I am looking forward to our first goals work session. I would envision two parts to the agenda:
1 1) a review of 1993 departmental goals including . a review of 1992 accomplishments; and 2) a
review of long term goals. A tentative agenda is shown below.
I I. 1993 Departmental Goals: It should be noted that the goals to be presented by the
department heads have been submitted to each of our respective commissions. By the
commission's themselves selecting"initial goals and having the City Council refine them,
I we will have created a cycler process wherein _the commission goals become the City
Council's goals, and similarly, that the Council's, goals are the commission's goals. This
assumes that our next meetings are with the commission whereat the refined goals are
I presented. It is also important to note that the goal process seldom represents a singular
year; i.e. the goal of being able to improve our water quality/better utilize our wetlands/
I and generally protect our environment was followed by a goal of establishing a Storm
Water Management Plan, followed by individual projects. New goals, stemming from the
original generalized goal, will continue to exist years into the future. The anticipated
1 schedule for presenting departmental/commission goals are as follows:
- Park and Recreation - Todd Hoffman
I - Planning Department - Paul Krauss
Finance Department - Tom Chaffee
- Public Safety Department - Bob Zydowsky
I - Public Works Department - Dave Hempel
Administration/Economic Development - Todd Gerhardt
1 II. Long Range Planning/Goals: Year end financial projections showed that approximately
$10 million will be generated and be available for local projects through the year 2000
within our tax increment district. Spending those dollars today would require a bond
I
�4g PRINTED ON RECYCLED PAPER
1
Mayor and City Council
February 1, 1993
Page 2
1
issue which would reduce the principal amount. Projects which have been discussed by
both the Council and HRA include:
Project Description Estimated Cost
Senior Housing $2.5M
City Center Park $1.0M
New Library $1.0M
Widening Downtown Roads/West 78th
Street Alignment/Signals $3.0M
Conference Center $3.545.0*
1
* Higher number available if private development is guaranteed as apart of the
project.
I would like to poll Council members as to whether or not the above listing represents
1
the Council's priorities and desires. Secondarily, I would ask whether these numbers
should be seen as absolutes or whether one project can be foregone if projected costs for
one of the other items increases, i.e. the addition of the community center to the
conference center could easily add $5M to the overall project. I would also like to talk
about the various options as to where some of these facilities may be located.
I would anticipate that the City Council has a number of additional goals which need to be listed
under either 1993 or the long range column. For example, our existing Postal Services exists
within a leased structure. The lease expires in mid -1994. It is likely that both parties will not
renew the lease - -the space is too small for postal needs and the existing owner has vowed that
he will not re -lease to the Postal Service. The Postal Service, similar to the library, would like
to be in the midst of downtown activity. For example, they would welcome the opportunity to
be able to serve the citizen who is stopping at the grocery store, picking up a book at the library,
and dropping off mail. They do not want a residential setting or an industrial setting.
Unfortunately, there are probably only three or four lots that currently are remaining which may
house our Postal Service within the downtown. It is very likely that these lots will not exist two
years from today. Do we play a role in the decision making process?
1
As stated at the beginning of this memorandum, I look forward to Saturday morning's meeting.
It should be an opportunity to speak freely, dream, and set the path for our future.
1
1
1
1
1
1
1
1
1
1
1 PARK AND RECREATION DEPARTMENT
1
1
1 CITYOF
1 �
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
MEMORANDUM
TO: Park and Recreation Commission
FROM: Todd Hoffman, Park and Recreation Director
' DATE: January 15, 1993
SUBJ: 1993 Park and Recreation Goals
1
Individual Park and Recreation Department staff goals were developed during the month of
December and cumulatively represent the goals of the Park and Recreation Department.
Ultimately, these goals must parallel and fulfill desires of the Park and Recreation Commission.
As such, prior to completing a one -half day goals retreat with the Mayor and City Council on
' Saturday, February 6, I am submitting said goals to the commission for your review. Any
amendments, deletions, or additions should be made at the forthcoming Park and Recreation
Commission meeting, allowing them to be documented prior to our meeting with Council.
Again, it should be made clear that the commission is in control of the development of the city's
park and recreational systems. Any shortcomings or differences of opinion should be noted
1 during this discussion.
PRINTED ON RECYCLED PAPER
1
C I TY 0 F
A ■ HANHASSEN'
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937-1900 • FAX (612) 937-5739
MEMORANDUM 1
TO: Don Ashworth, City Manager
I
FROM: Todd Hoffman, Park and Recreation Coordinator
DATE: December 22, 1992 I
SUBJ: Goals .
1
i
Please find attached the following documents pertaining to the three respective positions in the
Park and Recreation Department:
t • ‘-'
i ii
1. Program Specialist/Senior Coordinator. -
- Goals ,
. .
i.
2. Recreation Supervisor: ,, t 1
- Evaluation of 1992 Goals
,-,
- 1993 Goals
/ N 1
3. Park and Recreation Coordinator:
- Evaluation of 1992 Goals
111 - 1993 Goals ,
Cumulatively, these documents - represent the department's nccomplishments for 1992 and our
I
,.. ... . . . „......_ • ... -
goals for the coming year. ..
... ,
.- .
1
1
1
es-
it 4: PRINTED ON RECYCLED PAPER
I
I • C I TY 0 F
011ANIIASSEN
(6 90 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937-1900 • FAX (612) 937-5739
MEMORANDUM
TO: Todd Hoffman, Park and Recreation Coordinator
FROM: Dawn Lemme, Program Specialist ‘y: •
1 DATE: December 21, 1992
SUBJ: 1993 Goals
1
Attached please find my 1993 list of Goals and Objectives. This list is pretty specific and covers
1 all of my direct job responsibilities including senior citizen progranuning, youth and adult
programming, newsletter and public relations, as well as registration , computer, and staff
training. • „
I am looking forward to working on achieving these goals throughout the next year.
1
1
- 7 •
=.1
. PRINTED ON RECYCLED PAPER
1993 GOALS
1
1
PROGRAM SPECIALIST /SENIOR COORDINATOR
1. Increase the number of self - supporting programs offered each quarter (arts and crafts,
kid's exercise, cooking).
2. Develop an organized photo file of both parks and recreation programs.
3. Continue to work with the computer so the program registration system reaches its full
potential in accuracy and efficiency.
1
4. Begin training with the computer's WordPerfect and Windows programs.
S. Increase cooperative efforts and support from various local community and civic
organizations in regards to senior center activities and special events.
6. Coordinate and plan a free summer concert series, enlisting community groups or major
industries as co- sponsors.
7. Work with District 112 to acquire more space for programming. Also continue to work
with Community Education to provide special interest classes for seniors in the
Chanhassen Senior Center.
1
8. Pursue through the area colleges one intern per year as well as offer several 'fieldwork
opportunities for park and recreation.majors. 1
9. Help to develop and supervise a Senior Answer Line Service out of the Chanhassen
Senior Center. Work with greeters to coordinate a Frail Elderly Phone Service as well.
1
10. Get involved with MRPA through committee work or volunteer opportunities.
11. Coordinate and supervise operations at the new Lake Ann Park Shelter concession stand
and equipment rental outpost.
12. Initiate and offer a more extended playground program, possibly increasing the number
of days per week as well as number of hours.
13. Work with local newspaper to continue the weekly park and recreation column, and
increase the number of feature articles.
14. Develop some type of mid- summer motivational activity for seasonal staff to include both
Recreational staff and Park Maintenance staff.
1
1
15. Continue to coordinate the production of a quarterly city newsletter, developing an easily
readable, yet interesting format.
16. Coordinate with fellow Park and Recreation staff as well as with City staff in the running
of major special events. Provide assistance when needed in other program areas.
17. Develop a training manual for part-time or seasonal staff, as well as a benefit or
appreciation package to encourage people to work here.
•
1
1
i
1
CITYOF
1
s‘ CIIANHASSEN
� 1
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
MEMORANDUM
TO: Todd Hoffman, Park and Recreation Coordinator
FROM: Jerry Ruegemer, Recreation Supervisor 1
•
DATE: December 10, 1992 1
SUBJ: Evaluation of 1992 Goals
1
Goal: Work with Community Education 112 in developing and implementing the Building
Monitor positions that will be in place by January 1 in all district facilities. ,
The Building Monitor scenario is still on- going. A letter of understanding that will allow
volunteers from Chanhassen Park and Recreation and the Chanhassen Athletic Association 1
to monitor their sponsored programs has not been implemented yet. The letter of
understanding will be reviewed soon by the District 112 School Board. :After the
approval of this letter, monitors will be in place at no expense. 1
Goal: Continue to build a strong working relationship with the District 112 Facility Scheduler,
minimizing conflict dates ,with district and recreational programs. 1
This goal is going well with no conflicts to date. : -
Goal: To work with and maintain a positive relationship with all the staff at Chanhassen
Elementary School; _ a ,
_ .;ssF.*b:, 1:33• -FX) '� - "G "
I visit the Elementary School often enough to keep on top of any problems that may arise.
