2a. Approve Plans and Specs for Hwy 101 North Leg Railroad Crossing Project 88-22B-1 0241.- CITYOF CHANHASSEN ' 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: Don Ashworth, City Manager 1 FROM: Charles Folch, City Engineer DATE: February 22, 1993 SUBJ: Approve Plans and Specifications for Trunk Highway 101 North Leg Railroad Crossing; Authorize Advertising for Bids Project No. 88 -22B -1 At their regular meeting on December 14, 1992, the City Council awarded the Trunk Highway 101 North Leg Realignment Improvement Project No. 88 -22B to C. S. McCrossan. One of the specific elements of this project is the railroad crossing. Due to the specialized ' design and construction involved with this element, the work effort is being bid out under a separate contract. The construction timetable for the railroad grade crossing has been ' defined to be compatible with the overall roadway improvement project schedule which is anticipated to be substantially completed by the fall of 1993. The project plans and specifications for the railroad grade crossing have been completed and are ready for MnDOT submittal as such. Due to the size of the project plans and specifications, they could not be included with the packet but a copy is available in my office for review. It is therefore recommended that the City Council approve the plans and specifications for the railroad grade crossing in conjunction with the Trunk Highway 101 North Leg Realignment Project No. 88 -22B -1 and authorize the advertisement for bids. ktm Attachments: 1. Location map. 2. Letter from Jon Horn of BRW dated 3/17/93. c: Dave Hempel, Assistant City Engineer Bill Bement, Engineering Technician II ' Jon Horn, BRW • �s 5 • 1.4. PRINTED ON RECYCLED PAPER MI I= 111111 NM • • =I MIll = • • IIIIIII MN • MI NM IIIII NM • sp S P / / //' • 1 Z \ ti � / 713* ' N �x O ' ' / / / , Jo' R. ROADWAY 1 1 Z Q' o I e r V I SOS ei , 1 I 50' R +-� -+----"; / /' / I p P I OPOSED 6' CONC •/ / / / / ' /' / v EWA /,, /` / \\ / / I )... PROPOSE Q R W �� , 41°P. /, / U PROPOSED I6' CON • w / / � PR OS/ 'Q / / I. ISLAND � PROPOSED 6' CONC -Th�L �7" / f �SO R. ? OPOSED,2 CONC. / -SP' — —CS y / __ __ _ 90EwAEX '_/ D : 151. D PROPO 6' CONC. / c�'� / T PROPOSE T' CONC /� - - Y /.� 1 I 1 PROPOSE PJ 1 It care ✓ ' I I 1x I II I 10 1 9 I e 1 T I 6 , -5 , SLA.ND, •. ..' °�Y::. / BIT. PARKING b G ir O l0T 1 1 I 1 1 1 1 � � a+ �osED a x " ?'•• / TRACT B ' �r I il / ` • 1:0 : " •• >i'.. ..: e y .. 1 CHANHASSEN I L I _ / /' < j; PROPOSED RoADwAY 1 I R 8 _ - - /`/ 1 v :, ; O FFICE COMPLEX I I�"/ 'ems I ' ;: PRDPOSED R , W '(. g�. . /• PROPOSED R \w •. .:irr:.. 1 ;., 7i. . 5i * Ar ••5 ' it/ ' I 1 1 L �I— — J • Q I 1 = S 'V J S j 7,- PROPOSED 6' .'•�' . /- PROPOSED 6'ICONC, 7...... V AUC DE AL 1 a i " ARKIN LOT OS ED ROADw%T" �. I I e� PROPOSED R W Ode '� - - -�•' PROP 6' CWC. u � - �I * OW .4.- lt � �. ROP{1SED b% • 78thi. -ST --- f.— - - — — - - mr t: i7 r / / / �/ ` 19 / DE�rod` CURVE / 10 0 / / / PROPOSED ROADWAY 1V Y_au {� ,� ORTN /' \ / i /' / \ . _, - - /' / ..„,..,......._ LOCATION MAP MAR 17 '93 09 :44 FRW INC,: - -- ' ._.�._ _ F.2 ---- ^� 1 1 R \` r . March 17, 1993 1 1 B R W INC. Mr. Charles Folch, PE City Engineer I Planning City of Chanhassen Traruportatian 690 Coulter Drive Er t;tteering Chanhassen, MN 55317 1 Urban Design RE; TH 101 Realignment (North Leg) 'rh,re-.her square Railroad Improvements I 7G0 Third Street Fes,. City Project 88 -22C Minneapolis. 