Loading...
11. Authorize Feasibility study for Street Recon and Drainage Improvements in Chan Estates project 93-10 1 11 CITY OF t.� CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 1 (612) 937 -1900 • FAX (612) 937 -5739 1 MEMORANDUM 1 TO: Don Ashworth, City Manager FROM: Charles Folch, City Engineer 14 1 DATE: April 21, 1993 1 SUBJ: Authorize Feasibility Study for Street Reconstruction and Drainage Improvements in Chanhassen Estates Subdivisions Project No. 93 -10 1 In early 1992 the City Council received a draft five -year capital improvement program for 1 street reconstruction which was developed from the City -wide pavement management study conducted by Orr - Schelen - Mayeron & Associates (OSM) in 1991. You may recall that the pavement management study identified the Chanhassen Estates subdivisions as the highest 1 priority area with streets in need of reconstruction. The study indicated that due to the extent of deterioration and apparent subsoil problems that maintenance -type repair 1 strategies such as crack filling, sealcoating and even overlaying would not correct inherent problems and any money spent on these types of maintenance repair efforts would be essentially wasted. 1 In March of this year a letter was sent to all of the residents in the Chanhassen Estates area to inform them of the results of the pavement management study and to conduct a survey, 1 based on the information provided, as to whether or not they would recommend the City moving ahead with conducting a formal feasibility study to identify the primary elements, costs and potential special assessments associated with the street reconstruction program for the Chanhassen Estates subdivisions (see attached). A total 128 letters /surveys were sent out. Staff received a total of 53 survey responses to this inquiry. 32 of the 53 responses (60 %) indicated that they supported the idea of the City conducting a detailed feasibility 1 study. Another 12 responses indicated that they would wish for the City to not spend any more money on studies and just reconstruct the streets accordingly. Some of this group, however, indicated that they did not want to be assessed for any reconstruction costs. State 1 Statute §429 requires that the City follow a specified project process which includes the preparation of a project feasibility study. Five responses indicated that they would be interested in attending neighborhood meetings to acquire additional information. The final 4.7 PRINTED ON RECYCLED PAPER 1 1 Don Ashworth April 21, 1993 Page 2 1 four responses indicated that they did not wish for the City to pursue the idea of street 1 reconstruction in the Chanhassen Estates area and that they were in favor of their streets remaining at status quo. 1 The purpose for conducting this survey was to acquire resident input as to whether they believe the City should proceed with the process to conduct a formal street reconstruction ' project. The next step would of course be the preparation of a feasibility study. I have contacted Mr. David Mitchell of OSM to request a cost proposal to prepare the feasibility study (see attached). He has estimated that the cost would be approximately $14,400. ' Additional services as identified in the proposal dated April 23, 1993 will be billed on an hourly basis. ' It is apparent from the results of the survey that the majority of the resident responses would favor conducting a feasibility study. It is therefore recommended that the City Council authorize the preparation of a feasibility study for street reconstruction and ' drainage improvements in Chanhassen Estates subdivisions, Project No. 93 -10, and that OSM be designated as the project consultant engineer. ktm Attachments: 1. Location map. 2. Proposal from OSM dated April 23, 1993. 3. Letter to residents dated March 23, 1993. 4. Survey responses. 1 1 1 1 1 1 1 _,,,,,.iy ,,,,,,, ,,,,,...,„!, t . r 1 ' „_, e 0 �, a rod!.. II% i 1 4111/ 1 993 RECONSTRUCT � � � �� , � 1 . • `�� fr YENNE 1 • ~ • r 1 � *I i I', • NO SCALE LAK 4+LR' C I# /''' I 0 `�! Mai 1111%11 . ��'� '�', % 4� 7 ■ 199'3 RECONSTRUCT 1 z ..0111 yip. 4 . ,. ...„<ii iToor zei Ct I ..- t "::; Ve <X � _ i Alt Mr �- e•\ .f.-1 loit c% ` �!•` "cs'. �b - tai � � � • -z y i III MAR o ._■ LAKE W I SINNEN i- 1 I CIRCLE PARK - Cr lop 1 —Y 1 __ k , R /CE — Al , Al 1 Q • I lI 1 • • • • • 1993 RECONSTRUCT 1 111111111111111111111 RECONSTRUCT 1 1993 RECONSTRUCT LOCATION MAP 1 1 Orr OSP I?einc. 1 April 23, 1993 300 Park Place Center 5775 Wayzata Boulevard Minneapolis, MN 55416 -1228 ' Mr. Charles D. Folch, P.E. 612- 595 -5775 1-800-753-5775 595 -5774 City of Chanhassen Engineers Architects ' 690 Coulter Drive Planners P.O. Box 147 Surveyors Chanhassen, MN 55317 CITY OF CHAHHASSEN ' Re: 1993 Street Reconstruction Project GERM Chanhassen Estates Subdivision 1 City File No. PW -167A ppR 2 b 1993 OSM Proposal No. 0146.93 Dear Charles, ENCINEERIPA DEPT. This letter is in response to your request for an estimate of our fees to provide a 1 Feasibility Study for the reconstruction of the streets in the Chanhassen Estates area. The following is the basis used to estimate the fees for this task. Estimated Construction Cost $1,000,000 -1.4 miles total length 1 Estimated Basic Fee $62,000 -6.2% of Construction Cost per 1983 Contract for Engineering Consulting Services Estimated Fee for Feasibility Study $12,400 ' -20% of Basic Fee per 1983 Contract for Engineering Consulting Services ' On April 21, 1993 we discussed the possibility of two (2) neighborhood meetings and the possibility of meeting with individual property owners to discuss the project. The 1983 Contract for Engineering Consulting Services calls for a maximum of six (6) public ' Council meetings and public hearings to be included in the basic fee. It is my opinion that the neighborhood meetings would fall into this category. Individual meetings with concerned property owners would not be a part of the basic fee. You and I estimated ' ten (10) meetings with individual property owners. Billing of these meetings would be on an hourly basis. This cost would be in addition to the previously estimated fees and is estimated at $2,000. ' The total estimated fee to provide services through the Feasibility Study is $14,400. Costs for survey needs, soils investigations, comprehensive studies, analysis of more than one (1) alternative for storm water discharge, and preliminary assessment rolls would be billed on an hourly basis and would add to this estimate. 