5. Feas Stdy 2004 StreetImproveCITYOF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227,1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227,1190 Engineering Ph one: 952.227,1160 Fax: 952.227.1170 Finance Phone: 952,227.1140 Fax: 952,227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227,1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227,1110 Public Works 1591 Park Road Phone: 952,227.1300 Fax: 952.227,1310 Senior Center Phone: 952.227.1125 Fax: 952227.1110 Web Site www. ci.chanhassen.mn.us MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Teresa J. Burgess, Public Works Director/City Engineer DATE: September 17, 2003 SUB J: Approve Feasibility Study; Authorize the Preparation of Plans & Specifications for the 2004 Residential Street & Utility Improvement Project No. 04-01 REQUESTED ACTION Hold the public hearing and authorize preparation of Plans and Specifications for Project No. 04-01. DISCUSSION Attached is a final draft of the feasibility study for this project. The following changes have been made from the draft previously received: 1. Number of parcels to be assessed has been adjusted from 33 to 32 to match the City's Assessment Practice. 2. Added information on the existing sanitary sewer and watermain to be more descriptive of existing condition. 3. Added Pavement Condition Index (PCI) ratings to show existing pavement condition. 4. Minor typographical errors were corrected. Staff recommends that to reduce confusion, Council call property owners by streets as grouped below for the public hearing with a brief introduction of the existing condition and proposed improvements by staff as each group is called. Streets have been grouped that are similar in condition and are proposed to receive similar improvements. Kiowa, Iroquois, and Huron Drives The existing surface is in reasonable condition. The street will eventually need full depth reconstruction due to significant utility issues, however, the consultant, based on televised inspection of the existing sanitary sewer and review of logs of watermain breaks has recommended spot repairs in 23 locations. The improvements include repairs to cracked pipe, The City o! Chanhassen · A growiug community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play, Todd Gerhardt September 16, 2003 Page 2 0 misaligned pipe, removing tree roots, and replacing service wyes. It is proposed these 23 locations be excavated for the repairs and then patched. Normally the City would delay these improvements until the street was being done, however, the extreme joint displacement is causing problems with inflow of groundwater, tree roots blocking the pipe, and most critical is causing poor function in the sanitary sewer including back-ups into homes in the area. The City does not have adequate funding in 2004 to include this section in the reconstruction project. The spot repairs will postpone the need to fully reconstruct this section of roadway by an estimated 5-7 years. Santa Fe Trail and Del Rio · Watermain: The existing cast iron pipe was installed in Santa Fe Trail was installed in 1967. The pipe in Del Rio was installed in 1969. Expected functional life for watermain is 30-40 years. The City's clay soils are highly acidic and accelerate the aging of the pipe. The consultant has recommend replacement of the watermain with PVC to address this issue. Sanitary Sewer: The existing clay pipe was installed at the same time as the water main. The sanitary sewer is in similar condition to that on Kiowa, Huron, and Iroquois, however, delay of this project 7 years is not recommended with a project similar to that one due to the condition of the pavement and water main. The consultant is recommending full replacement of the sanitary sewer. Storm Sewer: The existing storm sewer does not adequately address the existing runoff due to intensification of development since its installation. Nor does the storm sewer system address current standards for storm water quality. The consultant has recommended improvements to the system storm sewer pipes and catch basins to address the quantity of storm water. Sidewalk: City standards call for a 5' sidewalk on one side of residential streets. A sidewalk has been proposed, however, Staff recommends that the issue of whether or not to install the sidewalk be decided by the property owners as part of the design process. Pavement: The current PCI is 56 for Santa Fe Trail