B. 2013-2017 CIP ReviewBuilding Inspections
The capital improvement plan is a five -year projection of the amount of money the
Phone: 952.227.1180
MEMORANDUM
Fax: 952.227.1190
TO: Mayor
CITY OF
City Council
CHMNSEN
FROM: Greg Sticha, Finance Director 6,L7.
7700 Market Boulevard
PO Box 147
DATE: October 8, 2012 �-
Chanhassen, MN 55317
CAPITAL REPLACEMENT EQUIPMENT FUND
Finance
SUBJ: 2013 -2017 CIP Review
Administration
The city currently levies $800,000 per year for the Capital Replacement Equipment
Phone: 952.227.1100
Fund (400) to finance capital equipment purchases. In 2013, these purchases are
Fax: 952.227.1110
CAPITAL IMPROVEMENT PLAN
Building Inspections
The capital improvement plan is a five -year projection of the amount of money the
Phone: 952.227.1180
city will need to maintain its existing capital assets and add improvements or system
Fax: 952.227.1190
expansions when necessary. It is incumbent on the City Council and staff to exercise
Engineering
prudent stewardship over these capital assets. This plan will fully fund our capital
Phone: 952.227.1160
needs while maintaining existing services.
Fax: 952.227.1170
refurbish seats in fire engines and ladders $67,500 (EQ -054); and $50,000 for
.2277.1404 .1404
Fax: 952.2
CAPITAL REPLACEMENT EQUIPMENT FUND
Finance
replacement of SCBA equipment with 45- minute bottles replacing the current
Phone: 952.227.1140
The city currently levies $800,000 per year for the Capital Replacement Equipment
Fax: 952.227.1110
Fund (400) to finance capital equipment purchases. In 2013, these purchases are
Park & Recreation
estimated to be $829,500.
Phone: 952.227.1120
Fire Station No. 3 (MB -009) is now slated for 2015/2016 with $1 million in
Fax: 952.227.1110
Some highlights of capital replacement purchases planned for 2013 are: $206,000 for
Phone: 952.227.1300
the replacement of a plow truck (EQ -016); approximately $178,000 in various
Recreation Center
software, hardware and computer upgrades (EQ -013 & EQ -048); replacement of two
2310 Coulter Boulevard
public works trucks $76,000 (EQ -029); replacement of command vehicle 93 and
0 2
P952 Fax:
refurbish seats in fire engines and ladders $67,500 (EQ -054); and $50,000 for
.2277.1404 .1404
Fax: 952.2
Lyman Boulevard Phase II (ST -003) improvements are scheduled in 2014, for a total
Fax: 952.227.1110
replacement of SCBA equipment with 45- minute bottles replacing the current
Planning &
30- minute bottles (EQ -004).
Natural Resources
or utility costs associated with the project.
Phone: 952.227.1130
OTHER MAJOR CAPITAL PROJECTS
Fax: 952.227.1110
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
Fire Station No. 3 (MB -009) is now slated for 2015/2016 with $1 million in
Public Works
7901 Park Place
equipment and a $2 million building. Its construction may also be dependent on the
Phone: 952.227.1300
sale of the old public works building, the proceeds of which will be used to offset the
Fax: 952.227.1310
total cost. This project will be reviewed again as part of the fire study that is just
getting underway and will be discussed with the city council in early 2013.
Senior Center
Phone: 952.227.1125
Lyman Boulevard Phase II (ST -003) improvements are scheduled in 2014, for a total
Fax: 952.227.1110
cost of $8.54 million. Other agencies and development in that area will fund
Web Site
$6.8 million of this amount, with the remaining portion being paid with MSA funding
www.ci.chanhassen.mn.us
or utility costs associated with the project.
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
Mayor & City Council
2013 -2017 CIP Review
October 8, 2012
Page 2
Improvements to TH 101 from Lyman Boulevard to Pioneer Trail (ST -028) will take place in
2013 at a total cost of $11.9 million. The city's costs for this project total $775,000 for water
and sewer system improvements, and the remainder will be funded by assessments, contributions
from other agencies, or MSA funding.
As discussed at previous meetings in September, staff is recommending that a total of $2 million
be transferred into the Revolving Assessment Construction Fund. This money would be used for
an additional $1.8 million in road improvements in 2013 and 2015, and to complete a trail
connection from the Rice Marsh Lake area to the Eden Prairie trail system. The funds would
come from the cable television fund ($1.3 million) and capital replacement fund ($700,000).
There are a number of utility projects that are dependent on development. Each of these will be
evaluated on an annual basis and adjustments will be made to the CIP in future years as
development dictates, and will also be made in conjunction with our annual rate study.
Listed below are the capital items greater than $250,000 for 2013 that have not been discussed
earlier in this memo, and the related funding source:
Project
Funding Source
Amount
Pioneer Pass Neighborhood Park Phase I
Park Dedication Fund
$350,000
Lift Station #10 Improvements
Sanitary Sewer Fund
$360,000
TH 101 /Pleasant View Road & Trail Improvements
Other Agencies, MSA,
Utilities, & Park Dedication
$1,258,000
Annual Street Improvement Project
Revolving Assmt Const Fund
$950,000
Repaint Lake Lucy Water Stand Pipe
Water Utility Fund
$550,000
Staff will be looking for feedback on the capital items listed in the CIP document, and in
particular, for direction on changes to any of the capital items for 2013. The final version of the
2013 -2017 CIP will be adopted at the city council meeting on December 10, 2012.
In addition, staff will be reviewing the long -range revolving assessment construction fund, bond
tax levy spreadsheet, and the MSA funding and expense projection spreadsheet with the city
council on Monday.
ATTACHMENTS
1. 2013 -2017 Capital Improvement Plan.
2. Revolving Assessment Construction Fund.
3. Bond Tax Levies Spreadsheet.
4. MSA Funding Projection Spreadsheet.
Revolving Assessment Fund
2005 2011
Project Cost (Street Only)
Assessments 40%
City Share
Other project Costs
Tsfs in
Fund Bal - BOY Estimate for 2012** **
Levy
Repayment
Project Costs
Investable Balance
MVHC
Street Levy & Tsf
Interest
Fund Bal - EOY
Repayment Schedule
8 yr assmt @ 6%
Project Year 2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
1,700,000
1,695,000
1,400,000
2,255,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
1,500,000
(680,000)
(678,000)
(560,000)
(902,000)
(600,000)
(600,000)
(600,000)
(600,000)
(600,000)
(600,000)
(600,000)
(600,000)
1,020,000
1,017,000
840,000
1,353,000
900,000
900,000
900,000
900,000
900,000
900,000
900,000
900,000
(200,000)
(75,000)
2,000,000
-
1,133,539
385,450
1,399,230
1,150,684
232,370
(20,859)
(42,319)
(31,916)
(52,824)
(52,829)
(74,041)
366,371
437,842
130,680
444,410
450,192
431,698
670,538
664,293
659,378
660,978
653,293
1,114,690
1,111,790
627,842
737,346
823,528
879,726
815,680
809,235
847,040
821,253
840,556
827,652
815,052
821,472
(1,825,000)
(1,695,000)
(1,475,000)
(2,255,000) ,
(1,500,000)
(1,500,000)
(1,500,000)
(1,500,000)
(1,500,000)
(1,500,000)
(1,500,000)
(1,500,000)
374,223
1,358,476
1,117,169
225,602
(20,252)
(41,087)
(30,987)
(51,286)
(51,291)
(71,885)
355,700
799,633
11,227
40,754
33,515
6,768
(608)
(1,233)
(930)
(1,539)
(1,539)
(2,157)
10,671
23,989
385,450
1,399,230
1,150,684
232,370
(20,859)
(42,319)
(31,916)
(52,824)
(52,829)
(74,041)
366,371
823,622
23,000
23,000
77,297
.34,000
34,000
34,000
209,300
209,300
209,300
103,063
103,063
103,063
58,795
58,795
58,795
122,387
122,387
122,387
$77,297.00
77,297
77,297
$90,180.13
$109,504.44
109,504
$145,254.42
$109,182.37
209,300
77,297
103,063
103,063
109,504
58,795
58,795
58,795
122,387
122,387
122,387
77,297
77,297
77,297
109,504
109,504
109,504
109,200
109,200
109,200
$90,180.13
90,180
90,180
$145,254.42
145,250
$96,621.57
122,387
77,297
77,297
109,504
109,504
109,200
109,200
90,180
90,180
145,250
145,250
96,600
96,600
$96,621.57
96,600
$96,621.57
109,504
109,200 109,200
90,180 90,180
145,250 145,250
96,600 96,600
96,600 96,600
96,600 96,600
$96,621.57 96,600
$96,621.57
90,180
145,250
145,250
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
$96,621.57
96,600
$96,621.57
2024
2025
2026
2027
2028
2029
2030
1,500,000
1,600,000
1,600,000
1,700,000
1,700,000
1,800,000
1,800,000
(600,000)
(640,000)
(640,000)
(680,000)
(680,000)
(720,000)
(720,000)
900,000
960,000
960,000
1,020,000
1,020,000
1,080,000
1,080,000
823,622
1,242,626
1,570,480
1,909,963
2,165,244
2,433,854
2,620,298
1,109,990
1,109,290
1,104,590
1,106,490
1,099,090
1,098,590
1,098, 590
772,822
772,822
779,263
785,726
798,630
811,534
830,880
(1,500,000)
(1,600,000)
(1,600,000)
(1,700,000)
(1,700,000)
(1,800,000)
(1,800,000)
1,206,433
1,524,738
1,854,333
2,102,179
2,362,965
2,543,978
2,749,768
36,193
45,742
55,630
63,065
70,889
76,319
82,493
1,242,626
1,570,480
1,909,963
2,165,244
2,433,854
2,620,298
2,832,261
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
96,600
$96,621.57
96,600
96,600
96,600
96,600
96,600
96,600
$96,621.57
96,600
96,600
96,600
96,600
96,600
$103,063.00
103,063
103,063
103,063
103,063
$103,063.00
103,063
103,063
103,063
$109,504.44
109,504
109,504
$109,504.44
109,504
$115,945.88
City of Chanhassen, Minnesota
Bond Tax Levies
2006 -2029
"- These funds to be used to pay down the debt levy each of the next four years.
#p - The PW facility is for 8 Million and bonding for $7 Million of the 8 Million.
++ -The Fire Station Facility is now for $2.5 Million with the assumption of no land acquisition costs, building costing $2.0 million and .5 in equipment, the other .5 in equipment to be funded
by the Capital Replacement Fund. It also has the assumption of the sale of the PW facility at $1.7 million to be used for construction of the Fire Station, therefore bonding for only 800,000
-The 20018 debt service fund has sufficient fund balance due to prepaid specials, we are able to cancel the levy needed to pay the debt in 2008 8 2009.
It is our plan to use that excess levy for General Fund Operations rather than lower the use of Cash Reserves to keep the debt levy flat from the previous year.
an -The 2009A Refunded the 2005A Mndot loand and 2006A MUSA area improvements.
Debt Levies
2005 C Ref
1998A Paris
2002A
2010A
Subtotal of 2001C
2003A
2004A
Subtotal of
1999
20018 -
Subtotal of
2000
Subtotal of
Total
Year of
GO Park
GO Library
GO Refund
Market GO Equip
GO Equip
GO
GO
GO Impr
GO Impr
Spec Assmt
GO Pub
Other
General
Collection
Bonds
Bonds
2002A Lib
Value Levies Cans
Carts
Bonds
Levies
Bonds
Bonds
Levies
Proj
Levies
Bonded Debt
2006
634,800
486,700
1,121,500
138,814
345,800
484,614
100,000
100,000
122,048
122,048
1,828,162
2007
696,500
489,100
1,185,600
141,380
346,900
488,280
100,000
100,000
122,548
122,548
1,896,428
2008
695,900
490,700
1,186,600
138,173
346,700
484,873
100,000
100,000
122,703
122,703
1,894,176
2009
972,700
491,300
1,464,000
297,900
297,900
-
122,603
122,603
1,884,503
2010
496,400
496,400
122,195
122,195
618,595
2011
495,400
495,400
126,420
126,420
621,820
2012
351,648
351,648
351,648
2013
445,310
445,310
445,310
2014
448,880
448,880
448,880
2015
446,098
446,098
446,098
2016
452,792
452,792
452,792
2017
451,952
451,952
451,952
2018
461,297
461,297
461,297
2019
459,512
459,512
459,512
2020
457,412
457,412
457,412
2021
465.497
465,497
465.497
Totals
2,999,900
2 949 600
4,440,398
10 389 898
418,367
1,337,300
1 755 667
300 000
300,000
738,515
738,515
13.184,080
2009A @@
2005
2008 ##
2010 ++
2010
Total Levy
Exceesto"
Potential
Actual
212 Bonds
PW Facility
Fire Station
Audubon
Year
w/ CIP Est
Pay debt
Excess Levy
Levy
2006
80,000
2006
1,908,162
285,000
-
1,938,790
2007
80,000
2007
1,976,428
67,238
-
1,909,190
2006
285,000
2008
2,179,176
269,986
-
1,909,190
2009
285,000
2009
2,169,503
460,313
-
1,809,190
2010
337,500
599,300
253,795
2010
1,809,190
-
-
1,809,190
2011
336,800
594,000
256,570
2011
1,809,190
-
1,809.190
2012
335,900
593,800
437,842
2012
1,719,190
-
1,719,190
2013
550,000
593,200
130,680
2013
1,719,190
-
1,719,190
2014
233,800
592,100
444,410
2014
1,719,190
-
1,719,190
2015
232,300
590,600
55,000
2015
1,323,998
395,192
1,719,190
2016
240,700
594,000
2016
1,287,492
431,698
1,719,190
2017
596,700
2017
1,048,652
670,538
1,719,190
2018
593,600
2018
1,054,897
664,293
1,719,190
2019
600,300
2019
1,059,812
659,378
1,719,190
2020
600,800
2020
1,058,212
660,978
1,719,190
2021
600,400
2021
1,065,897
653,293
1,719,190
2022
604,500
2022
604,500
1,114,690
1,719,190
2023
607,400
2023
607,400
1,111,790
1,719,190
2024
609,200
2024
609,200
1,109,990
1,719,190
2025
609,900
2025
609,900
1,109,290
1,719,190
2026
614,600
2026
614,600
1,104,590
1,719,190
2027
612,700
2027
612,700
1,106,490
1,719,190
2028
620,100
2028
620,100
1,099,090
1,719,190
2029
620,600
2029
620,600
1,098,590
1,719,190
Totals
_ -
-
- -
-
-
2.267.000
730.000
12.047.800
-
1.578.297
48.420
29.807.177
1.082.536
"- These funds to be used to pay down the debt levy each of the next four years.
