1d. Approve Change Order No. 2 for Upper Bluff Creek Project 91-17 for the Proposed Johnson/Dolejsi/Turner Project 92-5 1 c e: .0, i - C ITYOF 0%1 1 CHANHASSEN 1 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 i } MEMORANDUM . 2,17 -9 -. 1 TO: Don Ashworth, City Manager I FROM: Charles Folch, City Engineer 4 r''_- _ ' ., ., _ I 3 DATE: February 17, 1993 1 SUBJ: Approve Change Order No. 2 for Upper Bluff Creek Project No. 91 -17 for the Proposed Johnson /Dolejsi /Turner Project No. 92 -5 1 The attached Change Order No. 2 is proposed to be administrated through the Upper Bluff I Creek Trunk Utility Project No. 91 -17 for the purpose of constructing a portion of the trunk sanitary sewer through the wetland area adjacent to the Lake Ann interceptor for the Johnson /Dolejsi /Turner Project No. 92 -5. The overall project plans and specifications for 111 the Johnson /Dolejsi /Turner Project No. 92 -5 are currently being prepared in conjunction with the contract agreement executed between the City, Lundgren Brothers Construction and Rottlund Homes, Inc. I The local trunk sanitary sewer for this improvement project is proposed to connect into the Lake Ann interceptor which crosses through a portion of Prince's property. The area I immediately adjacent to the Lake Ann interceptor is a designated wetland. The pipe installation in this area would be better facilitated from both an economic and environmental standpoint under frozen conditions than during a typical summer construction I season. In fact, the MPCA, who is one of the permitting agencies for this project, has recommended that this work be scheduled during the frozen soil months to minimize disturbance and damage to the wetland and normally soft subsoils. It is estimated that I constructing this segment of pipe during the winter months could save approximately $15,000- $20,000 versus summer construction. 1 The overall project plans for the Johnson /Dolejsi /Turner Project No. 92 -5 are expected to be completed this spring with construction potentially taking place this summer. I Implementing this work as a change order to the currently existing Upper Bluff Creek Project No. 91 -17 would allow this work to be completed by the contractor during the month of March when soil conditions would likely still be frozen. The cost associated with this 1 change order, estimated to be $67,690, is proposed to be ultimately charged against the 14p PRINTED ON RECYCLED PAPER 1 I Don Ashworth February 17, 1993 Page 2 1 Johnson /Dolejsi /Turner Project No. 92 -5. The contractor's quote for the change order is based on construction during frozen conditions. If this work cannot begin before the spring thaw, this change order will be canceled and the wetland crossing will be bid as a part of the overall Johnson /Dolejsi /Turner Project No. 92 -5. I It is therefore recommended that Change Order No. 2 for the Upper Bluff Creek Trunk Utility Improvement Project No. 91 -17, for the purposes of completing the wetland sanitary sewer crossing for the Johnson /Dolejsi /Turner Project No. 92 -5, be approved conditioned I upon the work being initiated prior to spring thaw and that all associated costs will be the responsibility of Project No. 92 -5. 1 jms /ktm Attachment: 1. Location map. I 2. Letter from Phil Gravel dated February 17, 1993. 3. Change Order No. 2. 4. Letter from PCA dated February 11, 1993. I c: Dave Hempel, Assistant City Engineer Jerry Boucher, Utility Superintendent U Phil Gravel, Bonestroo & Associates Butch Landberg, PCI 1 1 1 1 1 1 1 ) • - -, - - — --- - I .