Problems are reviewed and rectified.
Goal: Work with the Senior Center Coordinator in developing quality programming for
Chanhassen's senior population. 1
Since hiring a couple of Senior Center Coordinators, the programming is being covered.
However, I help out any way I can. 1
1
ii 4, PRINTED ON RECYCLED PAPER
1
1 Mr. Todd Hoffman
December 10, 1992
1 Page 2
Goal: To create a positive working experience for the Program Specialist by providing a wide
' variety of tasks which will include the areas of: special events, sports, playground
activities, and children and adult programs.
' All of these areas have grown and improved in working closely with the Program
Specialist. Working closely as a team, our programs will grow, evolve, and be well
respected.
1 Goal: Improve seasonal staff's job knowledge by offering extended training in job specifics.
Extended training consisted of handouts, meetings, and on the job training.
Goal: Create a better understanding with the gate attendants of the importance of checking and
' inspecting incoming/outgoing boats for Eurasian Water Milfoil at the South Lotus Lake
Boat access.
1 Information and literature were presented to the gate attendants during training. However,
I believe there are additional ways to present knowledge, which I will have during next
year's meeting.
Goal: To create and design a new Summer Discovery Playground Program by utilizing existing
ry Y� g Y g g
and additional staff, extending program length from 6 weeks to 8 weeks, and by offering
1 new and exciting Wing Dings and Super Event programs.
The Summer Discovery Playground Program combined times so both age groups could
be dropped off at the same time. The program did expand to eight weeks which was
appreciated by a lot of parents and the Wing Dings and Super Events expanded as well
' from six to eight Wing Dings and Super Events.
Goal: To increase volunteer involvement from Chanhassen residents and civic groups for
Chanhassen's annual Fourth of July Celebration.
Volunteer involvement did increase with these civic groups assisting: Chanhassen Rotary,
1 members from St. Hubert's, the Chanhassen Jaycees, and other Chanhassen residents.
Goal: Add new features to the 4th of July Celebration.
New features added: Dunk tank, carnival games, family games, additional music in the
park.
' Goal: Implement a new registration procedure by eliminating the current "envelope system" and
replacing it with some type of computer software.
1
1
Mr. Todd Hoffman
December 10, 1992
Page 3 1
Computerized registration using the City Control System started slowing during the
summer with a few classes having program codes. Starting in the fall, all the programs ,
have program codes and registration is completely computerized.
Goal: Coordinate and allow Chanhassen residents to register over the phone and by fax for 1
recreational and social programs offered by the Parks and Recreation Department.
This goal has not been realized, but the investigation to make this possible will continue. ,
Goal: To work with Don Schwartz, Umpire Coordinator, in scheduling the summer softball
officials. '
Goal achieved with Don Schwartz coordinating the softball officials.
Goal: To provide the Chanhassen softball teams with pertinent league information in a timely
fashion. 1
Updated weekly standings were mailed to every team manager as well as tournament and
other league information. 1
Goal: Establish a special fee that will be paid by each team at the beginning of the season. If
for some reason a team forfeits games, has eligibility problems, or conduct problems, a
portion of the fee will be lost. The lost fee must be made up before the team's next
scheduled game.
Every softball team submitted a $100 check that was not cashed unless there were
problems. I did not have to cash one check because of a problem and they were all
returned.
Goal: Increase the use of the after -hours phone line during the softball season.
Many positive comments were received on the phone line. It was used to update teams
on rainouts, game information, and league information. Since adding the phone line, staff
time has freed up significantly not having to answer softball phone calls. 1
Goal: To assist the MRPA in hosting a state or regional softball tournament.
Hosted the 1992 Boys Senior State Tournament, Jul 18 -19.
y �, y
Goal: Increase involvement in the MRPA by volunteering at some special event. ,
Hosted the 1992 Boys Senior State Tournament.
1
1
1 Mr. Todd Hoffman
December 10, 1992
I Page 4
Goal: Implement "Rookie League" Baseball Clinic again this summer.
1 '
Camp started June 8 with 12 sessions on Mondays, Wednesdays and Fridays.
I Goal: Continue to pursue the "Teen Nights Out" in cooperation with the Chaska Parks and
Recreation Department and District 112 Community Education. A total of 3 or 4 will be
offered during 1992.
1 A total of three Teen Nights Out will be offered during the 1992/93 school year: October
23 and December 11, 1992, and January 22, 1993.
1 Goal: To oversee seasonal staff and execute/operate the concession stand at the Lake Ann Picnic
Shelter.
I Completion of the picnic shelter was not timely enough for the concessions to operate.
I Goal: Obtain information regarding a master's degree from various universities in the Twin
Cities metro area.
1 At this point I have looked briefly at master's programs, but I have not made any definite
plans.
1
1
1
1
1
1
1
1
IN
1
1993 GOALS 1
Recreation Supervisor
1. Increase 4th of July business donations to $4,000. I
2. Develop a time table or guideline for the events involved with the 4th of July celebration.
1
3. Add new features to the 4th of July celebration.
4. Continue to work with Community Education 112 in developing the building monitor I
Y P g g
positions for the district facilities.
5. To develop a comprehensive schedule for building monitors using district facilities.
6. Process all of the district facility request applications for the 1993/94 school year no later 1
than June 1st.
7. Continue to have a nice working relationship with all District 112 staff. 1
8. To assist the senior center coordination any way I can.
I
9. Continue to work with the Program Specialist in providing a wide variety of recreational
opportunities for the residents of Chanhassen.
1
10. Work with seasonal staff in developing a strong working knowledge of their duties and
responsibilities.
1
11. To develop and implement a volunteer network to assist in recreational activities and
special events. 1
12. Continue to work with the Program Specialist in creating and improving our computer
registration procedures. 1
13. Publish weekly softball standings in the Chanhassen Villager and Chaska Herald.
14. Continue to use the Leisure Line for adult athletics and recreational programs. I
15. Develop an outline comparing the available facilities to the number of softball teams.
1
16. Create a Softball Advisory Board to assist and obtain feedback regarding the adult
1 leagues.
17. Continue to look at eligibility problems in adult athletics by requiring all players to either I
have a photocopy of their drivers license, or some other form of identification proving
their residency, or by having a signed letter on company letterhead by the personnel
director verifying the player's employment.
I
1
1 18. Add the picnic reservations and Chanhassen's facilities to the existing City Control
System.
1 19. Continue to be involved with MRPA.
I 20. Continue to offer teen programming such as the "Teen Night Out ", providing 3 dances
next year, and the Friday Night Ski Trips, offering two to three trips.
1 21. Develop a tennis program/league for The adult residents of Chanhassen.
22. Continue to assist the Chanhassen Athletic Association as I have in the past.
I 23. Set 1994 picnic fees in December of 1993.
1
1
1
1
1
1
1
1
1
1
1
1
1
1
4 CITYOF
i0; , CHANHASSEN 1
1
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 1
(612) 937 -1900 • FAX (612) 937 -5739
'•a
MEMORANDUM
I
•
TO: Don Ashworth, City Manager
I
FROM: Todd Hoffman, Park and Recreation Coordinator 7
DATE: December 3, 1992 - 1
SUBJ: Progress Report 1992 Goals; 1993 Goals
I
In reflecting on my work efforts of 1992, memories of achievement and victory are tempered by
frustrations, i.e. progress of Lake Ann Park shelter and utilities and Herman Field ark grading
contract. I do not find this disheartening, however, as I continue to face problems or roadblocks
head on, always looking for a solution rather than becoming bogged down. As a speaker at our
I
annual Minnesota Recreation and Parks Association State Conference stated, "Employment is a
behavior rental agreement." I hope my actions as a city employee parallel this.
The following comments are a summary of the action or inaction on each of twenty -four specific
goals I identified for 1992. A listing my specific goals which are identifiable at present for 1993
follows this summary. . V I
Progress Report, 1992 Goals - ` a
1
1. Goal: Investigate and make a recommendation in the area of providing illumination and
portable warming houses for the city's neighborhood skating rinks.
As a part of the development of the 1992 Capital Improvement Program, the Park
and Recreation Commission deleted any funding allocations in this area.
:�
- sue - - -_�
2. Goal: Continue to perform preparatory work items related to the future development of
Bandimere Community Park. = : L.