#p - The PW facility is for 8 Million and bonding for $7 Million of the 8 Million.
++ -The Fire Station Facility is now for $2.5 Million with the assumption of no land acquisition costs, building costing $2.0 million and .5 in equipment, the other .5 in equipment to be funded
by the Capital Replacement Fund. It also has the assumption of the sale of the PW facility at $1.7 million to be used for construction of the Fire Station, therefore bonding for only 800,000
-The 20018 debt service fund has sufficient fund balance due to prepaid specials, we are able to cancel the levy needed to pay the debt in 2008 8 2009.
It is our plan to use that excess levy for General Fund Operations rather than lower the use of Cash Reserves to keep the debt levy flat from the previous year.
an -The 2009A Refunded the 2005A Mndot loand and 2006A MUSA area improvements.
City of Chanhassen, City # 194
MSA CONSTRUCTION FUND ACCOUNT
Estimated Yearly Expenditures and Balances
9/27/2012
Year
2012
2013
2014
2015
2016
2017
2018
2019
Beginning Year Balance
Allocation
-$0.95
$671,941.00
- $120,001
$24,999
- $695,001
"_ " "" '-----
- $1315001
----- ---- =-=----
$1,625,001
$1,935,001
$1,245,00 1
-- ---- --- - -- -
Yearl Ex Expenditure
Y
----- ------ -- - --- --
$791,941.00
$680000
-- '- - - --- 35, -- --- --
$535000
0
$"
- - -- '- - - - - - ' - - --- - --
$1,400,000
$" ,"000
680
"'--------- --
- - - - --
69-0000
--- ------------- - - - - --
---- - - - - --
$69- --
--- -------
- "_ " ""
- _
- -- - - 200 - --
- '-- -- - ---
$690,000
- - - - - - - - - -
_? _ _
Lyman Advancement $477,561.95
,000
TH 101 /Pleasant View 285,000 -
Flying Cloud Drive (CSAH 61)?
$1 30_0_000
_ _ _ _ _ _ $_1_000 000
- - - - - - - - - _ _ "
$1000 000
_ _ _ " " " - - - '
- - - - - - - -
- - - - - - - - - -
Projects
_ _ _ H 5 _TE & HSIP 120,000 _ -
TH 101 Lyman to Pioneer Trail
-- - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - - - - - -
- - - - - - - - - -
- - - - - - - -
- - - - - - - - - -
n ROW $194_379.05
- _ -
I I
Trail (Local Matching Funds)
Lyman Blvd. Powers Blvd to
Park Road, Park Court
- ------n - - --
- - - Lyma
- " - -
----- --- -- ---- ------
' - - - - - - - - - - - -- - -
$250,000
Audubon Rd. City
ty Share
and Park Drive
Kerber Blvd.
Lake Drive
YearEndin
Bala---ce
$120,001
--- -- ---- --- --- - --
$24 ' 999
-- -- --- '-- - " " - -"
-- "-----------
G: \ENG \state- aid \MSA Projection Fund Balance.xlsx
City of Chanhassen, NW
Capital Improvement Program
2013 thm 2017
FUNDING SOURCE SUMMARY
Source 2013 2 0 1 4 2015
20 2 017 T otal
Arterial Collector Dvlpmnt Fee
AssessmenURevolving Assess Fund
Cable TV Fund
Capital Replacement Equipment Fund
GO Bonds
MSA
Other Agency Contribution
Park Dedication Fund
Sewer Utility Fund
Street Pavement Management
Surface Water Utility Fund
Tax Levy
Water Utility Fund
GRAND TOTAL 18,772,750 13,351,300 11,922,350 6,975,650 5,074,760 56,096,810
100,000
100,000
1,970,000
1,775,000
1,850,000
1,500,000
1,500,000
8,595,000
39,000
25,000
25,000
39,000
25,000
153,000
829,500
1,058,050
887,100
1,335,400
907,510
5,017,560
2,000,000
500,000
2,500,000
535,000
1,700,000
1,300,000
1,000,000
1,300,000
5,835,000
11,703,000
6,435,000
900,000
35,000
150,000
19,223,000
670,000
225,000
300,000
115,000
275,000
1,585,000
628,000
482,000
2,107,000
720,000
180,500
4,117,500
300,000
100,000
175,000
100,000
100,000
775,000
336,250
396,250
371,250
371,250
171,250
1,646,250
200,000
200,000
200,000
200,000
200,000
1,000,000
1,562,000
855,000
1,807,000
1,060,000
265,500
5,549,500
GRAND TOTAL 18,772,750 13,351,300 11,922,350 6,975,650 5,074,760 56,096,810
City of Chanhassen, MN
Capital Improvement Program
2013 a ru 2017
PROJECTS BY FUNDING SOURCE
Source Project# Priority 2013 2014 2015 2016 2017 Total
Arter Collector Dvlpmnt Fee
Lyman Boulevard Improvements ST -003 n/a 100,000 100,000
Arterial Collector Dvlpmnt Fee Total 100,000 100,000
Assessme nt/Revolving Assess Fund
Tennis Courts
PK &T -072
n/a
75,000
75,000
Lyman Boulevard Improvements
ST -003
n/a
300,000
300,000
Annual Street Improvement Program
ST -012
n/a
1,895,000
1,400,000
1,850,000
1,500,000
1,500,000
8,145,000
TH 101 Improvements - Lyman Blvd to Pioneer Trail
ST -028
n/a
75,000
75,000
Assessment/Revolving Assess Fund Total
1,970,000
1,775,000
1,850,000
1,500,000
1,500,000
8,595,000
Cable TV Fund
Audio/Visual Equipment
EQ -026
n/a
25,000
25,000
25,000
25,000
25,000
125,000
Citizen Survey
MB -023
n/a
14,000
14,000
28,000
Cable TV Fund Total
39,000
25,000
25,000
39,000
25,000
153,000
Capital Replacement Equipment Fund
Fire Dept.: SCBA Equipment
EQ -004
n/a
50,000
7,500
7,500
65,000
PPE: TurnouVHelmets
EQ -010
n/a
27,000
27,400
27,800
28,200
28,650
139,050
Computer /Network Equipment Purchases /Upgrades
EQ -013
n/a
88,150
96,600
84,250
85,250
83,510
437,760
Telecommunication Purchases /Upgrades
EQ -014
n/a
5,500
5,500
6,500
4,000
4,000
25,500
Community Dev.: Light Duty Trucks
EQ -015
n/a
29,000
30,000
30,000
89,000
Dump /Plow Truck Replacements /Additions
EQ -016
n/a
206,000
209,000
216,000
218,000
849,000
Line Striper
EQ -025
n/a
9,000
9,000
Light Duty Trucks: Public Works
EQ -029
n/a
76,000
42,000
118,000
Software Purchases
EQ -048
n/a
90,750
90,750
82,750
84,050
86,050
434,350
Computerized Records Retention System
EQ -049
n/a
6,500
10,000
14,500
9,400
7,000
47,400
Fire Vehicles
EQ -054
n/a
67,500
150,000
46,000
47,500
311,000
Aerial Photography for City GIS Datasets
EQ -055
n/a
11,800
11,800
11,800
35,400
Engineering Vehicles
EQ -065
n/a
25,000
25,000
Storage Area Network (SAN)
EQ -081
n/a
26,000
28,000
54,000
CSO Truck
EQ -083
n/a
30,000
30,000
Office Furniture
EQ -084
n/a
5,000
5,000
5,000
5,000
5,000
25,000
Equipment for New Fire Station
EQ -086
n/a
500,000
500,000
Excavator
EQ -091
n/a
10,000
10,000
Radios
EQ -094
n/a
22,500
350,000
372,500
Skid loader- Parks
EQ -095
n/a
43,000
43,000
Skid loader Tracks - Parks
EQ -096
nla
7,500
7,500
Loader Mounted Snow Blower
EQ -098
n/a
141,000
141,000
Light Duty Trucks - Parks
EQ -100
n/a
40,000
40,000
Mower Replacement - Park
EQ -104
n/a
95,000
90,000
185,000
Source Project# Priority 2013 2014 2015 2016 2017 Total
Skid loader - Street Department
EQ -105
n/a
43,000
43,000
Tractor Replacement - Park
EQ -106
n/a
30,000
30,000
Paint Striper
EQ -111
n/a
21,000
21,000
Brush Chipper
EQ -115
n/a
56,000
56,000
Berti Rear Mount Mower
EQ -117
n/a
10,000
10,000
Street Sweeper
EQ -118
n/a
281,000
281,000
Bobcat Asphalt Planer
EQ -123
n/a
15,000
15,000
Annual Skid Loader Replacement
EQ -124
n/a
3,000
3,000
3,000
3,000 3,000
15,000
Copier Replacements
EQ -127
n/a
14,000
15,000
18,000
15,000
62,000
City Hall Remodel
MB -010
n/a
125,000
125,000
Bluff CreeklRec Center Roof Repair /Boiler
MB -019
n/a
170,000
170,000
Fire Station - Purchases /Maintenance /Refurbishment
MB -020
n/a
45,000
45,000
Data Room Cooling
MB -021
n/a
33,000
33,000
Fence- Medical Arts Parking Lot
MB -022
n/a
8,500
8,500
Main Fire Station Parking Lot Drainage Imp
MB -025
n/a
9,600
9,600
Rec Center Entrance Improvements
PK &T -117
nla
25,000
25,000
County Rd 61 (old 212) Corridor Study
PL -002
nla
75,000
75,000
Capital Replacement Equipment Fund
829,500
1,058,050
887,100
1,335,400 907,510
5,017,560
Total
GO Bonds
Equipment for New Fire Station
EQ -086
n/a
500,000
500,000
Fire Station 3
MB -009
n/a
2,000,000
2,000,000
GO Bonds Total
2,000,000
500,000
2,500,000
MSA
West 78th St Streetlights
ST -001
nla
300,000
300,000
Lyman Boulevard Improvements
ST -003
n/a
1,700,000
1,700,000
Annual Street Improvement Program
ST -012
n/a
1,300,000
1,000,000 1,000,000
3,300,000
TH 101/Pleasant View Rd Intersection & Trail Imp
ST -027
n/a
285,000
285,000
TH 101 Improvements - Lyman Blvd to Pioneer Trail
ST -028
n/a
250,000
2 50,000
MSA Total
535,000
1,700,000
1,300,000
1,000,000 1,300,000
5,835,000
Other Agency Contribution
Lyman Boulevard Improvements
ST -003
n/a
6,400,000
6,400,000
TH 101 Corridor Preservation Planning
ST -017
n/a
225,000
225,000
TH 101 /Pleasant View Rd Intersection & Trail Imp
ST -027
n/a
738,000
738,000
TH 101 Improvements - Lyman Blvd to Pioneer Trail
ST -028
n/a
10,800,000
10,800,000
Lower Bluff Creek Sediment Improvements
SWMP -024
n/a
165,000
35,000
125,000
35,000 150,000
510,000
Cranes Vineyard Creek
SWMP -039
n/a
225,000
225,000
West Central Lotus Lake -Phase II
SWMP -046
n/a
325,000
325,0
Other Agency Contribution Total
11,703,000
6,435,000
900,000
35,000 150,000
19,223,00
Park Dedication Fund
Picnic Tables /Park Benches
PK &T -042
n/a
10,000
10,000
10,000
10,000 10,000
50,000
Trees
PK &T -043
n/a
15,000
15,000
15,000
15,000 15,000
75,000
Rice Marsh Lake Trail
PK &T -074
n/a
200,000
200,000
Pedestrian Trail to Arboretum
PK &T -098
n/a
275,000
275,000
Chanhassen Native Preserve Trail, Final Phase
PK &T -099
n/a
90,000
90,000
Pioneer Pass Neighborhood Park Development -Phase 1
PK &T -109
n/a
350,000
350,000
Source Project# Priority 2013 2014 2015 2016 2017 Total
Bandimere Community Park Expansion /Phase 1 PK &T -114 n/a 250,000 250,000
Riley Ridge Neighborhood Park Development -Phase 1 PK &T -115 n/a 200,000 200,000
TH 101 /Pleasant View Rd Intersection & Trail Imp ST -027 n/a 95,000 95,000
Park Dedication Fund Total 670,000 225,000 300,000 115,000 275,000 1,585,000
Se wer Utility Fund
Light Duty Trucks: Utilities
EQ -062
n/a
17,000
17,000
20,500
54,500
Excavator
EQ -091
n/a
30,000
30,000
Portable Generator - Utility Department
EQ -097
n/a
17,000
17,000
Vactor /SewerJetting Truck
EQ -110
n/a
325,000
325,000
Sewer Push Camera Replacement
EQ -129
n/a
11,000
11,000
Lift Station 24 Roof Replacement
MB -024
n/a
25,000
25,000
Inflow and Infiltration Abatement
SS -012
n/a
75,000
75,000
75,000
75,000
75,000
375,000
Sanitary Sewer Replacement
SS -014
n/a
75,000
300,000
75,000
300,000
40,000
790,000
Sanitary Lift Station Rehabilitation Program
SS -017
n/a
15,000
40,000
40,000
20,000
20,000
135,000
2010 MUSA Sanitary Lift Station
SS -020
n/a
1,900,000
1,900,000
Lift Station 10 Improvements
SS -023
n/a
360,000
360,000
Lyman Boulevard Improvements
ST -003
n/a
20,000
20,000
TH 101 Improvements - Lyman Blvd to Pioneer Trail
ST -028
n/a
75,000
75,000
Sewer Utility Fund Total
628,000
482,000
2,107,000
720,000
180,500
4,117,500
Street Pavement Management
TH 101 Corridor Preservation Planning
ST -017
n/a
75,000
75,000
Pavement Management
ST -018
n/a
100,000
100,000
100,000
100,000
100,000
500,000
TH 101 /Pleasant View Rd Intersection & Trail Imp
ST -027
n/a
90,000
90,000
Repaint TH 5 Signals
ST -029
n/a
110,000
110,000
Street Pavement Management Total
300,000
100,000
175,000
100,000
100,000
775,000
Surface Water Utility Fund
Excavator
EQ -091
n/a
30,000
30,000
TH 101 /Pleasant View Rd Intersection & Trail Imp
ST -027
n/a
50,000
50,000
