1g. Approve Change Order No. 1 to Minnewashta Pkwy Improvement Project 90-15 lt iii OITYOF i 0 °;111 I 690 COULTER DRIVE • P.O. BOX 147' CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 I N Mtn by CRY Alffitteitteget Worse ✓ Dt.Ok I MEMORANDUM MedHk++ TO: Don Ashworth, City Manager kit wbmItbd to Commt FROM: Charles Folch, City Engineer "Tste stibmtftd 1 DATE: May 18, 1993 I SUBJ: Approve Change Order No. 1 to Minnewashta Parkway Improvement Project No. 90 -15, S.A.P. No. 194 - 111 -01 t. ' Attached is Change Order No. 1 for the Minnewashta Parkway Improvement Project No. 90-15, State -Aid Project No. 194 - 111 -01. This change order encompasses three work task I items. The first item involves the reconstruction of both the north and south parking lot at the Minnewashta Parkway fire station, replacement of concrete sidewalk and an extension of a storm drainage system. This work amounts to $25,840 and is proposed to be funded I through the Administrative Trust fund. The other two work items involve clearing and grubbing of additional trees for the installation of retaining walls in the amount of $3,250 and an increase in the amount of retaining wall construction on the project. It is not I uncommon on a reconstruction project such as this for the actual quantities of retaining wall work to vary from initial estimates once the new roadway elevation is actually graded and existing boulevard grade matching, trees, landscaping and property owner desires become I more clear. Staff and the project engineer have worked with individual property owners to insure their satisfaction with the boulevard grading and the retaining wall installation. A large share of the additional retaining wall was required in conjunction with the Boylan I property due to the road alignment being shifted slightly closer to the lake. The increase in this work item amounts to $34,510. 1 For the reconstruction of the Minnewashta Parkway fire station parking lot and sidewalk, this is an opportune time to complete the work of the deteriorated facility in a cost - effective I manner by taking advantage of the favorable unit bid prices from the larger overall Minnewashta Parkway improvement project. The additional tree removal and retaining wall work are necessary to properly complete the project improvements and meet the satisfaction I of affected property owners. Or. to of PRINTED ON RECYCLED PAPER 1 I Don Ashworth May 18, 1993 Page 2 I The contract amount to date is $1,379,285.05. The additional contract amount resulting 1 from this Change Order No. 1 is $63,600. Thus, the revised contract amount, including this change order, would be $1,442,885.05. It is therefore recommended that the City Council 1 approve Change Order No. 1 in the amount of $63,600 to the Minnewashta Parkway Improvement Project No. 90-15. I ktm Attachment: Change Order No. 1 c: Dave Hempel, Assistant City Engineer Bill Engelhardt, WRE &A I Allan Larson, WRE &A Wayne Brown, Brown & Cris, Inc. 1 1 1 1 1 1 1 1 1 1 1 1 Page 1 of 2 NA. =MB ORDER • Dated: May 18. 1993 _ 1 OWNERS Project N4. 3514 «11 +01 EmiNEERIs Frojct N. 00-91-n3 1 Project Ninnewashta PatWay, St Erke Aid Project CONTRACTOR Brown Sprig, Inc. _ 1 Contract )or _ $1,379.285.05 Contract Date __ABMs 19th. 1992 To: ; .)1 - - - 4 - - , Contractor You are directed to make the changes noted below in the subject contract. 1. Minnewashta Fire Station Parking Lot Reconstruction $25 2. Addition Tree ReiioVal for Retaining Walls $ 3,150.00 3. Addition Retaining W411 Construction 04,530.00 , Enclosures: EXhibit A - Itemised Schedule of Costs ' These changes result in the following adjustment of Contract Price ' and Contract Time: Contract Price Prior to This Change Order $ ' , Net Increase Resulting From This Change Order $ 530500.00 Current contract Price Including This change Order Contract Time Prior to This change order: As P r owner (nays or Date) ( 62LSL06 01 ' ON I 'SID '8 NP1068 WO8d 6S :0T £66T-8T -) N /I II EXHIBIT *a* 5otrrx„ G LoT - FIRE sTATQ 1 1-1/2“ aitu mit eus Nearing Course 485 S.Y. 8 $ 5.18/S.Y. ^ $ 2,512.30 1 2u Bituminous Base 59 Tons $ $ 44.00/x, _ $ 2,596.00 6" Class 5 Aggregate II Modified 176 Tone $ $ 11.00 /Ton _ $ 1,936.00 B612 Concrete Curb and Gutter 270 L.F. $ $ $.80 /L.F. _ $ 795.60 I Common Excavation 90 S.Y. 0 $ 2.40/8.Y. = $ 216.00 1 SUBTOTAL _ $10,431.90 II EaltaL AR ING LOT FI Sg AT I l1�N t 1 -1/2* Bituminous nearing Course 315 S.Y. $ $ 5.18/5•Y. w $ 1,631.70 I 3M Bituminous Base 57 Tons 8 $ 5 /Ton = $ 3,136.00 1 16" Class 5 Aggregate Modified 306 Tons 0 $ 11.40 /Ton = $ 3,355.00 6612 Concrete 1 Curb and Gutter 180 L.F. 1 $ 8.80/L.F. - $ 1,584.00 7' Concrete I Sidewalk 546 S.F'. $ $ 4.00 /S.F. = $ 2,184.00 12" PVC, Storm Sewer 76 L.P. $ $ 19.00 /L.P. 41 . $ 1.444.00 II Catch Basin 1 Each 1 $750.00 /Each = $ 750.00 II Roof Brain connection (To Catch Basin) 1 Each 0 $250.05 /Each - $ 250.00 1 Sod with Topsoil 60 J.Y. $ $ 2.40 /S.Y. _ $ 144.00 common Excavation 159 C.Y. 1 $ 5.$5 /C.!. m $ 930.15 II SUBTOTAL - $15,407.85 II II II 20d 62 .1.26 0± ' ON I `SIC '8 NM10aH WO8d 6S : OT £66T- BI -1,dW 1 Page 2of2 1 Net Increase Roaniting Tram This Mange Order -- (nay's) Currant Contract Time including This Change Order Gays or Data) T - 1 The Above Menges Are Accepted: Sr t'.hr' B ric Contractou VICE PRESIDENT 1 Data /c, , 19 *-5 - 1 The Above Changes Are Approved: g. angolbardt .. AssOCi S • t nc . Bngihe $y: Date _44 ventatirszglammeenway 'fie Above Changes Are Approved: yy��b ♦♦ Citry of �.nneso Attest/'.♦ A sk. . Owner By - . Mayor B Yom City Manager bat,. . . �9 1 . 1 1 t0 d t -L L�6 S 01 'ONI `SIZIO '8 Nf106E WO8d 00:TT £66T- 8T -AdW