1
The Park and Recreation Commission concluded that prior to moving forward with
any plans for development at Bandimere Community Park, a consensus of what the
community's position was on this subject should be reached. The " Bandimere"
question was the basis for a park needs survey distributed in July with 59% of
1
et
t 07 PRINTED ON RECYCLED PAPER
1
1
I Mr. Don Ashworth
December 3, 1992
1 Page 2
respondents stating they would oppose a park improvement bond totalling $800,000
1 to develop the park. Plans to move forward are now on hold.
3. Goal: Guide the re- grading and park design activities at Bandimere Heights
1 Neighborhood Park necessitated by the acceptance of excess fill material.
. This project caused me considerable frustration as a result of Public Works
1 accepting an excessive amount of fill material. I nicknamed the project "our lunar
landing pad." Through cooperation and understanding, however, from both the
street and park crews, an undesirable situation was alleviated to a large degree. The
1 end result is a park and soccer field which drains properly, but exists at a higher
elevation than was necessary.
1 4. Goal: Coordinate the planning and construction of the trails from Lake Susan Community
Park to the south to Chanhassen Hills and to the east to Hidden Valley and Chanhassen
I Estates.
Lake Susan Park to Hidden Valley and Chanhassen Estates: Complete.
1 Lake Susan Park to Chanhassen Hills: On hold awaiting acquisition of the land
necessary to complete the trail.
1 5. Goal: Pending the approval of a grant application for an aeration system for Lake Susan,
coordinate its installation and operation.
1 This grant application was denied. Request for funding from the IIRA has been
conditionally approved. Preparation of purchase documents has been initiated.
1 6. Goal: Complete park improvements initiated in 1991 at Curry Farms Park, Sunset Ridge
Park, and Herman Field Park.
1 Goal achieved.
I 7. Goal: Initiate and guide development of Pheasant Hill Neighborhood Park.
In progress.
I 8. Goal: Complete items specified in the 1992 Park Acquisition and Development Capital
Improvement Program.
1
Mr. Don Ashworth
December 3, 1992
Page 3 ,
See attached List for detailed information. Items included in the CIP were either
completed, postponed, deleted, or delivery of equipment which is now awaiting
installation was taken.
9. Goal: Ensure continuity of the trail being constructed on the north side of Highway 5: ,
An amendment to the match line at the trail's western terminus was coordinated to
ensure continuity with the existing trail to Lake Ann. 1
10. Goal: Continue to coordinate plans for the installation of utilities and the construction
of the picnic /recreation shelter at Lake Ann Park. ,
Ongoing.
11. Goal: Complete the inter -park trail through the wooded portion of Lake Ann Park.
Plans to improve the trail alignment currently grubbed out in the wooded section of
Lake Ann Park were put on hold as a result of the Park and Recreation
Commission's deletion of funding for this project from the 1992 CIP.
12. Goal: Continue to investigate the redevelopment of City Center Park in conjunction with 111 g P tY unc
l
the planning of Central Park.
Ongoing.
13. Goal: Pursue acquisition of park land west of Lake Minnewashta. 1
Ongoing.
1
14. Goal: Work with the engineering department in the development of an easements map.
Completed by Sara Berkland, Engineering Intern. ,
15. Goal: Identify and mark unknown park property boundaries to avoid encroachment
problems.
Completed when necessary in 1992. Will be an on -going effort.
16. Goal: Investigate the potential of presenting a park improvement bond referendum for
the purpose of funding major park acquisition, development, and improvement projects,
i.e. Bandimere Community Park, park land purchase west of Lake Minnewashta,
1
Mr. Don Ashworth
December 3, 1992
' Page 4
construction of major arterial trails, installation of ballfield lights at Lake Susan Park and
Lake Ann Park, and redevelopment of City Center Park.
Addressed by park needs survey distributed in July.
1
17. Goal: Install new park rules signs at entrance locations to all city parks.
' Goal achieved.
1 18. Goal: Initiate an Adopt -A -Park Program in the spring.
Kjell Ackerberg, Park and Recreation Intern, compiled information in this regard
1 and presented an initial report in May. Implementation of this program has been
postponed until the spring of 1993.
19. Goal: Provide timely information and recommendations concerning park and recreation
services to the Park and Recreation Commission and City Council.
1 Ongoing.
20. Continue my pursuit of a Masters of Arts degree in Public Administration at Hamline
' University.
Attended class winter /spring and summer quarters, 1992. Registered for
' winter /spring quarter, 1993.
' 21. Goal: Guide new developments in the area of recreation program registration.
Coordinated the implementation of the after hours service lobby and being guided
by Mike Neuruerer, Dave Hartley, Karen, Dawn, Jerry and you in regard to on -line
registration.
1 22. Goal: Complete the annual park facility inventory.
Completed on April 7 and 8, 1992.
' 23. Goal: Pursue grant programs and other available sources of funds or matching grants to
augment the Park Acquisition and Development Fund.
1
1
Mr. Don Ashworth I
December 3, 1992
Page 5
1
Fiscal Year 1992 grant application for a Cooperative Opportunities for Resource
Enhancement (CORE) grant submitted in late 1991. This grant was proposed to
fund a lake aeration system for Lake Susan. Result: Denied.
A grant application for bikeway /walkway development on Powers Boulevard north
I
was submitted in October through the Surface Transportation Program (STP) and
the Federal Intermodal Transportation Efficiency Act (ISTEA) to the Metropolitan
Council. 1
Coordinated allocation of Community Development Block Grant (CDBG) monies
with planning staff.
1
24. Goal: Provide leadership, direction and support to the Recreation Supervisor and all
seasonal staff. 1
I make a conscious effort to apply this goal, especially providing support, on a daily
basis. 1
1
1
1
1
1
1
1
1
1
1
1993 GOALS
PARK AND RECREATION DIRECTOR
1
1. Move forward with the purchase of parkland west of Lake Minnewashta of at least ten
acres in size.
2. Negotiate, plan and complete a trail connection from Herman Field Neighborhood Park
1 to Minnewashta Regional Park.
•
3. Complete the grading, surfacing, and restoration of Pheasant Hill Neighborhood Park.
1 Ensure that the bituminous trail is in place and the park is seeded by June 1, 1993.
4. Complete an amendment to the Recreation Section of the City's Comprehensive Plan,
1 including the creation of a Comprehensive Park Plan.
5. Successfully administer the Eurasian Water Milfoil, goose removal, and mosquito control
programs by initiating an action plan for each by April 30, 1993.
6. Complete all necessary renovations of existing park facilities maintained by the city to
ensure compliance with the Americans with Disabilities Act and the U.S. Consumer
_- roduct Safety Commission guidelines.
1 Implement a weekly inspection of all play structures maintained by the city.
8. Further promote the alliance between Park and Recreation maintenance and administration
staff.
9. Coordinate a successful completion of the Lake Ann Park Utilities and Picnic/Recreation
Shelter contracts, concluding with a grand opening of the facility on May 29, 1993.
' 10. Visualize, develop, promote, and implement a winter special event scheduled for
February, 1994.
1 11. Continue to identify park boundaries through field inspection and surveys to reduce
encroachment on park land.
' 12. Implement an Adopt a Park program in April of 1993.
13. Continue work in the area of realizing completion of the City's Comprehensive Trail Plan.
' 14. Develop, edit, edi and publish a Chanhassen Park and Trail brochure.
1 15. Work closely with the city's Housing and Redevelopment Authority and its Executive
Directors in areas of work relating to Lake Susan Park., Central Park, and the downtown
entertainment center.
1 •
1
16. Coordinate the first phase of construction at Power Hill Park, including all grading, 1
surfacing, seeding, bituminous paving, and restoration operations.
17. Resolve outstanding issues of ownership, capital improvement, and maintenance
responsibilities for Cathcart Park. •
18. Oversee the portion of the city's contract with C.S. McCrossan relating to the construction I
of the tennis courts at South Lotus Lake Park.
19. Successfully administer the city's contract with Innovative Irrigation for the irrigation of I
ballfields and spectator areas at Lake Ann Park. Realize substantial completion by June
15, 1993. 1
20. Pending approval, assume responsibility for a comprehensive boulevard planting program.
21. Make a concerted effort to ensure that the Chanhassen Tree Preservation Board is I
successful in its first year of operation.
22. Coordinate the completion of items specified in the 1993 Park Acquisition and
P sP q
Development Capital Improvement Program (CIP).
23. Continue my pursuit of a Masters of Arts degree in public administration at Harnline
University.
I
24. Complete the annual park inventory in April 1993.
25. Continue to pursue grant programs and other available sources of funds or matching 1
grants to augment the Park Acquisition and Development fund.
26. Provide leadership, direction, and support to the Recreation Supervisor, Program 1
Specialist/Senior Coordinator, and all seasonal staff.
27. Become sufficiently adept at computer operation to allow me to draft this document from 1
my office next year.