and 70 for Del Rio Drive. General streets with a PCI of 40-60 fall into the reconstruction classification, however, the significant utility work required on this project preclude the possibility of pavement rehabilitation instead of reconstruction. Todd Gerhardt September 16, 2003 Page 3 Santa Fe Circle (East and West) · Watermain: The existing cast iron pipe was installed both circles Santa Fe Trail was installed in 1967. Expected functional life for watermain is 30-40 years. The City's clay soils are highly acidic and accelerate the aging of the pipe. The consultant has recommend replacement of the watermain with PVC to address this issue. · Sanitary Sewer: The existing clay pipe was installed at the same time as the watermain. The sanitary sewer is in similar condition to that on Kiowa, Huron, and Iroquois, however, delay of this project 5- 7 years is not recommended with a project similar to that one due to the condition of the pavement and water main. The consultant is recommending full replacement of the sanitary sewer. · Storm Sewer: The catch basins do not meet City standards. In addition, the drainage from Santa Fe Trail runs into the cul-de-sac and causes further issues. The consultant has recommended improvements to the system storm sewer pipes and catch basins to address the quantity of storm water and "rain gardens" to address water quality. The issue of rain gardens will need to be further explored as part of the design process to gain property owner input and define maintenance responsibilities. Also, the rain gardens may have impacts on the desired use of the cul-de-sac that need to be discussed by the property owners once a radius has been designed and can be marked on the street for comment and discussion. · Sidewalk: The sidewalk proposed on Santa Fe Trail and Del Rio Drive will also serve this neighborhood although no sidewalk is proposed in the circles themselves. Staff recommends that the sidewalk issue be decided by the neighborhood as part of the design process. · Pavement: The current PCI is 52 for the eastern circle and 40 for the western circle. General streets with a PCI of 40-60 fall into the reconstruction classification. Both of these streets falls into this classification. Delay of the project is further undesirable due to the significant utility work necessary. FUNDING This project is proposed to be funded with a combination of assessments and bonding. c: Matt Saam, Assistant City Engineer Phil Gravel, Bonestroo g:\eng\public\04-0Bstaff report 9-16~03.doc FEA PORT FOR Santa Fe Trail Nei~borho0d 21 Chanhass~m nnesota I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Mark Statz, P.E. Date: August 25, 2003 Reg. No. 42717 Phil Gravel, P.E. Date: August 25, 2003 Reg. No. 19864 Table of Contents Table of Contents ................................................................................................................ 1 I. Introduction/Summary ................................................................................................. 2 Figure 1 - Location Map ....................................................................................... 3 II. Proposed Improvements ............................................................................................... 4 III. Cost Analysis / Financing ............................................................................................ 7 Table 1 - Estimated Project Costs Summary ....................................................... 7 Table 2 - Proposed Assessment Rates ................................................................. 8 Table 3 - Funding Summary ................................................................................ 8 IV. Project Schedule ........................................................................................................... 9 V. Easements and Permits ................................................................................................ 9 VI. Summary and Recommendations ............................................................................... 