Loading...
1c1 Shadow Ridge 3rd AdditionCITYOF O~y Center Drive, PO Box 147 ~anhassen, Minnesota 55317 Phone 612.937. I900 5eneral l ax 612.93Z5739 gineering Fax 612.93Z9152 Wic Safe{y Fax 612.934.2524 ~eb wzw. ci. chanhassen.,m.m MEMORANDUM TO: FROM: DATE: Todd Gerhardt, Acting City Manager Bob Oenerous, Senior Planner 0 % April 12, 1999 SUB J: Shadow Ridge 3ra Addition, Final Plat Approval, 94-4 SUB PROPOSAL SUMMARY The applicant is requesting final plat aPproval creating one lot for Shadow Ridge 3rd Addition. The proposed lot complies with the requirements of the RSF district. Staff is recommending approval of the final plat for the 3rd Addition subject to the conditions of the staff report. BACKGROUND On August 26, 1996, the Chanhassen City Council approved the preliminary and final plat for ShadOw Ridge 2na Addition splitting one lot into two lots. On September 12, 1994, the Chanhassen City Council approved the final plat for Shadow Ridge (Sub 94-4) creating 17 lots, one outlot, and associated right-of- way; the rezoning of the property from RR, rural residential, to RSF, single family residential; and setback variances to preserve natural features. On July 25, 1994, the Chanhassen City Council approved the preliminary plat for Shadow Ridge. FINAL PLAT PARKS & RECREATION The developer will be required to Pay park and trail fees pursuant to city ordinance. LANDSCAPING The development preserves a signifi.cant area of eXisting vegetation. A minimum of one tree must be located within the front yard of each lot. fity of Chanhassen. A growing commum'ff wt?h clean lakes, quali(y schvoh, a charming downtown, thriving businesses, and beaut!fal parks. A great place to live, work, and plaY' 0£~ )91. )8~ LIII Shadow Ridge 3rd Addition Final Plat April 12, 1999 Page 2 STORMWATER MANAGEMENT The proposed single family residential development of 0.98 developable acres is responsible for a water quality connection and a water quantity charge of $2,447.00. GRADING In conjunction with Phase I of Shadow Ridge, the lots along Yosemite Lane were partially graded. Over the last few years, additional fill material has been placed on Lot 1 to create the proposed house pad. Due to the sanitary sewer elevation in Yosemite, it was necessary to elevate the house pad approximately three feet higher than the preliminary plat proposal. Staff does not anticipate any additional fill material will be needed to build on this lot. Some additional tree loss may be encountered with the extension of the sewer and water service to the property from Yosemite Lane. DRAINAGE Due to the size of this development, no storm drainage improvements are necessary. The front portion of the property will drain towards Yosemite and eventually back towards the wetland through adjacent lots to the south. The rear yard area of the lot will drain towards the existing wetland. The development will be required to pay Surface Water Management fees pursuant to city ordinance. Phase I of the development did not include the area now being platted. Therefore, staff has calculated the Surface Water Management fees for this phase at $2,447.00 assuming a net developable acreage of 0.98 acres. These fees are payable prior to the city signing the final plat. UTILITIES During review of the preliminary plat for this subdivision, the lots along Yosemite were considered premature without the extension of sanitary sewer and water service along Yosemite from Lake Lucy Road and Yosemite being upgraded to an urban street section. The developerhas demonstrated that sanitary sewer service could be extended from the existing sanitary manhole in Yosemite to the lot. The upper level of the home will be serviced via gravity. The basement will require the use of a grinder pump however, Staff has reviewed this proposal and considers it feasible given the timing of extending sewer and water along Yosemite. The remaining lots south of Lot 1 will require sanitary sewer and water Shadow Ridge 3rd Addition Final Plat April 12, 1999 Page 3 extension along Yosemite from Lake Lucy Road and upgrading Yosemite to urban street standards in conjunction with final platting. The developer will be responsible for sanitary sewer and water hook up and connection charges in the amount of $10,736.00 (1999 charges). The developer will be entitled to a credit against the sewer and water hook up fees for extending the sewer and water services to the property line. Staff has estimated a typical sanitary sewer and water service at $2,500.00. Therefore, the developer's net sewer and water hook up connection fees payable to the city will be $8,236.00. The developer will also need to supply an escrow in the amount of $2,500.00 with the city for street restoration and supply the city with a two-year maintenance bond to guarantee against poor materials and faulty workmanship. The developer shall be responsible for obtaining a Construction in Right-of-Way Permit and the appropriate building permits from the city for the extension of the sewer