1
1
1
1
1
1
1 AMENDED
PROPOSED 1992 FUNCTION 410 PARK ACQUISITION AND DEVELOPMENT
1 CAPITAL IMPROVEMENT BUDGET
AUGUST, 1991
1 Current Estimate
Bandimere Community Park
1 Bandimere Heights Park
Wood Park Identification Sign $ 250.00 $ 200.00 Complete
1 Bluff Creek Park
I Carver Beach Park
Play Area Refurbishment 2,200.00 2,200.00 Postponed
I Carver Beach Playground
Wood Park Identification Sign 250.00 200.00 Complete
Replacement of Swing 950.00 950.00 Complete
I Addition of Two Spring Animals 1,000.00 1,000.00 Complete
Border Wood and Pea Gravel 1,400.00 1,400.00 Complete
I Chanhassen Estates Mini -Park
Wood Park Identification Sign 250.00 200.00 Complete
I Chanhassen Hills Park
Wood Park Identification Sign 250.00 200.00 Complete
Construction of a Ballfield 1,500.00 1,500.00 Postponed
1 Installation of Trees 800.00 00.00 Complete
Chanhassen Pond Park
1 Wood Park Identification Sign for Kerber Blvd. 250.00 200.00 Complete
Wheel Chair Accessible Picnic Tabel 500.00 500.00 Delivered
Picnic Table 450.00 450.00 Delivered
I City Center Park -
Play Equipment Expansion (50% Share) 10,000.00 00.00 Deleted
1 New Basketball Poles and Standards 1,200.00 00.00 Deleted
Curry Farms Park
1 Wood Park Identification Sign 250.00 200.00 Complete
I Greenwood Shores Park
Herman Field Park
I 1st Phase Play Area with Border Wood/Pea Gravel 13,000.00
6,000.00 1 3,000.00 Delivered
Superdeck Boardwalk 6.000.00 Postponed
Picnic Tables and Play Area Bench 1,500.00 1,500.00 Postponed
Lake Ann Park I
First Aid Supplies 400.00 00.00 Postponed
Lifeguard Room Equipment 1,500.00 00.00 Postponed'
Rescue Board • 500.00 00.00 Postponed
Cash Register 750.00 150.00 Postponed
Freezer 400.00 00.00 Postponed I
Refrigerator 500.00 00.00 Postponed
Microwave 300.00 00.00 Postponed
Menu Boards 300.00 00.00 Postponed
Building Supplies and Equipment 3,000.00 00.00 Postponed
Row Boats 650.00 00.00 Postponed
Canoes (2) 1,000.00 00.00 Postponed
Paddle Boats (2) 1,650.00 00.00 Postponed
Life Jackets (20) 500.00 00.00 Postponed
Canoe Paddles (10) 200.00 00.00 Postponed'
Play -Aks (6) 1,800.00 00.00 Postponed
Play -Ak Paddles (8) 200.00 00.00 Postponed
Outboard Motor 750.00 00.00 Postponed 1
Shelter Landscaping 1,500.00 00.00 Postponed
Drainage Improvements, Field #6 1,000.00 1,000.00 Postponed'
Supplies for Conversion of Field #2 to
Little League 500.00 500.00 Complete
Bituminous Trail Loop 10,500.00 00.00 Deleted 1
Basketball Pole 600.00 00.00 Deleted •
Fencing 2,200.00 2,200.00 Complete
Boundary Buoys 1,300.00 00.00 Deleted 1
Lake Susan Park
Trail Link to Chanhassen Hills 21,000.00 *21,000.00 Postponed 1
Archery Range Targets 300.00 300.00 Complete
Aeration System Installation 4,000.00 00.00 Electrical
Service 1
Installed
Track Ride 00.00 Deleted
Meadow Green Park '
Installation of Trees 400.00 400.00 Postponed
Minnewashta Heights - .
1
Play Area Expansion 3,000.00 3,000.00 Delivered
North Lotus Lake Park
*This project will require additional funding, with planning/construction spanning both 1992 and 1993. 1
1
1
I Pheasant Hills Park
Engineering, Surveying, Staking, Grading
Surfacing and Site Preparation Associated
With Initial Phase of Construction 20,000.00 10,000.00 In Progress
1 Power Hill Park
1 Prairie Knoll Park
Rice Marsh Lake Park
' Play Area Expansion 6,000.00 4,000.00 Complete
South Lotus Lake Park
1 Sunset Ridge Park
Installation of trees 800.00 800.00 Complete
1 Park Rules Sign
50 Signs 3,500.00 3,500.00 Complete
1 Picnic Tables, Benches, Spectator Seating, Signage 5,500.00 3,000.00 Complete
1 Boy Scout Project 1,000.00 00.00
Tree Farm 200.00 200.00 Complete
I Contingency 4.500.00 1.000.00
1 TOTAL $145,000.00 $80,750.00
DIFFERENCE $64,250.00
1
Postponements were made in the cases when expenditures were no longer necessary, and to allow for the funding
1 of the Lake Ann Park irrigation system, a $45,000 contact.
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
A
1
1
1
1
1
1
1
PLANNING DEPARTMENT
1
1
1
1
1
1
1
1
1
1
1
CITYOF
1 �
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
' (612) 937 -1900 • FAX (612) 937 -5739
MEMORANDUM
TO: Don Ashworth, City Manager
' FROM: Paul Krauss, Planning Director
1 DATE: October 12, 1992
SUBJ: 1993 Planning Department Goals and Budget Request
In formulating the Planning Department's budget for 1993, I believe it is first necessary to
1 examine departmental goals that have been set; 'have put these goals out for discussion
purposes, fully expecting that they will be modified, but with gained from both the Planning
Commission and the City Council. In establishing' these goals, I believe it would be useful to
1 re- examine the 1992 goals to see if we have made progress. The following constitutes this
review. These goals were presented in a report to the City Council last year.
1 : :
1. Organize and complete the Highway 5 Corridor Study and related project in
developing a land use plan for the south study area.
' While we have made significant progress in this area, the Highway 5 Corridor Study
remains a work in progress. However, much has been accomplished to date. During
1 1992, the city worked with Bill Morrish and his staff to complete the visioning study
for the corridor. While this work is no official standing, it has certainly proven to be
a point of common ground between the HRA, City Council and the Planning
' Commission and points the way towards the goals of the expanded Highway 5
Corridor Program. The city has been receiving extremely good reviews for having
completed this work and it has already paid significant dividends. Staff has been
1 working extensively with MnDOT engineers to refine plans for the next phase of Hwy.
5 construction. We have also had an opportunity to meet with representatives of the
Metropolitan Council, who will be responsible for dispersing ISTEA funds early next
1 year. Both organizations have been impressed by this study and we have been able to
use it to leverage improvements to the highway design and of increased availability of
funding to accomplish these improvements. MnDOT is already making substantial
1 financial commitments to improve the highway /frontage road concept. We have also
been able to use the process which has been started to gain improved development
proposals in the corridor with the Target project being the prime example. Lastly, the
1
��
PRINTED ON RECYCLED PAPER
1
Don Ashworth 1
October 12, 1992
Page 2 1
Highway 5 study effort is on track. The task force has been established and has
already met several times. We are currently in the process of working up Phase II
contractual agreements and will be embarking on the fast track study immediately.
2. Surface Water Management Program.
The 1992 goals included developing a revised wetlands ordinance and official map, as
well as developing a strong public relations and information effort regarding the 1
program. It was recognized that this program would not be completed in 1992 but
that significant positive results should begin to be generated.
We believe we have exceeded these oals. The wetlands ordinance and map have
g P
been developed and are being forwarded to the Planning Commission and City
Council for adoption at the present time. In addition, a City of Chanhassen Best
Management Practices Handbook has been developed and is also in the process of
being approved. This handbook establishes new and very detailed requirements for all
grading and erosion control operations conducted in the city. The handbook is
designed to ensure that water quality standards are met.
Over the year we have been able to incorporate water quality and wetland 1
improvement standards into a number of development projects using newly developed
expertise. In many cases these improvements were done at little or no cost to the city.
Examples include the Lundgren Willowridge project and the newly developed Target
site plan. The city has also embarked upon a strong educational effort regarding the
program and sensitive land management practices to protect water quality. 1
3. The Senior Commission/Senior Center goal for 1992 was to complete design and
construction of the Senior Center and develop its operation and programs in a manner
that provides the highest level of service for our residents at the least possible cost.
This goal was achieved ahead of schedule and under budget. We have gone from
having no facilities for seniors to having an operating Senior Center that is beginning
to offer a variety of programs and opportunities. Staffing needs have been rethought
and reallocated to carry us forward into the future. Management responsibilities for
day to day operations of the Senior Center are in the process of being passed over to
the Park and Recreation Department, which was another part of this goal.