■L I / ,:,, • H - •\ I ) 1 : , 1.....41 / i• ' Y I i t7 i • d j r I . .1 — 1 f, ,. / Sub Trunk . , --..i II / 4 Service Area ; .. ‘4, 7 :....11 , „,. , ...,.,, 1 H4RRISON • 1 i : _ .. a Lake Ann .)/ r Interceptor 1 (1 r --- - -- - --- , -/ ,....t., ; k • r a i 1 t C f: • -•••*4 7 / i ) I r , I / / 1 i , 1 ri WELL NO. 3 4 ! ....2 1 I g) / (Son / ri r).-----1... ,----e'V. t • t \ 1 1 i 1 -, ii...--,: ,-., f „„, ii 0 ,____.,),\„\..,;...„,•< -b. --. ••! ! 1 4i :,.::: ... . ,.., \ , :// • • „ , ..• . ' t-;-;,./ . 1,4 // , , - / / if --4.....,, . ,-- ; ,...., — ii! . ., I , • • • Lundgren Bros. i i . • l / Proposed • . - Developement ,„ , . 12" Gravity ..._ ._. , , .,...,..J , ,„„ .., ... . Sanitary Sewe Proposed - / / St S I. Lift Station 11 ---T— t --: , , ,. Proposed i i I • „...., r !, i - - Force Main / i '-- ? : 3 0%., --3, i I I • 1 0 '• 3 Ci I I i , • __ WY. — - •---___ /. .—..r----71 L 1 . H 5 '. . • • L 1 o moo ■ST•1 Scale n feet 0 . • ''''' 1 Legend Lrn,"" K"' ' ' "' P• C°1. , --- *: /Vi.- .., \ 400-- Proposed Sanitary Sewer FM .11 *-+—• Proposed Trunk Sanitary Sewer ' it- c ., '•• • " \,. --A--• • Proposed Lift Station ' II 1 ..' , 1 3 - ii , sli 1 / ,„ ii i 1 1 II Boneatroo Trunk Sanitary Sewer Improvements Roaene I , . Anderlik & Johnson—Dolesji Property Project FIGURE 2 ill Associates Trunk Sanitary Sewer & Trunk Watermain Improvements I Chanhassen, Minnesota 39308F02 DWG SEPT. 1992 COMM. 39308 III 02 -17 -1993 09:24 612 636 1311 BONESTROO & ASSC. P.02 I hi Otto G &An= PE Howard A, Sanford, PE. Above! P. Rau. PE Mires B. Jensen, P.E. Bonestro0 ROW W ROW*, P1. Keith A O don. P..E ire M Ring. A.IC.P L PMiip (Raw III, PE Joseph C. MOWER, PE. Robert R. What a. PE Thomas W. Peterson. PE. Karen L. Wtemcri, PE Rosene e Marvin L SC M et PE Reward W Foster. PE Michael C Lynch, P.E, Gary D Ktistorrts. PE. Nom s RKhard E Tame, PE David O. Loixota. P.E. James R. Malone, P.E. F Tadd Foster, PE. I Anderilk & Glenn R. Cook PE Robert C. Russell. MA, Jerry 0 Pert:uh. P.E Kern R. Yam P. (1 ironies E. Noyiei P.E. Jerry A Bourdon, PE Kenneth P Anderson, PE Shawn 0 Gustafson. P.E a�tt Robert G. Schunicht, P,E. Mark A Hanson. PE Mark 1 Ras, PE. Ceceio Ouwer, PE A ssociates Susan M. Ebell% C.PA Michael T, Rautmann, P.E. Mark A Sep P.E. Charles A Errckson "Sef & Consultant Ted K PMks, PE, Gary W Motien, P.E. Lee M Pp.el,ty 1 Engineers 8e Architects Thomas R. Anderson. A,LA. Daniel J. Eugenon, P.E. Henan M own Donald C Durgardt, PE. Daryl K. Kksthermtan, P.E. James F Engelhardt TMmas E. MguS, PE PhlNp 1 Cacwrl. P.E. WWI Woo, PE. Mark D. WAIL PE February 17, 1993 1 Mr. Charles Folch, P.E. City of Chanhassen 690 Coulter Drive, fax 147 I Chanhassen, MN 55317 Re: Change Order for Wetland Crossing I Johnson, Dolesji, Turner Property City Projects 91 -17A and 92 -5 Our File Nos. 39305 and 39308 1 Dear Charles: I Attached is a construction change order to complete a portion of the Johnson- Dolesji- Turner project (City project 92.5). The construction covered by the change order consists of the sanitary sewer crossing of the wetland area adjacent to the Lake Ann interceptor 1 sewer on Prince's property. The change order is proposed at this time because we would like to complete the wetland 1 crossing under frozen conditions. Crossing the wetland under frozen conditions is desirable from both an economic and an environmental standpoint. The estimated change order amount is $67,690.00. The cost to complete the work under summer conditions