Property Acquisition
SWMP -014
n/a
75,000
75,000
75,000
225,000
Street Improvement Projects - Storm Water Mgmt
SWMP -019
n/a
50,000
200,000
50,000
200,000
500,000
Lower Bluff Creek Sediment Improvements
SWMP -024
n/a
75,000
35,000
75,000
35,000
75,000
295,000
Stormwater Pond Improvements
SWMP -032
n/a
50,000
20,000
60,000
20,000
60,000
210,000
LID Implementation Project
SWMP -035
n/a
11,250
11,250
11,250
11,250
11,250
56,250
Cranes Vineyard Creek
SWMP -039
n/a
75,000
75,000
Storm Water Infrastructure Maintenance /Replacement
SWMP -045
n/a
25,000
25,000
25,000
25,000
25,000
125,000
West Central Lotus Lake -Phase II
SWMP -046
n/a
75,000
5,000
80,000
Surface Water Utility Fund Total
336,250
396,250
371,250
371,250
171,250
1,646,250
Tax Levy
Pavement Management
ST -018
n/a
200,000
200,000
200,000
200,000
200,000
1,000,000
Tax Levy Total
200,000
200,000
200,000
200,000
200,000
1,000,000
Water Utility Fund
Light Duty Trucks: Utilities
EQ -062
n/a
17,000
17,000
20,500
54,500
Excavator
EQ -091
n/a
30,000
30,000
Source Prqject# Priority 2013 2014 2015 2016 2017 Total
Vactor /SewerJet6ng Truck
EQ -110
Lyman Boulevard Improvements
ST -003
TH 101 Improvements - Lyman Blvd to Pioneer Trail
ST -028
Watermain Replacement
W -024
Pressure Reducing Station
W -027
Well Rehabilitation Program
W -032
Repaint Lake Lucy Water Stand Pipe
W -041
Well #15 Improvements
W -048
High Zone High Service Pump
W -050
78th Street Watermain Loop Improvements
W -055
MUSA Trunk Watermain Oversizing
W -056
Water Utility Fund Total
GRAND TOTAL 18,772,750 13,351,300 11,922,350 6,975,650 5,074,760 56,096,810
n/a
100,000
100,000
n/a
20,000
20,000
n/a
700,000
700,000
n/a
175,000
700,000
125,000
700,000
75,000
1,775,000
n/a
65,000
75,000
140,000
n/a
40,000
40,000
60,000
60,000
200,000
n/a
550,000
550,000
n/a
1,400,000
1,400,000
n/a
120,000
120,000
n/a
150,000
150,000
n/a
200,000
110,000
310,000
1,562,000
855,000
1,807,000
1,060,000
265,500
5,549,500
City of Chanhassen, MN
Capital Improvement Program
2013 thru 2017
DEPARTMENT SUMMARY
Department 2013 2014 2015 2016 2017 Total
Major Equipment
803,400
1,190,050
551,100
2,285,400
973,510
5,803,460
Municipal Buildings
110,100
2,295,000
14,000
25,000
2,444,100
Park & Trail Improvements
575,000
300,000
325,000
115,000
275,000
1,590,000
Planning
75,000
75,000
Sanitary Sewer Improvements
525,000
415,000
2,090,000
395,000
135,000
3,560,000
Street Improvements
15,463,000
10,240,000
3,750,000
2,800,000
3,100,000
35,353,000
Surface Water Management
451,250
401,250
1,046,250
406,250
321,250
2,626,250
Water System Improvements
845,000
805,000
1,790,000
960,000
245,000
4,645,000
TOTAL 18,772,750
13,351,300
11,922,350
6,975,650
5,074,760
56,096,810
City of Chanhassen, MN
Capital Improvement Program
2013 thru 2017
PROJECTS BY DEPARTMENT
Department Project# Priority 2013 2014 2015 2016 2017 Total
Major Equipment
Fire Dept.: SCBA Equipment
EQ -004
n/a
50,000
7,500
7,500
65,000
PPE: TumoutlHelmets
EQ -010
n/a
27,000
27,400
27,800
28,200
28,650
139,050
Computer /Network Equipment Purchases /Upgrades
EQ -013
n/a
88,150
96,600
84,250
85,250
83,510
437,760
Telecommunication Purchases /Upgrades
EQ -014
n/a
5,500
5,500
6,500
4,000
4,000
25,500
Community Dev.: Light Duty Trucks
EQ -015
n/a
29,000
30,000
30,000
89,000
Dump /Plow Truck Replacements /Additions
EQ -016
n/a
206,000
209,000
216,000
218,000
849,000
Line Striper
EQ -025
n/a
9,000
9 1 000
AudiolVisual Equipment
EQ -026
nla
25,000
25,000
25,000
25,000
25,000
125,000
Light Duty Trucks: Public Works
EQ -029
n/a
76,000
42,000
118,000
Software Purchases
EQ -048
n/a
90,750
90,750
82,750
84,050
86,050
434,350
Computerized Records Retention System
EQ -049
n/a
6,500
10,000
14,500
9,400
7,000
47,400
Fire Vehicles
EQ -054
n/a
67,500
150,000
46,000
47,500
311,000
Aerial Photography for City GIS Datasets
EQ -055
n/a
11,800
11,800
11,800
35,400
Light Duty Trucks: Utilities
EQ -062
n/a
34,000
34,000
41,000
109,000
Engineering Vehicles
EQ -065
n/a
25,000
25,000
Storage Area Network (SAN)
EQ -081
n/a
26,000
28,000
54,000
CSO Truck
EQ -083
n/a
30,000
30,000
Office Furniture
EQ -084
nla
5,000
5,000
5,000
5,000
5,000
25,000
Equipment for New Fire Station
EQ -086
n/a
1,000,000
1,000,000
Excavator
EQ -091
n/a
100,000
100,000
Radios
EQ -094
n/a
22,500
350,000
372,500
Skid loader - Parks
EQ -095
n/a
43,000
43,000
Skid loader Tracks - Parks
EQ -096
n/a
7,500
7,500
Portable Generator - Utility Department
EQ -097
n/a
17,000
17,000
Loader Mounted Snow Blower
EQ -098
n/a
141,000
141,000
Light Duty Trucks - Parks
EQ -100
n/a
40,000
40,000
Mower Replacement - Park
EQ -104
n/a
95,000
90,000
185,000
Skid loader- Street Department
EQ -105
n/a
43,000
43,000
Tractor Replacement - Park
EQ -106
n/a
30,000
30,000
Vactor /Sewer Jetting Truck
EQ -110
n/a
425,000
425,000
Paint Striper
EQ -111
n/a
21,000
21,000
Brush Chipper
EQ -115
n/a
56,000
56,000
Berti Rear Mount Mower
EQ -117
n/a
10,000
10,000
Street Sweeper
EQ -118
n/a
281,000
281,000
Bobcat Asphalt Planer
EQ -123
n/a
15,000
15,000
Annual Skid Loader Replacement
EQ -124
n/a
3,000
3,000
3,000
3,000
3,000
15,000
Copier Replacements
EQ -127
n/a
14,000
15,000
18,000
15,000
62,000
Sewer Push Camera Replacement
EQ -129
n/a
11,000
11,000
Major Equipment Total
803,400
1,190,050
551,100
2,285,400
973,510
5,803,460
Municipal Buildings
Fire Station 3
MB -009
n/a
2,000,000
2,000,000
City Hall Remodel
MB -010
n/a
125,000
125,000
Department Project# Priority 2013 2014 2015 2016 2017 Total
Bluff Creek/Rec Center Roof Repair /Boiler
MB -019
n/a
170,000
170,000
Fire Station - Purchases /Maintenance /Refurbishment
MB -020
n/a
45,000
45,000
Data Room Cooling
MB -021
n/a
33,000
33,000
Fence- Medical Arts Parking Lot
MB -022
n/a
8,500
8,500
Citizen Survey
MB -023
n/a
14,000
14,000
28,000
Lift Station 24 Roof Replacement
MB -024
n/a
25,000
25,000
Main Fire Station Parking Lot Drainage Imp
MB -025
n/a
9,600
9,600
Municipal Buildings Total
110,100
2,295,000
14,000
25,000
2,444,100
Park & Trail Improvements
Picnic Tables /Park Benches
PK &T -042
n/a
10,000
10,000
10,000
10,000
10,000
50,000
Trees
PK &T -043
n/a
15,000
15,000
15,000
15,000
15,000
75,000
Tennis Courts
PK &T -072
n/a
75,000
75,000
Rice Marsh Lake Trail
PK &T -074
n/a
200,000
200,000
Pedestrian Trail to Arboretum
PK &T -098
n/a
275,000
275,000
Chanhassen Native Preserve Trail, Final Phase
PK &T -099
n/a
90,000
90,000
Pioneer Pass Neighborhood Park Development -Phase 1
PK &T -109
n/a
350,000
350,000
Bandimere Community Park Expansion /Phase 1
PK &T -114
n/a
250,000
250,000
Riley Ridge Neighborhood Park Development -Phase 1
PK &T -115
n/a
200,000
200,000
Rec Center Entrance Improvements
PK &T -117
n/a
25,000
25,000
Park & Trail Improvements Total
575,000
300,000
325,000
115,000
275,000
1,590,000
Planning
County Rd 61 (old 212) Corridor Study
PL -002
n/a
75,000
75,000
Planning Total
75,000
75,000
Sanitary Sewer Improvements
Inflow and Infiltration Abatement
SS -012
n/a
75,000
75,000
75,000
75,000
75,000
375,000
Sanitary Sewer Replacement
SS -014
n/a
75,000
300,000
75,000
300,000
40,000
790,000
Sanitary Lift Station Rehabilitation Program
SS -017
n/a
15,000
40,000
40,000
20,000
20,000
135,000
2010 MUSA Sanitary Lift Station
SS -020
n/a
1,900,000
1,900,000
Lift Station 10 Improvements
SS -023
n/a
360,000
360,000
Sanitary Sewer Improvements Total
525,000
415,000
2,090,000
395,000
135,000
3,560,000
Street Improvements
West 78th St Streetlights
ST -001
nla
300,000
300,000
Lyman Boulevard Improvements
ST -003
n/a
8,540,000
8,540,000
Annual Street Improvement Program
ST -012
n/a
1,895,000
1,400,000
3,150,000
2,500,000
2,500,000
11,445,000
TH 101 Corridor Preservation Planning
ST -017
n/a
300,000
300,000
Pavement Management
ST -018
n/a
300,000
300,000
300,000
300,000
300,000
1,500,000
TH 101/Pleasant View Rd Intersection & Trail Imp
ST -027
n/a
1,258,000
1,258,000
TH 101 Improvements - Lyman Blvd to Pioneer Trail
ST -028
n/a
11,900,000
11,900,000
Repaint TH 5 Signals
ST -029
n/a
110,000
110,000
Street Improvements Total
15,463,000
10,240,000
3,750,000
2,800,000
3,100,000
35,353,000
Surface Water Management
Property Acquisition
SWMP -014
n/a
75,000
75,000
75,000
225,000
Street Improvement Projects - Storm Water Mgmt
SWMP -019
nla
50,000
200,000
50,000
200,000
500,000
Lower Bluff Creek Sediment Improvements
SWMP -024
n/a
240,000
70,000
200,000
70,000
225,000
805,000
Stormwater Pond Improvements
SWMP -032
n/a
50,000
20,000
60,000
20,000
60,000
210,000
Department Project# Priority 2013 201 2 2016 2017 Total
LID Implementation Project
SWMP -035
Cranes Vineyard Creek
SWMP -039
Storm Water Infrastructure Maintenance /Replacement
SWMP -045
West Central Lotus Lake -Phase II
SWMP -046
Surface Water Management Total
25,000 25,000 25,000
25,000 25,000
125,000
Water System Improvements
Watermain Replacement
W -024
Pressure Reducing Station
W -027
Well Rehabilitation Program
W -032
Repaint Lake Lucy Water Stand Pipe
W -041
Well #15 Improvements
W -048
High Zone High Service Pump
W -050
78th Street Watermain Loop Improvements
W -055
MUSA Trunk Watermain Oversizing
W -056
Water System Improvements Total
GRAND TOTAL
n/a
11,250 11,250 11,250
11,250 11,250
56,250
n/a
300,000
1,775,000
300,000
n/a
25,000 25,000 25,000
25,000 25,000
125,000
nla
400,000
5,000
405,000
40,000
451,250 401,250 1,046,250
406,250 321,250
2,626,250
n/a
175,000
700,000
125,000
700,000
75,000
1,775,000
n/a
65,000
75,000
140,000
nla
40,000
40,000
60,000
60,000
200,000
nla
550,000
550,000
n/a
1,400,000
1,400,000
n/a
120,000
120,000
nla
150,000
150,000
n/a
200,000
110,000
310,000
845,000
805,000
1,790,000
960,000
245,000
4,645,000
18,772,750 13,351,300 11,922,350 6,975,650 5,074,760 56,096,810
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -004
Project Name Fire Dept.: SCBA Equipment
Account #1 400 - 4115 -4705
Account #2
Account #3
Account #4
Department Major Equipment
Contact John Wolff
Type
Equipment
Useful Life
20 years
Category
Fire
Priority
n/a
Description Total Project Cost: $174,600
This program is to provide additional and/or replacement SCBA air bottles, SCBA face masks, and upgrades to SCBA air packs as needed. We
will also be replacing 30 minute air bottles with 45 minute bottles.
Justification
Firefighting is a very rigorous and demanding activity that is performed in an environment of extremes. The periodic replacement and/or additions
to SCBA equipment is required to maintain current quantities through replacement of damaged or destroyed equipment and to equip new
placing existing 30 minute bottles with 45 minute bottles extends work time and allows for additional time to exit the hazard zone. A portion of
cost of the 45 minute bottles will be offset by the sale of the 30 minute bottles.
