Loading...
2. Award of Bid, TH 41 Trail Extension & Stair Connector0 CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 7901 Park Place Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Todd Hoffman, Park and Recreation Director DATE: August 27, 2012 6� SUBJ: Award of Bid: TH 41 Trail Extension and Stairway Connector a PROPOSED MOTION The City Council awards the TH 41 Trail Extension and Stairway Connector Project to Midwest Asphalt Corporation in the amount of $293,750.05 and amends the 2012 Park & Trail Acquisition & Development CIP, increasing the budget for this project to $294,000. Approval requires a simple majority vote of the city council. BACKGROUND On February 13, 2012, the City Council approved the plans and specifications for City Project No. PK &T for the T.H. 41 Trail Extension, At -Grade Pedestrian Crossing and Stairway Connector and authorized the advertisement for bids. On June 25, 2012, the City Council approved Flashing Signal Agreement No. 000887M for a State Highway 41 Pedestrian Crossing to be constructed as a component of the trail extension project. OVERVIEW The City of Chanhassen and Carver County are currently participating in a joint powers agreement to construct a pedestrian trail and underpass within the Highway 41 corridor. This project will construct a trail with a northern terminus at the Minnetonka Middle School driveway. In early discussions with Carver County, it was determined that due to funding reimbursement requirements associated with the Federal Transportation Enhancement grant, the joint project could not be expanded to extend the trail north of the driveway or build the stairway connector. Therefore, the city entered into a separate professional services agreement with SRF Consulting Group to design and build the "city" trail extension and stairway. The northerly trail extension starts at the school driveway and extends 450 feet to Chaska Road and includes a pedestrian crossing of Highway 41 immediately south of Chaska Road. A pedestrian crossing in the vicinity of the school has been sought after for many years. The design of the crossing features a raised median landing in between the north and southbound lanes, an amenity that will provide a refuge for pedestrians as they negotiate crossing this busy roadway in addition to a flashing beacon signal system. Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Mr. Todd Gerhardt August 27, 2012 Page 2 The stairway connection included in this project was a feature identified during the development review phase of the Highover neighborhood. The stairway is designed to include a series of 5 -ft. long and 6t /2 -ft. wide landings connected by three 6'/2 -inch risers. The top side of the stairway will be connected to Highover Drive with a concrete sidewalk and the bottom side of the stairway will be connected to the new Highway 41 trail in the same fashion. FUNDING This project is scheduled in the 2012 Park and Trail Improvement CIP at a cost of $205,000. The final engineer's estimate was $258,222. Approval of this project in the amount of $293,750.05 will require that the City Council amend the Park and Trail Acquisition and Development CIP, increasing this project budget to $294,000. The park fund will finance this project and it is anticipated that Minnetonka School District 276 will contribute $50,000. SCHEDULE Work is anticipated to commence shortly after bid award with substantial completion