two lots, Clearwater Development.
EXECUTIVE SUMMARY
On August 11, 2003, staff submitted the final plat for Arboretum Shopping Center to the
City Council for approval. The plat consisted of an outlot (Outlot D, Arboretum Village)
being replated into two lots and a lot (1, Block 4, Vasserman Ridge) replated into the
same. The applicant contacted staff to question some park and trail fees pertaining to the
replat of the Vasserman Ridge Lot. The city code has been amended to require payment
of park and trail fees at the time of filing the final plat. When Vasserman Ridge was
platted, the ordinance required payment of V3 of the fees at the time of plat filing and 2/3 at
the time of building permit issuance. The applicant questioned staff if he can omit the
Vasserman Ridge lot from the plat. Staff had no objection to the request since
Vasserman Ridge is already a platted lot. The remaining 2/3 of the park and trail fees will
be collected at the time of building permit issuance.
The applicant is requesting final plat approval to replat Outlot D, Arboretum Village with
an area of 2.84 acres into 2 lots. Each parcel will house a multi-tenant building. Lot 2 will
also house gas pumps and a car wash.
The site is located north of Highway 5, east of Century Boulevard and south of West 78th
Street. Access to the site is via a full access curb cut off of West 78m Street and a right in/out
off of Century Boulevard. The site is zoned Planned Unit Development- Neighborhood
Commercial.
The subdivision request is a straightforward action. Based upon the foregoing, staff is
recommending approval of the subdivision, with conditions outlined in the staff report.
Staff is recommending approval of the subdivision with no variances subject to
conditions outlined in the attached staff report.
RECOMMENDATION
Staff is recommending approval of the subdivision. The recommendation is located on
page 6 of the attached staff report.
ATTACHMENTS
1. Staff report and final plat for Arboretum Shopping Center.
The City of Chanhassen · A growing community with clean lakes, quality schools a charming downtown, thrivinc businesses winding trails, and beautibl [},arks A great place to live. 'work and Pat'
CITY OF
CHANHASSEN
PC DATE:
CC DATE: August 11 25, 2003
REVIEW DEADLINE: September 20, 2003
CASE #: 2003-8 SUB
BY: A1-Jaff
STAFF REPORT
PROPOSAL: Final Plat to Replat Outlot D, Arboretum Village and Lot 1, Block 4, Vasserman Ridge
(a,.79 2.84 acres), into ~ two lots.
LOCATION: North of Highway 5, East of Century Boulevard and South of West 78th Street.
APPLICANT:
North Coast Panners
% Clearwater Development
Scott Schmitt
24 South Olive Street
Suite 105
Waconia, MN 55387
(952) 442-8799
Property Owners
Pulte Homes of MN Corp
815 Northwest Parkway
Suite 140
Eagan, MN 55121
(65 i) 452-5727
Lundgren Bros.
935 E. Wayzata Blvd.
Wayzata, MN 55391
(952) 473-1231
PRESENT ZONING:
PUD, neighborhood commercial
2020 LAND USE PLAN: Commercial
ACREAGE: 4.79 2.84 acres
DENSITY: N.A.
SUMMARY OF REQUEST: Replat of an outlot and a lot into 5; 2 lots. Staff is recommending
approval of the application.
LEVEL OF CITY DISCRETION IN DECISION-MAKING: The City's discretion in approving or
denying a preliminary plat is limited to whether or not the proposed plat meets the standards outlined in
the Subdivision Regulations and Zoning Ordinance. If it meets these standards, the City must approve
the preliminary plat. This is a quasi-judicial decision.
Clearwater Development
August -14 25, 2003
Page 2
BACKGROUND
On July 28, 2003, the Chanhassen City Council approved the following:
· Planned Unit Development amendment in the commercial portion of Arboretum Village and
Vasserman Ridge to clarify parking setbacks and establish sign criteria.
· Conditional Use Permit #2003-2 CLIP to allow the construction of a convenience store with gas
pumps on Lot 2, Block 1, Arboretum Shopping Center, with conditions.