4. Computerize Departmental Functions.
The city continues to make progress towards creating and utilizing a GIS data base. 1
We are working towards having materials prepared in digitized format and all the
materials provided to the city from Bonestroo Engineering will be digitized. While
1
1
Don Ashworth
October 12, 1992
' Page 3
we cannot state that we have the GIS or permit tracking systems up and running yet,
' we believe the infrastructure is in place and these goals can be accomplished in the
near future.
1 5. Continue Recycling Efforts.
The goal was to expand a range of materials that can be collected as well as improve
' coordination with Carver County. The city has managed a compost site on Bandimere
Park as well as a compost demonstration site near City Hall. We have also entered
into a cooperative agreement to distribute composters to residents below cost.
' 6. Continue to Respond to Needs to Upgrade, Revise, and Improve the Zoning
Ordinance.
' This is an ongoing goal with the city and we believe that much has been achieved in
this area. With the exception of the residential component, the PUD ordinance has
been adopted and work is proceeding on that portion of the code. We are also in the
process of greatly improving our wetland and water quality standards.
1 7. Continue to refine and improve city procedures relative to development. Strive to
maintain and improve Chanhassen's image as a progress community that sets high
standards for development. Maintain good working relationships with developers and
brokers and to ensure that the residents concerns are heard in our review process.
This again is an ongoing goal that we need to reaffirm annually. We believe the city
has made great strides in furthering its image as a progressive community. Our
environmental protection efforts have received a good deal of coverage in the region.
' Our working relationship with the Metropolitan Council has never been better.
1993 DEPARTMENTAL GOALS
The following constitutes preliminary departmental goals for 1993. These goals will be
presented to the Planning Commission and City Council for further discussion and refinement.
You should also be aware that we have the ongoing work items list that is updated by the
Planning Commission on a monthly basis. This indicates work in progress or which is
desired by the Planning Commission and City Council. A copy of this document has been
attached for your review.
1. Complete the Highway 5 Corridor Study. The Highway 5 Corridor Study is
1 growing in its ultimate importance to the city and its future. The program as
envisioned will result in improved development standards, input into MnDOT highway
designs for future Highway 5 expansions to increase design sensitivity, designation of
1
Don Ashworth 1
October 12, 1992
Page 4
1
environmental sensitive areas for preservation, refinements of land use, and
development of a capital improvements plan. This project needs to be maintained on a
fast track if we are to position ourselves in front of developments that are going to be
proposed. The benefits of being able to have a proactive stance on development
should be evident to all those who were involved with the Target site plan. Funding
1
for the program is to be provided by the HRA.
2. Complete the Surface Water Management Program Planning and Establish the '
Program on a Permanent Footing. Work on developing the Surface Water
Management Plan, Water Quality Protection Plan and Wetland Protection Effort will
be completed during the first half of 1993. We have undertaken and achieved a lot to
date. The program is beginning to show its worth as evidenced by our educational
efforts, input into developments, city programs such as the early street sweeping
designed to protect water quality, etc. The completion of the plan is in Winston
Churchill's words, "not the beginning of the end, but rather the end of the beginning."
We need to move forward into a proactive position that allows us to continue to
monitor our lakes. We need to be able to institute the capital improvements projects
needed to reverse the decline of water quality in our lakes and wetlands and put it on
an upwards path. We also need to continue our educational efforts and coordination
with other governmental agencies, both in terms of staffing and financial assistance.
3. Senior Commission /Senior Center. Now that the Senior Center is up and running,
the Planning Department's direct role in this operation is being intentionally
diminished. We are passing the baton over to the Park and Recreation Department
where day to day operations can be more effectively conducted. The Senior
Commission is moving on to its next goal which is to complete a feasibility study for
senior housing options in Chanhassen. If the housing proves to be feasible, we would
then need to launch a follow up program to see how we may cause it to be
constructed. The contract for the housing feasibility study has been issued and is
being paid for out of Community Development Block Grant Funds.
4. Community Development Block Grant Program/Maintaining Eligibility. As the
Council is aware, we have used our CDBG funds to greatly enhance our ability to
provide programs and facilities for our seniors and handicapped residents. Due to the
1
loss of population in the Hennepin County portion of Chanhassen, our continued
ability to remain in the CDBG program has been threatened. Staff is working
diligently in conjunction with the Mayor to have HUD rules revised or re- interpreted
1
so that we may continue to be involved in the program. We are working intensively
with the staff of Congressman Ramstad and Senator Wellstone's Offices to this end.
1 Resolution of this matter may well take into next year.
1
1
1 Don Ashworth
October 12, 1992
1 Page 5
5. Computerize Departmental Functions. 1993 represents the year in which we may
' actually achieve the goal of significantly increasing our use of technology. Planning
Department staff already composes significant portions of staff reports on our
individual computers but its potential in terms of an information store house and its
' ability to track permit requests through the city has yet gone untapped. We believe
that we may be able to complete this program in 1993. However, we should also be
aware that we do not want to push the cutting edge of technology too far with adverse
1 cost impacts, so care must be exercised.
6. Continue to Enhance Recycling Efforts. Last year the city made some progress in
improving our recycling services to our residents. We want to continue this trend in
1993. The city should continue to work with Carver County to cooperatively offer
compost site facilities to our residents. We are also seeking to enhance the range of
1 materials which are eligible for our recycling program. Plastics and waste paper are
two primary candidates. Cooperative efforts with Hennepin County, that have made
available reduced cost composters to our residents, should be further explored and
1 offered. Lastly, our educational efforts need to continue.
7. Continue to Respond to Needs to Upgrade, Revise and Improve the Zoning
' Ordinance. As we have noted in past years, this is a continuing effort and if we are
doing our jobs, it will never be completed. Staff continues to work to refine the
' ordinance to deal with new situations as they arise as well as to incorporate state of
the art techniques. For example, in 1993, we will probably be adopting an overlay
district in the Highway 5 corridor as well as improving our design oriented
' performance standards for development throughout the community.
8. Strive to maintain and improve Chanhassen's image as a progressive community
' that sets high standards for development. Maintain good working relationships
with developers, residents and outside agencies to ensure that the city goals and
policies can be achieved. Increased reliance on computerization will facilitate our
' ability to be responsive to both residents and developers. We must continuously work
to maintain a positive attitude and provide high levels of public service and
responsiveness. Relative to improving Chanhassen's stature with other agencies, I
' believe we have made great strides in this area. As you are aware, the city has
developed an excellent reputation for being in the forefront of environmental
protection issues. Staff has been asked to serve on special committees and task forces
designed to develop rules for the new State Wetlands Law and to protect the
Minnesota River. Our relationship with the Metropolitan Council has never been
better and we are frequently asked to assist them on projects of regional significance.
We must also continue to work with our local Metropolitan Council representative,
both individually and through the Southwest Communities Coalition. In all
probability, we will be losing Bonnie Featherstone as our Metropolitan Council
1
Don Ashworth 1
October 12, 1992
Page 6 1
representative due to reappointment and need to work with whoever is selected to
replace her to be sure that our concerns are adequately conveyed. These efforts will
need to be continued in the coming years.
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
ONGOING ISSUES
REVISED FEBRUARY 3, 1993
•
ISSUES STATUS
t 1.* 1995 Study Area (North) and Hwy. 5 On-going work with Task Force. Public
Y (N ) wY g g
Corridor Study Hearing to CC on 2/8/93.
I Assigned to Planning 1995 Study Area (South) g g Commission staff.
1 Work to be initiated as time commitments
allow
' OTHER ITEMS
Staff update and review of issues due for the
' March 3, 1993, Planning Commission
Meeting
' 1.* Sign Ordinance Work is continuing to progress with task
force. Program expected to be completed
shortly. CC asked that the committee look
' at limiting the number of sign boards on
building exteriors for office buildings.
' 2. Tree Protection Ordinance, Mapping Inventory is completed. Over view of
of significant vegetative areas existing tree protection regulations requested
by Commissioner Erhart. Advisory Tree
1 Board established by City Council. First
meeting on 1/28/93.
1 3. Shoreland Ordinance Staff is currently working on draft of the
ordinance. Initial comments delivered to
MnDNR. Will place on upcoming PC
1 agenda.
4. PC input in Downtown Planning and Ongoing - Review ongoing projects
Traffic Study discussed at 9/2/92 meeting.
5. Review of Architectural Standards to 1992 /may be combined in part with Hwy. 5
Promote High Quality Design work.
1 1
1
1
6. Bluff Creek Corridor Greenway Park and Recreation Commission is I
undertaking update of the recreational
element of the Comprehensive Plan. Bluff 1
Creek issues to be dealt with in this format.