would be 1 approximately $15,000 to $20,000 higher. Since project 92-5 has not yet been bid, we are proposing to change order the wetland I crossing to Project 91-17A (Upper Bluff Creek Utilities, Phase 1) with the understanding that the change order costs will be the responsibility of Project 92 -5. The remainder of the I Project 92 -5 construction will be bid this April and constructed from May to August. Th e change order prices very reasonable and we are confident in the Contractor's ability I p tes are ry to complete the difficult wetland crossing construction. Please note that the Contractor has quoted the change order based on frozen conditions. If we have an early spring and the work can not begin until after the ground has thawed, we will not execute the change order I and will bid the wetland crossing along with the rest of Project 92 -5. Yours very truly, BO ESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. 1 � ., Phil Gravel, P.E. 4./ I PG:dh ...IE Myra,• Lai..W....... 2L . e. es...a ••e_� ..-_._ ere I It . Lei_L3LJLM 02 -17 -1993 09:25 612 636 1311 BONESTROO 1: ASSC. P.03 0 O Ro �e+r o ' Owner City of Chanhassen, 690 Coulter Drive, Chanhassen, MN 55317 Date February 17, �J93 -- nswc�ua — - 7 1 ; ' Contractor Progressive Contractors, Inc., 8736 Zachary Lane, Osseo, MN 55369 Change Order No. 2 1"`;. 1,4 Bond Co. 7284386 Cobb- Strc:cker•Dunphy, John Martinson, 150 S 5th St, #2000, Mpls., MN 55402 CHANGE ORDER NO. 2 I Upper Bluff Creek District Sanitary Sewer & Water Main Improvements 1 Project No. 91 -17A (92 -5) File No. 39305 (39308) 1 IDescription of Work Wetland Crossing - project No. 92-5 This change order adds the installation of a portion of the trunk sanitary sewer ussucint� with City Project No. 92 -5 to the existing contract for Project No. 91 -17A. The sewer proposed with this change order consis of the crossing of a wetland area adjacent to the existing MWCC Lake Ann Interceptor Sewer. The wetland crossing is necessa to provide sanitary sewer service to the area west of the interceptor, The wetland crossing is both economically and environmentally hest completed during the winter. Therefore, that portion c' Project No. 92 -5 shall be completed at this time under the existing Project No. 91 -17A. The remainder of Project 92 -5 wilt he completed later this summer as part of a larger public improvement project. 1 The proposed wetland crossing will be completed between March 1, 1993 and April 9, 1993. This change order does not inclui any contract completion date extensions for Project No. 91 -17A. Coatraet Unit 'ibt;' 1 No. Item Unit Quantity Pricy Mount Change Order No. 2 - I Wetland Crossing - Project No. 92 -5 1 Mobilization LS 1 14,000.00 14,000.0 2 Clear and grub LS 1 1,200.00 1,200.0 3 Selvage & reistall existing fence LT 70 20.00 1,400.0( 4 Install 12x8 DIP on existing 8" drop and connect to manhole LS 1 1,800,00 1,1100.00 5 12" DIP Class 52 sewer, 0.12' deep LF 20 40.25 $05.011 6 12" RCP Class 5, 0'- 8' deep in place LT 288 21.75 6,264.00 7 12" RCP Class 5, 8'- 10' deep in place LF 436 21.75 9,483.01 8 12" RCP Class 5, 10'- 12' deep in place I_F 200 2100 4,400.110 9 12" RCP Class 5, 12'• 14' deep in place 1_1 132 23.00 3,036.0' 3) JLCEIA CO -1 1 02 -17 -1993 09:25 612 636 1311 BONESTROO & ASSC. P.04 1 Contract Unit 'tk,ta! 1 No. Item Unit Quantity Price Amount 1 10 12" RCP Class 5, 14'- 16' deep in place LF 100 24.75 2,475.00 11 12" RCP Class 5, 16'. 