1 Equal Opportunity Employer Mr. Charles D. Folch ,. City of Chanhassen April 23, 1993 Page 2 1 Please advise me as to any Council action regarding this matter. I am looking forward to working with you, City Staff, and the residents of Chanhassen Estates on this project. 1 Please call me at 595 -5699 if you have any questions. Sincerely, ORR- SCHELEN- MAYERON 1 & ASSOCIATES, INC. Cilw.61 n 11 1 David D. Mitchell, P.E. Project Manager /nm 1 1 1 1 1 1 1 1 1 CITYOF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 1 (612) 937 -1900 • FAX (612) 937 -5739 1 March 23, 1993 1 ' Re: Chanhassen Estates Street Condition File No. PW -167A 1 Dear Resident: Over the past few years many of you have contacted myself or other City staff regarding the 1 condition of the streets within the Chanhassen Estates subdivision. Those of you who have discussed these matters with me learned that the City was undertaking a study on the condition of all the local streets within the City. At this point in time I believe that it is 1 appropriate to provide you with some background history and an update on the completed City -Wide Pavement Management Study. In late 1990, the City's Engineering Department, with the assistance of the consulting engineering firm of Orr - Schelen - Mayeron & Associates (OSM) embarked on a City -wide study of the condition of all of the local streets. The purpose for the study was to ' accomplish a number of goals including cataloging each street infrastructure, identifying problems inherent with the street, assigning the appropriate repair strategy, estimating the cost of the needed repairs and prioritizing streets needing repair. Data accumulated for each street was entered into the CalTrans Pavement Management computer program for processing. 1 Based on the extent of road surface deterioration and subgrade soil problems, the CalTrans program assigned repair strategies ranging from "do nothing" to crack filling and seal coating ' to overlaying to total street reconstruction. Streets recommended for total reconstruction were then ranked and prioritized in terms of need. A draft 5 -year capital improvement program for street reconstruction was developed and presented to the City Council in early ' 1992. Streets recommended for sealcoating or overlaying will be administrated through annual street maintenance programs. ' As many of you might expect, the Chanhassen Estates subdivision ranked as the highest priority area with streets in need of reconstruction. It is also evident from this study report that due to the extent of deterioration and apparent subsoil problems of the streets in the to PRINTED ON RECYCLED PAPER 1 March 23, 1993 Page 2 Chanhassen Estates area, other repair strategies such as crack filling, sealcoating and even overlaying would not solve the problem and any monies spent on these types of repair efforts would essentially be wasted. The City would like to hear from you, the residents from the Chanhassen Estates subdivision, to assist in determining whether or not a detailed feasibility for a street reconstruction in your area should be conducted. I have attached a brief questionnaire as to your thoughts and ideas regarding your streets. Please fill out the brief survey and return by mail or deliver in person to City Hall by April 16, 1993. A copy of the Pavement Management Study is available for review in the Engineering Department during normal business hours, Monday through Friday, 8:00 a.m. to 4:30 p.m. Thank you in advance for taking the time to complete this survey. Sincerely, CITY OF CHANHASSEN ' Charles D. Folch, P.E. City Engineer ' CDF:ktm Attachment: Survey c: Don Ashworth, City Manager Dave Hempel, Assistant City Engineer Bill Bement, Engineering Technician II Dave Mitchell, OSM 1 City Council Administrative Packet (4/12/93) 1 1 1 1 1 1 CHANHASSEN ESTATES STREETS SURVEY ' Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 ❑ I would recommend that the City conduct a detailed feasibility study to identify the 1 primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean 1 that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in 1 the Chanhassen Estates area. I I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: 1 1 1 Please remit questionnaire to: City Engineer 1 City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 1 CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): I would recommend that the City conduct a detailed feasibility study to identify the I primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study I to find out more information). El I would recommend that the City conduct a detailed feasibility study as stated above I and I would be interested in attending an informal neighborhood meeting to further . discuss the Pavement Management Program and its findings regarding the streets in I the Chanhassen Estates area. El I would like to attend an informational neighborhood meeting to discuss the results I of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. 1 0 I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. 1 0 Other opinion: 1 1 Please remit questionnaire to: City Engineer City of Chanhassen ' 690 Coulter Drive Chanhassen, MN 55317 1 Car OF ell A ANHASSIs bakifire 3 EMNEER NR Q EPA 1 CHANHASSEN ESTATES STREETS SURVEY I Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 I would recommend that the City conduct a detailed feasibility study to identify the ill I primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean I that I necessarily support the project. I only support conducting the feasibility study to find out more information). 1 0 I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in 1 the Chanhassen Estates area. ID I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. I I do not wish for the City to pursue the idea of street reconstruction in Chanhassen 1 Estates any further. I am in favor of the streets remaining at status quo. 0 Other opinion: 1 1 1 I Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive 1 Chanhassen, MN 55317 CITY OF CHANHASSEN 1 M RW /f n APR 0 9 19Fil I ENGINEERING DEPT. 1 I CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street I reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study 1 to find out more information). I would recommend that the City conduct a detailed feasibility study as stated above I and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. III • 0 I would like to attend an informational neighborhood meeting to discuss the results I of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. 