and water service to the lot. STREETS Lot 1, Block 1 is adjacent to Yosemite which is a substandard urban street section. Staff does not recommend that the segment of roadway in front of this lot be upgraded at this time to city urban standards until the remaining outlot is developed. It should be denoted in the development contract that this lot will be subject to future street assessments for the upgrade of Yosemite Road. The parcel north of this development (Stewart) is serviced via a gravel driveway from Yosemite Avenue. The developer is dedicating one-half of the necessary right-of-way (30 feet) to provide public right-of-way for future development of the Stewart parcel in accordance with preliminary plat approval. EROSION CONTROL Erosion control measures have been installed adjacent to the wetlands in conjunction with placing fill on the lot. Maintenance of the existing erosion control fence will be required until all disturbed areas are revegetated. Additional erosion control fence shall be provided adjacent to Yosemite Road. All disturbed areas as a result of site grading shall be restored within two weeks after grading is completed in accordance with the City's Best Management Practice Handbook. Shadow Ridge 3rd Addition Final Plat April 12, 1999 Page 4 COMPLIANCE TABLE Description Code Lot 1, Block 1 Outlot A ROW Total Minimum setbacks: Area (Sq. Ft.) minimum 15,000 42,748.6 155,173.8 10,408.1 208,330.6 Frontage (Ft.) 90 127.3 491.1 Depth (Ft.) 125 338.1 310.8 Front yard: Rear yard: Side yard: Wetland: thirty (30) feet thirty (30) feet ten (10) feet fifty (50) feet from the wetland edge REVIEW OF CONDITIONS OF APPROVAL Staff has reviewed the conditions of approval and ~~td6'a determination of the compliance with the conditions. The applicant shall provide detailed storm sewer calculations for 1 O-year and 100-year storm events and provide ponding calculations for stormwater quality/quantity ponds in accordance with the city's Surface Water Management Plan for the city engineer to review and approve. The applicant shall provide detailed pre-developed and post- developed stormwater calculations for 100-year storm events. Normal water level and high water level calculations in existing basins and individual storm sewer calculations between each basin segment will also be required to determine if sufficient catch basins are being installed. In addition, water quality ponding design calculations shall be based on Walker's Pondnet model. *This condition does not apply to this phase. The proposed development will be responsible for a water quality assessment fee of $25,938.00 assuming 13.1 acres of developable land. Water quality assessments will be waived if the applicant constructs an on-site Walker pretreatment basin. The fees will be negotiated based on the developer's contribution to the city's SWMP for the site. SWMP fees for water quantity and quality are pending formal approval of the SWMP by City Council. If there are any modifications to the fees, they will be changed prior to final plan. Shadow Ridge 3rd Addition Final Plat April 12, 1999 Page 5 *This condition shall be modified as follows: The proposed single family residential development of 0.98 developable acres is responsible for a water quality connection an, a water quantity charge of $2,447.00 which shall be payable to the city prior to recording the final plat. Stormwater runoff from Lot 16 and the access road is shown to discharge to Lake Luc3 Road. The applicant shall demonstrate the runoff fi.om this portion of land can be handled by the existing drainage system on Lake Lucy Road. Detailed storm calculations shall be provided to the city. *This condition is not applicable to this phase. The applicant shall report to the City Engineer the location of all drain tiles found during construction. Drain tiles shall be relocated or abandoned as directed by the city engineer. *This condition does not apply to this phase. The existing home on Lot 1, Block 1, will be required to connect to city water once th~ well fails. *This condition does not apply to this phase. The applicant shall work with staff in determining the feasible location to extend sanitary sewer and water services to the north (Stewart parcel). *This condition does not apply to this phase. The grading plan shall be revised to limit the house types on Lots 2, 3, 6 and 7, Block to rambler style homes and Lots 4, 5, 8 and 13, Block I, to side/comer walkout type dwelling. The lot grading on Lots 2 and 3, Block 1, shall be revised to maintain the existing "sheet flow" to the west. Concentrated or funneled runoff shall be prohibited *This condition does not apply to this phase. · The existing outbuildings and septic system and wells on the site shall be abandoned i accordance with city and/or state codes. *This condition does not apply to this phase. Shadow Ridge 3rd Addition Final Plat April 12, 1999 Page 6 The stormwater retention pond shall be relocated further to the northeast on Lots 10 and 11. The storm sewer system between Lots 15 and 16, Block 1, shall be redirected within the proposed street and combined into one discharge point on Lot 11, Block 1. *This condition does not apply to this phase. 