3e Change Order No 1, Lake Ann Irrigation Project 3 C ITYOF I ,v 1 CHANHASSEN ‘ ,,, 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 I Action by City Administmtot 1 MEMORANDUM 6►dorsed.. Modified Rejected . I TO: Don Ashworth, City Manager 2r. Date Dote Submitted to Commission FROM: Todd Hoffman, Park and Recreation Director 1 Diode Submitted to Cornett DATE: August 17, 1993 81/2 3 /9 3 1 SUBJ: Change Order No. 1, Lake Ann Irrigation Project I This item was originally presented to the City Council for consideration and approval on Monday, July 12, 1993, as Item le. on the consent agenda (see attachment). I was on vacation that week and as such was unavailable to address questions of the City Council. In reviewing 1 the minutes of the July 12 meeting, I offer the following responses and information: The change order is divided between two items: I 1. Relocation of the irrigation pumping station from g P P the concession building and additional equipment $3,413 I 2. Additional irrigation zone to Field #2 $1,960 I Of the $3,413, in additional costs for item #1, $1,637 of the improvements are not related to the new enclosure but represent additional items mandated by the city, i.e. mercoid switch, manual I pressure relief valve, etc. The remainder of the costs associated with this item, $1,776 are directly related to the enclosure for the pumping station. The original specifications to locate the pumping station inside the building were developed on the same premise discussed by the I Council, to rid the park of an additional utility enclosure. However, after further consideration, I cannot recommend this design be utilized for the following reasons: I 1. The existing space within the concession stand is very small, representing one -fifth of the building's total area. I 2. Locating the station within the building would still require a second enclosure (in addition to the building itself) be constructed to protect the people operating the concession stand from the equipment and visa versa. 1 1 1 I Don Ashworth August 17, 1993 Page 2 1 3. The pumping operations include a pressure relief valve, which if needed, releases water. The location of the pump needs to allow for this discharge without resulting in water I damage and by providing sufficient drainage. 4. The Legion donated this building to the city at a cost in excess of $17,000 for use as a I concession stand. An alternative to the present recommendation was investigated. A totally self - enclosed pad I mounted unit manufactured by Watertronics of Elm Grove, Wisconsin, was priced at $7,798. The unit was passed over in favor of the current proposal which, with all the equivalent equipment, is considerably less expensive. The outdoor pad mounted enclosure is currently on 1 site and is scheduled to be installed near the existing NSP utility box. The second item of $1,960 represents an additional irrigation zone for Field #2, an addition I which is justifiable if one assumes that the fence on Field #2 may at some point in the future be moved back to its original location. 1 RECOMMENDATION Approval of Change Order No. 1, Lake Ann Park Irrigation Project in the amount of $5,373 is 1 recommended. 1 1 1 1 1 1 1 1 1 City Council Meeting - July 12, 1993 1 Mayor Chmiel: Oh yes, you're right. Okay. As Roger provided us earlier, the Findings of Fact and Decision regarding the Schmids Acre Recreational Beachiot. There is one addition to that that was left off what he provided us and that was the bottom line of boats on land, one. That should be added to the Findings of Fact and Decisions. Roger Knutson: My notes were just inaccurate. When I got your Minutes and I found that error just today. ' Mayor Chmiel: So with that I'd like to get approval for item (b), (g) and item (h). Councilwoman Dockendorf moved, Councilman Mason seconded to approve the following Consent Agenda items pursuant to the City Manager's recommendations: b. Findings of Fact, Schmids Acres Recreational Beachiot, as amended. g. Approval of Accounts. ' h. City Council Minutes dated June 28, 1993 Planning Commission Minutes dated June 16, 1993 ' All voted in favor and the motion carried. E. APPROVE CHANGE ORDER N0. 