· Site Plan Review 2003-6 SPR for the construction of three multi-tenant buildings, one of which
contains a convenience store with gas pumps and coffee shop, and a car wash as shown in plans
prepared by Damberg, Scott, Gerzina, Wagner Architects dated Received May 16, 2003, subject
to conditions.
· Preliminary plat to replat Outlot D, Arboretum Village and Lot 1, Block 4, Vasserman Ridge
(4.79 acres), 2003-8 SUB into three lots as shown on plans dated June 4, 2003, subject to the
following conditions:
1. The developer shall provide a cross access and cross parking agreement for the three
parcels.
Finding: This condition still applies.
2. The following park dedication charges will apply: Lot 1- $8,540; Lot 2- $11,620; and
Lot 3 - $13,650, which shall be paid prior to recording of the final plat.
Finding: This condition still applies.
3. The total SWMP fees of $58,824.57 are due payable to the city at time of final plat
recording.
Finding: This condition has been modified to read "The total SWMP fees of $58,337.00
are due payable to the city at time of final plat recording."
4. Public utility improvements will be required to be constructed in accordance with the
city's latest edition of Standard Specifications and Detail Plates. Detailed construction
plans and specifications will be required at the time of final platting. The applicant will
also be required to enter into a development contract with the city and supply the
necessary financial security in the form of a letter of credit or cash escrow to guarantee
installation of the improvements and the conditions of final plat approval. Permits from
the appropriate regulatory agencies must be obtained, including but not limited to, the
MPCA, Department of Health, Watershed District, MnDOT, etc.
Finding: This condition has been partially met. Detailed construction Plans have been
submitted."
On August 11, 2003, staff submitted the final plat for Arboretum Shopping Center to the City
Council for approval. The plat consisted of an outlot (Outlot D, Arboretum Village) being replated
into two lots and a lot (1, Block 4, Vasserman Ridge) replated into the same. The applicant
contacted staff to question some park and trail fees pertaining to the replat of the Vasserman
Clearwater Development
August 44 25, 2003
Page 3
Ridge Lot. The city code has been amended to require payment of park and trail fees at the time
of filing the final plat. When Vasserman Ridge was platted, the ordinance required payment of ~
of the fees at the time of plat filing and % at the time of building permit issuance. The applicant
questioned staff if he can omit the Vasserman Ridge lot from the plat. Staff had no objection to
the request since Vasserman Ridge is already a platted lot. The remaining % of the park and trail
fees will be collected at the time of building permit issuance.
The following constitute staff's review of the final plat.
PROPOSAL/SUMMARY
The applicant is requesting final plat approval to replat Outlot D, Arboretum Village and Lot 1, Block ~i,
Vasserman Ridge (4-.-.-.~ 2.84 acres), 2003-8 SUB into thr-ee two lots. Each parcel will house a multi-
tenant building. Lot 2 will also house gas pumps and a car wash.
The site, with an area of 4.79 2.84 acres, is located north of Highway 5, east of Century Boulevard and
south of West 78th Street. Access to the site is via a full access curb cut off of West 78th Street and a right
in/out off of Century Boulevard. The site is zoned Planned Unit Development- Neighborhood Commercial.
The subdivision request is a straightforward action. Based upon the foregoing, staff is recommending
approval of the subdivision, with conditions outlined in the staff report.
SUBDIVISION
The applicant is requesting preliminary plat approval to replat ~ 2.84 acres into three two lots. The
site is zoned Planned Unit Development-Neighborhood Oriented Retail District and is located north of
Highway 5, east of Century Boulevard, and north of West 78th Street.
Lot 1 is proposed to be the future site of multi-tenant Building "A" with an area of 1.26 acres. Lot 2 is
proposed to house a convenience store with gas pumps, a coffee shop with a drive thru and a car wash. Lot
2 has an area of 1.57 acres. Lot 3 will house Building "C" which will be occupied by two restaurants. Lot
3 has an area of 1.95 acres.