of the trail and stairway portion of the project being attained by year's end. The goal is also to have the flashing beacon system installed and operational by year's end, but dependent on material delivery and weather, this work may not be completed until the spring of 2013. ATTACHMENTS 1. Bid Abstract 2. Engineer's Review of Bids 3. CIP Budget Sheet Park and Recreation Commission Mike McGarvey, SRF Consulting Midwest Asphalt Corporation g: \park \th \hwy 41 trail and underpass \bid award.doc NJ CHANHASSEN SRF Project Number 7237 T. H. 41 TRAIL Bid Abstract CONSULTING GROUP, INC 17- Aug -12 0 Engineer's Estimate 1 Midwest Asphalt 2 MN State Curb & 3 Rosti Construction Corporation Gutter Bid Item Bid Item Description Number Quantity Unit Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Item Category 0 2011.601 CONSTRUCTION SURVEYING 1 LUMP SUM 5,000.00 5,000.00 6,000.00 6,000.00 12,750.00 12,750.00 12,000.00 12,000.00 2021.501 MOBILIZATION 1 LUMP SUM 15,000.00 15,000.00 3,000.00 3,000.00 31,000.00 31,000.00 31,000.00 31,000.00 2101.501 CLEARING 0.5 ACRE 3,000.00 1,500.00 8,600.00 4,300.00 6,250.00 4,125.00 7,000.00 3,500.00 2101.506 GRUBBING 0.5 ACRE 3,000.00 1,500.00 2,700.00 1,350.00 2,575.00 1,287.50 7,000.00 3,500.00 2102.501 PAVEMENT MARKING REMOVAL 400 SO FT 1.00 400.00 2.70 1,080.00 1.00 400.00 5.00 2,000.00 2104.501 REMOVE CURB AND GUTTER 120 LIN FT 5.00 600.00 6.60 792.00 7.50 900.00 15.00 1,800.00 2104.503 REMOVE BITUMINOUS PAVEMENT 2800 SO FT 2.50 7,000.00 0.85 2,380.00 1.40 3,920.00 15.00 42,000.00 2104.503 REMOVE BITUMINOUS WALK 1800 $O FT 0.50 900.00 0.40 720.00 0.70 1,260.00 15.00 27,000.00 2104.503 REMOVE CONCRETE SIDEWALK 320 SO FT 1.00 320.00 1.00 320.00 1.50 , 480.00 20.00 6,400.00 2104.509 REMOVE CONCRETE APRON 1 EACH 350.00 350.00 500.00 500.00 1,030.00 1,030.00 31000.00 3,000.00 2104.509 REMOVE DROP INLET 2 EACH 400.00 800.00 1,080.00 2,160.00 1,030.00 2,060.00 1,200.00 2,400.00 2104.513 SAWING BIT PAVEMENT (FULL DEPTH) 500 LIN FT 5.00 2,500.00 2.65 1,325.00 5.00 ' 2,500.00 4.00 2,000.00 2104.523 SALVAGE SIGN TYPE C 2 EACH 40.00 80.00 27.00 54.00 33.00 66.00 100.00 200.00 2105.501 COMMON EXCAVATION (P) 357 CU YD 5.00 1,785.00 11.40 4,069.80 12.00 4,284.00 30.00 10,710.00 2105.507 SUBGRADE EXCAVATION 200 CU YD 7.50 1,500.00 11.75 2,350.00 24.50 4,900.00 10.00 2,000.00 2105.522 SELECT GRANULAR BORROW (CV) 200 CU YD 12.00 2,400.00 19.00 3,800.00 28.00 5,600.00 10.00 2,000.00 2105.523 COMMON BORROW (LV) 371 CU YD 10.00 3,710.00 14.00 5,194.00 11.50 4,266.50 10.00 3,710.00 2105.604 GEOTEXTILE FABRIC TYPE V 300 So YD 1.50 450.00 2.50 750.00 1.25 375.00 5.00 1,500.00 2123.610 1.5 CU YD BACKHOE 10 HOUR 100.00 1,000.00 125.00 1,250.00 135.00 1,350.00 100.00 1,000.00 2123.610 STREET SWEEPER (WITH PICKUP BROOM) 10 HOUR 100.00 1 110.00 1 110.00 1,100.00 100.00 1,000.00 2211.503 AGGREGATE BASE (CV) CLASS 5 280 CU YD 25.00 7,000.00 33.00 9,240.00 32.00 8,960.00 40.00 11,200.00 2357.502 BITUMINOUS MATERIAL FOR TACK COAT 12 GAL 5.00 60.00 4.00 48.00 7.75 93.00 20.00 240.00 2360.501 TYPE SP 12.5 WEARING COURSE MIX (4,F) 50 TON 200.00 10,000.00 143.00 7,150.00 133.00 6,650.00 150.00 7,500.00 ,2360.503 TYPE SP 12.5 WEARING COURSE MIX (2,13) 1325 SO YD 18.00 23,850.00 15.00 19,875.00 14.30 18,947.50 3.0" THICK 20.00 26,500.00 2411.601 CONCRETE STEPS 1 LUMP SUM 60,000.00 60,000.00 83,000.00 83,000.00 78,000.00 78,000.00 100,000.00 100,000.00 2501.515 18" RC PIPE APRON - 1 EACH 600.00 