18' deep in place LF 100 26,35 2,635.00 1 12 12" x 6" factory installed Kor -n -tee for service EA 1 150.00 150.00 1 13 Improved pipe foundation per 6" depth increment for 12" diameter pipe LF 1,490 3.00 4,470.00 I 14 Standard 4' diameter manhole w /casting EA 6 1,500.00 9,000.00 15 4' diameter depth greater than 8 feet LF 9.8 90.00 8182.00 I 16 Structure marker sign with post EA 7 10.00 70.00 17 Anti- seepage collars EA 2 400.00 800,00 18 Erosion control silt fence, Type 1 LF 200 2,50 500.00 1 19 Seed with mulch, fertilizer & 3" existing topsoil AC 1.5 780,00 1,170.00 1 20 Common borrow (LV) CY 700 4.50 3,150.00 Total Change Order No. 2 - $67,690.00 1 Wetland Crossing • Project No. 92.5 1 Original Contract Amount $ 2,352,258.00 1 Previous Change Orders 43,281.75 This Change Order No. 2 - ADD 67,690.00 1 Revised Contract Amount (including this Change Order) $ 2,463,229.75 1 1 1 1 1 3601.CHA CO -2 02 -17 -1993 09:26 612 636 1311 BONESTR00 & ASSC. P.05 1 Recommended for Approval by: UONES`TROO, ROSENE, ANDERL.DC & ASSOCIATES, INC. 4101.1.1r 1 Approved by Contractor: Approved by Owner: 1 PROOF' IVE CONTRACTORS INC. CITY OF CHANHASSEN, MN 1 ■■..■ ter Date: ' Distribution 1 - Owner 1 • Contractor 1 • Engineer 1 - Bond Co, 1 1 1 1 1 1 1 1 39305 CHA ('O -3 c ti��� > F s/ ` �_ Minnesota Pollution Control Agency I Celebrating our 25th anniversary and the 20th anniversary of the Clean Water Act 1 CITY Of RR CHANHASSEN February 11, 1993 lnE(MiNg 1 FEB 12 1993 Mr. Ben Wopat ENGINEERINS DEPT. I Regulatory Branch, St. Paul District U.S. Army Corps of Engineers 1421 U.S. Post Office & Custom House St. Paul, Minnesota 55101 -9808 ' I Dear Mr. Wopat: I RE: CENCS -CO -R 93- 00251- NW -GAE Individual Project 401 Certification Nationwide Permits 33 CFR Part 330 Appendix A (12) City of Chanhassen - Sanitary Sewer . 1 Wetland, Carver County This letter is submitted by the Minnesota Pollution Control Agency (MPCA) under authority of Section 401 of the Clean Water Act (33 USC 1251 et seq.) and Minn. I Stat. chs. 115 and 116. The applicant proposes a project to be eligible for a nationwide permit as referenced above. The project involves a proposal to install a 12 -inch diameter gravity sanitary sewer through a wetland located in I the SW 1/4 NE 1/4 Section 10, T 116 N, R 23 W, Carver County, Minnesota. The MPCA will waive certification of the referenced project with the following II conditions since the project's individual and cumulative impacts do not appear to be significant as defined by present water quality standards. 1. The impacts to wetlands should be avoided to the maximum extent possible. I Those impacts that are unavoidable should be minimized to the to the extent possible. All impacts should be mitigated. I 2. Work should be scheduled during the frozen months if possible when damage to the normally soft soils will be minimized. 3. Any clearing of vegetation should be kept to a minimum and all cleared II areas should be immediately revegetated with an appropriate monitoring plan to assure a successful growth. II 4. Side casting of excavated material in wetland area should be done on mats. 5. Insure that trenching is closed immediately and compacted properly after I pipe installation to avoid drainage of the wetland from occurring.through the trench system. 6. Erosion and sedimentation prevention practices shall be incorporated into II the task. Lafayette Rd , St. Paul, MN 55155 -3898; (612) 296 -6300; Regional Offices: Duluth • Brainerd • Detroit Lakes • Marshall • Rochester 1 20 Frnjal r)nnnrtunity Employer • Printed on Recycled Paper