Prior
109,600
Total
Expenditures 2013 2014 2015 2016 2017 To
Equipment 50,000 7,500 7,500 65,000
Total 50,000 7,500 7,500 65,000
Prior Funding Sources
2013 2014
2015 2016
2017
Total
109,600 Capital Replacement Equipme
50,000
7,500
7,500
65,000
Total Total
50,000
7,500
7,500
65,000
Budget Impact/Other
Chere should be no operational impact from this purchase. The current maintenance budget will accommodate for this addition.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -010
Project Name PPE: Turnout/Helmets
Account #1 400 - 4105 -4705
Account #2
Account #3
Account #4
Department
Major Equipment
Contact
John Wolff
Type
Equipment
Useful Life
5 -7 years
Category
Fire
Priority
n/a
Description Total Project Cost: $240,550
This is for the purchase of PPE (turnout gear) to meet the NFPA 1851 standard, along with the replacement of turnout gear that has reached its
average service life of 5 to 7 years. The department will also provide new members with turnout gear after they complete their probationary
period. Funding for turnout gear of the new firefighters to staff station 3 in 2015 will be funded out of the station 3 equipment fund.
Justification
Turnout gear lasts approximately 5 -7 years on average.
Prior Expenditures
101,500 Maintenance
Total
27,000
27,400
27,800
28,200
28,650
139,050
Total 27,000
27,400
27,800
28,200
28,650
139,050
28,650
139,050
Total Total
27,000
27,400
Prior Funding Sources
2013
2014
2015
2016
2
Total
101,500 Capital Replacement Equipme
27,000
27,400
27,800
28,200
28,650
139,050
Total Total
27,000
27,400
27,800
28,200
28,650
139,050
2013 2014 2015 2016 2017 Total
Budget Impact/Other
Phere should be no operational impact from this purchase. The current maintenance budget will accommodate for this addition.
Capital Improvement Program 2013 thru 2017 Department Major Equipment
City of Chanhassen, MN Contact Richard Rice
Project # EQ -013
Project Name Computer/Network Equipment Purchases/Upgrades
Account #1 400 - 4126 -4703
Account #2
Account #3
Account #4
Type Equipment
Useful Life 3 -8 years
Category Administration
Priority n/a
Total Project Cost: $917,110
the purchase of replacement user and network computer, printer, peripherals, and networking hardware. The replacement schedule was
d in 1999 and is subject to modification by the MIS Coordinator with the approval of the City Manager and department heads.
Justification
Budgeting and purchasing computer equipment through this project allows the City greater flexibility to direct equipment to where it is needed the
most, rather than in individual budgets. The replacement schedule was developed by the MIS Coordinator in 1999 and approved by the 1999
Council appointed IT Task Force. Expenditures in the 2013 budget requests are for the replacement of one domain controller, 1 network switch, 2
network attached storage servers, 3 workstations, 10 desktop PC's and 5 notebook PC's. Most of the equipment being replaced will be recycled
and re- issued to City staff. The oldest equipment in the inventory will be sold on the City public surplus auction site.
Prior Expenditures
2013
2014
2015
2016
2017
Total
F -- 4 - 79 — ,35 - 0 - 1 Office Equipment
88,150
96,600
84,250
85,250
83,510
437,760
Total
Total 88,150
96,600
84,250
85,250
83,510
437,760
Prior
479,350
Total
Funding Sources 2013 2014 2015 2016 2017 Total
Capital Replacement Equipme 88,150 96,600 84,250 85,250 83,510 437,760
Total 88,150 96,600 84,250 85,250 83,510 437,760
Budget Impact/Other
Most items purchased for this account come with a 1 to 3 year warranty. Repairs to items are done by MIS staff after the warranty period expires.
Spare parts or outside repairs are funded out of 101 -1160 -4530 (Repair & Maintenance - Equipment) or 101- 1160 -4300 (Consulting).
Capital Improvement Program 2013 rhru 2017
City of Chanhassen, MN
Project # EQ -014
Project Name Telecommunication Purchases/Upgrades
Account #1 400 -4101 -4703
Account #2
Department Major Equipment
Contact Richard Rice
Type
Equipment
Useful Life
10 years
Category
Administration
Priority
n/a
Description I Total Project Cost: $98,700
['his project funds the expansion and upgrades to the City telephone systems, excluding cellular equipment and service which remains an
ndividual department budget item. The current City telephone system provides phone service for City Hall, the Library, Public Works, the
tecreation Center, Fire Station 1, and the Water Treatment Plant.
Justification
A central PBX system simplifies the management of phone services and allows for the integration of phone services with other City applications
such as unified messaging and fax services. The PBX system was replaced with a Mitel 5000 in 2012. Additional IP and digital handsets will be
ordered as replacements for existing Intertel phones in 2013 -2014. New IP phones in 2015 will be for projected Fire Station 3.
Prior Expenditures
73,200 Office Equipment
Total
2013
2014
2015
2016
2017
Total
5,500
5,500
6,500
4,000
4,000
25,500
Total 5,500
5,500
6,500
4,000
4,000
25,500
Prior Funding Sources
73,200 Capital Replacement Equipme
Total Total 5,500 5,500 6,500 4,000 4,000 25,500
Account #3
Account #4
2013 2014
5,500 5,500
2015 2016
6,500 4,000
2017 Total
4,00 25,500
Budget Impact/Other
vlaintenance for the replacement telephone system will continue to be funded out of the MIS department services budget after the expiration of the
varranty period.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -015
Project Name Community Dev.: Light Duty Trucks
Account H1 400 - 4107 -4704
Account #2
Account #3
Account t4
Department Major Equipment
Contact PaulOehme
Type Vehicles
Useful Life Unassigned
Category Community Development
Priority n/a
Total Project Cost: $173,000
purchases are consistent with the Vehicle Replacement Schedule. Replacement units are generally purchased early in the year to
modate the time frames established by Hennepin County and the State of Minnesota Cooperative Purchasing Program.
15 - #603 2001 Ford Ranger Pickup
16 - #604 2002 Ford Ranger Pickup
17 - #6112004 Dodge Dakota
Justification
Chese vehicles are used to provide building inspection services throughout the community. The average replacement age is over 10 years.
Prior Expenditures
84,000 Vehicles
Total
2013 2014 2015
2016
2017
Total
29,000
30,000
30,000
89,000
Total 29,000
30,000
30,000
89,000
Prior Funding Sources
84,000 Capital Replacement Equipme
Total Total 29,000 30,000 30,000 89,000
2013 2014 2015 2016 2017 Total
29,000 30,000 30,000 89,000
Budget Impact/Other
These purchases will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the vehicles replaced.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project it EQ -016
Project Name Dump/Plow Truck Replacements /Additions
Account #1 400 - 4108 -4704
Account #2
Account #3
Account #4
Department Major Equipment
Contact Paul Oehme
Type
Vehicles
Useful Life
Unassigned
Category
Street Equipment
Priority
n/a
Total Project Cost: $1,368,800
These purchases are required to maintain a reliable truck fleet. Costs include truck chassis, dump box, hydraulic system, snow wing, snow plow
and sander. Truck chassis costs are higher due to new federal mandated anti -lock braking requirements effective since 2000. These vehicles are
purchased using either the Hennepin County or State of MN cooperative bid systems. Orders for truck chassis are typically required to be placed
up to one year in advance of delivery.
Replacement schedule is as follows:
2013 - #120 1995 Ford LS8000 Dump/Plow Truck
2014 - # 121 1995 Ford LS8000 Dump/Plow Truck
2016 - # 122 1996 Ford LS8000 Dump/Plow Truck
2017 - # 123 1997 Ford LS8000 Dumi)/Plow Truck
Justification
These vehicles are used to provide a variety of maintenance services throughout the community including winter response for plowing and hauling
snow. The average replacement age is 18.5 years. Winter emergency service necessitates these vehicles be reliable and dependable. Growth in the
community creates additional work for these trucks. These vehicle purchases are consistent with the Vehicle Replacement Schedule and are
purchased through MnDot State contracts..
Prior
519,800
Total
Expenditures 2013 2014 2015 2016 2017 Total
Vehicles
206,000 209,000 216,000 218,000 849,000
Total 206,000 209,000 216,000 218,000 849,000
Prior
519,800
Total
Funding Sources 2013 2014 2015 2016 2017 Total
Capital Replacement Equipme 206,000 209,000 216,000 218,000 849,000
Total 206,000 209,000 216,000 218,000 849,000
Budget Impact/Other
i'hese purchases will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the vehicles replaced.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, XW
Project # EQ -025
Project Name Line Striper
Account #1 400 - 0000 -4705 Account #3
Account #2 Account #4
Description
'rovides for the replacement of an existing line- striping machine.
!014 - 1994 Graco GM5000 Line Striper 5 hp
Department
Major Equipment
Contact
Paul Oehme
Type
Equipment
Useful Life
Unassigned
Category
Street Equipment
Priority
n/a
Total Project Cost: $9,000
Justification
This machine is used to paint pavement markings and stripe lanes on roads. This purchase will ensure timely and reliable pavement marking
operations. The purchase is consistent with the Equipment Replacement Schedule,
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 9,000 9,000
Total 9,000 9,000
Funding Sources 2013 2014 2015 2016 2017 Total
Capital Replacement Equipme 9,000 9,000
Total 9,000 9,000
Budget Impact/Other
This purchase will include a limited warranty.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, NIN
Project # EQ -026
Project Name AudioNisual Equipment
Account #1 210 - 0000 -4705 Account #3
Account #2 Account #4
Desc
Provides for the systematic maintenance and upgrading of audio /visual equipment.
Justification
The original AN equipment was purchased in 1989, with the upgrades in 1994 and 2008.
Prior Expenditures
50,000 Maintenance
Total
Prior Funding Sources
50,000 Cable TV Fund
Total
Department
Major Equipment
Contact
Laurie Hokkanen
Type
Equipment
Useful Life
Unassigned
Category
Administration
Priority
n/a
Total Project Cost: $175,000
2013 2014 2015 2016 2017 Total
25,000 25,000 25,000 25,000 25,000 125,000
Total 25,000
25,000
25,000
25,000
25,000
125,000
2013
2014
2015
2016
2017
Total
25,000 25,000 25,000 25,000 25,000 125,000
Total 25,000 25,000 25,000 25,000 25,000 125,000
Budget Impact/Other
Phis purchase will include a limited warranty. In 2008, a major remodeling including cameras, display screens, AN control systems, and Ch 8
nanagement was undertaken. Future upgrades include expanding access to programming to those without access to cable, and continued
enhancement of the live and broadcast experience.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -029
Project Name Light Duty Trucks: Public Works
Account #1 400 - 4120 -4704
Account #2
Account #3
Account #4
Department Major Equipment
Contact PaulOehme
Type
Vehicles
Useful Life
Unassigned
Category
Street Equipment
Priority
n/a
Description Total Project Cost: $151,000
Provides for schedule7 replacement of light duty trucks in the street and garage departments. Replacement units are generally purchased early in
the year in order to accommodate the time frames established by Hennepin County and the State of MN Cooperative Purchasing Program.
2013 - #110 1996 Chevrolet 3/4 ton 4x4 ($38,000)
2013 - #125 1999 Dodge 3/4 ton 4x4 with plow ($38,000)
2016 - #112 2002 Chevrolet 3/4 ton with plow ($42,000)
Justification
These vehicles are used for a variety of services throughout the community. The average replacement age is 13 years. These purchases are
consistent with the Vehicle Replacement Program.
Prior Expenditures
2013 2014 2015
2016 2017
Total
3 Vehicles
76,000
42,000
118,000
Total
Total 76,000
42,000
118,000
Prior Funding Sources
2013 2014 2015
2016 2017
Total
33,000 Capital Replacement Equipme
76,000
42,000
118,000
Total Total
76,000
42,000
118,000
B udget Imp act/Ot h e r
These purchases will include a limited warranty and will reduce annual maintenance and repair costs as compared to the vehicles replaced.
Capital Improvement Program 2013 rhru 2017
City of Chanhassen, MN
Project # EQ -048
Project Name Software Purchases
Account #1 400 -4117 -4703
Account #2
Account #3
Account #4
Department Major Equipment
Contact Richard Rice
Type Equipment
Useful Life 3 -6 years
Category Administration
Priority n/a
Description Total Project Cost: $734,540
This project funds the purchase of software for all City departments that is not associated with a specific, individual project. Most annual software
support and license renewal fees are funded out of account 101 -1160 -4300. Some reoccurring software costs were moved to this account in 2010.
Justification
The major portion of funds requested for this project are for Microsoft software purchases. In 2007, the City joined the Microsoft Office
Enterprise Agreement for the State of Minnesota. Microsoft Office is the standard desktop software application for all City users. Participating in
the state agreement allows the City to spread the cost of the product over a period of six years in which there are no additional fees for product
upgrades. Additional Microsoft Server licenses are proposed to update existing Windows Server 2000 and 2003 licenses. Some reoccurring
software costs were moved to this account in 2010. The City is participating in a joint software licensing agreement with Carver County and
several other cities for ESRI GIS software, which is funded from this account.
Prior
300,190
Total
Expenditures 2013 2014 2015 2016 2017 Total
Office Equipment 90,750 90,750 82,750 84,050 86,050 434,350
Total 90,750 90,750 82,750 84,050 86,050 434,350
Prior Funding Sources
2013
2014
2015
2016
2017
Total
300,190 Capital Replacement Equipme
90,750
90,750
82,750
84,050
86,050
434,350
Total Total
90,750
90,750
82,750
84,050
86,050
434,350
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -049
Project Name Computerized Records Retention System
Account #1 400 - 4124 -4703 Account #3
Account #2 Account #4
Description
Department Major Equipment
Contact Richard Rice
Type Equipment
Useful Life 3 -5 Years
Category Administration
Priority n/a
Total Project Cost: $115,400
This project originally funded the purchase of an electronic records retention system in 2002. Laserfiche was the vendor chosen for the project.
This project is now used to fund its expansion and the replacement costs for associated scanning equipment, which have an useful life expectancy
of 3 to 5 years. Additional software modules are proposed for later years to allow for managing retention policy compliance and to integrate with
other City application software.
Justification
This system allows for quick and simultaneous retrieval of documents from any computer on the City network. Both physical document storage
space and the occurrence of lost or misfiled documents will be significantly reduced. In addition, documents specified for public access can be
easily made available to residents and constituents from any internet capable computer. An addition of client licenses is planned for 2013, along
with the replacement of 1 production scanner.