1, LAKE ANN PARK IRRIGATION PROJECT. 1 Mayor Chmiel: I think Don took off for some things that I have some concerns about. That is where this is a change order for Lake Ann irrigation project whereby they're going to be requesting another $5,000.00 plus dollars to offset some additional costs for the, as they call it, their company, Innovative Irrigation. It was $5,373.00. Indicated that they did not have room within the shelter portion that we have and it seems to me that I think we can probably still make some changes in there. What I'd like to do is table this so a resolvement can come from it. Rather than putting on another box out in the middle of the ballfield. Another green contained metal cabinet. And if there's nothing that can be done other than what they've indicated, I've tried to get some answers and I've discussed it with Don. I think what we'd like to do is to see if we can find another way of doing it. If there isn't, then we'll resolve it back to where we're at. So with that I'd like to make a recommendation that we table item (e) for the irrigation project. Councilman Senn: Don, I'd also like to see just some, I mean I understand it's a change order and $5,000.00 sounds like a little bit of money but I mean that's over 10% of the total budget's a change order. That concerns me. But I'll move tabling. ' Mayor Chmiel: Is there a second? Councilman Mason: Second. ' Councilman Senn moved, Councilman Mason seconded to table action on Change Order No. 1 for the Lake Ann irrigation project. All voted in favor and the motion carried unanimously. 3 r 1 1 CITYOF CHANHASSEN 101 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 INN Pi oft mentmerator MEMORANDUM d ./ - b ' tAod;�ied` TO: Don Ashworth, City Manager ileiecte" — Datr 1— 1 FROM: Todd Hoffman, Park and Recreation Director Date Submitted to Commission DATE: July 8, 1993 Date ' �: to council SUBJ: Change Order No. 1, Lake Ann Irrigation Project Please find attached information in regard to recommended changes to the Lake Ann Park g g Irrigation contract with Innovative Irrigation. These changes have been initiated by the city to address a variety of relatively minor issues. The changes will result in the city receiving a job which meets the expectations of all departments associated with the project, park maintenance, park administration, inspections and utilities. The itemized costs for these changes in contract specifications have been reviewed and are "in- line" with industry standards. ' Approval is recommended. The current contract price, including the change order, will be $50,870.00. The original estimate for the project was $60,000. 1 1 1 1 1 PRINTED ON RECYCLED PAPER 1 WILLIAM R. ENGELHARDT ASSOCIATES, INC. 7' I. n it //1719 (' ny ne4' J 1107 HAZELTINE BOULEVARD CHASKA, MINNESOTA 55318 (612; 448 -8838 , July 1, 1993 City of Chanhassen c/o Mr. Todd Hoffman 690 Coulter Drive Chanhassen, MN. 55317 , RE: Change Order No. 1 Lake Ann Park Irrigation Project City of Chanhassen C.P. R.A. 350 Honorable Mayor and City Council Members: Enclosed is Change Order No. 1 for the Lake Ann Park Irrigation ' System project. The additional work required by Change Order No. 1 consists of: (1) Relocation of the irrigation pumping station from the existing concession building to an exterior metal enclosure and additional equipment. There is a limited amount of space in the existing concession building and it was determined that it would be better to retain the existing space as is and move the pumping station to an exterior location. 