7. Temporary uses, sales - new Staff to bring back to Planning Commission
1
ordinance at a March meeting.
8. Sexually oriented businesses PC reviewed on 3/4/92. Sent to Public 1
Safety Commission. Reviewed on 7/8/92.
To be forwarded to CC.
I
9. Tree Conservation Easements Reviewed by PC in November.
10.* Fence Requirements To be reviewed by CC 2/8/93.
11. Open Space Zoning Requested by PC. 1
12. Upgrade landscaping ordinance To PC in March I
standards to meet criteria established
during Target Review.
* Change in status since last report. 1
1
1
1
1
1
1
1
2 1
1
1
1
1
I
1
1
I FINANCE DEPARTMENT
1
1
1
1
1
1
1
1
1
1
1
CITY OF
I ,
CHANHASSEN
i�
1 \ i
p90 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
�� (612) 937 -1900 • FAX (612) 937 -5739
MEMORANDUM
1 TO: Don Ashworth, City Manager
I FROM: Jean Meuwissen, Treasurer
Tom Chaffee, Finance Coo r inator
DATE: January 4, 1993
I SUBJECT: Finance Department Goals and Objectives - 1992/1993
I Reflecting on the year just past and reviewing the Goals and Objectives
for that year (copy attached) we feel we again had a productive and
I rewarding year. Summarizing our Goals and Objectives, as we have the
past five years, and including only new or modified items tends to
over -look the "routine" tasks of the Finance Department which have come
to be taken for granted to a certain extent. ,
1 Additionally, the one or two line identification of specific target,
objectives seems to minimize the importance as well as the potential
work effort necessary to accomplish the stated objective.
I More often than not, specific goals and objectives frequently over -lap
years and some of ours have seemed to just be ongoing.
Annually, we invariably are called upon mid-year to implement one or
I more major changes as a result of new legislation enacted during the
current legislative session and are required to place new projects on
a back burner.•This past year was no exception. Some of the mid -year
I fires which we were called on to extinguish included:
I. State Budget Cuts -'
This perennial problem at the state legislature always ends
I up, to some extent, in our lap. 1992 proved to be no exception.
a. Decreased Revenue - `
I Again we were confronted with various proposals for reductions
in aid to cities which includes HACA (Homestead /Agriculture
Credit Aid) as well as LGA (Local Government Aid). We monitored
I and analyzed the potential impact of the several proposals
as they related specifically to Chanhassen. The final reduction
amounted to slightly more than $12,000 which we absorbed in
I stride in our normal budget process.
I % s r PRINTED ON RECYCLED PAPER
•
Don Ashworth, City Manager I'
January 4, 1993
Page 2 '
•
•
I. State Budget Cuts(continued)
b. Sales /Use tax on cities -
Outwardly, the implication of extending the 6.5V. state sales/
use tax seemed simple enough: now every -thing we buy will
cost an additional 6.5 %. The operational impact of this change
was considerably greater than that. We instituted special
accounting procedures to not only account for the tax stated
on bills rendered by our vendors but also to accrue and report
use -tax on out -of -state purchases, off -road diesel fuel, and
water usage by City facilities. The net impact on our budget
for 1992 was approximately $30,000 with an estimated annual
impact here -after of between $60,000 and $80,000. From our
view -point it would have been much simpler to have reduced
our HACA by that amount and avoided all of the additional
on -going transactions and process.
c. Water Testing Fee -
On the surface, this may have had the appearance of a totally
new program when, in reality, it was another budget balancing
measure by the state. The new Federal mandate for expanded
water quality testing allowed the state to treat it as a new
process and pass the costs on to local governments.
We implemented the "Water Test" fee changes in July and are
now billing our water customers regularly for this mandate.
1 Another continuing process to add to the list !!
II. Federal Arbitrage Reimbursement Regulations
The I.R.S. continues its relentless pursuit of local
government bonding capabilities and, insists on further
complicating our lives with reports and restrictions.
After meeting with our auditors, bond counsel, and financial
consultants, we prepared and had adopted the necessary
council resolution to address their current mandates.
III. State pursuit of fund reserves
Through the budget balancing process, the state legislature
in concert with the state auditor has been considering the
usage of fund balances as a factor in determining any
aid distribution (HACA or LOA) to cities.
Our auditors recommended re- alignment of some of our fund
designations to more appropriately reflect the nature of
the funds and protect any reserves that would normally
be part of the state considerations.
We embarked on a program in September to re- designate
and re- allocate funds according to their recommendations.
1
1
Don Ashworth, City Manager
January 4, 1993
Page 3
Refering Y to the attached cop of 1992 Goals and Objectives, we present
the following update:
' 1. The anticipated major revision to our existing payroll system
is still in the field testing stages and will probably not be
' available until March or April of 1993. We still intend to
install this revision as soon as it becomes available to us.
2. Some restructuring took place with Deloitte & Touche causing
' a delay in the schedule for implementing our Fixed Asset
Management and Reporting system. We now have our master file
installed and further implementation efforts are now back on
1 track.
3. Some efforts were placed on downloading historical data files
' as well as initial control file designs for the ultimate
intent of starting check writing functions in -house in 1993.
4. Utility system files have been converted and down - loaded to
1 the PC's where more work is being done to make them usable
in an on -line interactive mode. This will continue to be a
work effort into 1993 and perhaps into 1994.
' 5. Time constraints prevented any action on the special assessment
system but provisions are being included in the property
information system to address potential special assessment
issues.
6. The 1991 audit process and Annual Financial Report produced
' the first "clean" tun-qualified) auditors opinion statement
which is the first step toward GFOA certificate application.
This will continue to be an objective for 1993.
1 7. Time restricions prohibited any efforts to even investigate
the possibilities of automated water meter reading.
8. The sewer /water operations was showing signs of stress as a
result of several years of huge increases in our M.W.C.C.
payments. We implemented a sewer rate increase in January, 1992
' and are preparing to implement the other phase of that increase
this month.
9. Our continued aggressive investment strategy has paid some very
good dividends and should continue to do so in 1993. A more
specific report will be prepared in the next several weeks.
10. Inter - office communication continues to be a priority with us
as we continue to expand and grow as a City. Inter - departmental
cooperation is and will continue to be important to the success
1 of the City.
1
Don Ashworth, City Manager
January 4, 1993
Page 4 ,
Enough of the reflecting on the past! 1
We anticipate another exciting year in 1993 with new and better means
and methods for accomplishing the routine tasks, as well as additional
challenges from the state and federal governments as they continue to
share their financial woes and budgetary crises with us.
We continue to be faced with the challenge to do MORE with LESS!! 1
FINANCE DEPARTMENT 1
1993 GOALS AND OBJECTIVES
•
1. Install major revision to payroll system.
2. Complete phase 2 of the Fixed Asset Management and Reporting.
(Including initial implementation of Central Services Fund
for vehicles and equipment)
3. Continue installation efforts for in -house processing of
Financial Accounting System.
4. Continue installation efforts for in -house processing of
Utility Billing System.
5. Complete requirements and make application for G.F.O.A.
Certificate of Achievement.
7. Finalize Arbitrage reporting and rebate relative to 1988
bond issues. (payment and report due 2/28/93) ,
8. Continue to monitor closely the water /sewer operations to
assure financial stability.
9. Continue aggressive investment strategy and monitor results
more closely. Establish basic cash flow modeling.
10. Continue work on Property Information data base.
11. Improve fire department reporting conditions and system.
12. Actively monitor legislative efforts affecting Local
Governments and share information with Mayor /Council and
City Manager.
1
II
Don Ashworth, City Manager
II February 19, 1992
Page 5
II FINANCE DEPARTMENT
1992 GOALS AND OBJECTIVES
I 1. Install major revision to payroll system.
I 2. Complete phase 2 of the Fixed Asset Management and Reporting.
(Including initial implementation of Central Services Fund
for vehicles and equipment)
II _. Begin installation of in -house processing of Financial
Accounting System.
I 4. Begin installation of in -house processing of Utility Billing
System.
II °_. Begin de=sign work on data base for Special Assessment Accounting.
6. Complete requirements and make application for G.F.O.A.
I Certificate of Achievement.
7. Work closely with City Engineer on proposal for installing
automated water meter reading system.
II S. Continue to monitor closely the water /sewer operations to
assure financial stability. (May lead to proposal for more
II rate increases!)
9. Continue aggressive investment strategy and monitor results
more closely. Establish basic cash flow modeling.
I 10. Communicate more closely with Manager and department heads on
finance related issues.