Prior
Expenditures
2013
2014
2015
2016
2017
Total
68,000
Office Equipment
6,500
10,000
14,500
9,400
7,000
47,400
Total
Total
6,500
10,000
14,500
9,400
7,000
47,400
Prior
Funding Sources
2013
2014
2015
2016
2017
Total
68,000
Capital Replacement Equipme
6,500
10,000
14,500
9,400
7,000
47,400
Total
Total
6,500
10,000
14,500
9,400
7,000
47,400
Budget Impact/Other
and repairs are funded out of account 101- 1160 -4300.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -054
Project Name Fire Vehicles
Account N1 400 -4135 -4704
Account #2
Account #3
Account #4
Department
Major Equipment
Contact
John Wolff
Type
Vehicles
Useful Life
10 -15 years
Category
Fire
Priority
n/a
cription Total Project Cost: $579,000
item allows for the replacement of existing equipment. Vehicles are purchased off either the Hennepin County or State of Minnesota
erative bid. Orders are typically required to be placed up to one (1) year in advance of delivery.
Justification
As vehicles age they become less reliable and require more costly maintenance. Vehicles proposed for replacement in this budget are:
2013 - Replace 1988 Chevy Truck, Command Vehicle 3 ($45,000)
2013 - Refurbish seats in Engine 12, Engine 21 and Ladder 11 ($22,500)
2014 - Refurbish Rescue 12
2015 - Replace 2004 Dodge Durango, Command Vehicle 1
2016 - Replace 2004 Dodge Durango, Command Vehicle 2
Prior Expenditures
2013
2014
2015
2016 2017
Total
f - 268,666 - 1 Vehicles
67,500
150,000
46,000
47,500
311,000
Total
Total 67,500
150,000
46,000
47,500
311,000
Prior Funding Sources
2013
2014
2015
2016 2017
Total
F - 268,666 1 Capital Replacement Equipme
67,500
150,000
46,000
47,500
311,000
Total Total
67,500
150,000
46,000
47,500
311,000
Budget Impact/Other
These purchases will include a limited warranty and will reduce the annual maintenance and repair costs.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -055
Project Name Aerial Photography for City GIS Datasets
Account #1 400 - 0000 -4752
Account #2
Account #3
Account #4
Department Major Equipment
Contact Richard Rice
Type Improvement
Useful Life 2 -3 years
Category Administration
Priority n/a
Total Project Cost: $99,650
This project funds the aerial photography for the integration with the City's existing GIS datasets. The City is participating with Carver County
and several other cities and counties in a joint project to purchase services and data. An initial joint aerial flyover for high resolution orthographic
imagery data was conducted in April of 2005 and was scheduled to be re -flown every three years. The schedule was revised as needed to
accommodate budget changes and to allow for a collaborative project. A County/City aerial flyover for high resolution photography was
completed in 2011. A separate flight will be done in 2014 and again in 2017 to update the Pictometry oblique photography. These costs will be
spread over two years.
Justification
City Planners, Engineers and Utility staff use this data in conjunction with other GIS datasets to help resolve geographical issues with residents and
contractors without repeated site visits. It is used in nearly every scheduled staff meeting and has proven useful to the Sheriffs Office and fire
department when conducting area searches. In 2008, Carver County chose a new vendor ( Pictometry), which added a three dimensional view to
mapping data. The Pictometry solution provides the ability for staff to view each side of buildings and includes a toolset which allows for accurate
measurement of areas and lines. Enhanced map layers (Planometrics), created from the aerial data collected is also used by staff to measure and
display hard surface coverage such as driveways, parking lots and others.
Prior
64,250
Total
Total 11,800 11,800 11,800 35,400
Prior Funding Sources 2013
2014
2015 2016
2017
T
64,250 Capital Replacement Equipme
11,800
11,800
11,800
35,400
Total Total
11,800
11,800
11,800
35,400
Expenditures 2013 2014 2015 2016 2017 Total
Maintenance 11,800 11,800 11,800 35,400
Budget Impact
Jo operational impact is expected.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -062
Project Name Light Duty Trucks: Utilities
Account #1 700 - 7025 -4704 Account #3
Account #2 701- 7025 -4704 Account #4
Description
Fhis allows for replacement of existing vehicles in the Water and Sewer department.
!013 - #316 1997 Chevrolet 3/4 ton pickup
!015 - #3012002 Chevrolet 3/4 ton pickup
!017 - #3212004 Chevrolet 3/4 ton pickup
Justification
Fhis replaces pickups in accordance with the vehicle replacement plan.
Prior Expenditures
218,000 Vehicles
Total
34,000 34,000 41,000 109,000
Total 34,000 34,000 41,000 109,000
Prior
Funding Sources
2013 2014
2015 2016
2017
Total
218,000
Sewer Utility Fund
17,000
17,000
20,500
54,500
Total
Water Utility Fund
17,000
17,000
20,500
54,500
Total 34,000
34,000
41,000
109,000
Department
Major Equipment
Contact
Paul Oehme
Type
Vehicles
Useful Life
Unassigned
Category
Utilities
Priority
n/a
Total Project Cost: $327,000
2013 2014 2015 2016 2017 Total
Budget Impact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -065
Project Name Engineering Vehicles
Department
Major Equipment
Contact
Paul Oehme
Type
Vehicles
Useful Life
Unassigned
Category
Street Equipment
Account #1 400 - 0000 -4704 Account 93 Priority n/a
Account #2 Account #4
Description Total Project Cost: $60,000
Fhe Crown Victoria was purchased in 1993 and is used for general transportation for City Hall employees and site inspections.
Justification
Chis replacement is in accordance with the vehicle replacement plan.
Prior Expenditures
35,000 Vehicles
Total
25,000 25,000
Total 25,000 25,000
Prior Funding Sources 2013 2014 2015 2016 2017 Total
35,000 Capital Replacement Equipme 25,000 25,000
Total Total 25,000 25,000
2013 2014 2015 2016 2017 Total
Budget Impact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -081
Project Name Storage Area Network (SAN)
Account #1 400 -4126 -4703
Account #2
Account #3
Account #4
Department Major Equipment
Contact Richard Rice
Type Improvement
Useful Life 5 -7 years
Category Administration
Priority n/a
Description I Total Project Cost: $171,600
This project funds the purchase of a storage area network (SAN), which will gradually replace all internal disk drives in existing network servers.
The storage area network is a central storage device made up of individual storage modules, and managed from a single console. The SAN allows
disk storage to be modified as storage needs change, without any downtime for users. New network servers will not be ordered with internal
storage. Existing network servers are being migrated to a virtualized environment which will utilize the SAN for all data storage needs.
Justification
Che need for digital storage space for City documentation and applications is growing at a rate of approximately 1Th per year. Existing storage
,pace became difficult to manage on individual network servers. Internal storage utilization is inefficient, and requires system downtime to
- econfigure. SAN storage allows for real time reconfiguration as well as the ability to make real time copies for redundancy and for daytime
>ackup processes. The initial SAN array was purchased in 2008, a second unit in 2009, and a replication SAN in 2010. A third production SAN
uTay was added in 2012. Currently all units reside in City Hall, however the replication SAN is planned to be relocated to the County data center
>nce the county wide fiber project is completed. The initial SAN is projected to reach the end of its serviceable life in 2014 and is scheduled to be
eplaced. At that time, staff will evaluate moving to a cloud based storage option versus local hardware.
Prior
Expenditures 2013
2014 2015
2016 2017
Total
117,600 I
Equipment
26,000
28,000
54,000
Total
Prior
Total
Funding Sources 2013
26,000
2014 2015
28,000
2016 2017
54,000
Total
1 170
Capital Replacement Equipme
26,000
28,000
54,000
Total
Total
26,000
28,000
54,000
Budget Impact/Other
Software and hardware support for the storage systems will be funded out of the MIS services account 101- 1160 -4300.
Capital Improvement Program 2013 rhru 2017
City of Chanhassen, MN
Project # EQ -083
Project Name CSO Truck
2013 2014 2015 2016 2017 Total
Account #1 400 - 41294704 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $60,000
This allows for replacement of an existing CSO truck. This truck will have approximately 180,000 miles at the time of trade in.
!017 - #704 2010 Chev Colorado 4x4 Quad Cab
Justification
Phis replaces a vehicle in accordance with the vehicle replacement plan.
Prior Expenditures
F -7 3 - 0,70 - 0 1 Vehicles
Total
Total 30,000 30,000
Prior Funding Sources 2013 2014 2015 2016 2017 Total
30,000 Capital Replacement Equipme 30,000 30,000
Total Total 30,000 30,000
Department
Major Equipment
Contact
Paul Oehme
Type
Vehicles
Useful Life
Category
Administration
30,000 30,000
Budget Impact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -084
Project Name Office Furniture
Account #1 400 - 0000 -4703 Account #3
Account #2 Account #4
Description
Provide for office furniture and chair replacements.
Justification
Phis item will allow items to be replaced as they wear out or needs change.
Prior Expenditures
25,000 Office Equipment
Total
Total 5,000 5,000 5,000 5,000 5,000 25,000
Prior Funding Sources 2013 2014 2015 2016 2017 Total
775 Capital Replacement Equipme 5,000 5,000 5,000 5,000 5,000 25,000
Total Total 5,000 5,000 5,000 5,000 5,000 25,000
Budget Impact/Other
Department
Major Equipment
Contact
Laurie Hokkanen
Type
Unassigned
Useful Life
Category
Administration
Priority
n/a
Total Project Cost: $50,000
2013 2014 2015 2016 2017 Total
5,000 5,000 5,000 5,000 5,000 25,000
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -086
Project Name Equipment for New Fire Station
Department
Major Equipment
Contact
John Wolff
Type
Equipment
Useful Life
20 years
Category
Fire
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $1,000,000
This project funds new equipment for a satellite fire station scheduled to be constructed in 2014. These funds will pay for a rescue truck, engine,
firefighting equipment, station supplies, furniture, radios, PPE, SCBA equipment and personal equipment for 15 new firefighters.
Justification
Phis project is based on projections for growth south of Highway 5.
Expenditures 2013
2014 2015 2016
2017 Total
Equipment
1,000,000
1,000,000
Total
Funding Sources 2013
1,000,000
2014 2015 2016
1,000,000
2017 Total
Capital Replacement Equipme
GO Bonds
500,000
500,000
500,000
500,000
Total
1,000,000
1,000,000
Budget Impact/Other
Phese purchases will include a limited warranty and will reduce the annual maintenance and repair costs.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -091
Project Name E xc a vator
Account #1 400 - 0000 -4705
Account #2 700 - 7025 -4705
Account #3 701 - 7025 -4705
Account N4 720 - 7025 -4705
Department Major Equipment
Contact Paul Oehme
Type Equipment
Useful Life
Category Public Works
Priority n/a
Description Total Project Cost: $100,000
Fhis is for the replacement of the City's rubber tire backhoe with a used track excavator. The City's backhoe is a 1989 model that will be 26 years
)ld when it is replaced.
Justification
'urrently the City is renting an excavator or hiring a contractor to complete most excavation projects. These projects include watermain breaks,
;ewer pipe repairs and storm sewer pipe improvements. The City's backhoe is not large enough and does not have the necessary features to
:omplete these tasks. The pay back for purchasing an excavator is estimated at 2 years.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 100,000 100,000
Total 100,000 100,000
Funding Sources 2013 2014 2015 2016 2017 Total
Capital Replacement Equipme
10,000
10,000
Sewer Utility Fund
30,000
30,000
Surface Water Utility Fund
30,000
30,000
Water Utility Fund
30,000
30,000
Total
100,000
100,000
Budget Impact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -094
Project Name Radios
Account #1 400 - 4122 -4705
Account #2
Expenditures
Department Major Equipment
Contact John Wolff
Type Equipment
Useful Life 7 -10 years
Category Fire
Priority n/a
Total Project Cost: $385,000
The fire department utilizes 800 MHz radios to communicate at fire and rescue scenes. The radios also allow for communication with other
surrounding departments, Carver County Sheriff deputies and various other agencies at the local, state and federal levels. Base radios at both
stations are used to communicate with field radios from the station dispatch centers. The base radios at Station 1 were replaced in 2012 and
Station 2 will be done in 2013. A longer range issue is the current portable /mobile radios are no longer manufactured by Motorola so replacement
parts are difficult to acquire. It is expected that all the portable /mobile radios will need to be replaced in 5 to 7 years.
Justification
The base radio at Station 2 needs to be replaced since it is obsolete and replacement parts are no longer available.
Prior
12,500
Total
Account #3
Account #4
2013 2014 2015 2016 2017 Total
Equipment 22,500 350,000 372,500
Total 22,500 350,000 372,500
Prior Funding Sources
2013 2014 2015
2016 2017
Total
12,500 Capital Replacement Equipme
22,500
350,000
372,500
Total Total
22,500
350,000
372,500
Budget Impact/Other
There should be no operational impact from this purchase. The current maintenance budget will accommodate for this addition.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -095
Project Name Skid loader - Parks
Account #1 400 - 4119 -4705
Account #2
Description
2002 753H Bobcat ( 713)
Department
Major Equipment
Contact
Todd Hoffman
Type
Equipment
Useful Life
43,000
2014 2015
Category
Park
Account #3 Priority n/a
Account #4
Total Project Cost: $43,000
Justification
This piece of equipment is used extensively by the park department for construction projects.
Expenditures 2013
2014 2015
2016 2017 Total
Equipment
43,000
43,000
Total
Funding Sources 2013
43,000
2014 2015
43,000
2016 2017 Total
Capital Replacement Equipme
43,000
43,000
Total
43,000
43,000
Capital Improvement Program 2013 rhru 2017
City of Chanhassen, MN
Project # EQ -096
Project Name Skid loader Tracks - Parks
Account #1 400 - 4119 -4705 Account #3
Account #2 Account #4
Description
teplacement of rubber tracks for skid loader.
Justification
Approximately every three years these tracks have to be replaced because of wear.