10. Lots 1 through 5, Block 2, shall be platted as an outlot due to lack of adequate utilities and street. This outlot would not be subdividable or buildable until Yosemite Road is upgraded to the city's urban standard, municipal sanitary sewer and water is extended adjacent to the parcel, and wetland setback and buffer area issues are resolved. *This condition shall be modified as follows: Outlot A, Shadow Ride 3rd Addition, is not subdividable or buildable until Yosemite Road is upgraded to the city's urban standard and municipal sewer and water is extended adjacent to the parcel and wetland setback and buffer area issues are resolved. 11. Drainage and utility easements shall be dedicated for all utility lines outside the plat. The minimum easement width shall be 20 feet. *This condition has been met. 12. The applicant shall enter into a development contract with the city and provide the necessary financial security to guarantee the installation of the public improvements and compliance of the conditions of approval. *This conditions shall be modified as follows: The applicant shall enter into an addendum to the development contract for Shadow Ridge with the city and provide the necessary financial security to guarantee the installation of the public improvements and compliance of the conditions of approval. 13. All utility and street improvements Shall be constructed in accordance with the latest addition edition of the city's standard specification and detail plates. Detailed street and utility construction plans and specifications shall be submitted to staff for review and formal approval by the City Council in conjunction with final plat consideration. *This condition does not apply t° this phase.. 14. The applicant shall apply for and obtain the necessary permits form the Watershed District, DNR, Department of Health, MPCA, and other appropriate regulatory agencies and comply with their conditions of approval. Shadow Ridge 3rd Addition Final Plat April 12, 1999 Page 7 *This condition does not apply to this phase. 15. Upon completion of site grading, all disturbed areas shall be restored with seed and disc-mulched or wood-fiber blanket within two weeks of completing the site grading unless the city's best management practice handbook planting dates dictate otherwise. All erosion control measures shall be in accordance to the city's best management practice handbook. *This condition still applies. 16. Upon completion, the developer shall dedicate to the city the utility and street improvements within the public right-of-way and drainage and utility easements for permanent ownership. *This condition does not apply to this phase. 17. Wetland buffer areas shall be surveyed and staked in accordance with the city's wetland ordinance. The city will install wetland buffer edge signs before construction begins and will charge the applicant $20 per sign. *This condition does not apply to this phase. 18. Prior to the final plat approval, a woodland management plan and tree preservation plan must be developed by a landscape professional pursuant to section 18-61 (d) of the City Code. This pan must be submitted to the city for staff approval. *This condition has been met. 19. A 25 foot front setback is allowed on Lot 2, Block 1, and a 20 foot front setback is granted on Lots 3 through 16, Block 1, to move the building pads away from the top of the slope and to preserve trees. The applicant shall incorporate retaining walls and custom grading to assure that slopes and trees are minimally impacted. Staff encourages the developer to incorporate bluffprotection guidelines in the development. *This condition does not apply to this phase. 20. Pay park and trail fees as specified by city ordinance. *This condition still applies. Shadow Ridge 3rd Addition Final Plat April 12, 1999 Page 8 21. Submit revised utility plans for approval of locations of fire hydrants. Fire hydrant spacing is 300 foot maximum. *This condition does not apply to this phase. 22. A ten foot clear space must be maintained around all fire hydrants, i.e., street lamps, trees, shrubs, bushes, NSP, NW Bell, cable TV, transformer boxes. This is to ensure that fire hydrants can be quickly located and safely operated. *This condition does not apply to this phase. 23. Submit turning radius and cul-de-sac dimensions to the City Engineer and Fire Marshal for approval. *This condition does not apply to this phase. 24. Advise Fire Marshal of the status of water main and fire hydrant placement and spacing on Yosemite Avenue, west of Lots 1 - 5, Block 2. *This condition does not apply to this phase. 