1 tviN ;'.'t; Dear Mr. Folch; t>12 r 370- 0200 tax 612/ 370- i.; 74 BRW and AST are currently completing the plans and specifications for the Denver TH 101 Realignment (North Leg) Railroad Improvements Project, CP 88- I ` 22C. The project includes the installation of rubberized crossing and mi signal system improvements for the new TH 1 101 and West 78th Street at- I Orlando grade crossings with the Twin Cities and Western Railroad. r'hoenix Pnrtla„ci The construction of the new TH 101 and West 78th Street roadway I San Dirac alignments and all earthwork required to install the railroad improvements Seattle will be performed as a part of the TH 101 Realignment (North Leg) Project, City Project 88 -22B. The contract for this project was awarded I Dana Id W. Rittro_ -e by the City Council on December 14, 1992. All work performed as a part Richard P WokfPld rri�mas i L'ain,u of the railroad improvements project will be required to be coordinated Craig A. Amundsen with the roadway improvements work. 1 Donald E. Hunt juhn l3. Mc\amaLa The railroad crossing and signal improvements are being designed and Richard 0, Pilgrim constructed on behalf of the Twin Cities and Western Railroad (TC & W) I Dale N. Beckmann since all improverrients will be performed within TC & W right -of -way. Jeffery L. Benson A copy of the plans and specifications are being submitted to the Twin I Ralph C. i.;JLtrn Cities and Western for their review to ensure compliance with their Cory J, f.rick�un requirements and standards. The Twin Cities and Western review process John L. Lynch could result in some changes to the design of the proposed improvements Pa.ii N. B_, as well as some changes to the project cost. I Subn Avai Gary A. Lhrct Anthony I ieppe :cn:uin I Arijs Pakaln9 Martha :vIkf'h, x f coward P Preston I Deckni . P. Pinb:.t I MHR 17 ' 93 09 :45 BRW INC. _ _ .,..- -- ---- _--P. B ... ... 1 Mr, Charles Folch I March 17, 1993 Page 2 1 The proposed improvements will also require the review and approval of 1 the Minnesota Department of Transportation (MN /DOT). The plans and specifications will be submitted to MN /DOT after receiving the comments of the TC & W and making arty necessary revisions. The MN/DOT review I process could also result in some design changes and associated changes in the estimated costs. 1 We have prepared an engineer's cost estimate for the project based upon the completed plans and specifications. The following is a summary of the estimated costs. I ITEM ENGINEERS ESTIMATE 1 TH 101 Signal Improvements $ 120,000.00 West 78th Street Signal Improvements $ 90,000.00 I TH 101 Track Improvements $ 60,000.00 West 75 #h Street Track Improvements $ 30 1 TOTAL CONSTRUCTION COST $ 300,000.00 It should be noted that this is an estimated construction cost only and I does not include any contingencies or easement acquisition, administrative, overhead, and engineering costs. 1 The schedule for the project will be coordinated with the schedule for the roadway improvements work. The following is a preliminary schedule for the project considering the current roadway improvements schedule: I Approve Plans and Specifications and March 22, 1993 Authorize Advertisement for Bids I Advertise for Bids March 25, 1993 Receive Bids April 6, 1993 Award Contract April 12, 1993 I Start Construction July 26, 1993 Complete Construction August 13, 1993 1 It should be noted that this is a preliminary schedule only and that it may change depending upon the schedule for the roadway improvements I work. MAP 17 ' 93 09:46 ERN INCo .< — _ 1 Mr. Charles Folch March 17, 1993 Page 3 1 We recommend that the City Council approve the plans and specifications and authorize the advertisements for bids for this project on March 22, 1993. It is important that bids are received and a contract awarded at the earliest possible date to ensure that adequate time is available to manufacture and install the railroad improvements in accordance with the schedule for the roadway improvements. Please call if you have any questions or we can provide any additional information. Sincerely, 1 BRW, INC. • n B. orn, PE 1 Project Engineer JBH /lab cc: File 1480A90 1 1 1 1 1 1 1 1