The ordinance states that, "All lots shall abut for their full required minimum frontage on a public street
as required by the zoning ordinance; or be accessed by a private street; or a flag lot which shall have a
minimum of thirty feet of frontage on a public street."
All three Both lots have street frontage. Access, on the other hand, is mainly gained from West 78th Street
via a private street and a cross access agreement between the properties. Private streets are permitted in this
district if the following conditions exist:
1. The prevailing development pattern makes it unfeasible or inappropriate to construct a public
street. In making this determination the city may consider the location of existing property lines
Clearwater Development
August 44 25, 2003
Page 4
and homes, local or geographic conditions, and the existence of wetlands.
After reviewing the surrounding area, it is concluded that an extension of the public street system
is not required to serve other parcels in the area, improve access, or to provide a street system
consistent with the comprehensive plan.
3. The use of a private street will permit enhanced protection of the city's natural resources
including wetlands and forested areas.
A public street is not required to serve these parcels. In fact, the majority of our commercial
establishments have cross access easements, share curb cuts and access (Market Square, Chanhassen
Retail, Frontier, Byerly's, Crossroads Plaza, etc.).
Access to the subdivision will be provided via a full access curb cut off of West 78th Street and a right in/out
only off of Century Boulevard. The subdivision request is a relatively straightforward action and staff is
recommending approval with conditions.
SUBDIVISION FINDINGS
1. The proposed subdivision is consistent with the zoning ordinance;
Finding: The subdivision meets the intent of the city code subject to the conditions of the
staff report and the PUD.
The proposed subdivision is consistent with all applicable city, county and regional plans including
but not limited to the city's comprehensive plan;
Finding: The proposed subdivision is consistent with applicable plans.
The physical characteristics of the site, including but not limited to topography, soils, vegetation,
susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are
suitable for the proposed development;
Finding: The proposed site is suitable for development subject to the conditions specified in
this report.
The proposed subdivision makes adequate provision for water supply, storm drainage, sewage
disposal, streets, erosion control and all other improvements required by this chapter;
Finding: The proposed subdivision will be served by adequate urban infrastructure.
5. The proposed subdivision will not cause environmental damage;
Clearwater Development
August 44 25, 2003
Page 5
Finding: The proposed subdivision will not cause environmental damage subject to
conditions of approval.
6. The proposed subdivision will not conflict with easements of record.
Finding: The proposed subdivision will not conflict with existing easements, but rather will
expand and provide all necessary easements.
The proposed subdivision is not premature. A subdivision is premature if any of the following
exists:
ao
Lack of adequate storm water drainage.
Lack of adequate roads.
Lack of adequate sanitary sewer systems.
Lack of adequate off-site public improvements or support systems.
Finding: The proposed subdivision is provided with adequate urban infrastructure.
WETLANDS
No wetlands exist on site.
GRADING/DRAINAGE/EROSION CONTROL
The Phase I portion of the site was previously rough graded as a part of the Arboretum Village
development. As such, the only area where the grades will be significantly changed is for the
berming along West 78th Street.
Rough grading for Phase II of the site is currently being completed with the Vasserman Ridge 2nd
Addition project. As such, the existing contours for the Phase II portion of the site should reflect the
Vasserman Ridge 2"~ Addition grading.
· Drainage for the Phase I portion will be routed to an existing pond on the west side of Century
Boulevard. This pond has been previously sized to accommodate the runoff from the Phase I site.
Likewise, most of the Phase II site will drain to an existing pond just east of the site. This pond is
being increased in size to accommodate the Phase II site as a part of the Vasserman Ridge 2nd
Addition project.
Erosion control measures and site restoration must be completed in accordance with the City's Best
Management Practice Handbook (BMPH). The applicant is proposing Type III erosion control fence
for the area adjacent to the existing pond just east of the site. In addition, erosion control blankets
are shown on the steep slopes of the site.