25. Revise the preliminary grading plan to show the location of house pads using standard designation and lowest level floor and garage elevations prior to final plat approval. *This condition has been met. 26. The tree preservation areas shall be delineated on the final grading plan as part of the final plat approval. The tree preservation areas in Lots 2, 3, 11, 12, 14, and 15 shall be re-evaluated and either be revised or realigned to avoid grading areas, or have the grading plan revised to stay out of the tree preservation areas, or have the woodland management plan address the replanting of these areas. *This condition does not apply to this phase. 27. Calculations for buildable space on each lot shall be forwarded to City Council. *This condition does not apply to this phaSe. 28. In conjunction with submittal of a building permit application for Lot 17, Block 1, the applicant shall submit detailed grading, drainage and erosion control plan subject to the Watershed District's approval prior to the issuance of a building permit. Shadow Ridge 3rd Addition Final Plat April 12, 1999 Page 9 *This condition does not apply to this phase. 29. The grading of the outlot is contingent on the applicant providing type I erosion control around the wetlands and maintaining a minimum 20 foot buffer strip around the northerly wetland (basin 3) and a minimum 30 foot buffer strip around the southerly wetland (basin 2) as part of the revised grading plan. *This condition has been met. Upon review of the plans prepared by Schoell & Madson dated March 18, 1999, the following recommendations are proposed to be added: A sanitary sewer and water hook up and connection charge shall be collected at time of building permit issuance for Lot 1, Block 1. A credit of $2,500.00 shall be applied to the sewer and water connection charge for the developer installing a water and sewer service to the property. The developer shall escrow with the city $2,500.00 to guarantee street restoration in conjunction with extending the sewer and water service to Lot 1, Block 1. In addition, the developer shall provide the city with a two-year maintenance bond to guarantee against poor material and faulty workmanship. 3. Lot 1, Block 1 will be subject to future street and storm drainage assessments in conjunction with the upgrade of Yosemite to city urban street standards. Erosion control fencing shall be installed and maintained around the grading limits until all disturbed areas are revegetated and the city authorizes removal. The developer shall escrow with the city $1,000.00 to maintain erosion control measures. RECOMMENDATION Staff recommends that the City Council adopt the following motion: "The City Council approves SUB 94-4 granting Final Plat approval for Shadow Ridge 3rd Addition creating one lot and one outlot subject to the following conditions: Shadow Ridge 3rd Addition Final Plat April 12, 1999 Page 10 o o o o The proposed single family residential development of 0.98 developable acres is responsible for a water quality connection and a water quantity charge of $2,447.00 which shall be payable to the city prior to recording the final plat. Outlot A, Shadow Ride 3rd Addition, is not subdividable or buildable until Yosemite Road is upgraded to the city's urban standard and municipal sewer and water is extended adjacent to the parcel and wetland setback and buffer area issues are resolved. The applicant shall enter into an addendum to the development contract for Shadow Ridge with the city and provide the necessary financial security to guarantee the installation of the public improvements and Compliance of the conditions of approval Upon completion of site grading, all disturbed areas shall be restored with seed and disc-mulched or wood-fiber blanket within two weeks of completing the site grading unless the city's best management practice handbook planting dates dictate otherwise. All erosion control measures shall be in accordance to the city's best management practice handbook. Pay park and trail fees as specified by city ordirf,'itte~? A sanitary sewer and water hook up and connection charge shall be collected at time of building permit issuance for Lot 1, Block 1. A credit of $2,500.00 shall be applied to the sewer and water connection charge for the developer installing a water and sewer service to the property. The developer shall escrow with the city $2,500.00 to guarantee street restoration in conjunction with extending the sewer and water service to Lot 1, Block 1. In addition, the developer shall provide the city with a two-year maintenance bond to guarantee against poor material and faulty workmanship. Lot 1, Block 1, Shadow Ridge 3rd Addition, will be subject to future street and storm drainage assessments in conjunction with the upgrade of Yosemite to city urban street standards. Erosion control fencing shall be installed and maintained around the grading limits until all disturbed areas are revegetated and the city authorizes removal. The developer shall escrow with the city $1,000.00 to maintain erosion control measures." Shadow Ridge 3rd Addition Final Plat April 12, 1999 Page 11 ATTACHMENT 1. Final plat. g:\plan\bgXshadow ridge 3rd.doe