0 I do not wish for the City to pursue the idea of street reconstruction in Chanhassen I Estates any further. I am in favor of the streets remaining at status quo. Other opinion: //? /- //7 (? S - f*sz-L 5,5/,="-(> S /-7v , -, I 1 1 Please remit questionnaire to: City Engineer City of Chanhassen 1 690 Coulter Drive Chanhassen, MN 55317 1 Clty or CHAtIH�SSE ppRpu193 1 Eii6tNEERH s Ilt" 1 1 I CHANHASSEN ESTATES STREETS SURVEY I Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 I 0 I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean I that I necessarily support the project, I only support conducting the feasibility study to find out more information). 1 ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in 1 the Chanhassen Estates area. I I32 I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. I ❑ Ido not wihf r the City pursue of r reconstruction o t e C ty to pu sue the idea o street econstruction m Chanhassen I Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: , 7 7, & r.-eii.� =�' .l- u',- f n` 1 -/"--7"- l,�/ /- ��, c./.‘-?- i 4,---e----/--et-ti Please remit questionnaire to: City Engineer �'(- �e.---f----�. I City of Chanhassen 690 Coulter Drive I Chanhassen, MN 55317 CITY OF CHANHASSEN APR 0 7 7993 1 ENGINEERING DEPT. CHANHASSEN ESTATES STREETS SURVEY 1 Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ' El I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. 1 o I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ID I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. 1 DA Other opinion: " ' ' � ° - -tA Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 CITY OF CHANHASSEN OEM APR 0 7 1993 1 ENGINEERING DEPT. 1 1 CHANHASSEN ESTATES STREETS SURVEY ' Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): I would recommend that the City conduct a detailed feasibility study to identify the ' primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). c X( I would recommend that the City conduct a detailed feasibility study as stated above ' and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. 0 I would like to attend an informational neighborhood meeting to discuss the results ' of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ' 0 I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. • 0 Other o i P 'on: ' 7f' S e , /T en .17)(0)1 r; 17 , j&4( z y & 0) .�-, D7 4 /// Please remit questionnaire to: City Engineer CITY OF CHANHASSEN City of Chanhassen ��fl�n 690 Coulter Drive Chanhassen, MN 55317 APR 0 6 1993 ENGINEERING DEPT. I CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 el I would recommend that the City conduct a detailed feasibility study to identify the 1 primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to rind out more information). El I would recommend that the City conduct a detailed feasibility study as stated above tY tY Y and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. O I would like to attend an informational neighborhood meeting to discuss the results 1 of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. 1 El I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. O Other opinion: 1 1 1 Please remit questionnaire to: City Engineer 1 City of Chanhassen 690 Coulter Drive 1 Chanhassen, MN 55317 CITY OF CHANHASSEN OTIMEM APR 0 5 1993 1 ENGINEERING DEPT. 1 CHANHASSEN ESTATES STREETS SURVEY ' Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 I would recommend that the City conduct a detailed feasibility study to identify the ' primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study ' to find out more information). E I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in 1 the Chanhassen Estates area. ' 0 I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ' ID I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. El Other opinion: 1 1 1 Please remit questionnaire to: City Engineer ' City of Chanhassen 690 Coulter Drive 1 Chanhassen, MN 55317 Of CHANHASSEN OITMD APR 0 5 1993 ENGINEERING DEPT. CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 El I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ra I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. 1 D I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. El Other 'pinion:, / - t-P ' - � - AAPVIMPYAREP Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 1 CITY OF CHANHASSEN GECO1FPNn APR 0 2 1993 ENGINEERING DEPT. 14 1 CHANHASSEN ESTATES STREETS SURVEY I Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 I )3( I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean I that I necessarily support the project. I only support conducting the feasibility study to find out more information). 1 ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further I discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. ID I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. I ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen 1 Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: 1 ()/ o kA.700( q/ r v 1 i' ,r tJe0'1 e0 (--- u)0 J/ ` Z < ri) / `tom 74 // / / Ile (_ u r R 7 f T _ (0 1 /zoiil & l `l e r r 1 ` Oct e q C / a 1 e r c..��rv-o-v v( 6 i? . �P � Please remit questionnaire to: City Engineer - = -,.� e 1 City of Chanhassen f� �� S 690 Coulter Drive 1 Chanhassen, MN 55317 r a ,l� f%'� z, 1/1 S /01 , / . L oCU r i'e S,✓r / /16y.67 1 C��i,, /.,..cseer t Al s - s3/ 7 CHANHASSEN ESTATES STREETS SURVEY 1 Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above 1 and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. ❑ I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: 1 1 Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 1 1 1 1 RECEIVED CHANHASSEN ESTATES STREETS SURVEY 4 P 1 01 1993 CITY h 23, , ivy.s F t ` I SEN Based on the information provided in the City Engineer's letter dated Marc , ' ' offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 I would recommend that the City conduct a detailed feasibility study to identify the 1 primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean 1 that I necessarily support the proje1, I only support conducting the feasibility study to find out more information). I D I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in 1 the Chanhassen Estates area. I D I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. 1 ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: 1 1 1 Please remit questionnaire to: City Engineer 1 City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 1 1 CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 In( I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). 13 I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. 