1 (2) Adding one additional irrigation zone to Ballfield No. 2. This would allow the size of Ballfield No. 2 to be expanded. If you have any questions please contact us. Sincerely, WILLIAM R. ENGELHARDT ASSOCIATES, INC. ' 6/d Dennis W. Saari R C p ,- , ' DWS /las ' encl. '` 11 il Page 1 of 2 NO. 1 CHANGE ORDER II Dated: June 22, 1993 II OWNER'S Project No. CP NO. RA 350 ENGINEER'S Project No. 92 -91 -04 II Project Lake Ann Park Irrigation System 1 CONTRACTOR Innovative Irrigation 1 Contract For 545,497.00 Contract Date October 12. 1992 1 I To: Innovative Irrigation Contractor I You are directed to make the changes noted below in the subject contract. I 1. Relocation of irrigation pumping station from concession building to exterior metal enclosure and additional equipment. I 2. Add one additional zone to Ballfield No. 2. Enclosures: Exhibit A, Exhibit B and Revised Plan Sheet II Itemized Schedule of Costs and Revised Plan Sheets 1 These changes result in the following adjustment of Contract Price and Contract Time: II Contract Price Prior to This Change Order $ 45.497.00 Net Increase Resulting From 1 This Change Order $ 5,373.00 Current Contract Price Including This II Change Order $ 50,870.00 1 1 Page 2 of 2 1 Contract Time Prior to This Change Order: June 30. 1993 (Days or Date) ' Net Increase Resulting From This Change Order 15 days (Days) Current Contract Time Including This Change Order July 15, 1993 (Days or Date) The Above Changes Are Accepted: Innovative Irrigation Contractor B y : Date /poem.? A S , 19 93 The Above Changes Are Approved: ' William R. Engelhardt Associates, Inc. Engineer Date 4 1 - _ , 71* The Above Changes Are Approved: City of Chanhassen, Minnesota ' Attest: Owner By: , Name Mayor By: Title City Manager Date , 19 1 1 1 EXHIBIT "A" 1 1. Relocation of irrigation pumping station from concession building to exterior metal 1 enclosure and additional equipment. 1 DA31 -2 Range 7 Mercoid Switch $ 160.00 1 (Low pressure switch as requested by city water department) 1 Tee, nipples and installation of $ 180.00 1 Mercoid switch 1 60" x 36" x 36" Outdoor Padmount $1,320.00 1 Enclosure with double doors, pad - lockable vault type handle oven baked enamel paint - forest green 1 1 Concrete Slab $ 100.00 1 Running electrical for pump enclosure $ 175.00 1 1 Difference between 3" wet tap, tapping $ 475.00 saddle and gate valve and 4" wet tap, ' tapping saddle and gate valve 1 Three 3" elbows and two 3" nipples to $ 181.00 allow equipment to fit into enclosure 1 1 Two 3" unions, two 3" nipples to allow $ 260.00 for seasonal and repair removal 1 1 Installation of unions and nipples $ 60.00 1 Manual pressure relief valve watts 530c $ 170.00 1 Substitute reduced pressure backflow $ 332.00 prevention assembly for pressure vacuum breaker. Febco Model 825YA 2 -inch instead of Model 765 -2 SUBTOTAL $3,413.00 1 1 1 II II 2. Add one additional zone to Ballfield No. 2. 1. Extra zone to water Ballfield No. 2 $1,960.00 II including main and lateral line alterations, additional wire, piping, I valve and valve box fittings and seven sprinkler heads. Extra zone for field #2 including 7 sprinkler heads, valve, main I and lateral line alterations SUBTOTAL $1,960.00 1 TOTAL $5,373.00 1 II II 1 1 1 II II II II II II MI OM NM MI - INII INN■ ■M ■ I I= = = I= r um m N EX IIIBI'T "13' PUMPING STATION CABINET NOT TO SCALE - -- 60" MIN. " L______ 36" MIN. - J - 1 t 11 1 w m . 7 .. r - Z 2" ANGLE IRON WELDED TO SIDES OF CABINET FOR 3 MOUNTING PURPOSES a CABINET FRAME -2 "x 4" TREATED WOOD SPACERS MOUNTING BOLT - (SIDES ONLY/ .' i ti ice .. ... ...... .......... . . . .. ... .._ . ....,. ... • , 8 MIN ii 4 IN. 72 M 4" CONCRETE SLAB FRONT VIEW SIDE VIEW NOTES; . • 1. CABINET SHALL BE FABRICATED FROM 12 GA. C.R.S., FORMED AND WELDED INTO AN OUTDOOR. PADMOUNT ENCLOSURE. 2. CABINET SHALL BE PROTECTED INSIDE AND OUT WITII BAKED ON RUST INHIBITING PRIMER AND A FINISH COAT OP BAKED ON ENAMEL. COLOR SIIALL BE FOREST GREEN. 3. DOORS SHALL BE PAN FORMED TYPE WITH CONTINUOUS IIINGES. WIND LATCHES AND A PADLOCABLE VAULT TYPE IIANDLE. 4. CABINET SIIALL BE MOUNTED TO CONCRETE PAD WITH 1/2' X 6' BOLTS THROUGH 2' X 4' TREATED WOOD SPACERS INTO CONCRETE PAD (4 REQUIRED). 5. CONTRACTOR TO VERIFY CABINET SIZE REQUIRED TO ENCLOSE