Clearwater Development
August -14 25, 2003
Page 6
UTILITIES
The proposed sanitary sewer and watermains will be considered public utility lines since they will
serve more than one lot. In addition, the public watermain will be looped through the site and
connect with the existing water line in West 78th Street. A 30froot wide public easement has been
shown over the public sewer and watermain.
Each of the underlying parcels has been previously assessed for utilities and those assessments have
been paid. Sanitary sewer and water hookup charges along with the Met Council's SAC fee will be
due at the time of building permit issuance. All of these charges are based on the number of SAC
units assigned by the Met Council. The current 2003 sanitary hookup charge is $1,440/unit, the
water hookup charge is $1,876/unit and the SAC fee is $1,274/unit.
Public utility improvements are required to be constructed in accordance with the City's latest
edition of Standard Specifications and Detail Plates. Detailed construction plans and specifications
have been submitted for review. The applicant will be required to enter into a development contract
with the City and supply the necessary financial security in the form of a letter of credit or cash
escrow to guarantee installation of the improvements and the conditions of final plat approval.
Permits from the appropriate regulatory agencies must be obtained, including but not limited to the
MPCA, Department of Health, Watershed District, MnDOT, etc.
STREETS & DRIVE AISLES
The main drive aisle through the site will be a private street since it serves multiple lots. As such, the
road must be a minimum of 26-feet wide, built to a 9-ton design, and enclosed within a 40-foot wide
private easement. The developer is required to provide inspection reports to the City verifying that the
private street is built to these standards.
RECOMMENDATION
Staff recommends the City Council adopt the following motion:
"The City Council approves the final plat to replat Outlot D, Arboretum Village and Lot 1, Block 4,
Vasserman Ridge (4.79 2.84 acres), 2003-8 SUB into three two lots as shown on plans dated J-tree4
August 13, 2003, subject to the following conditions:
1. The developer shall provide a cross access and cross parking agreement for the three
parcels.
2. The following park dedication charges will apply: Lot 1- $8,540; Lot 2- $11,620; aha
Lot 3 $13,650, which shall be paid prior to recording of the final plat.
3. The total SWMP fees of $58,337.00 $34,710 are due payable to the city at time of final
plat recording.
Clearwater Development
August 44 25, 2003
Page 7
o
o
Public utility improvements will be required to be constructed in accordance with the
city's latest edition of Standard Specifications and Detail Plates. The applicant will also
be required to enter into a development contract with the city and supply the necessary
financial security in the form of a letter of credit or cash escrow to guarantee installation
of the improvements and the conditions of final plat approval. Permits from the
appropriate regulatory agencies must be obtained, including but not limited to, the
MPCA, Department of Health, Watershed District, MnDOT, etc.
The main drive aisle through the site must be installed with the first phase of
development.
Street lights are required at the southeast intersection of W. 78th Street/Century Boulevard
and at the southeast comer of W. 78th Street and the new drive aisle.
The developer shall be responsible for a pedestrian crosswalk on the west side of the
driveway at West 78th Street. The crosswalk will be from the south to the north side of
West 78th Street and connect with the existing bituminous trail.
A "No U-turn" sign will be required at the north end of the median on Century
Boulevard.
Private easements are required for the storm sewer lines that run from one lot to another.
10.
11.
12.
13.
Seed and mulch or sod the site within two weeks of grading completion. If dirt is
required to be brought into or out of the site, provide a haul route for review and
approval.
Minimum 30-foot wide easements will be required over the public portion of the utility
lines.
Sanitary sewer and water hookup charges along with the Met Council's SAC fee will be
due at the time of building permit issuance. All of these charges are based on the number
of SAC units assigned by the Met Council. The current 2003 sanitary hookup charge is
$1,440/unit, the water hookup charge is $1,876/unit and the SAC fee is $1,274/unit.
The main drive aisle through the site will be a private street since it serves multiple lots.
As such, the road must be a minimum of 26-feet wide, built to a 9-ton design, and
enclosed within a 40-foot wide private easement."
ATTACHMENTS
1. Final plat.