1 o I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. 13 I do not wish for the City to pursue the idea of street reconstruction in ty p o Chanhassen Estates any further. I am in favor of the streets remaining at status quo. 1 3 Other opinion: 1 1 1 Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 CITY OF CHANHASSEN APR 01 1993 1 ENGINEER DEPT 1 CHANHASSEN ESTATES STREETS SURVEY ' Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 1: I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study 1 to find out more information). I I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in 1 the Chanhassen Estates area. I I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ' ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. 1 ❑ Other opinion: 1 1 1 Please remit questionnaire to: City Engineer ' City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 CITY OF CHANHASSE, 1 M mro APR O 1 1993 ENGINEERNIS DEPT. 1 1 CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). 0 I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. 0 I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. 0 I do not wish for the City to pursue the idea of street reconstruction in Chanhassen ty p C anhassen Estates any further. I am in favor of the streets remaining at status quo. 0 Other opinion: 1 Please remit questionnaire to: City Engineer City of Chanhassen P11 O 1 690 Coulter Drive OF CHANHASSEN Chanhassen, MN 55317 +R flRIFn APR 01 1993 ENGINEERING DEPT 1 CHANHASSEN ESTATES STREETS SURVEY ' Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 I would recommend that the City conduct a detailed feasibility study to identify the 1 primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study 1 to find out more information). I I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. ❑ I would like to attend an informational neighborhood meeting to discuss the results ' of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. 1 ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. 1 ❑ Other opinion: 1 1 1 Please remit questionnaire to: City Engineer ' City of Chanhassen CITY of CHANHASSEN 690 Coulter Drive Chanhassen, MN 55317 GERM APR 01 1993 ENGINEERS DEPT. 1 RECEIVED CHANHASSEN ESTATES STREETS SURVEY APP 0 1 199? CITY Or Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. 1 ❑ I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: 1 1 1 Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 CITY OF CHANHASSEN MCA C�RBd13 APR 01 1993 1 ENGINEERING DEPT. 1 1 CHANHASSEN ESTATES STREETS SURVEY ' Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 Yie I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean 1 that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in 11 . the Chanhassen Estates area. I D I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: _ 1 1 1 Please remit questionnaire to: City Engineer 1 City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 1 CHANHASSEN ESTATES STREETS SURVEY 1 Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): V I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in 111 the Chanhassen Estates area. o I would like to attend an informational neighborhood meeting to discuss the results 1 of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. O I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. Other opinion: 1 ,fE. j , )f ` -i„.1 s - 1' ( ( ) / 1 - Y 1'14 " 1 1, 7 - kj 0 1- q / 1, d a 1 j vriv<. 0 v 04 1 Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 CITY OF CHANHASSEN 1 APR 19 1993 ' ENCINEERIIG DEPT. 1 II . 1 Residential streets rarely fail due to fatigue from overloading. A common failure is from foundation failure and most often this type of failure is from moisture intrusion. 1 The failure I observed is consistent with the type of distress that comes from water in the soil support system. ' The Blacktop and the aggregate base course will have to be removed and replaced. Then the soil support system will have to be addressed in terms of drainage. ' Some suggestions for drainage are adequate side slope of the soils and edge drains added to remove the water, adequate side slope and a drainage layer (8 ") placed between the soil and the aggregate base course or a geotextile soil fabrics placed in lieu of the drainage layer. ' Project costs would be calculated and the most feasible construction could be accomplished. The attached designs are for estimates only. The length ' and width were assumed at 4224'by 22' and the construction cost is only an estimate since I don't know the costs in your area. 1 M. A JOHNSON, CMR 8054 ERIE SPUR 1 CHANHASSEN, MN 55317 932)- C, 1 1 1 1 1 I ^ • II . ASPHALT PAVEMENT DESIGN SYSTEM 9 II Serial No. 19210310045 - Version 2.10 Date: 04/12/1993 Time: 09:44 AM II Project Name • Chanhassen Project Description.. : Street II Design Number • 1 COMPARISON OF DESIGNS II Depth in Inches 1 HMA SURFACE MIX Surface $ 1.74 1.5 --- ~-- II 2 HMA BINDER/INTERMEDIATE Bin/Int $ 1.62 1.5 -~- ~-- 0 HMA BASE MIX HMAbase $ 1.51 --~ -~�- --- 4 DENSE GRADED AGG BASE AggBase $ 0.72 6.0 --- _-- II 5 CEMENT TREATED AGG BASE CTAbase $ 0.78 --- ---- ---- 6 AGGREGATE SUBBASE Agg.Sub $ 0.72 __~ _-- -_- 7 LIME TREATED SUBGRADE LimeSub $ 0.50 --- ~-~- --- II 8 CEMENT TREATED SUBGRADE [�emStab $ 0.50 --- --- --- 9 CEMENT TREATED AGG SUBBASE CTA.Sub $ 0.78 --- -~- _-- 10 SELECT SOIL Soil $ 0.22 ~-_- -~- ~-_' 11 Excavation per cu.yd. Excay. $ 3.00 <0.0> <0.0> <0.0) NI Length(ft) x Width(ft) x Depth(in) 4,224 22 ==> 9.0 0.0 0.0 II No.1 No.2 No.3---- total Square Yards = 10,325 10,325 10,325 II total Cubic Yards = 2,581 0 0 Cost/sq.yd. of Pavement Section = $ 9.36 $ 0.00 $ 0.00 Cost/sq/yd of additional excavation = $ 0.00 $ 0.00 $ 0.00 II Pavement Section Cost = $ 96,645 $ 0 $ 0 I Additional Excavation Cost = $ 0 $ 0 $ 0 TOTAL COST INCLUDING ADD^i-"EXCAV"^ = $ 96,645 $ 0 $ 0 II 1 II II ' ' • II I I ASPHALT PAVEMENT DESIGN SYSTEM 1 Serial No. 19210310045 - Version 2.10 Date: 04/12/1993 Time: 09:44 AM Project Name • Chanhassen I Project Description.. : Street Design Number • 1 I 20 Year Design Life Material File = GENERIC.MAi - Region = II I Reliability Serviceability 2.5 Static C.B R = 3.0 I Resilient Modulus _ 4,500 Soil Support Value 3.0 Trip Gen. Zone = SINGLE FAMILY I Trip Factor = 10 trips per Unit No. of Units 45 Total Trips = 450 Annual X. Growth = 2.00 I Number of Lanes = 1 Design Avg.Daily Traffic = 559 Single Frame Truck Vol = ( 4.00 70 I Multi -Frame Truck Vol = 5 ( 1.00 '/. ) Equivalent Axle Load 54,122 Number of Layers = THREE ( 3 ) Cost per Square Yard = $ 9.36 1 Required