10 Figure 2 - Proposed Improvements Figure 3 - Typical Section Figure 4 -Map of Assessment Area Appendix A - Preliminary Cost Estimate Appendix B - Preliminary Assessment Roll Appendix C - Assessment Practice Summary Appendix D - Section Condition Report for Pavement Management Study I. Introduction/Summary This report presents information concerning the proposed 2004 Residential Street Improvement Project (City Project 04-01). The project is part of the City's ongoing annual street improvement program. Municipal improvements proposed herein include sanitary sewer replacement, water main replacement, drainage improvements, and street reconstruction. This report was initiated by the City Council on April 23, 2003. The costs of the proposed improvements are detailed in Appendix A. Cost allocation and a cost summary are presented in the Cost Analysis section. Financing for the project will come from assessments, the water fund, the sewer fund, the pavement management fund and the surface water management fund. Assessments proposed in this report are consistent with past projects and Council direction concerning assessment methodology. A copy of the current city assessment practice is attached as Appendix C. The proposed project assessment area consists of 32 lots and is shown on Figure 4. The proposed assessments are based on the preliminary cost estimates and may be revised at the time of the final assessment hearing. LOCATION MAP CHANHASSEN, MINNESOTA 2004 RESIDENTIAL STREET F[qure 1 DATE: 08/03 FIGURE 1 IMPROVEMENTS COMM: .393-03-141 Bonestroo Rosene Anderlik & ~ Associates Engineers & Architects II. Proposed Improvements Sanitary Sewer Repairs in Kiowa, Iroquois, and Huron Area. In April of 2003 the Public Works Department engaged Infrastructure Technologies to complete a television inspection of the sanitary sewer in the neighborhood that includes West 76th St., Chan View, Kiowa, Iroquois, and Huron. Segments of the sewer in this neighborhood were previously lined in the early 1980's. The results of the 2003 television inspection indicate that the sewers in the neighborhood are in poor to fair condition. Specifically, 23 spot locations were identified that need to be repaired soon. The required improvements include repairing cracked pipe, repairing misaligned pipe, removing tree roots, and replacing service wyes. It is proposed to repair these 23 spot locations by excavating them and patching the street. The sewer repairs in this neighborhood are proposed to be included in the 2004 Residential Street Project because of their close proximity to the Santa Fe area and because including the sewer repairs with the larger project should result in better bids. Sanitary Sewer Replacement in Santa Fe and Del Rio Area. The existing sanitary sewer in the Santa Fe and Del Rio area consists of 30+ year old clay pipe. The sanitary sewer has been inspected and has been determined to be in an unacceptable condition. It is proposed to replace all sanitary sewer in the project area as part of the overall street project. Sewer replacement will include replacing sewer pipe, service wyes and any substandard manholes. Water Main. Existing water main in the Santa Fe and Del Rio area consists of 30+ year old cast iron pipe. The acidic, clay soils in Chanhassen have deteriorated the pipe over time, as a result, there have been eight water main breaks in the past ten years in the area. As part of the street project it is proposed to replace all existing water main with PVC main. Replacing the existing water main will include replacing all hydrants and valves. Sanitary Sewer and Water Services. Individual sanitary sewer and water services for homes in the project area will be replaced to the right-of-way line as part of this project. Replacement of the sanitary sewer services will include new 6-inch pipe. Replacement of the water services will include new service pipe and new curb boxes. Drainage. Drainage improvements are proposed as part of the overall street project. Short storm sewer laterals will be extended at some intersections to provide better collection of surface drainage. In addition, subsurface draintile will be installed along each side of the reconstructed streets to improve the subsurface drainage and to provide outlets for residential sump pump drainage. Water quality improvements are also proposed as part of the project. Sediment trapping sump manholes and catch basins will be installed where necessary. In addition, water quality "rain gardens" are proposed to be constructed in the center or the two cul-de-sacs (Santa Fe Circle West and Santa Fe Circle East). Rain gardens are temporary ponding and sediment removal areas that are landscaped with plants that can withstand the conditions. It is proposed to construct the