Department Major Equipment
Contact Todd Hoffman
Type Equipment
Useful Life
Category Park
Priority n/a
Total Project Cost: $15,000
Prior Expenditures 2013 2014 2015 2016 2017 Total
7, Equipment 7,500 7,500
Total Total 7,500 7,500
Prior Funding Sources 2013 2014 2015 2016 2017 Total
7,500 Capital Replacement Equipme 7,500 7,500
Total Total 7,500 7,500
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -097
Project Name Portable Generator -Utility Department
Account #1 701 - 7025 -4705 Account #3
Account #2 Account #4
Department
Major Equipment
Contact
PaulOehme
Type
Equipment
Useful Life
Category
Utilities
Priority
n/a
Total Project Cost: $17,000
1984 7.5 khw Generator ( #310)
Justification
Chis generator is used for generation of power for lift stations when power is interrupted. The City maintains 31 lift stations and most of the lift
stations do not have onsite standby generation. Generators for lift stations need to be in good working order when needed.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 17,000 17,000
Total 17,000 17,000
Funding Sources 2013 2014 2015 2016 2017 Total
Sewer Utility Fund 17,000 17,000
Total 17,000 17,000
Budget Impact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -098
Project Name Loader Mounted Snow Blower
Account #1 400 - 0000 -4705 Account N3
Account #2 Account #4
Description
1989 Loader Mounted Snow Blower
Department Major Equipment
Contact Paul Oehme
Type Equipment
Useful Life
Category Public Works
Priority n/a
Total Project Cost: $141,000
J
Phis snow blower is used by the street and park departments for removal of snow primarily in the downtown streets, library parking lot and trails.
or large snow events or when snow piles up, snow needs to be removed from the downtown because of lack of storage space.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 141,000 141,000
Total 141,000 141,000
Funding Sources 2013 2014 2015 2016 2017 Total
Capital Replacement Equipme 141,000 141,000
Total 141,000 141,000
Budget Impact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -100
Project Name Light Duty Trucks - Parks
Account #1 400 - 4120 -4704 Account #3
Account #2 Account #4
Description
1995 Chevrolet 3/4 ton pickup with plow ( #415)
Justification
Prior Expenditures
F -- 6 - 5 - , — O0 - 0 1 Vehicles
Total
40,000 40,000
Total 40,000 40,000
Prior
Funding Sources 2013
2014 2015 2016
2017 T
65,000
Capital Replacement Equipme
40,000
40,000
Total
Total
40,000
40,000
Department
Major Equipment
Contact
Todd Hoffman
Type
Vehicles
Useful Life
Category
Park
Priority
n/a
Total Project Cost: $105,000
2013 2014 2015 2016 2017 Total
Budget hnpact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -104
Project Name Mower Replacement - Park
Account #1 400 - 0000 -4705
Account #2
Description
?014 - 2000 Toro 580D ( #453)
1015 - 1998 Toro 560D ( #452)
Department
Major Equipment
Contact
Todd Hoffman
Type
Equipment
Useful Life
95,000
Category
Park
Account #3 Priority n/a
Account #4
Total Project Cost: $242,000
Justification
Che City had 4 high - production grounds mowers. Each machine is used daily during the growing season and needs to be in good working
condition. In 2012, the City replaced two 325D mowers with one large Toro 4000 mower. It is anticipated that staff will be able to mow just as
nuch with one large mower.
Prior
Expenditures 2013
2014
2015 2016
2017 Total
57,000
Equipment
95,000
90,000
185,000
Total
Total
95,000
90,000
185,000
Prior
Funding Sources 2013
2014
2015 2016
2017 Total
57,000
Capital Replacement Equipme
95,000
90,000
185,000
Total
Total
95,000
90,000
185,000
Capital Improvement Program 2013 thru 2017
City of Ch MN
Project # EQ -105
Project Name Skid loader - Street Department
Account #1 400 - 0000 -4705 Account #3
Account #2 Account #4
Description
2000 863H Bobcat (# 149)
Department Major Equipment
Contact Paul Oehme
Type Equipment
Useful Life
Category Street Equipment
Priority n/a
Total Project Cost: $43,000
Justification
Chis piece of equipment is used extensively by the street department for construction projects and street maintenance,
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 43,000 43,000
Total 43,000 43,000
Funding Sources 2013 2014 2015 2016 2017 Total
Capital Replacement Equipme 43,000 43,000
Total 43,000 43,000
Budget Impact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -106
Project Name Tractor Replacement - Park
Account #1 400 - 0000 -4705
Account #2
Account #3
Account #4
Department
Major Equipment
Contact
Todd Hoffman
Type
Equipment
Useful Life
Category
Park
Priority
n/a
Total Project Cost: $30,000
ese tractors are used for field maintenance at park facilities.
14 - 1997 John Deere 455 ( #468)
14 - 1999 John Deere 455 ( #469)
Justification
Chese tractors are used for maintenance and upkeep of baseball fields. The tractors will be 15 and 17 years old before they are replaced.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 30,000 30,000
Total 30,000 30,000
Funding Source 2013 2014 2015 2016 2017 Total
Capital Replacement Equipme 30,000 30,000
Total 30,000 30,000
Budget Impact/Other
Capital Improvement Program 2013 thru 2017
C ity o C MN
Project # EQ -110
Project Name Vactor /Sewer Jetting Truck
Account #1 701 - 7025 -4704
Account #2 700 - 7025 -4704
Account #3
Account #4
Department
Major Equipment
Contact
Paul Oehme
Type
Equipment
Useful Life
425,000
2014 2015 2016 2017
Category
Utilities
Priority
n/a
Descripti Total Project Cost: $425,000
This truck was purchased by the City in 2000 and will be 16 years old when it will be replaced. This truck is used mainly by the utility department
for sewer jetting, emergency sewer back -ups, watermain breaks and delicate excavations around utilities. This truck has to be reliable and in good
working condition because of the projects and emergency calls it is used for.
Justification
To have the truck as reliable as possible with minimal downtime.
Expenditures 2013
2014 2015 2016 2017
Total
Equipment
425,000
425,000
Total
Funding Sources 2013
425,000
2014 2015 2016 2017
425,000
Total
Sewer Utility Fund
Water Utility Fund
325,000
100,000
325,000
100,000
Total
425,000
425,000
Impact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -111
Project Name Paint Striper
Account #1 400 - 0000 -4705
Account #2
Description
Zeplace existing riding paint striper used for painting athletic fields.
Account #3
Account H4
Department Major Equipment
Contact Todd Hoffman
Type Equipment
Useful Life
Category Park
Priority n/a
Total Project Cost: $21,000
Justification
The City currently stripes 10 ball fields and 19 soccer fields. The current paint striper is 10 years old and the City is having considerable more
repair and maintenance problems with the machine.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 21,000 21,000
Total 21,000 21,000
Funding Sources 2013 2014 2015 2016 2017 Total
Capital Replacement Equipme 21,000 21,000
Total 21,000 21,000
Budget hnpact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -115
Project Name B rush Chipper
Account #1 400 - 0000 -4705
Account #2
Account #3
Account #4
Department Major Equipment
Contact Paul Oehme
Type Equipment
Useful Life
Category Street Equipment
Priority n/a
Desc rip t i o n I Total Project Cost: $56,000
This item is to replace the brush and tree limb chipper. This unit will be 16 years old when it is replaced. This unit is used heavily year round by
all the public works departments and needs to be in good working condition.
Justification
To keep equipment in good repair. This purchase is consistent with the vehicle replacement program.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 56,000 56,000
Total 56,000 56,000
Funding Sources 2013 2014 2015 2016 2017 Total
Capital Replacement Equipme 56,000 56,000
Total 56,000 56,000
Budget Impact/Other
Capital Improvement Program 2013 thru 2017
Ci o f C hanhassen, MN
Project # EQ -117
Project Name B erti Rear Mount Mower
Account #1 400 - 0000 -4705 Account #3
Account #2 Account #4
Description
This purchase is required to maintain a reliable piece of equipment of mowing.
Department
Major Equipment
Contact
Todd Hoffman
Type
Equipment
Useful Life
Category
Park
Priority
n/a
Total Project Cost: $10,000
Justification I
This tractor mounted attachment was purchased in 2006 and is used to mow the 500 acre park system, which features 5 community parks, 22
neighborhood parks and 55 miles of trails and sidewalks. Mowing is done in the parks and along the trails and sidewalks which is hard on
equipment. Growth in the park system creates additional work for this mower. This equipment purchase is consistent with the equipment
replacement schedule.
Expenditures
2013 2014 2015 2016 2017 Total
Equipment 10,000 10,000
Total 10,000 10,000
Funding Sources 2013 2014 2015 2016 2017 Total
Capital Replacement Equipme 10,000 10,000
Total 10,000 10,000
Budget Impact/Other
Capital Improvement Program 2013 thru 2017
C of Chanhassen, MN
Project # EQ -118
Project Name Street Sweeper
Account #1 400 - 0000 -4705 Account #3
Account 92 Account N4
Description
This purchase is required to maintain a reliable piece of equipment for street sweeping.
#136 Elgin Eagle Street Sweeper
Department
Major Equipment
Contact
Paul Oehme
Type
Equipment
Useful Life
Category
Street Equipment
Priority
n/a
Total Project Cost: $281,000
Justification I
This piece of equipment was purchased in 2003 and provides street sweeping for the 108 miles of local streets within the City of Chanhassen. The
street department sweeps all the streets at least once a year starting as soon as weather permits in the spring. This piece of equipment is also used
spring through fall to maintain safe streets void of debris that accumulates from storms, construction and general use. Street sweeping is also part
of the City's Storm Water MS4 permit requirement. This equipment purchase is consistent with the equipment replacement schedule.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 281,000 281,000
Total 281,000 281,000
Funding Sources 2013 2014 2015 2016 2017 Total
Capital Replacement Equipme 281,000 281,000
Total 281,000 281,000
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -123
Project Name Bobcat Asphalt Planer
Account ill 400 - 0000 -4705 Account 0
Account #2 Account #4
Description
This item would fund a new Bobcat Asphalt Planer.
Department
Major Equipment
Contact
Paul Oehme
Type
Equipment
Useful Life
15,000
2014 2015 2016
Category
Street Equipment
Priority
n/a
Total Project Cost: $15,000
Justification
The 1996 Bobcat Asphalt Planer will not operate on the newer bobcats because the controls have changed. We will need to update the planer by
2014 when we trade in the last older Bobcat.
Expenditures 2013
2014 2015 2016
2017 Total
Equipment
15,000
15,000
Total
Funding Sources 2013
15,000
2014 2015 2016
15,000
2017 Total
Capital Replacement Equipme
15,000
15,000
Total
15,000
15,000
Budget Impact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -124
Project Name Annual Skid Loader Replacement
Department
Major Equipment
Contact
Paul Oehme
Type
Equipment
Useful Life
Total
Category
Street Equipment
Account #1 400 - 0000 -4705 Account #3 Priority n/a
Account #2 Account #4
scription Total Project Cost: $18,000
item would fund the annual trade in of skid loaders.
Justification I
Due to the state bid pricing, we are able to trade our skid loaders off annually for approximately $14.00 per hour. Buying new every year
guarantees there will be no other expenses except oil changes and grease jobs because the machine will always have a warranty. This approach is
also a better cost benefit over keeping the machines for 15 years. There is no guarantee on the state bid pricing or the trade in price, so we will be
pricing annually to determine if it is a fair deal or if we should hold on to the machine for another year.
Prior
Expenditures
2013
2014
2015
2016
2017
Total
F - 3,000 - 1
Equipment
3,000
3,000
3,000
3,000
3,000
15,000
Total
Total
3,000
3,000
3,000
3,000
3,000
15,000
Prior
Funding Sources
2013
2014
2015
2016
2017
Total
3,000
Capital Replacement Equipme
3,000
3,000
3,000
3,000
3,000
15,000
Total
Total
3,000
3,000
3,000
3,000
3,000
15,000
Budget hnpact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -127
Project Name Copier Replacements
Account #1
Account #2
Account #3
Account #4
Department Major Equipment
Contact Richard Rice
Type Equipment
Useful Life 5 -7 years
Category Administration
Priority n/a
Total Project Cost: $62,000
item funds the replacement of departmental copiers. Copiers were previously part of individual department requests but were moved to the
department by the Finance Director in 2012.
Justification I
The city has 4 multifunction departmental copiers located in City Hall and the Public Works Facility. The Konica 7040 copier in the building
department was purchased in 2000 and is the oldest copier in service. This copier is beyond its repairable life span and is scheduled for
replacement in 2013.
t
Item
Year Purchased
linistration
Canon Imagerunner 105
2003
.ding
Konica 7040
2000
ineering
Ricoh 2232C
2005
lie Works
Konica Bizhub 250
2006
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 14,000 15,000 18,000 15,000 62,000
Total 14,000 15,000 18,000 15,000 62,000
Funding Sources 2013
2014
2015 2016
2017
Total
Capital Replacement Equipme 14,000
15,000
18,000
15,000
62,000
Total 14,000
15,000
18,000
15,000
62,000
Budget Impact/O
Chere should be no operational impact.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # EQ -129
Project Name Sewer Push Camera Replacement
Account #1
Account #2
Account #3
Account #4
Department Major Equipment
Contact Paul Oehme
Type Equipment
Useful Life
Category Utilities
Priority n/a
D I Total Project Cost: $11,000
The original Utility department push camera has been repaired several times and used a DVR to record video (which has also been replaced). The
camera's video feed will cut out intermittently. This camera is a vital tool that has proven to be invaluable.
Justification
New camera technology allows digital media storage instead of CD's. This allows for easy storage and email ability of the footage. The picture
quality is also much better and the hardware is more rugged. The camera comes equipped with a sonde that will allow us to use our current
RD7000 utility locator to trace sanitary sewer lines.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment
Funding Sources
11,000 11,000
Total 11,000 11,000
2013 2014 2015 2016 2017 Total
Sewer Utility Fund 11,000 11,000
Total 11,000 11,000
Budget hnpact/Other
Capital Improvement Program 2013 thru 2017 Department Municipal Buildings
City of Chanhassen, MN Contact John Wolff
Project # MB -009 Type Improvement
Useful Life 30 Years
Project Name Fire Station 3 Category Fire
Account #1 Account #3 Priority n/a
Account #2 Account #4
Desc rip t i o n Total Project Cost: $2,000,000
This is for the proposed third fire station to be built in the southern area of the City which is currently being developed.
Justification
Response time from the other two stations will be unacceptable for the new commercial and residential development that will surround the 212
corridor.