Structural Number... = 2.10 Equivalent Design SN = 2.16 11 DESIGN O.K. 1 no. Description Mat.Type Coef. Min. Max. Price Thick. I 1 HMA SURFACE MIX Surface 0.44 1.5 3.0 $ 1.74 1.50 2 HMA BINDER /INTERMEDIATE Bin /Int 0.44 1.5 3.0 $ 1.62 1.50 3 DENSE GRADED AGG BASE AggBase 0.14 6.0 8.0 $ 0.72 6.00 II Total Thickness = 9.00 1 11 ASPHALT PAVEMENT DESIGN SYSTEM 1 1 Serial No. 19210310045 - Version 2.10 Date: 04/12/1993 Time: 09:44 AM Project Name • Chanhassen Project Description.. : Street Design Number : 1 LISTING OF DEFAULTS i 1. Design Method = AASHTO 2. Design State = AASHTO , 3. Soil Support Method = Static C.B.R. 4. Material / Price File = GENERIC.MAT 5. AASHTO (So) = .44 6. Reliability Factor (Zr) = 70 7. Serviceability (F'SI) = 2.5 ' 8. Design Region = II 9. Drainage Factor = •7 10. Drive \Path for Maps = C:'\APDS'\ 11. Minimum Structural No. Allowed = 1.72 12. No. of Lanes in One Direction = i -Lane ( *i =100%) ' 13. Design Tolerances = .1 above / .01 below 14. Number of Structural Layers = FOUR ( 4 ) 15. Printer Selection = Epson FX -286E / FX -1050 16. EAL Vehicle Factors = 0.0021 / 0.1060 / 0.7020 1. . 1 II 11 ASPHALT PAVEMENT DESIGN SYSTEM h II I Serial No. 19210310045 - Version 2.10 Date: 04/12/1993 Time: 09 :50 AM Project Name • Chanhassen II Project Description.. : Street Design Number • 2 II 20 Year Design Life Material File = GENERIC.MAT I Region Reliability 70 Serviceability = 2.5 Static C.B R = 2.0 I Resilient Modulus = 3,000 Soil Support Value 2.3 Trip Gen. Zone - SINGLE FAMILY I Trip Factor = 10 trips per Unit No. of Units 45 Total Trips = 450 I Annual °/. Growth = 2.00 Number of Lanes i Design Avg.Daily Traffic 559 Single Frame Truck Vol = 2 ( 4.00 X) I Multi-Frame Truck Vol = 5 ( 1.00 %) ivalent Axle Load 54.12: Number of Layers = THREE ( 3 ) II Cost per Square Yard = $ 9.56 Required Structural Number... = 2.46 II Equivalent Design SN = 2.52 ii DESIGN O.K. II no. Description Mat.Type Coef. Min. Max. Price Thick. I 1 HMA SURFACE MIX Surface 0.44 2.0 3.0 $ 1.74 2.00 2 DENSE GRADED AGG BASE AggBase 0.14 6.0 8.0 $ 0.72 6.00 SELECT SOIL Soil 0.10 0.1 9.0 $ 0.22 8.00 II Total Thickness = 16.00 II 1 1 I ASPHALT PAVEMENT DESIGN SYSTEM , Serial No. 19210310045 - Version 2.10 Date: 04/12/1993 Time: 09:50 AM , Project Name • Chanhassen Project Description.. : Street Design Number LISTING OF DEFAULTS ' 1. Design Method = AASHTO 2. Design State = AASHTO 3. Soil Support Method = Static C.B.R. 4. Material / Price File = GENERIC.MAT 5. AASHTO (So) = .44 6. Reliability Factor (Zr) = 70 7. Serviceability (PSI) = 2.5 8. Design Region = II 9. Drainage Factor = .72 i0. Drive \Path for Maps = C : \APDS\ 11. Minimum Structural No. Allowed = 1.72 12. No. of Lanes in One Direction = 1 -Lane ( #1 =100%) 13. Design Tolerances = .1 above / .01 below 14. Number of Structural Layers FOUR ( 4 ) 15. Printer Selection = Epson FX -286E / FX -1050 ' 16. EAL Vehicle Factors = 0.0021 / 0.1060 / 0.7020 1 il ASPWALT PAVEMENT DESIGN SYSTEM �� m II `^ Serial No. 19210310045 - Version 2.10 II Date: 04/12/1993 Time: 09:50 AM Project Name • Chanhassen Project Description.. : Street I Design Number ^ 2 COMPARISON OF DESIGNS II Depth in Inches I 1 HMA SURFACE MIX Surface $ 1.74 2.0 1.5 1.5 2 HMA BINDER/INTERMEDIATE f3in/Int $ 1.62 ~-- 1.5 1.5 3 HMA BASE MIX HMAbase $ 1.51 --- --- --- 4 DENSE GRADED AGG BASE p)ggBase $ 0.72 6.0 6.0 6.0 5 CEMENT TREATED AGG BASE C�TAbase $ 0.�8 ~-- --- --- 6 AGGREGATE SUBBASE Agg.Sub $ 0.72 ---- --- --- 7 LIME TREATED SUBGRADE LimeSub $ 0.50 --- ---- --- I 8 CEMENT TREATED SUBGRADE CemStab $ 0.50 --- --- --- 9 CEMENT TREATED AGG SUBBASE CTA.Sub $ 0.78 --- --- --- 10 SELECT SOIL Soil $ 0.22 8.0 8.0 --- 11 Excavation per cu.yd. Excay. $ 3.00 <7.0> <8.0� <0.0> I Length(ft) x Width(ft) x Depth(in) 4,224 22 ==> 16.0 17.0 9.0 I No.1 No.2 No 3---- total Square Yards = 10,325 10,325 10,325 I total Cubic Yards = 4,589 4,876 2,581 Cost/sq.yd. of Pavement Section = $ 9"56 $ 11.12 $ 9.36 Cost/sq/yd of additional excavation = $ 0.58 $ 0.67 $ 0.00 I 98 Pavement Section Cost = $ 98,710 $ 114,818 $ 96,645 ,710 Additional Excavation Cost = $ 6,023 $ 6,884 $ 0 TOTAL COST INCLUDING ADD'L.EXCAV ;= $ 104,733 $ 121,702 $ 96,645 1 1 II II 1 CHANHASSEN ESTATES STREETS SURVEY 1 Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. O I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ' ❑ Other opinion: Our S-t r e e-i 5 need 74 0 b e- r 1 If c c� f v✓lrned / a f� I y }� %eqs� 7 Kr- C< C7iGn CI ,; 1 K ( v r G4 7f7c i"Gcad 3 Yom_ if ci nn�i ir' ecmrn y Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive CITY OF CHANHASSEN Chanhassen, MN 55317 G3R ETE® 1 APR 16 1993 ENCINEERIND DEPT. 1 1 1 APR -02 -1993 16:15 FROM SINCLAIR OIL CORP. TO MINNEAPOLIS P.04 1 CHANHASSEN ESTATES STREETS SURVEY 1 Based on the information provided in the City Engineer's letter dated March 23, 1993, I 1 offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): • ❑ I would recommend that the City conduct a detailed feasibility study to identify the ' primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean -Se.,: _ •..• e •r•'ex. _ •I n• in he aSibll', . d 1 to find out more information). • i would recommend that the City conduct a detailed feasibility study as stated above 1 and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. ❑ I would like to attend an informational neighborhood meeting to discuss the results 1 of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. 0 I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: 1 1 Please re %) . CITY OF CHANHASSEN Sinclair Oil Corporation .� CB U!5® LAWRENCE F. FELDSIEN, P.E. 17 APR 15 1993 1 Field Engineer 6602 PORTLAND AVENUE SOUTH ENGINEERING DEPT. 1 RICHFIELD, MN 55423 612/869-2436 FAX - 612/869 -1619 I CHANHASSEN ESTATES STREETS SURVEY I Based on the information provided in the City Engineer's letter dated March 23, 1993, I 1 offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the I primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study I to find out more information). I would recommend that the City conduct a detailed feasibility study as stated above 1 and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in I the Chanhassen Estates area. o I would like to attend an informational neighborhood meeting to discuss the results 1 of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. I ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: i 1 1 Please remit questionnaire to: City Engineer 1 City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 1 CITY OF CHANHASSEN IN BE® 1 APR 14 1993 1 ENGINEERRIS DEPT. 1 1 1, CHANHASSEN ESTATES STREETS SURVEY 1 Based on the information provided in the City Engineer's letter dated March 23, 1993, I I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 ❑ I would recommend that the City conduct a detailed feasibility study to identify the I primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study 1 to find out more information). I in I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in 1 the Chanhassen Estates area. ❑ I would like to attend an informational neighborhood meeting to discuss the results I of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. 