rain gardens on Santa Fe Circle East and Santa Fe Circle West in the middle of the cul-de-sacs as "center islands". Drainage from the rain gardens will be conveyed to the existing storm sewer through subsurface drains and through overflow piping. Street. The streets proposed to be included in this project have been identified as requiring improvements by a previous Pavement Management Study. The Pavement Management Study included a surface condition evaluation of all streets in the City and assigned each street segment a Pavement Condition Index (PCI). Generally streets with a PCI in the range of 40-60 require some surface reconstruction. With the amount of subsurface utility work included with this project, a full street reconstruction is the only feasible improvement option. A summary of the PCI information from the Pavement Management Study for the streets in the project area is attached as Appendix D. .b'~;osibi/i(; .R~¥~orS/br pr~?jecI 2004 Resicjer,~io/ Street Improvemc;a~s Pc~g~.~ 5 Street improvements proposed include total reconstruction of Del Rio (between Laredo and Santa Fe), Santa Fe Trail, Santa Fe Circle East and Santa Fe Circle West. The reconstructed streets will be close to the existing street widths. Street construction will include removing the existing street surface, excavation for a new street base, and construction of a new street. The street section will match the city's standard section and includes: 1.5-inch bituminous wear course (pave in 2005) 2-inch bituminous base course (pave in 2004) · B618 concrete curb and gutter · 12-inch Class 5 aggregate base 24-inch granular borrow · draintile geotextile fabric (where necessary) Street construction will include driveway repair with in-kind surfaces. In general, driveways will be removed 5 to 10 feet behind the edge of the street to fit in with the new street grade. Concrete driveway aprons will be placed for all driveways, and the area beyond the concrete apron will match the existing driveway surface. Sidewalk. In accordance with city practice for new streets, a sidewalk is proposed for one side of Santa Fe Trail and Del Rio. The sidewalk will consist of a 5-foot wide concrete walk located on one side of the street. ?r~ge 6' II. Cost Analysis / Financing Cost Estimate The estimated project cost to complete the improvements proposed herein are presented below in Table 1. These costs include construction costs, a 7% contingency cost and an estimated 30% indirect costs: financial (2%), legal (5%), administrative (5%), engineering (18%). The estimated indirect costs are reviewed at the time of the final assessment hearing. This estimate does not include easement acquisition costs. Table 1. Project 04-01 Estimated Project Cost Summary (See Appendix A for Detailed Cost Estimate) Item Total Cost Sanitary Sewer Spot Repairs $ 117,000 Streets and Storm (Rehab) $ 636,500 Sanitary Sewer $ 122,400 Water Main $ 151,700 Streets and Storm (New) $ 76,000 Sidewalk $ 55,500 Rain Gardens $ 27,800 Total $ 1,186,900 Assessments Assessments are proposed for the benefited properties as shown on Figure 4. A Preliminary Assessment Roll is presented in Appendix B. The city's assessment practices are attached in Appendix C. The proposed assessments herein are consistent with past practice and previous City Council direction concerning assessment methodology. A summary of the proposed Assessment Rates is presented in Table 2 below. The assessment rates are based on 32 total parcels and the preliminary cost estimates. Table 2. Project 04-01 Proposed Assessment Rates (per parcel based on 32 assessable parcels) Item % Assessed Rate Sanitary Sewer Spot Repairs 0 $ 0 Streets and Storm (Rehab) 40 $ 7,956.25 Sanitary Sewer 40 $ 1,530.00 Water Main 40 $1,896.25 Streets and Storm (New) 100 $ 2,375.13 Sidewalk 100 $ 1,734.38 Rain Gardens 0 $ 0 Total Per Parcel Assessment $15,492.01 Funding Summary Table 3. Project 04-01 Funding Summary Item Estimated Cost Assessments City Share Sanitary Sewer Spot Repairs $ 117,000 $0 $117,000 Streets and Storm (Rehab) $ 636,500 $254,600 $381,900 Sanitary Sewer $ 122,400 $48,960 $73,440 Water Main $ 151,700 $60,680 $91,020 Streets and Storm (New) $ 76,000 $76,000 $0 Sidewalk $ 55,500 $55,500 $0 Rain Gardens $ 27,800 $0 $27,800 TOTAL $1,186,900 $495,740 $691,160 Fund Sewer PMF Sewer Water SWMF Area to be Included The area to be assessed for this project is listed in Appendix B and shown on