II
1
II
II
II
1
1
1
1
1
1
PUBLIC SAFETY
1
1
1
1
1
1
1
1
CITYOF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CI-(ANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
' MEMORANDUM
TO: Don Ashworth, City Manager
FROM: Scott Harr, Public Safety Director
' DATE: December 9, 1992
SUBJ: Goals and Objectives
Following are my 1992 goals and objectives, with comments:
1) Exercise the Emergency Management Plan: This was successfully
completed on Minnesota Tornado Awareness Day, with copies of
' the plan being distributed to all department heads and
applicable personnel.
2) Review job description for position of Community Service
Officer: This was accomplished, with the position of Public
Safety Officer growing out of this review.
' 3) Review animal control contract to consider whether we wish to
continue in 1993: This was done, With the commitment being
made to continue the contract for next year.
4) Embark on considering long range planning: This has been
done.
5) Review shooting boundaries within the City : This was done,
with changes being made.
' 6) Review police contract hours for 1993: This was accomplished,
with the result being increased to four additional hours per
day for 1993.
1 7) Review Building Inspection staff members for 1993: This was
done, with the decision being made to maintain the present
level of staff.
' 8) Continue to develop a positive working relationship with the
emergency response agencies that work in the City: Positively
11 completed.
t*, PRINTED ON RECYCLED PAPER
Don Ashworth I/
December 9, 1992
Page 2 1
9) Analyze building inspection review from contractors: This was
done, with many positive benefits coming from it, including
our sponsoring a seminar for contractors, which was attended
with many positive responses. Our staff analyzed the
responses from the inspection survey, utilizing the results to
assist us in training and planning. The result has been an
obvious decrease in complaints regarding inspections.
10) Implement use of computers within the department to a greater 1
degree: This has been accomplished.
I would like to submit the following specific goals and objectives 1
for 1993:
1) Review procedure for dealing with traffic complaints. 1
2) Pursue future planning for Public Safety needs.
3) Review and refine Emergency Management Plan.
4) Utilize volunteer resources within the City, by considering
increased use of volunteer programs within the Carver County
Sheriff's Department.
5) Consider complaint form for inspection & enforcement staff. 1
6) Consider a need for additional secretarial help.
7) Review animal control contract for the following year,
considering whether we wish to - continue providing this
service. 1
8) Provide joint training for law enforcement officers and our
fire department.
9) Continue providing public education. „
10) Develop crime prevention services, Neighborhood Watch &
Operation Identification.
1
1
1
1
1
1
1
1
1
' PUBLIC WORKS
1
1
1
1
1
1
1
1
1
1
1
CITYOF
A ClIANIIASSEN
1 �
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
�f I (612) 937 -1900 • FAX (612) 937 -5739
MEMORANDUM
1 TO: Don Ashworth, City Manager
FROM: Charles Folch, City Engineer 0(
' DATE: December 14, 1992
SUBJ: Review of 1992 Primary Go and Objectives and
Establish 1993 Top Priority Goals and Objectives
File No. PW -227
The following is a review of the top priority goals and objectives for the Public Works
1 Department in 1992:
1. Pavement Management - Develop a S -year street rehabilitation capital improvement
' program including annual crack filling and sealcoating programs based on the
findings and recommendations of the city -wide pavement management report.
' Institution of an assessment policy for the funding of these rehabilitation projects.
Status - A 5-year street rehabilitation capital improvement program has been
' prepared with a priority schedule based on findings and recommendations of the
Pavement Management Report. The Pavement Management Report identified that
approximately $140,000 to $150,000 a year should be allocated for sealcoating, crack
1 filling and localized patching programs in order to be able to sealcoat every street
on a 5 - year reoccurring interval. Based on the top_ priority needs, the study also
identified approximately $600,000 to $800,000 per year of street reconstruction work.
' One of the key elements that needs to be resolved prior to implementing the CEP is
to establish an assessment policy for street reconstruction projects. During 1992 the
City has undertaken studies to develop comprehensive sanitary sewer and water
policy plans which will identify ultimate infrastructure needs for the City upon full
development. These plans are very near completion and staff believes that these
utility policy programs in conjunction with the pavement management program need
1 to be reviewed concurrently to determine annual dollar demands in relation to the
financial capabilities of the City. Therefore, a street reconstruction assessment policy
is not expected to be completed until sometime in early 1993.
NOT PRINTED ON RECYCLED PAPER
1
Don Ashworth, City Manager
December 14, 1992
Page 2
2. Infiltration /Inflow Program - Continue implementation of the City's annual
infiltration /inflow (I /I) removal program including line televising flow monitoring
as it relates to the MWCC establishing future incentive /disincentive programs to
reduce Local I /I. Consider the elimination of private clear water sources such as
sump pumps and foundation drainage from the City's sewer system as per
Ordinance No. 90 -130.
Status - In 1992 the Metropolitan Waste Control Commission completed their study
on the metro area infiltration /inflow problem. Their study basically concluded that
it appears that there are municipalities within certain geographical areas of the metro
area which may be experiencing I/I problems due to high water tables, soil
conditions and other natural subterranean features. However, in these high I/I areas,
the study was not detailed enough to be able to determine whether MWCC
interceptor facilities had lower I/I than corresponding local sanitary sewer systems.
Therefore, the recommendation from the MWCC study was to delay implementation
of incentive /disincentive programs to reduce I/I but rather provide technical and
administrative assistance to help communities with potential I/I problems and
implement solutions.
In 1992 a sewer rehabilitation program was designed. Due to the lateness of the year
and small construction size of the program, bids received were higher than expected.
The program was canceled and dollars will be added to the 1993 program.
3. Comprehensive Sanitary Sewer and Watermain Policy Plans - Prepare a
comprehensive sanitary sewer and watermain study for the entire City of Chanhassen
which will provide information on trunk sanitary sewer, lift station, well, watermain
and water storage facility needs, locations and projected timing schedules. As the
City continues to grow towards an ultimate development density, these policy plans
will also provide information on the associated costs of these needed improvements
and uniform trunk sewer and water assessment rates which will be adjusted on an
annual basis with inflation to provide adequate funding. These overall policy plans
will also identify deficient or problem areas within our existing system that are in
need of repair or upgrade.
1
Status - In 1992 the City Council authorized the preparation of the comprehensive
sanitary sewer and watermain policy plans for the City of Chanhassen. These plans
are approximately 90% complete at this time. The remaining work is waiting upon
the completion of the digitized mapping of the City. This work is expected to be
completed in early 1993. During 1992, uniform trunk sanitary sewer and watermain
1
area charges were established.
1
1
1
Don Ashworth, City Manager
December 14, 1992
' Page 3
4. Staffing, Equipment and Space Allocation - Prepare 5 and 10 -year staffing,
equipment and space utilization plans for the departments within public works in
an effort to proactively plan for maintaining adequate City services as the City
continues to grow in population and more streets, utilities and parklands are added
to our infrastructure.
' Status - Preliminary work has begun in these areas involving research and discussions
at monthly superintendent's meetings. Information on fleet management systems and
software are being studied. Space and staffing needs will be developed in a
cooperative manner with administration. This process is expected to be continued
in 1993.
' 5. Project Management - Continue to provide project management of all public and
private development projects within the City. Specific City projects that are known
at this time are as follows:
A. MnDOT's Trunk Highway 5 Improvement Program, Dell Road to County
Road 17 construction and County Road 17 to Trunk Highway 41 design.
' Status - The Trunk Highway 5 project from Dell Road to County Road 17 in
g Y P J tY
Chanhassen is substantially completed. The Engineering Department will continue
' to provide technical assistance and review of the design plans for the Trunk Highway
5 improvement project from County Road 17 to Trunk Highway 41 and the proposed
north access boulevard road.
B. Trunk Highway 101 Realignment, Phase II (North Leg) - Design/Property
' Acquisition /Construction.
Status - During 1992 the Engineering Department provided technical and
administrative assistance in the acquisition of the Taco Shop and apartment building
property acquisition and demolition. The project plans were completed in the fall
and a contract was awarded in December. Construction will take place in 1993.
1 C. West 78th Street Detachment from Kerber Boulevard to County Road 17 and
County Road 17 South to Trunk Highway 5.
' Status - With the approved development plans for the Target site, the project plans
are now being completed for the detachment project which will be constructed in
1993. Additional improvements to West 78th Street east of Kerber Boulevard will
include the installation of traffic signals.
1
1
Don Ashworth, City Manager
December 14, 1992
Page 4 1
D. Minnewashta Parkway Road Improvement Project Between Trunk Highway 1
7 and Trunk Highway 5.
Status - The construction of improvements for this project have completed all of the
storm sewer, retaining wall, earthwork and road base preparation including
placement of the Class 5 aggregate. The curb and gutter and bituminous surfacing
including the trail will be completed in 1993. 1
E. Trunk Utility Improvements to Facilitate Development in Lake Riley Hills
Area. 1
Status - Public hearings were held on this proposed improvement project but this
project was not ordered due to lack of area support. This project is expected to
come up again in 1993.