1 ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ' Z 71--e-? Pic a d- x1e."14 � Other opinion: ' ai et- o- d a---r ' .sae -tee ?"7"14S7 Q.P. )1.0.0..•1 Atate'ZJ 1 _ .- • At _,„„ ` � ' ' r': l 0 ' . ter% A _L.,_ _ _ - _ 7 c Gil 12ei_ C' Please remit questionnaire to: City Engineer R _....,-Q I City of Chanhassen � �_ � 690 Coulter Drive - Chanhassen, MN 55317 24 o � ; C , CITY OF CHANHASSEN , cy-e -, .62-4. NM VP 1 APR 13 1993 .� Ze A _A22e .. ENGINEERS DEPT - �..1 �°� .-�,�, - I PT. m ez4.4. a ,. CITY of 1 ROHM CHANHASSEN CHANHASSEN ESTATES STREETS SURVEY 1 APR 1 3 1993 Based on the information provided in the City Engineer's letter date rigd 1 offer the following opinion regarding the streets in the ChanhassenMt : • (please check only one box): 1 ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). 4}c j„}GrlK . }1 Rt :L y 5 A fI I would recommend that the City conduct a detailed feasibility study as stated above 1 and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. ❑ I would like to attend an informational neighborhood meeting to discuss the results ' of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. , ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. 1 Other opinion: LgT5 40 a r 64 q0, 6 � i c/J 5 L},,; : er 4trez teQ- '£ I4 uE L1 sPezi 1 ' f\, A "/L Kral" t1 P Tb kiLd — C rats c i-r 'Z m ex, Cc) let . 0 �ZT'y /ICS tc Desi6NC- �- 3 uji � p 5-- l • • Dv tOor /r434 7a FA 1.1-- Ic} PI3 &T / to A- h-AiL `ico Sm•wT `4 Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 1 Dcc —L r Gu ? '' 1 a'✓ W 5tit 1.:d / 0 0 Sd � l l Di glens ��, . 1 CHANHASSEN ESTATES STREETS SURVEY ' Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study • •u m•r ' .rrr : *i I). ' ! I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. ❑ I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: 1 1 Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 CITY OF CHANHASSEN MORPH APR 0 9 1993 ENGINEERIlI S DEPT. i . CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 0 I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street I reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). 1 I would recommend that the City conduct a detailed feasibility study as stated above - I and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. 1 0 I would like to attend an informational neighborhood meeting to discuss the results I of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. o I do not wish for the City to pursue the idea of street reconstruction in Chanhassen I Estates any further. I am in favor of the streets remaining at status quo. 0 Other opinion: 1 1 1 Please remit questionnaire to: City Engineer City of Chanhassen 1 690 Coulter Drive Chanhassen, MN 55317 CITY OF CHANHASSEN 1 WBd[f1 APR 091993 1 ENGINEERNAS DEPT. 1 1 CHANHASSEN ESTATES STREETS SURVEY ' Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 I would recommend that the City conduct a detailed feasibility study to identify the 1 primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ri I would recommend that the City conduct a detailed feasibility study as stated above ' and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in 1 the Chanhassen Estates area. ' 0 I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. 0 I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. 0 Other opinion: 1 1 Please remit questionnaire to: City Engineer CITy OF CHAIN ' City of Chanhassen ; Ra ASSEN 690 Coulter Drive � Chanhassen, MN 55317 AP R 0 b' 1993 � ENGINEERI DEPT I CHANHASSEN ESTATES STREETS SURVEY 1 Based on the information provided in the City Engineer's letter dated March 23, 1993, I I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 0 I would recommend that the City conduct a detailed feasibility study to identify the I primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). I I would recommend that the City conduct a detailed feasibility study as stated above I and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in 1 the Chanhassen Estates area. 0 I would like to attend an informational neighborhood meeting to discuss the results I of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. 0 I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. 1 0 Other opinion: 1 1 Please remit questionnaire to: City Engineer I City of Chanhassen 690 Coulter Chanhassen, MN 55317 CITY OF CHANHASSEN APR 0 3 1993 i ENGINEERING DEPT. 1 1 CHANHASSEN ESTATES STREETS SURVEY I Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 I El I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction 5rogram for the Chanhassen Estates subdivision (this does not mean I that I necessarily support the project. I only support conducting the feasibility study to find out more information). 1 * I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in 1 the Chanhassen Estates area. I E I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. I I do not wish for the City to pursue the idea of street reconstruction in Chanhassen I Estates any further. I am in favor of the streets remaining at status quo. El Other pinion: .,' � �--� - I V • / I Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive 1 Chanhassen, MN 55317 CITY OF CHANHASSEN 0Q3 1 EN61NEEAPR RIN 1 19DEPT 1 1 CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I 111 offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 1 ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street 1 reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. ❑ I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the Ci ty to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: i- Li,' el � 1 � , � � f �- `-`" -"'ei ',tr' S 4 - Da irorel v .? t U E („ a J' L eri r Si' 1 i b! Leo 1' K U/G 7 / //'M , b ose c`ro ' /7 # ,r - 71- q 4- e - p'L e - 7i: Nl yu Please remit questionnaire to: City Engineer City of Chanhassen 1 690 Coulter Drive CITY OF CHANHASSEN Chanhassen, MN 55317 QERNM APR 01 1993 ENGINE 1 ERMIC DEPT 1 1 1 CHANHASSEN ESTATES STREETS SURVEY I Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ID I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean I that I necessarily support the project. I only support conducting the feasibility study to find out more information). 