Figure 4. IV. Project Schedule A tentative project schedule is shown below. The project schedule can be modified and/or delayed if the City or neighborhood residents request it. Council Authorize Feasibility Report Staff Review Draft Feasibility Report Council Receive Report & Call for Hearing Neighborhood Meeting Public Hearing Order Preparation of Plans and Specifications Approve Plans & Specs, Authorize Bids Open Bids Assessment Hearing Award Contract Begin Construction Substantial Completion Final Bituminous Wear Paving April 23, 2003 July-August 2003 August 25, 2003 September 9, 2003 September 22, 2003 September 22, 2003 January 12, 2004 February 13, 2004 March 8, 2004 March 8, 2004 May 17, 2004 July 30, 2004 July 2005 V. Easements and Permits Easements for proposed construction will not be required from the adjacent property owner(s). Permits and approvals will be required from the following: Minnesota Pollution Control Agency (sewer and grading) Metropolitan Council Environmental Services Minnesota Department of Health Watershed District City of Chanhassen, Wetland Alteration Permit Preparation of an Environmental Assessment Worksheet (EAW) for the Public Improvements is not required. Fer~xibi/iO' .Re~?orl,fi>r Pre?jet;! 2004 Rexidemi~! Street b~provernen~s Pc.~ge 9 VI. Summary and Recommendations The total estimated cost for this project is $1,186,900 including both construction and indirect costs. The proposed work is necessary, cost effective, and feasible from an engineering standpoint. The following recommendations are presented for the Chanhassen City Council: 1. The City should adopt the report as the criteria for installation of the improvements contained herein. 2. The City should review and adopt the proposed assessment and financing methods contained herein. o A formal public hearing should be held to discuss the proposed improvements and assessments. All properties that are proposed to be assessed and all properties within 500 feet of the project area will be notified of the public hearing. UTILI DEL mO STEET WORK - NEW B618 CURB AND GJTTER - ~TRE--'T W ~";l'HS TO REMA'[N-TRE~'~.A~E-OR-St.:t3HTL~-WDER - SECTICN PER CIFY SFAND~RD + FABRIC WHE:~E N~EDEI~  TREET SANITARY SEWER ~ui~"OT-REp~ R$ PROPOSED IMPROVEMENTS CHANHASSEN, MINNESOTA FIGURE 2 2004 RESIDENTIAL STREET IMPROVEMENTS Figure 2 DATE: 08/0,3 COMM: .393-03-141 Bonestroo Rosene m-m Anderlik & ~l~ Associates Engineers & Architects PL 25' CL 25' PL V~BLE ' ~ VARI~$LE ' to Back . .1.F~5' to Back . f 4' PPE --~ / 4" Topsoil, Seed \ 8c Mulch or Sod. \ 618 ~,,,ountable \ Concrete Curb~ -- Wear Course to be 1/2" -- Above Edge of Gutter 1' ~ 3.0% 2.0% ~ 5' SIDEWALK 1 1/2"-Plant Mixed Bituminous Wearing Course Type #41WEA50055B Tack Coat - 2357 2"-Plant Mixed Bituminous Base Course Type #31BBB50000B 12"-Class 5 Aggregate Bose, 100% Crushed 24" MNDOT 31¢9.2B Select Granular Borrow (See Note 7) GEOTEX71LE FABRIC 1. Right-of-Way Required - ~e'. 2. Maximum street grade 7.0%. 3. Minimum street grade 0.75~ 4.0' Topsoil placed in disturbed areas. 5. 2 Roll3 3od behind curb. SOD ALL DISTURBED AREAS. 6. The bltumlnous weorlng surface shell be placed the next construction season following placement of the bituminous bose. 7. A test roll of the prepared subgrode shell be performed by the owner in the presence of o city inspector. The city has the authority to require oddiUonol subgrode correction or to reduce the requirement of 24" MNDOT Select Granular Borrow to 12" based on the test roll. CITY OF 2-97 FI~ NAME: 393_5200 TYPICAL RESIDENTIAL STREET SECTION PLATE NO.: 5200 *ITALICS INDICATE CHANGES TO CITY'S STANDARD DETAIL PLATE TYPICAL SECTION CHANHASSEN, MINNESOTA 2004- RESIDENTIAL STREET Fiqure 5 DATE: 8/03 FIGURE ,3 IMPROVEMENTS COMM: ,393-03-141 jBonestroo Rosene Anderlik & Associates Engineers & Architects DEL I~0 -~"~ AREA TO BE ASSESSED-~..