Expenditures 2013 2014 2015 2016 2017 Total
Construction 2,000,000 2,000,000
Total 2,000,000 2,000,000
Funding Sources 2013 2014 2015 2016 2017 Total
GO Bonds 2,000,000 2,000,000
Total 2,000,000 2,000,000
Budget Impact/Other
There will need to be additional hiring of approximately 15 firefighters to staff the third station.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # MB -010
Project Name City Hall Remodel
Account #1 400-4142 -
Account #2
Account #3
Account #4
Department
Municipal Buildings
Contact
Laurie Hokkanen
Type
Improvement
Useful Life
Category
Administration
Priority
n/a
Total Project Cost: $125,000
and refurbish areas of City Hall that need paint, carpet or storage areas added.
Justification
,ertain areas of City Hall will be in need of some small repair and maintenance needs in 2015.
Expenditures 2013 2014 2015 2016 2017 Total
Maintenance 125,000 125,000
Total 125,000 125,000
Funding Sources 2013 2014 2015 2016 2017 Total
Capital Replacement Equipme 125,000 125,000
Total 125,000 125,000
Budget Impact/Other
Capital Improvement Program 2013 thru 2017
Ci ty of Chanhas M N
Project # MB -019
Project Name Bluff Creek/Rec Center Roof Repair/Boiler
Account #1 400 - 0000 -4706
Account #2
Account #3
Account #4
Department Municipal Buildings
Contact Todd Hoffman
Type Improvement
Useful Life
Category Park
Priority n/a
Description I Total Project Cost: $170,000
One of the boilers in the building was rebuilt in 2009 but will need to be replaced at some point. Phase 1 of the roof repair will start with the
Recreation Center and phase 2 will focus on the Bluff Creek Elementary side of the building. The joint powers agreement that the City has with
ISD 112 requires the City to pay for 24% of all costs associated with the building.
Justification
3oth of these systems as originally constructed were estimated to have a 15 year life -span and the building is now 17 years old. Also, the original
ystems were the cheapest you could buy at the time the building was constructed.
Expenditures 2013 2014 2015 2016 2017 Total
Maintenance 170,000 170,000
Total 170,000 170,000
Funding Sources 2013 2014 2015 2016 2017 Total
Capital Replacement Equipme 170,000 170,000
Total 170,000 170,000
Budget Impact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # MB -020
Project name Fire Station - Purchases /Maintenance/Refurbishment
Account #1 400 - 0000 -4706
Account #2
Account #3
Account #4
D
This project is for large purchases, maintenance and refurbishment of the fire stations.
Department Municipal Buildings
Contact John Wolff
Type Maintenance
Useful Life
Category Fire
Priority n/a
Total Project Cost: $50,000
Justification
Che Main Fire Station was originally built in the 1960's and remodeled in the late 1980's. The West Fire Station was built in the early 1980's.
3oth stations hold various public events during the year (4th of July, Election Voting, Fire Prevention Week, Open House, National Night Out
;tc.) and these buildings are the face of the Fire Department to the public. The buildings and the contents require periodic replacement, upgrading,
naintenance and refurbishment to ensure a positive image of the Fire Department and the City of Chanhassen.
Prior Expenditures
f - 5,00 - 0 1 Maintenance
Total
45,000 45,000
Total 45,000 45,000
Prior Funding Sources 2013 2014 2015 2016 2017 Total
5,000 I Capital Replacement Equipme 45,000 45,000
Total Total 45,000 45,000
2013 2014 2015 2016 2 Total
Budget Imp act/Other
Fhere should be no operational impact from these improvements. The current maintenance budget will accommodate for this addition.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # MB -021
Project Name Data Room Cooling
Department
Municipal Buildings
Contact
Richard Rice
Type
Improvement
Useful Life
30 Years
Category
Administration
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $33,000
The air conditioning unit responsible for cooling the server room housing the majority of the City's network hardware is undersized and proven
unreliable in the peak cooling season.
Justification
Several portable air conditioning units are being used in the server room to compensate for the difference in cooling capacity for the existing
system. These units can maintain a safe operating temperature in the room but cannot in the event of the primary system failure which has been
occurring multiple times each year.
Expenditures
2013 2014
2015 2016 2017 Total
Equipment
33,000
33,000
Total
Funding Sources
33,000
2013 2014
33,000
2015 2016 2017 Total
Capital Replacement Equipme
33,000
33,000
Total
33,000
33,000
Budget hnpact/Other
Capital Improvement Program 2013 rhru 2017
City of Chanhassen, MN
Project # MB -022
Project name Fence - Medical Arts Parking Lot
Account #1
Account #2
Account #3
Account #4
Department Municipal Buildings
Contact Laurie Hokkanen
Type
Improvement
Useful Life
15 years
Category
Administration
Priority
n/a
Description Total Project Cost: $8,500
Replace the fence that was installed in 1987 located in the Medical Arts parking lot, behind Axel's.
Justification
Phis fence has been falling down for the last 8 years. The City has repaired the posts numerous times, but the whole fence is rotting and needs to
)e replaced.
Expenditures 2013 2014 2015 2016 2017 Total
Construction 8,500 8,500
Total 8,500 8,500
Funding Sources 2013 2014 2015 2016 2017 Total
Capital Replacement Equipme 8,500 8,500
Total 8,500 8,500
Budget hnpact/Other
Capital Improvement Program 2013 thru 2017
C o Chanhas M N
Project # MB -023
Project Name Citizen Survey
Account #1 Account #3
Account #2 Account #4
Description
The City will conduct a triennial survey of residents.
Department
Municipal Buildings
Contact
Laurie Hokkanen
Type
Improvement
Useful Life
28,000
Category
Administration
Priority
n/a
Total Project Cost: $28,000
Justification
Phe City will use the feedback to monitor and respond to residents values and concerns. The 2013 results will also be interfaced with the Long
Zange Fire Study.
Expenditures
2013 2014
2015 2016 2017
Total
Study
14,000
14,000
28,000
Funding Sources
Total 14,000
2013 2014
14,000
2015 2016 2017
28,000
Total
Cable TV Fund
14,000
14,000
28,000
Total 14,000
14,000
28,000
Budget Impact/Other
Capital Improvement Program 2013 thru 2017 Department Municipal Buildings
City of Chanhassen, MN Contact Paul Oehme
Project # MB -024 Type Maintenance
Useful Life
Project Name Lift Station 24 Roof Replacement Category Utilities
Account #1 Account 0 Priority n/a
Account #2 Account #4
D e sc rip t i o n Total Project Cost: $25,000
This project is to replace the failing asphalt shingle roof and install a steel shingle system and gutters.
Justification
The original roof that was installed in 1991 is failing and losing shingles. A steel roofing system is recommended for hail and wind protection.
The current lack of gutters and down spouts is creating water damage on the walkway in front of the doors.
Expenditures 2013
2014 2015 2016 2017
Total
Maintenance
25,000
25,000
Total
Funding Sources 2013
25,000
2014 2015 2016 2017
25,000
Total
Sewer Utility Fund
25,000
25,000
Total
25,000
25,000
Capital Improvement Program 2013 thru 2017 Department Municipal Buildings
City of Chanhassen, MN Contact Paul Oehme
Project # MB -025 Type Improvement
Useful Life
Project name Main Fire Station Parking Lot Drainage Imp Category Engineering
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $9,600
This project will fix a drainage issue in the parking lot of the Main Fire Station. This drainage issue causes dangerous ice dams near the dumpsters.
Justification
k roof drain at the Main Fire Station discharges water to the parking lot and in front of the western entrance. During freeze /thaw periods, the
vater freezes. Installation of a catch basin and drainage pipe will collect the water to prevent it from freezing in the parking lot and in front of the
vestem entrance.
Expenditures
2013 2014
2015 2016 2017 Total
Construction
9,600
9,600
Total
Funding Sources
9,600
2013 2014
9,600
2015 2016 2017 Total
Capital Replacement Equipme
9,600
9,600
Total
9,600
9,600
Budget hnpact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # PK &T -042
Project Name picnic Tables/Park Benches
Account #1 410 - 000 -4705
Account #2
Description
Purchase of picnic tables and park benches.
Department
Park & Trail Improvements
Contact
Todd Hoffman
Type
Improvement
Useful Life
30 Years
Category
Park
Account #3 Priority n/a
Account #4
Total Project Cost: $96,000
Justification
few tables and benches are needed annually to replace old stock and meet new needs.
Prior
Expenditures
46,000 1
Equipment
Total
50,000
Prior
Funding Sources
F - 46,000 1
Park Dedication Fund
Total
50,000
Budget Impact/Other
2013 2014 2015 2016 2 017 Total
10,000
10,000
10,000
10,000
10,000
50,000
Total 10,000
10,000
10,000
10,000
10,000
50,000
2013
2014
2015
201
2017
Total
10,000 10,000 10,000 10,000 10,000 50,000
Total 10,000 10,000 10,000 10,000 10,000 50,000
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # PK &T -043
Project Name Trees
Account #1 410 - 0000 -4701
Account #2
Account #3
Account #4
Department Park & Trail Improvements
Contact Todd Hoffman
Type Improvement
Useful Life 50 Years
Category Park
Priority n/a
Description I Total Project Cost: $155,000
knnual tree planting program. This program is proposed to be accelerated to mitigate the affects of Emerald Ash Borer.
I Justification
I Parklands and other City properties experience tree loss annually, due to storm damage, disease, stress, etc. 1
Prior Expenditures
2013
2014
2015
2016
2017
Total
80,000 1 Land Improvement
15,000
15,000
15,000
15,000
15,000
75,000
Total
Total 15,000
15,000
15,000
15,000
15,000
75,000
Prior Funding Sources
F - 80,000 - 1 Park Dedication Fund
Total
201 2014 2015 2016 2017 Total
15,000 15,000 15,000 15,000 15,000 75,000
Total 15,000 15,000 15,000 15,000 15,000 75,000
Capital Improvement Program 2013 thru 2017
City of Ch M
Project # PK &T -072
Project Name Tennis Cou
Account #1 400 - 00004706 Account #3
Account #2 Account #4
Des
Re -build two courts at the Chanhassen Recreation Center, patch and resurface remainder of courts.
Department
Park & Trail Improvements
Contact
Todd Hoffman
Type
Improvement
Useful Life
25 years
Category
Park
Priority
n/a
Total Project Cost: $200,000
Justification
We have deliberately limited the number of courts constructed within our system to lower overall maintenance costs associated with tennis courts.
The courts we do offer are kept in playable condition through patching and resurfacing on a six to ten year cycle.
Prior Expenditures
F - 125,000 1 Maintenance
Total
75,000 75,000
Total 75,000 75,000
Prior Funding Sources 2013 2014 2015 2016 2017 Total
F - 125,000 1 Assessment/Revolving Assess 75,000 75,000
Total Total 75,000 75,000
2013 2014 2015 2016 2017 Total
Budg Imp act/Oth er
Maintenance and operations costs.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, NM
Project # PK &T -074
Project Name Ri ce Marsh Lake Trail
Department Park & Trail Improvements
Contact Todd Hoffman
Type Improvement
Useful Life
Category Park
Account #1 410 - 00004710 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $200,000
Che Rice Marsh Lake Trail will travel south of Rice Marsh Lake connecting the cities of Chanhassen and Eden Prairie. Construction of new
Hghway 212 and an associated trail underpass near the border of the two cities will permit connection of this trail to the Lake Riley area. This
;ection of trail will be 3,600 feet in length and when combined with trails in Eden Prairie will provide a complete trail loop around Rice Marsh
,ake approximately 4 miles in length.
Justification
This important section of pedestrian trail will prove to be a favorite among residents. The entire trail corridor is situated in wooded and wetland
areas. Connecting to Eden Prairie, the Highway 212 underpass and extensive trail systems to the east will provide significant benefits for trail
users.
Expenditures
Construction
Funding Sources
2013 2014 2015 2016 2017 Total
200,000 200,000
Total 200,000 200,000
2013 2014 2015 2016 2017 Total
Park Dedication Fund 200,000 200,000
Total 200,000 200,000
Budg Impac
vlaintenance and operations costs.
Capital Improvement Program 2013 thru 2017
Ci ty o Chan MN
Project # PK &T -098
Project name P edestrian Trail to Arboretum
Department Park & Trail Improvements
Contact Todd Hoffman
Type Improvement
Useful Life
Category Park
Account #1 410 - 0000 -4710 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $275,000
k ten foot wide bituminous pedestrian trail located on the south side of State Highway 5, from Century Boulevard to the Minnesota Landscape
krboretum entry road. The total project cost will exceed $250,000, requiring additional funding partners /sources to be identified for the project
Chis funding allocation is the City's match for a transportation enhancement grant.
Justification
Completing a pedestrianibicycle trail route to the Arboretum has been a long range goal for the City. The Arboretum will continue the trail from
their entrance into the property.
Expenditures 2013
2014 2015 2016
2017 Total
Construction
275,000
275,000
Total
Funding Sources 2013
275,000
2014 2015 2016
275,000
2017 Total
Park Dedication Fund
275,000
275,000
Total
275,000
275,000
Budget hnpact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # PK &T -099
Project Name Chanhassen Native Preserve Trail, Final Phase
Department Park & Trail Improvements
Contact Todd Hoffman
Type Improvement
Useful Life
Category Park
Account #1 410 - 0000 -4710 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $90,000
A 900 foot section of eight foot wide bituminous trail, located at the perimeter of Lot 2, Block 1 Arboretum Business Park 7th Addition.
J ust i fication
Mis section of trail is the final phase of a two mile trail loop around the Chanhassen Native Preserve. The trail project was initiated in 1995.
Expenditures 2013
2014 2015 2016 2017
Total
Construction
90,000
90,000
Total
Funding Sources 2013
90,000
2014 2015 2016 2017
90,000
Total
Park Dedication Fund
90,000
90,000
Total
90,000
90,000
B udget Impact/Other I
Aaintenance and operation costs. Will need to be included in the pavement management program.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # PK &T -109
Project Name Pioneer Pass Neighborhood Park Development -Phase 1
Department Park & Trail Improvements
Contact Todd Hoffman
Type Improvement
Useful Life
Category Park
Account #1 410 - 00004706 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $350,000
Construction of an 8.7 acre neighborhood park in southern Chanhassen. This property is being acquired through a combination of dedication and
fee purchase as a component of the Pioneer Pass housing development.
Justification
This new park is being acquired and developed to fulfill the neighborhood park needs of a large portion of the 2005 MUSA area. This is the first
new neighborhood park acquisition in the past 15 years.