1 X I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in I the Chanhassen Estates area. ID I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. I 0 I do not wish for the City to pursue the idea of street reconstruction in Chanhassen 1 Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: 1 1 1 I Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive CITY 1 Chanhassen, MN 55317 Of CHANHASSE Maas 1 iT D � APR 1 ti 1993 � 03 C E . e ENGINEER ia DERV I CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. 1 ❑ I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. Other opinion: AS THE /1obt€ E; e^ 10E4 A T T HE c g-,) E& ERI D En)D ST THAT L �S 7, rya I S T -7 „t/C+LCC D L / KE To 5£l. THE C i TY A84/3 DcA) T H6 STREET ANb tiD iG M y t'i2LYP 2T j" An;b ) To (L4 /<-,‘ Elf HBC. i Q Pc SS THE. S - Ft/ /-S r.Joa r AK£. /1i 1 f ■REBt-(ICDitiE, q D EA 17 `TILE . i 1 Please remit questionnaire to: City Engineer City of Chanhassen ' 690 Coulter Drive Chanhassen, MN 55317 CITY OF CHANHASSEN OEM APR 1 u 3 199 ENGINEERINC DEPT. I CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 0 I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). 0 I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. 0 I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. 0- Other opinion: TOW /Ova/whorl QlreaI ///&f(( (1. e, a5ki (tit T} Y2 iY) ) , W '1211 d "P 7? I l u( $72i/1 \J vw111 ( fi h 2'i l IN of rf'&l r(CS , 7X10' re5CU cou sl� - eI\J fret d. 1;1 at)/ (OrlYNIV Vi 5.f(J'1 1 : r ?/�'� o1 strt /t Ca2 /l' i4(U sa /d r 1 . y &&`7'r it ft orhil i:^ melt /t'?t' h7' 0pit' for 0i1 11 i IX tt n t of r €.201 - 5 neMSar • i hLi e(Cr(, ✓ve f 1' I -dn az rt70n2 l Still is �!iiviir( a'� ir a''lz( 7'IYr / rr� rniation colle%7eI in 'h e hiddlr� "Fvm<e55 ant r /ad itine� o fiie )oUr «s, will be St1 is f1t�,f - nuke ' ef/ ei f dIciv1 Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 kfr2 1 31(0. d4/1a t.. GT ircie q + + - /)X • CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ❑ opinion: A1� IN b 'VY lJLd� Other op ah(L ./)ti y . 9/..1 ' 1 11 I .. ■ . I mo .._ - G-,N, C Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 CITY OF CHANHASSEK APR 08 1993 ENGINEERING DEPT. • CHANHASSEN ESTATES STREETS SURVEY • Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. y3 Other ojilinion: / • S a 'ran 1 . SQQ . ace — l,:a• ' $ "• L. 0. I .I► . L .• r • flea, _ �rll ,a.. S L- t Ott).• • ,, 64-0( 44 CIJ Ne .F( 0,r1 3 t, E.a{ -- 14 :s 44. ,mac r , c719 / Er Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 CITY OF CHANHASSEN APR 06 1993 ENGINEERING DEPT CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. y( I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. o Other opinion: 7;e41_ _ /r2a .ram c c cJ L- - -' &,'/N� /rbf / Z / /e / 4 /� 1.o/ idli _ / �� - ' $ . • _ W r . e . - 7 . - , - c am / t 4 v e - e - ( - 1 4 L - Please remit questionnaire to: City Engineer eZLL4_ '' a/k .c.. ,1'-)' City of Chanhassen y!d , li t CITY OF CNANNISSEN 690 Coulter Drive (A � r,Y�t ,, // n , II ff,�� Chanhassen, MN 55317 Y '�`� `'G `' ApR0 Eti61111init DEPT. CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. • 1 El Other opinion: IL! i • _ _ 11 .4 m • olo I *14°C 6 ‘41.4A. 1 � Please remit questionnaire to: City Engineer City of Chanhassen �N 690 Coulter Drive CITY OF CNANHASSE Chanhassen, MN 55317 OBE] APR 01 1993 ENGINEERING DEPT. RECEIVED • CHANHASSEN ESTATES STREETS SURVEY MAR 3 1 1993 CITY ur Lh/ '4HASSEN Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): 0 I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). 0 I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in , the Chanhassen Estates area. I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 Cliff o Ream" n "S rrrN? -' 1 X553 nill DEPT. CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive (fl( til Chanhassen, MN 55317 APR o 1993 /Pork 1.., EKGINEERDID DEPT. dam �f F7/ - // CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. x . Other opinion: JIB c got- 1 L 'te - Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 CITY OF CHANHASSEN MERU APR 13 1993 ENGINEERING DEPT. CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive I Chanhassen, MN 55317 CITY OF CHANHASEN 4a [i �Gt n BEITE LT APR 2 2 1553 67/4A 55 , Wi SS 317 ENGINEERING DEPT. CHANHASSEN ESTATES STREETS SURVEY • Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project, I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. Q I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: We were out of town when this was due, se please excuse the lateness. Cne very i r.portant issue I would like to call your at uentioil O, an - c - -- . - - Cha':ha szen Estates 2nd ;editi n.1 Tha l at.Pr i q t.ha nna wI t,h cnr- and gutter and a street base which was out in and paid for by the contractor. We do NOT want to become a part of payinu for the 1st Pdditions necessary road work when we have already paid for ours. Have any questions? Cell me: 934 -6306 Please remit questionnaire to: City Engineer City of Chanhassen ROBERT R. OSTLUND 690 Coulter Drive 8047 CHEYENNE AVE. Chanhassen, MN 55317 CHANHASSEN, MN 55317 CITY OF CHANHASSEN EMU APR 2 3 1693 ENGINEERIII DEPT. CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. ❑ I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. Other opinion: EN () v f h as Gas %/,%, ],, /t /4 /04Gt Th__ 5V - rC '* Slaw sZ•,� Q_ /C.¢ a/ir sal. ziA c ` r5 . MI' sfvd¢CS A.1 44 Se ve,i � c�te4 i5. \..6 r.t.41 C. ZSI ao yiiir.e. Aug.. Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 CITY OF CHANHASSEN CITY @D;,:' 4.3 SEN { � + i 5 1993 EN W EER �g�pl�� , . � DEPT E .R. 11 43 DEPT 1. What's left to discuss. The street needs replacement patching and filling pot holes is only delaying the inevitable, ultimately costing the city and the tax payer, me, more money. 2. It's already been identified in a study as the highest priority, why would the city spend more money on a detailed feasibility study? Who is going to pay for this, the taxpayer? 