~TA F~ MAP OF ASSESSMENT AREA CHANHASSEN, MINNESOTA FIGURE 4 2004 RESIDENTIAL STREET IMPROVEMENTS Bonestroo Rosene Anderlik & ~ Associates Engineers & Architects Figure 4- DATE: 08/03 COMM: 395-05-141 Appendix A Preliminary Cost Estimate PRELIMINARY COST ESTIMATE 9/9/2003 2004 RESIDENTIAL STREET IMPROVEMENTS No. 6 7 Item Units Qty Unit Price Total Price Part 1 - Kiowa Area - Sanitary Sewer Spot Repairs MOBILIZATION LS 15 $ TRAFFIC CONTROL LS 1 $ $ REMOVE BITUMINOUS PAVEMENT SY 1700 $ $ SAWING BITUMINOUS PAVEMENT LF 2500 $ AGGREGATE BASE, CLASS 5 (CV) CY 6O0 $ TYPE LV 3 NON WEARING COURSE TN 200 $ $ MIXTURE (B) TYPE LV 4 WEARING COURSE TN 200 $ $ MIXTURE (B) SANITARY SEWER MAIN SPOT EA 25 $ $ REPAIRS Total Construction Costs - Part 1 - Kiowa Area - Sanitary Sewer Spot Repairs Contingencies (7%) Indirect Costs (30%) Total Project Costs - Part 1 - Kiowa Area - Sanitary Sewer Spot Repairs EE Unit Price $2,000.00 $5OO.OO $2.50 $1.50 $16.00 $34.00 $36.00 $2,000.00 EE Total Price I $2,000.00 $5OO.OO $4,250.0O $3,750.00 $9,6OO.OO $6,800.00 $7,200.00 $50,000.00 $84,100.00 $5,887.00 $26,996.10 $117,000.00 Appendix A.xls A-1 Cost Estimate PRELIMINARY COST ESTIMATE 9/9/2003 2004 RESIDENTIAL STREET IMPROVEMENTS No. 10 11 12 13 14 15 16 17 18 19 20 21 Item Units Qty Unit Price Total Price Part 2A - Del Rio/Santa Fe/CDS - Streets and Storm (Rehab.) MOBILIZATION LS 1 $ TRAFFIC CONTROL LS 1 $ INSTALL SILT FENCE LF 200 $ PROTECTION OF CATCH BASIN IN EA STREET STREET SWEEPER WITH PICK UP HR BROOM WITH OPERATOR REMOVE BITUMINOUS PAVEMENT SY 14 $ 10 $ 7600 $ REMOVE BITUMINOUS DRIVEWAY SY 1700 $ REMOVE CONCRETE CURB AND LF GUTTER REMOVE CONCRETE DRIVEWAY SY PAVEMENT SALVAGE AND REINSTALL FENCE LF 150 $ 850 $ 300 $ SAWING BITUMINOUS PAVEMENT LF 700 $ SAWING CONCRETE PAVEMENT LF 250 $ 85 SALVAGE AND REINSTALL SIGN EA $ $ $ $ $ $ $ $ $ $ $ $ $ EE Unit Price $5,000.00 $2,000.00 $2.50 $85.OO $135.00 $2.50 $3.50 $3.00 $5.00 $10.00 $1.50 $2.00 $100.00 EE Total Price I $5,000.00 $2,0O0.O0 $5O0.O0 $1,190.00 $1,350.00 $19,000.00 $5,950.00 $450.00 $4,250.00 $3,000.00 $1,050.00 $500.00 $800.00 Appendix A.xls A-2 Cost Estimate NO. 22 23 24 25 26 27 28 29 30 31 32 33 Item SALVAGE AND REINSTALL MAILBOX SALVAGE AND REINSTALL SPRINKLER SYSTEM PIPING & CLEAR AND GRUB SELECT GRANULAR BORROW (CV) TOPSOIL BORROW (LV) COMMON EXCAVATION (EV) SUBGRADE EXCAVATION (EV) GEOTEXTILE FABPdC, TYPE IV 4" PERFORATED POLYETHYLENE PIPE AGGREGATE BASE, CLASS 5 (CV) TYPE LV 3 NON WEARING COURSE MIXTURE (B) TYPE LV 4 WEARING COURSE MIXTURE (B) PRELIMINARY COST ESTIMATE 2004 RESIDENTIAL STREET IMPROVEMENTS Units Qty Unit Price Total Price EA 32 $ $ LF 500 $ $ TREE 5 $ $ CY 6750 $ $ CY 1300 $ $ CY 11250 $ $ CY 1250 $ $ SY 7700 $ $ LF 4350 $ $ CY 2750 $ $ TN 700 $ $ TN 525 $ $ EE Unit Price $75.O0 $5.00 $5OO.O0 $12.00 $14.00 $4.50 $6.00 $1.25 $6.00 $16.00 $34.00 $36.00 9/9/2003 EE Total Price i $2,400.00 $2,500.00 $2,500.00 $81,000.00 $18,200.00 $50,625.00 $7,500.00 $9,625.00 $26,100.00 $44,000.00 $23,800.00 $18,900.00 Appendix A,xls A-3 Cost Estimate No. 34 35 36 37 38 39 40 41 42 43 44 Item BITUMINOUS DRIVEWAY 6" CONCRETE DRIVEWAY PAVEMENT MODULAR BLOCK RETAINING WALL SODDING, LAWN TYPE REMOVE STORM SEWER PIPE REMOVE STORM SEWER MANHOLE REMOVE CATCH BASIN CONNECT TO EXISTING CATCH BASIN OR MANHOLE 15" RCP STORM SEWER, CLASS 5 2' X 3' CATCH BASIN 4' DIAMETER STORM CBMH PRELIMINARY COST ESTIMATE 2004 RESIDENTIAL STREET IMPROVEMENTS Units Qty Unit Price SY 1450 $ SY 1100 $ SY 250 $ SY 97OO $ EA 120 $ EA 6 $ EA 6 $ EA 1 $ LF 120 $ EA 6 $ EA 6 $ Total Price $ $ $ $ $ $ $ $ $ $ $ Total Construction Costs - Part 2A - Del Rio/Santa Fe/CDS - Streets and Storm (Rehab.) Contingencies (7%) Indirect Costs (30%) Total Project Costs - Part 2A - Del Rio/Santa Fe/CDS - Streets and Storm (Rehab.) EE Unit Price $20.00 $35.OO $3O.OO $2.50 $10.00 $500.0O $300.0O $500.00 $24.00 $1,000.00 $1,800.00 9/9/2003 EE Total Price i $29,000.00 $38,500.00 $7,500.00 $24,250.00 $1,200.00 $3,000.00 $1,800.00 $500.00 $2,880.00 $6,000.00 $10,800.00 $457,620.00 $32,033.40 $146,896.02 $636,500.00 Appendix A.xls A4 Cost Estimate PRELIMINARY COST ESTIMATE 9/9/2003 2004 RESIDENTIAL STREET IMPROVEMENTS NO. Item Units Qty Unit Price Total Price EE Unit Price EE Total Price 45 46 47 48 49 50 51 52 53 54 55 56 Part 2B - Del Rio/Santa Fe/CDS - Sanitary Sewer REMOVE SANITARY SEWER PIPE LF REMOVE SANITARY SEWER SERVICE LF PIPE REMOVE MANHOLE EA ADJUST MANHOLE CASTING EA IMPROVED PIPE FOUNDATION LF CLOSED CIRCUIT TV INSPECTION LF INTERIM CONVEYANCE LS 4' DIAMETER SANITARY MANHOLES EA SANITARY MANHOLE OVERDEPTH LF 8" PVC SANITARY SEWER PIPE, SDR LF 35, 13-18' DEEP CONNECT TO EXISTING SEWER EA SERVICE 4" PVC, SDR 26 SERVICE PIPE LF 1670 $ $ 8OO $ $ 10 $ $ 95 $ 1670 $ $ 1670 $ $ 15 $ 10 $ $ 7O $ $ 1670 $ $ 32 $ $ 800 $ $ $1.00 $1.00 $5OO.OO $100.00 $2.0O $0.70 $2,000.00 $1,500.00 $100.00 $22.00 $150.00 $10.00 $1,670.00 $8OO.OO $5,000.00 $900.O0 $3,340.00 $1,169.00 $2,000.00 $15,000.00 $7,000.00 $36,740.00 $4,80O.00 $8,000.00 