600.00 1,400.00 1,400.00 1,390.00 1,390.00 1,500.00 1,500.00 2501.561 18" RC PIPE CULVERT DES 3006 CL V 8 LIN FT 100.00 800.00 44.00 352.00 1,340.00 10,720.00 100.00 800.00 2502.604 4" INSULATION 430 SO YD 5.00 2,150.00 42.00 18,060.00 42.25 18,167.50 100.00 43,000.00 2503.541 12" RC PIPE SEWER DES 3006 CL V 16 LIN FT 75.00 1,200.00 43.00 688.00 41.00 656.00 100.00 1,600.00 Page 1 0 Engineer's Estimate 1 Midwest Asphalt 2 MN State Curb & 3 Rosti Construction Corporation Gutter Bid Item Bid Item Description Quantity Unit Number Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total Unit Price Total 2503.602 CONNECT TO EXISTING STORM SEWER 2 2506.501 CONST DRAINAGE STRUCTURE DESIGN G 10.5 2506.516 CASTING ASSEMBLY 2 2506.522 ADJUST FRAME & RING CASTING 1 2521.501 4" CONCRETE WALK 1365 2521.501 6" CONCRETE WALK 1220 2531.501 CONCRETE CURB AND GUTTER DESIGN B424 390 2531.618 TRUNCATED DOMES 300 2557.501 WIRE FENCE DESIGN 60V -9322 70 2563.601 TRAFFIC CONTROL 1 2564.531 SIGN PANELS TYPE C 124.5 2564.537 INSTALL SIGN TYPE C 2 2564.552 HAZARD MARKER X4 -2 2 2565.616 PEDESTRIAN CROSSWALK FLASHER SYSTEM 1 2573.502 SILT FENCE, TYPE MACHINE SLICED 600 2573.512 TEMPORARY DITCH CHECK TYPE 2 500 2573.530 STORM DRAIN INLET PROTECTION 15 2573.602 TEMPORARY ROCK CONSTRUCTION 2 ENTRANCE 4.00 2575.523 EROSION CONTROL BLANKETS CATEGORY 3 1000 2575.571 RAPID STABILIZATION METHOD 3 5 2575.605 TURF ESTABLISHMENT 0.3 2582.502 12" SOLID LINE YELLOW -EPDXY 110 2582.502 4" DOUBLE SOLID LINE YELLOW -EPDXY 285 2582.503 CROSSWALK MARKING -EPDXY 510 Subtotal For Category: 0 6,710.00 Totals: EACH 500.00 1 650.00 1,300.00 490.00 980.00 600.00 1,200.00 LIN FT 300.00 3,150.00 500.00 5,250.00 630.00 6,615.00 100.00 1 EACH 600.00 1,200.00 530.00 1,060.00 515.00 1,030.00 500.00 1,000.00 EACH 300.00 300.00 450.00 450.00 515.00 515.00 300.00 300.00 SO FT 4.00 5,460.00 5.10 61961.50 4.50 6,142.50 8.00 10,920.00 SO FT 10.00 12,200.00 5.25 6,405.00 5.50 6,710.00 10.00 12,200.00 LIN FT 10.00 3,900.00 29.00 11,310.00 24.50 9,555.00 26.00 10,140.00 SO FT 40.00 12,000.00 53.00 15,900.00 35.00 10,500.00 50.00 15,000.00 LIN FT 20.00 1,400.00 38.00 2,660.00 40.00 2,800.00 90.00 6,300.00 LUMP SUM 7,500.00 7,500.00 7,400.00 7,400.00 3,000.00 3,000.00 8,000.00 8,000.00 SO FT 50.00 6,225.00 37.00 4,606.50 42.25 5,260.13 40.00 4,980.00 EACH 50.00 100.00 160.00 320.00 180.00 360.00 200.00 400,00 EACH 75.00 150.00 80.00 160.00 80.00 1160.00 100.00 200.00 SYS 34,000.00 34,000.00 30,000.00 30,000.00 50,000.00 50,000.00 55,000.00 55,000.00 LIN FT 1.50 900.00 2.10 1,260.00 2.65 1 4.00 2,400.00 LIN FT 3.50 1,750.00 4.50 2,250.00 3.35 1,675.00 5.00 2,500.00 EACH 500.00 7,500.00 100.00 1,500.00 50.00 750.00 200.00 3,000.00 EACH 1,000.00 2,000.00 750.00 1,500.00 250.00 500.00 1,600.00 3,200.00 SO YD 1,00 1 2.45 2,450.00 1.28 1,280,00 2.00 2,000.00 MGALLON 250.00 1,250.00 345.00 1,725.00 460.00 2,300.00 250.00 1,250.00 ACRE 2,000.00 600.00 6,000.00 1,800.00 6,500.00 1,950.00 3,000.00 900.00 LIN FT 1.20 132.00 10.80 1,188.00 10.50 1,155.00 12.00 1,320.00 LIN FT 1.00 285.00 3.25 926.25 3.30 940.50 5.00 1,425.00 SO FT 1.50 765.00 6.00 31060.00 5.65 2,881.50 7.00 3,570.00 $258,222.00 $293,750.05 $345,887.63 $499,315.00 $258,222,00 $293,750.05 $345,887.63 $499,315.00 $0.00 $0.00 $0.00 $0.00 Page 2 SRF No. 7237 August 20, 2012 Mr. Todd Hoffman Park and Recreation Director CITY OF CHANHASSEN 7700 Market Blvd. Chanhassen, MN 55317 SUBJECT: TH 41 TRAIL