3. This is not just fixing something for cosmetic aesthetics, this is a public safety issue. The road is a safety hazard, who is going to be held accountable when someone gets hurt from twisting their ankle while walking, falling off a bicycle, being hit by a car that looses control after bouncing in and out of the ruts and pot holes. The city will be responsible and once again the tax payer will bear the burden for the payment of the lawsuit that will result. I have heard that there is opposition to the replacement because someone thinks it makes people drive slower making it safer. This is a false sense of security. My personal observations have been this doesn't deter people from driving fast. They are going to drive fast regardless and they do that now. This is a traffic enforcement problem to be handled by the Carver County Sheriffs Department. A few tickets issued is the solution to this problem. They do make street signs that read "slow children at play ", wouldn't this be a more reasonable approach than not fixing the road. The residents of a community have basic expectations that need to be met. A safe road to travel on is one of those. What have you people been doing with the tax money? It certainly hasn't been going to road repair!! CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. ❑ I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. Other opinion: orll T tAiA g A' A 4 STl Y, J us ,Z tP ouT THE ()cis 2p.4� .4- .PT , j 4 IUEtc Ro,S Ljtfl4 CIQBrivG . Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive CITY o f Chanhassen, MN 55317 o C���� APR 1 � 19 (NG Y EE R!# � DEp� CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): D I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). D I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. D I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. D I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. Other opinion: 6 vv r r f� CMS 1Yi^ C ��rv� . -1- cnm �r� �eSX� dl `�..^ CIS S � 4 S l G 1 cr—S („9, .4t Esc . s 1 �. '. -•— rv\ J u S� 2 S s 2 Cn Ns20 N �2...e '�°-�� 1 e �' �^ S re Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 CITY OF H KH�sSE� pC� APR2 - . 19 93 ENGIKEERI1 DEP1. CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. ❑ I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. k Other opinion: wo w' R<...commo,a S(�C�R,� b�aS � ; Aim r et)k, . E., R. u i • i - .• 1 y y\k - xe* ►h a girir►ync O aw, ;,fir' n2 boyaa•l meth1 roc� to - Ctkr-fivcAr o O Prtoncs . be-) &u o su P16,17 A-SSeSS1i - - r'S, aNI " ")1 144 1/e-- --- Please remit questionnaire to: City Engineer 4 93 City of Chanhassen y, 690 Coulter Drive �O! /a e � ��T' l Chanhassen, MN 55317 CITY OF CHANHASSEN afigC Bd[ f) APR 08 1993 ENGINEERING DEPT. CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. ❑ I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. Other opinion: a-- •• l ( Cam- IV IB��� �. Ix Please remit - questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive CITY OF CHANHASSEN Chanhassen, MN 55317 ERBdt® A?R 0 8 1993 ENGI NEERNIID DEPT. CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. ❑ I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: A/c, e 7 0.69 e . /2J -k 7 1 e J Cox_ _ZGOQ/ -/A S 1/et7 ,.._ / • yiI..ee.i .�J C SC' � T � T a 17 S - �/� /2 3(� L �e .� � Gam e- S c e G . sras �(c s // Don/ - t,' /1(71 i ��ii'lCl� % G�Qtc`fcT - - %/2y , itts/ e �C�C'_ Cam'/ C I 7 3S fit �F�1 J .A.'La.ap2 - �GC — OG Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. ❑ I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. ❑ I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any furtherr.. I am in favor of the streets remaining at status quo. Ot,:r o. •.n: fit � . Rvo 3Yr __-� 1U PE 011.1121 ANEW (e (EMIL fOaL__ l&t,PFEP--1 Please remit questionnaire to: City Engineer R S ) a C1 E-c City of Chanhassen 1 ,, ► MO, S � 3 t� 690 Coulter Drive i Chanhassen, MN 55317 � -S5 3 ( CITY OF CHANHASSE11 GERIMM APR 01 1993 ENGINEERS DEPT. APR 1 4 1993 CHANHASSEN ESTATES STREETS SURVEY CITY OF ch AiI omSSEN Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. ❑ I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: Clip Of � Please remit questionnaire to: City Engineer 0,0 y� ##/ si `q r City of Chanhassen � 7 1) 690 Coulter Drive CITY OF CHANHASSEN Chanhassen, MN 55317 /� _ ma@Bwao 'gni VII APR 14 1993 EItGt4IEER(G DEPT. CHANHASSEN ESTATES STREETS SURVEY Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. ❑ I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. Pt I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: e ?? 7t ,Dos s / /i /e /x-) e Gus is e r 5-7/ - f r� ever.i - C.fSe , )e7- 16";11 e err- e licee, / Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 CITY OF CHANHASSEN GEREET APR 0 1993 ENGINEERING DEPT. RECEIVED CHANHASSEN ESTATES STREETS SURVEY APR U 5 1993 CITY OF CHANHASSEN Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. ❑ I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. nil I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ❑ Othe o. inion: i A /.,._ Gt�e .. • -Lk - re�o ��� _ ti , �` ' _y.�- : AL. ad._ tau, , - d i . "a-AL ) - C4-}1 v1.0 L o2 Co l: ` � re: U?e i�.li'iv'v1 ' tneLti Please remit questionnaire to: City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 CITY OF CHANHASSEN D �N / � i >u. Cfi@ Bd11® dp2 7 APR 05 1993 e , 575 t? ENGINEERS DEPT. 93 ? RECEI"EC CHANHASSEN ESTATES STREETS SURVEY APR 1 9 1993 CITY 0- (?IMNHASSEN Based on the information provided in the City Engineer's letter dated March 23, 1993, I offer the following opinion regarding the streets in the Chanhassen Estates subdivision (please check only one box): ❑ I would recommend that the City conduct a detailed feasibility study to identify the primary elements, costs, and potential special assessments associated with a street reconstruction program for the Chanhassen Estates subdivision (this does not mean that I necessarily support the project. I only support conducting the feasibility study to find out more information). ❑ I would recommend that the City conduct a detailed feasibility study as stated above and I would be interested in attending an informal neighborhood meeting to further discuss the Pavement Management Program and its findings regarding the streets in the Chanhassen Estates area. ❑ I would like to attend an informational neighborhood meeting to discuss the results of the Pavement Management Study and findings regarding the streets in Chanhassen Estates subdivision. I do not wish for the City to pursue the idea of street reconstruction in Chanhassen Estates any further. I am in favor of the streets remaining at status quo. ❑ Other opinion: -, v - --2 -- J t2 - � -' =`� " z,f...6„.> /lam � �crc�t/✓ , �.r - - L --■ _ - - - 1 / i fi e fiis .✓ a'i %c f > .1 Please remit stionnane to: City Engineer City of Chanhassen 690 Coulter Drive G L� cyr". Chanhassen, MN 55317