Appendix A.xls A-5 Cost Estimate PRELIMINARY COST ESTIMATE 9/9/2003 2004 RESIDENTIAL STREET IMPROVEMENTS No. 57 Item Units Qty Unit Price Total Price 4" PVC WYE EA 32 $ $ Total Construction Costs - Part 2B - Del Rio/Santa Fe/CDS - Sanitary Sewer Contingencies (7%) Indirect Costs (30%) Total Project Costs - Part 2B - Del Rio/Santa Fe/CDS - Sanitary Sewer EE Unit Price $50.00 EE Total Price $1,600.00 $88,019.00 $6,161.33 $28,254.10 $122,400.00 58 59 60 61 62 63 64 65 Part 2C - Del Rio/Santa Fe/CDS - Water Main REMOVE WATER MAIN LF REMOVE CURB STOP AND BOX EA REMOVE GATE VALVE AND BOX EA REMOVE HYDRANT EA REMOVE WATER SERVICE PIPE LF ADJUST VALVE BOX EA CONNECT TO EXISTING WATER MAiN 6" FITTING RESTRAINT EA EA 1865 $ $ 32 $ $ 85 $ 85 $ 800 $ $ 85 $ 35 $ 38 $ $ $5.00 $5O.OO $100.00 $300.00 $1.00 $125.00 $1,000.00 $20.00 $9,325.00 $1,600.00 $800.00 $2,400.00 $800.00 $1,000.00 $3,000.00 $760.00 Appendix A.xls A-6 Cost Estimate No. 66 67 68 69 70 71 72 73 74 75 76 Item 8" FITTING RESTRAINT DUCTILE IRON FITTINGS INSTALL HYDRANT 6" PVC WATER MAIN 8" PVC WATER MAIN 6" GATE VALVE AND BOX 8" GATE VALVE AND BOX CONNECT TO EXISTING WATER SERVICE 1" CORPORATION STOP 1" CURB STOP AND BOX 1" TYPE "K" COPPER WATER SERVICE PRELIMINARY COST ESTIMATE 2004 RESIDENTIAL STREET IMPROVEMENTS Units Qty Unit Price Total Price EA 22 $ $ LB 3000 $ $ EA 8 $ $ LF 535 $ $ LF 1330 $ $ EA 10 $ $ EA 6 $ $ EA 32 $ $ EA 32 $ $ EA 32 $ $ LF 800 $ $ Total Construction Costs - Part 2C - Del Rio/Santa Fe/CDS - Water Main Contingencies (7%) Indirect Costs (30%) Total Project Costs - Part 2C - Del Rio/Santa Fe/CDS - Water Main EE Unit PHce $25.00 $1.50 $1,750.00 $20.OO $22.00 $600.00 $750.00 $150.00 $100.O0 $120.00 $1o.oo 9/9/2003 EE Total Price $550.00 $4,500.00 $14,000.00 $10,700.00 $29,260.00 $6,000.00 $4,500.00 $4,800.00 $3,200.00 $3,840.00 $8,000.00 $109,035.00 $7,632.45 $35,000.24 $151,700.00 Appendix A.xls A-7 Cost Estimate PRELIMINARY COST ESTIMATE 9/9/2003 2004 RESIDENTIAL STREET IMPROVEMENTS No. Item Units Qty Unit Price Total Price EE Unit Price EE Total Price 77 78 79 80 Part 2D - Del Rio/Santa Fe/CDS - Streets and Storm (New) B618 CONCRETE CURB AND GUTTER 15" RCP STORM SEWER, CLASS 5 2' X 3' CATCH BASIN 4' DIAMETER STORM CBMH LF 4350 $ $ LF 510 $ $ EA 4 $ $ EA 2 $ $ Total Construction Costs - Part 2D - Del Rio/Santa Fe/CDS - Streets and Storm (New) Contingencies (7%) Indirect Costs (30%) Total Project Costs - Part 2D - Del Rio/Santa Fe/CDS - Streets and Storm (New) $8.00 $24.00 $1,000.00 $1,800.00 $34,800.00 $12,240.00 $4,000.00 $3,600.00 $54,640.00 $3,824.80 $17,539.44 $76,000.00 Appendix A.xls A-8 Cost Estimate PRELIMINARY COST ESTIMATE 9/9/2003 2004 RESIDENTIAL STREET IMPROVEMENTS No. 81 82 83 84 Item Units Qty Unit Price Total Price Part 2E - Del Rio/Santa Fe/CDS - Sidewalk 4" CONCRETE SIDEWALK SY 1200 $ $ CONCRETE PEDESTRIAN CURB RAMP AGGREGATE BASE, CLASS 5 (CV) SY 20 $ $ CY 200 $ $ Total Construction Costs - Part 2E - Del Rio/Santa Fe/CDS - Sidewalk Contingencies (7%) Indirect Costs (30%) Total Project Costs - Part 2E - Del Rio/Santa Fe/CDS - Sidewalk Part 2F - Del Rio/Santa Fe/CDS - Rain Gardens RAIN GARDEN EA 25 $ Total Construction Costs - Part 2F - Del Rio/Santa Fe/CDS - Rain Gardens Contingencies (7%) Indirect Costs (30%) Total Project Costs - Part 2F - Del Rio/Santa Fe/CDS - Rain Gardens EE Unit Price $30.00 $35.00 $16.00 $10,000.00 EE Total Price $36,000.00 $700.00 $3,200.00 $39,900.00 $2,793.00 $12,807.90 $55,500.00 $20,000.00 $20,000.00 $1,400.00 $6,420.00 $27,800.00 Appendix A.xls A-9 Cost Estimate PRELIMINARY COST ESTIMATE 9/9/2003 2004 RESIDENTIAL STREET IMPROVEMENTS No. Item Units Qty Unit Price Total Price Total Project Costs - Part 1 - Kiowa Area - Sanitary Sewer Spot Repairs Total Project Costs - Part 2A - Del Rio/Santa Fe/CDS - Streets and Storm (Rehab.) Total Project Costs - Part 2B - Del Rio/Santa Fe/CDS - Sanitary Sewer Total Project Costs - Part 2C - Del Rio/Santa Fe/CDS - Water Main Total Project Costs - Part 2D - Del Rio/Santa Fe/CDS - Streets and Storm (New) Total Project Costs - Part 2E - Del Rio/Santa Fe/CDS - Sidewalk Total Project Costs - Part 2F - Del Rio/Santa Fe/CDS - Rain Gardens EE Unit Price EE Total Price $117,000.00 $636,500.00 $122,400.00 $151,700.00 $76,000.00 $55,500.00 $27,800.00 $1,186,900.00 Appendix A.xls A-10 Cost Estimate APPENDIX B Preliminary Assessment Roll W r-'} APPENDIX C City of Chanhassen Assessment Practice CITY OF CHANHASSEN