F. County Road 17 South of Trunk Highway 5 to North of Future Lake Drive
West.
Status - This project was canceled by the Council in the spring of 1992. Carver 1
County is developing a capital improvement program. This project may be discussed
again in the future. 1
G. Trunk Sanitary Sewer and Watermain Facilities Including Lift Stations in the
Upper Bluff Creek District to Facilitate Proposed Office /Industrial /Single
Family Residential Developments Local to the Area.
Status - The project plans were prepared and a contract awarded for this
improvement project which began construction in late summer and is expected to
continue during the winter and be completed by late spring /early summer of 1993.
1
1
1
•
1
1
Don Ashworth, City Manager
December 14, 1992
Page 5
The following items are considered to be the top priority goals and objectives for the Public
Works Department in 1993:
' 1. Pavement Management - Develop an assessment policy for street reconstruction
projects within the City. The key question in terms of an assessment policy involves
whether or the not the City should be responsible for a portion of the costs involved
in the street reconstruction work. From one perspective, if the street has lived its
useful life expectancy of 20-25 years, then the cost to rebuild a new street should be
borne by the benefitting property owners as such when the road when was initially
t constructed. This would be analogous to buying a car which may last 10 years and
100,000+ miles. When its useful life is over the car is typically scrapped or junked
and a new one is purchased.
' From another perspective, some are of the opinion that once a street is built it is the
City's responsibility to provide funds from the general revenue to rehabilitate and
maintain the streets. This is the key issue that needs to be decided prior to
implementing the 5-year capital improvement program which was prepared in 1992.
It should also be noted that the state legislature is once again considering instituting
a street utility similar to that created for surface water management whereby once
a district is created, the revenues generated will be dedicated to aid in funding street
reconstruction -type improvement projects.
' 2. Comprehensive Sanitary Sewer and Watermain Policy Plans - Complete the
P rY cY P
' preparation of comprehensive sanitary sewer and watermain policy plans for the City.
Develop, approve and implement utility infrastructure capital improvement programs.
' 3. Solid Waste Collection - Investigate and review the concept of establishing solid
waste collection service contracts for the City. In the past legislative sessions there
have been a number of changes to the statutes regulating collection of solid waste
' in Minnesota cities. One of the mandates requires that all cities with a population
of 5,000 or more must insure that every residential household and business within the
city have a solid waste collection service in one of three ways: 1) city- provided
' collection, 2) city - organized collection or, 3) city- required proof of private contracts
for collection service. There are many pros and cons which will be brought to light
in association with each of these solid waste collection options; however, one
' problem which has become an ongoing annual problem for the City is waste
collection service during the weight restrictive times during the spring thaw. Many
of the haulers cannot provide their service to customers within the City and still meet
the weight restrictions imposed during the spring. One of the major concerns from
a public works standpoint is that the current solid waste service is an independent
and random service whereby these heavy vehicles are frequently on residential streets
Don Ashworth, City Manager 1
December 14, 1992
Page 6
(the same street possibly 5 times a week). The impact on the life of our City streets
is significant particularly during the spring thaw when the load carrying capabilities 1
of our streets are at their weakest. This is a critical issue that needs to be resolved.
4. Staffing Equipment and Space Allocation - Continue to acquire information in
developing staffing, equipment and space utilization plans for the Public Works
Department.
5. Project Management - Continue to provide project management of all public and
private development projects within the City. Specific projects which are known at
this time are as follows:
A. Preparation of plans and specifications for the Trunk Highway 5 Improvement
Project and north boulevard access road from County Road 17 to Trunk
Highway 41. Construction is expected to take place in 1996.
B. Trunk Highway 101 Realignment, Phase II (North Leg) - Administrate '
construction contract.
C. West 78th Street Detachment Project from Kerber Boulevard to County Road
17 and County Road 17 South to Trunk Highway 5 - Complete design and
project plans and specifications, administrate construction contract and
assessment hearing.
D. Minnewashta Parkway Road Improvement Project between Trunk Highway
7 and Trunk Highway 5 - Complete the installation of road improvements
consisting of curb and gutter, bituminous surfacing and trail installation and
administrate assessment hearing. '
E. Trunk Sanitary Sewer and Watermain Facilities in the Upper Bluff Creek
District, Phase I - Continue to administrate construction contract and have
these facilities on -line for service during the_summer of 1993.
F. Various Private Projects '
c: Engineering Department Staff '
Jerry Boucher, Utility Superintendent
Mike Wegler, Street Superintendent
Dale Gregory, Park Maintenance Superintendent
Harold Brose, Shop Superintendent
1
1
1
1
1
1
1
i ADMINISTRATION
1
1
1
1
1
1
1
1
1
1
1
1
1
1993 ADMINISTRATION GOALS
•
1
City Council/Manager
1. Assist with the City Council and staff goal setting session for 1993. Continue to follow
up with staff in providing status report updates to the City Manager on a timely basis
1 throughout the year (January - December).
Personnel/Administration
2. Complete a compensation program for meritorious employees for seniority with the city
(January - June).
' 3. Review and select a software program for the city's cafeteria plan (June - October).
4. Review the pros and cons of the LOGIS Health Care Program (January - December).
5. Review and update "performance review sheets" (January - December).
Communication
6. Coordinate the publication of the city's newsletter, expanding on the overall quality of
current events and the amount of graphics (January - December).
1 7. Complete City Safety Program manual.
1 Cable Administration
8. Continue to improve the amount and quality of cable programs provided by the City of
1 Chaska, School District 112, Triax Cable Company, and the Chanhassen Fire Department.
9. Continue to upgrade audio visual capabilities for the Council Chambers, community, and
1 City Hall. Upgrade microphones.
1
1
1
1
1
1
1993 HRA GOALS January, 1993 I
1. Highwav 101 Relocation Project 1
- Start construction of north leg of Highway 101 Project (June - November).
- Acquisition and demolition of the Apple Valley Red -E -Mix Plant (June -
I
September).
- Develop overall landscape/beautification plan for this intersection.
2. West 79th Street I
- Start construction of entry monument at Great Plains Boulevard and Market 1
Boulevard (June - August).
- Continue to market the remaining portion of land owned by the HRA east of
Americana Bank site (January - December). 1
3. Highway 5 Beautification/Landscape Corridor Project
- Complete Corridor Study with the University of Minnesota, Barton - Aschman, and
Corridor Study Committee. Provide quarterly updates to the HRA on progress I
(January - December).
4. Market Square Development
I
- Continue to assist in marketing Lots 2, 3, 4, and Outlot A (January - December).
5. Development of Downtown Park South of City Hall 1
- Continue negotiations on the acquisition of the old bank site property (January - I
June).
- Continue to finalize park plans (January - December).
6. Chanhassen Conference /Community Center Development I
- Establish a redevelopment contract with Bloomberg Companies, Inc. and Country
I
Suites of Chanhassen.
Preliminary schedule for design, plans, and construction of center:
1
a. Schematic design (January - February)
b. Plans and specifications (February - August)
1
c. Award of bids (September - October)
d. Start construction (October - November)
e. Grand opening (October 1994)
1
1
1
- Public hearing on the proposed center for citizen comments (February -
March).
7. Downtown Objectives
1 - Determine new library location (January - June).
Consider construction/location of senior housing project (January - December).
' - Construction of the recommended roadway design changes /traffic signals by
Strgar- Roscoe - Fausch for west (May - August).
' - Demolition of the Chanhassen Lawn and Sports building (February).
P g �'Y
1 - Close on the sale of land for Phase 11 of the Medical Arts building and start
construction (April - August).
8. Target
' - Continue condemnation proceedings on James property (January - May).
Finalize redevelopment agreement with Ryan Construction as the "Master
Redeveloper" for Outlot B.
9. Hanus Facility
- Review and approve landscaping/facade improvements to the Hanus facility
(January - September).
10. Review potential sites for a new Post Office.
1
1
1
1
1
1
1
1
1993 ECONOMIC DEVELOPMENT GOALS
1
1. Acquisition of parkland /trail easements from Chanhassen Business Center.
2. Continue to improve the city's overall tax base and expand employment opportunities
P Y P PP
within the city through the city's special assessment reduction program (January-
December).
3. Continue to participate with the Chanhassen Chamber of Commerce, citizen/business
groups, and neighborhood organizations (January - December).
4. Maintain inventory of commercial/industrial land and building space availability
(January- December ).
5. Work with the HRA and the Highway 5 Corridor Plan (January- December).
6. Acquisition of land for a new elementary school site.
7. Creation of a new TIF District for the new Opus Industrial Park at Highways 5 and 1
41.