EXTENSION AND PEDESTRIAN CROSSING RECOMMENDATION OF .AWARD Dear Mr. Hoffman: Bids for the TH 41 Trail Extension and Pedestrian Crossing. project, were opened:. on Thursday__ August 16. Three bids were received, ranging from $293,750.05 to $499,315. The apparent low- bid is Midwest Asphalt Corporation. The final Engineers Estimate was $258,222. The high bids reflect the current trend towards higher bids and a late season bid opening. The primary differences in the law bid, and engineers estimate are in the cost of the concrete stairway and the cost for insulation under the stairway to protect an existing water main. A phone conversation with the low bid contractor after opening suggested that insulation prices are unusually high this year. SRF recommends awarding the project to Midwest Asphalt Corporation in the amount of $293,750.05. Sincerely IUV H.• iProjects?72371 _Correspondencell etters420819 Bid award letter tnpm.docx www.srfconsuIting.com One Carlson Parkway North,, Suite 150 1 Minneapolis, MN 554474443 f 763.475,0010 Fax: 763,4751429 An Equal Opportunity Employer ENGINEER 5 PLANNERS DESIGNERS U ESIGNERS Consulting Group, Inc. SRF No. 7237 August 20, 2012 Mr. Todd Hoffman Park and Recreation Director CITY OF CHANHASSEN 7700 Market Blvd. Chanhassen, MN 55317 SUBJECT: TH 41 TRAIL EXTENSION AND PEDESTRIAN CROSSING RECOMMENDATION OF .AWARD Dear Mr. Hoffman: Bids for the TH 41 Trail Extension and Pedestrian Crossing. project, were opened:. on Thursday__ August 16. Three bids were received, ranging from $293,750.05 to $499,315. The apparent low- bid is Midwest Asphalt Corporation. The final Engineers Estimate was $258,222. The high bids reflect the current trend towards higher bids and a late season bid opening. The primary differences in the law bid, and engineers estimate are in the cost of the concrete stairway and the cost for insulation under the stairway to protect an existing water main. A phone conversation with the low bid contractor after opening suggested that insulation prices are unusually high this year. SRF recommends awarding the project to Midwest Asphalt Corporation in the amount of $293,750.05. Sincerely IUV H.• iProjects?72371 _Correspondencell etters420819 Bid award letter tnpm.docx www.srfconsuIting.com One Carlson Parkway North,, Suite 150 1 Minneapolis, MN 554474443 f 763.475,0010 Fax: 763,4751429 An Equal Opportunity Employer Capital Improvement Program 2012 thru 2016 City of Chanhassen, MN Project # PK &T -110 Project Name Hwy 41 Trail Extension /Stairway Department Park & Trail Improvements Contact Todd Hoffman Type Improvement Useful Life Category Park Account #1 410- 0000 -4706 Account #3 Priority n/a Account #2 Account #4 Description I Total Project Cost: $205,000 ?xtension of the Highway 41 trail from Minnetonka Middle School West to the intersection of Highway 7 and Highway 41 and construction of a )edestrian stairway connecting to Highover Drive. Justification The current trail project being undertaken by Carver County in cooperation with the City terminates at Minnetonka Middle School West. Extending the trail to Highway 7 will allow for a signalized at grade pedestrian crossing. Expenditures 2012 2013 2014 2015 2016 Total Construction 205,000 205,000 Total Funding Sources 205,000 2012 2013 205,000 2014 2015 2016 Total Park Dedication Fund 205,000 205,000 Total 205,000 205,000 Budget Impact/Other Will need to be included in the pavement management program.