ASSESSMENT PRACTICE This Assessment Practice is intended to provide direction to City Staff in preparation of assessment roles to ensure fair and consistent treatment of all properties within the City of Chanhassen. MAINTENANCE: (Pothole filling, Patching, crack sealing, seal coat) Maintenance costs are not assessed to abutting property owners. Maintenance costs are financed through the City's Annual Budget process. REHABILITATION: (Repair of problem areas to full depth, Milling of edge or full width of existing pavement, Repair to existing catch basins and/or curb and gutter, Pavement Overlay) Rehabilitation costs are assessed using the following formula: Total Project Cost = 60% Paid by City (City share may be MSA, General Fund, TIF, Federal or State Grants, etc.) 40% Assessed to abutting Property Owners Residential properties that abut collector or commercial streets shall be assessed using the same formula, however, the assessments shall be reduced to be equivalent to a typical 31' residential street section. RECONSTRUCTION: (Removal of existing street and construction of new street,. May include sanitary sewer or watermain work, May recycle the existing asphalt as gravel base) Reconstruction costs are assessed using the same formula as Rehabilitation. NEW CONSTRUCTION: (Construction of new street or utilities or a significant upgrade from the previous facilities, i.e. a 4-lane street replaces an existing 2-lane.) New Construction will be assessed 100% to the benefiting properties. NOTE: If a feature (sanitary sewer, water, curb and gutter, etc.) that did not previously exist is added during a rehabilitation or reconstruction, the cost of that item is treated as new construction with the remaining project costs being treated as rehabilitation or reconstruction. WORK DONE BY CITY CREWS: Work done by City Crews may be maintenance, rehabilitation, or new construction. This work is not typically assessed. Exceptions would include work associated with an assessment agreement signed by the property owner and approved by the City Council and work specifically authorized by the City Council to be done by City Crews and assessed to the abutting properties. g:\cng\forms\asscssments\assessment practices.doc Appendix D Section Condition Report for Pavement Management Study 0000 September 17, 2003 Page 1 of 1 Burgess, Teresa From: Littfin, Mark Sent: Wednesday, September 17, 2003 12:23 PM To: Burgess, Teresa Subject: cul-de-sac comments September 17, 2003 To: Teresa Burgess, City Engineer From: Mark Littfin Fire Marshal Subject: Center islands in Cul-de-sac's It has been brought to my attention that there is discussion regarding proposed center islands in the cul-de-sacs on Santa Fe. The Fire Dept. has some concerns regarding these islands I would like to share with you. 1. Fire Department operations can be greatly hindered due to parking area being eliminated by the island' s. Vehicles may wind up having to park a greater distance from the fire slowing firefighting operations. 2. With the island installed, no parking of any vehicles would be allowed in the cul- de-sac. Even 1 vehicle illegally park would prevent fire apparatus from driving around and thru the turnaround. 3. Setting up our aerial platform truck would be compromised due to the narrowness of the turnaround. To properly set up the truck, the outriggers need a minimum of 18 feet clearance. The center island and parked cars could prevent us from using this vehicle. 4. The current dimensions of the Santa Fe cul-de-sac's are already below today's city standards for new installations. In the event of a fire the parking space would very quickly get overcrowded resulting again parking at a greater distance from the fire. 5. With the addition of center islands in any size cul-de-sac, we occasionally loose the option of turning around vehicles quickly. When that happens, we have to jockey them forward and backwards, 2 to 3 times, which is time-consuming. Even with today's current design standards, when 1 or 2 vehicles are parked in a cul-de- sac, the forward and backward method of turning around is sometimes our only option. 6. If you have any questions or comments that I can elaborate on please feel free to call me. The center islands may look nice when installed, but on the whole they can block the view of the fire hydrant, and greatly hinder fire apparatus accessibility as well as fire ground operations. 9/17/2003