Expenditures 2013 2014 2015 2016 2017 Total
Construction 350,000 350,000
Total 350,000 350,000
Funding Sources 2013 2014 2015 2016 2017 Total
Park Dedication Fund 350,000 350,000
Total 350,000 350,000
.t Impact/Other
operation and maintenance.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # PK &T -114
Project Name Bandimere Community Park Expansion/Phase 1
Department
Park & Trail Improvements
Contact
Todd Hoffman
Type
Improvement
Useful Life
Category
Park
Account #1 410- 00004701 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $750,000
Acquisition of a 2.5 acre parcel of land and single family home located adjacent to Bandimere Community Park.
Justification
To accommodate a new park entrance road, expansion of park amenities and expansion of storm water ponding. The park entrance as currently
designed has resulted in an above normal level of vehicle collisions and close calls.
Prior Expenditures
500,000 Land Improvement
Total
Prior Funding Sources
F - 500,000 1 Park Dedication Fund
Total
2013 201 2015 2016 2017 Total
250,000 250,000
Total 250,000 250,000
2013 2014 2015 2016 2017 Total
250,000 250,000
Total 250,000 250,000
Budget hnpact/Other
Capital Improvement Program 2013 thru 2017
City o f C hanh asse n, M
Project # PK &T -115
Project Name Ri ley Ridge Neighborhood Park Development -Phase 1
Account #1
Account #2
Account #3
Account #4
Department Park & Trail Improvements
Contact Todd Hoffman
Type Improvement
Useful Life
Category Park
Priority n/a
Description I Total Project Cost: $200,000
Construction of a 4.7 acre neighborhood park in south eastern Chanhassen, just north of Lake Riley. This property has been acquired through a
combination of park dedication and fee purchase as a component of the Reflections at Lake Riley housing development.
Justification
This new park is being acquired and developed to fulfill the neighborhood park needs of a large area of the community located south of Highway
212 and north of Lyman Blvd.
Expenditures
2013 2014
2015 2016 2017 Total
Construction
200,000
200,000
Total
Funding Sources
200,000
2013 2014
200,000
2015 2016 2017 Total
Park Dedication Fund
200,000
200,000
Total
200,000
200,000
Budg hnpact/Oth
Annual operation and maintenance.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # PK &T -117
Project Name Rec Center Entrance Improvements
Department Park & Trail Improvements
Contact Todd Hoffman
Type Improvement
Useful Life
Category Park
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $25,000
nstallation of front entry walkway lighting and repair of heaved front entrance concrete panels.
I Jus t ifi cation I
(These improvements are categorized as safety improvements.
Expenditures 2013 2014 2015 2016 2017 Total
Construction 25,000 25,000
Total 25,000 2 5,000
Funding Sources 2013 2014 2015 2016 2017 Total
Capital Replacement Equipme 25,000 25,000
Total 25,000 25,000
Budge Impact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # PL -002
Project Name County Rd 61 (old 212) Corridor Study
Account #1 400 - 0000 -4752 Account #3
Account #2 Account #4
Description
'orridor design along new County Road 61 and old State Highway 212.
Department
Planning
Contact
Kate Aanenson
Type
Improvement
Useful Life
10 -15 years
Category
Planning
Priority
n/a
Total Project Cost: $75,000
Justification
Che specific corridor study is an extension of the comprehensive plan identifying necessary improvements and developing configurements for
>arcels along the right of way.
Expenditures 2013 2014 2015 2016 2017 Total
Planning /Design 75,000 75,000
Total 75,000 75,000
Funding Sources 2013 2014 2015 20 16 2017 Total
Capital Replacement Equipme 75,000 75,000
Total 75,000 75,000
dget Impact/Other
corridor study will identify development potential and specific infrastructure improvements needed for development.
Capital Improvement Program 2013 thru 2017
Ci ty of C h a nh ass en, MN
Project # SS -012
Project Name Inflow and Infiltration Abatement
Account #1 701 -70xx -4751
Account #2
Account #3
Account #4
Department Sanitary Sewer Improvements
Contact Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
Utilities
Priority
n/a
Description I Total Project Cost: $1,050,000
Ibis annual project includes televising, repairs and rehabilitation of existing sanitary sewer. The program also detects and eliminates points of
mtry of ground water and surface water into the City sanitary sewer system. Projects have been identified from the 2006 Inflow and Infiltration
teport. The projects were reviewed by Metropolitan Council and approved in lieu of surcharge fees.
Justification
�ity staff has identified numerous older sewer lines that are in need of repair. The City of Chanhassen pays the Metropolitan Council for sewage
reatment. Those payments are based on the amount of flow generated by the City of Chanhassen. Surface water and ground water that makes its
vay into the system either through breaks, displaced joints, manhole covers, or private connections to the system increase the amount charged to
he City for sewage disposal and increasing the load on the City's lift stations.
Prior
675,000
Total
Prior
675,000
Total
Expenditures
2013
2014
2015
2016
2017
Total
Maintenance
75,000
75,000
75,000
75,000
75,000
375,000
Total 75,000
75,000
75,000
75,000
75,000
375,000
Funding Sources
2013
2014
2015
2016
2017
Total
Sewer Utility Fund
75,000
75,000
75,000
75,000
75,000
375,000
Total 75,000 75,000 75,000 75,000 75,000 375,000
Budget Imp act/Other I
The efforts may decrease operational costs, MCES fees and emergency call outs. It is also the City's intent to use connection charges to help fund
for those costs. It is the City's belief that as new customers come on line those connection fees should help fund future infiltration problems.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # SS -014
Project Name Sanitary Sewer Replacement
Department
Sanitary Sewer Improvements
Contact
Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
Utilities
Account #1 701- 70254751 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $1,340,000
Replacement or rehabilitation of existing sanitary sewer lines in conjunction with the reconstruction of the City street.
Justification
The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by
consolidating these projects.
Prior Expenditures
f - 550,000 1 Construction
Total
Prior Funding Sources
550,000 I Sewer Utility Fund
Total
2013 2014 2015 2016 2017 Total
75,000 300,000 75,000 300,000 40,000 790,000
Total 75,000
300,000
75,000
300,000
40,000
790,000
2013
2 014
2015
2016
2017
Total
75,000 300,000 75,000 300,000 40,000 790,000
Total 75,000 300,000 75,000 300,000 40,000 790,000
Budget hnpact/Other
This project will decrease maintenance costs.
Capital Improvement Program 2013 thru 2017
Ci ty o C M N
Project # SS -017
Project Name S a n itary Lift Station Rehabilitation Program
Account 91 701- 70254751
Account #2
Account #3
Account #4
Department Sanitary Sewer Improvements
Contact Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
Utilities
Priority
n/a
Description I Total Project Cost: $525,000
[be sanitary lift station rehabilitation program is designed to minimize sewer backups and emergency calls due to failed lift station equipment.
Phe City currently maintains 31 lift stations. Many of these lift stations are high service pumps and need frequent servicing. The program will
oervice or replace pumps, pipe gallery, and electrical components as needed. The proposed lift stations scheduled for improvements over the next
i years are as follows:
2013 - #22
2014 - #26
2015 - #1, #7 and #21
2016 - #20 and #28
2017 - #2, #16 and #18
Justification
Prior
390,000
Total
emergency calls and potential sewer backups.
Expenditures 2013 2014 2015 2016 2017 Total
Maintenance 15,000 40,000 40,000 20,000 20,000 135,000
Total 15,000 40,000 40,000 20,000 20,000 135,000
Prior
Funding Sources
2013
2014
2015
2016
2017
Total
390,000
Sewer Utility Fund
15,000
40,000
40,000
20,000
20,000
135,000
Total
Total 15,000
40,000
40,000
20,000
20,000
135,000
Budget Impact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
PIrlojectNarne oject # SS -020
2010 MUSA Sanitary Lift Station
Account #1 701 - 7025 -4702
Account #2
Account #3
Account #4
Department
Sanitary Sewer Improvements
Contact
Paul Oehme
Type
Improvement
Useful Life
Category
Utilities
Priority
n/a
Description I Total Project Cost: $1,900,000
This lift station will be located on Powers Boulevard south of TH 212 to service the future 2010 MUSA and will also be used by future MUSAs.
The project needs to be constructed before this area starts to develop and is contingent on when that happens.
Ju st ifi cation
tequired for future development of the 2010 MUSA. The cost for this improvement will be assessed to future MUSA areas using connection fees.
Expenditures 2013 2014 2015 2016 2017 Total
Construction 1,900,000 1,900,000
Total 1,900,000 1,900,000
Funding Sources 2013 2014 2015 2016 2017 Total
Sewer Utility Fund 1,9 00,000 1,900.000
Total 1,900,000 1,900,000
Budget Impact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # SS -023
Project Name Lift Station 10 Improvements
Department
Sanitary Sewer Improvements
Contact
Paul Oehme
Type
Improvement
Useful Life
Category
Utilities
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $360,000
This project would increase the wet well capacity, replace the pumps with more efficient pumping sequencing and replace the outdated electrical
panel of the lift station.
I Justification I
Lift Station 10 has a large sewer shed which is located on the west side of Lotus Lake in the Carver Beach area. The station is one of the largest
the City maintains. Currently Lift Station 10 has a significantly undersized wet well capacity. The pumps cycle continuously which causes
premature wear on the pumps and motors and is very inefficient. Also, the small wet well does not allow much time for the utility department to
respond if station problems occur. The lift station is located next to Lotus Lake, which could lead to environmental problems if an accident were
to occur.
Expenditures
Construction
Funding Sources
Sewer Utility Fund
Budget Impact/Other
2013 2014 2015 2016 2017 Total
360,000 360,000
Total 360,000 360,000
2013 2 014 2015 2016 2017 Total
360,000 360,000
Total 360,000 360,00
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # ST -001
Project Name West 78th St Streetlights
Department
Street Improvements
Contact
Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
Streets/Highways
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $300,000
Install street lights on West 78th Street from the western edge of Lake Ann Park to Century Blvd. Street lights already exist on the section of West
78th Street east of this section of road.
J ust ifi cation I
Visibility will be improved with the installation of street lights.
Expenditures 2013 2014 2015 2016 2017 Total
Equipment 300,000 300,000
Total 300,000 300,000
Funding Sources 2 013 2014 2015 2 016 2017 Total
MSA 3 00,000 300,000
Total 300,000 300,000
Budget Impact/Other
Chis project will increase maintenance and electrical usage costs.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # ST -003
Project Name Lyman Boulevard Improvements
Account ill
Account #2
Account #3
Account #4
Department Street Improvements
Contact Paul Oehme
Type Improvement
Useful Life Unassigned
Category Streets/Highways
Priority n/a
Description I Total Project Cost: $8,540,000
Che City will need to participate in the reconstruction of Lyman Boulevard between Powers Boulevard and TH 41 based on the master funding
agreement plan for the corridor. The corridor is proposed to be widened and urbanized to accommodate increased traffic volume from TH 212,
tew developments in the area and the new Chanhassen High School. Improvements include roadway widening, storm sewer, trail, and plans for
sanitary sewer and trunk watermain improvements.
Phase II - 2014 - Improvements are from Audubon south to Powers Blvd
I Jus
[To improve safety capacity and mobility along the corridor.
Expenditures 2013 2014 2015 2016 2017 Total
Construction 8,540,000 8,540,000
Total 8,540,000 8,540,000
Funding Sources 2013 2014 2015 2016 2017 Total
Arterial Collector Dvlpmnt Fee
100,000
100,000
Assessment/Revolving Assess
300,000
300,000
MSA
1,700,000
1,700,000
Other Agency Contribution
6,400,000
6,400,000
Sewer Utility Fund
20,000
20,000
Water Utility Fund
20,000
20,000
Total
8,540,000
8,540,000
Budget I mpact / Other I
Chis project will increase maintenance costs in relation to the increase in City utilities and trails constructed with the project.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # ST -012
Project Name Annual Street Improvement Program
Account #1 601 -xxxx -4751 Account #3
Account #2 Account #4
Department Street Improvements
Contact Paul Oehme
Type Improvement
Useful Life Unassigned
Category Streets/Highways
Priority n/a
ion I Total Project Cost: $17,845,000
Annual project to rehabilitate and reconstruct streets in the City. Current 5 -year plan shows the following neighborhood areas:
2013 - Greenwood Shores, Melody Hill neighborhoods, Horseshoe Curve, Indian Hill Road, Sandy Hook Road neighborhood, Rice Marsh Lake
trail loop extension
2014 - Dartmouth Drive, Cypress Drive and Kiowa Trail
2015 - Carver Beach area (south and west of Carver Beach Road), Ches Mar Drive, Lone Cedar, Saddlebrook Pass neighborhood
MSA - Park Road, Park Court and Park Drive
2016 - North Manor Road, Washta Bay Road, Tanagers Lane, Sandpiper Trail, Piper Ridge Lane and Minnewashta Woods Drive
MSA - Kerber Blvd
2017 - Flamingo Drive area and 96th Street
MSA - Lake Drive
Justification
The City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the
life of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective.
Rehabilitation projects extend the life of the street. In cases with utility or poor sub grade needs to be replaced or where streets have deteriorated
to a point where rehabilitation will no longer be practical reconstruction of the street is necessary. A feasibility study is written to consider the
merits of the project and scope of work.
Prior
6,400,000
Total
Expenditures 2013 2014 2015 2016 2017 Total
Construction 1,895,000 1,400,000 3,150,000 2,500,000 2,500,000 11,445,000
Total 1,895,000 1,400,000 3,150,000 2,500,000 2,500,000 11,445,000
Prior Funding Sources 2013
6,400,00 Assessment/Revolving Assess 1,895,000
Total MSA
2014 2015 2016
1,400,000 1,850,000 1,500,000
1,300,000 1,000,00
2017 Total
1,500,000 8,145,000
1,000,000 3,300,000
Total 1,895,000 1,400,000 3,150,000 2,500,000 2,500,000 11,445,000
Budget Impact/Other
Fhis project may decrease maintenance costs.
Capital Improvement Program 2013 thru 2017
City of C MN
Project # ST -017
Project Name TH 101 Corridor Preservation Planning
Account #1
Account #2
Account #3
Account #4
Department Street Improvements
Contact Paul Oehme
Type Improvement
Useful Life Unassigned
Category Streets/Highways
Priority n/a
Description I Total Project Cost: $480,000
A preliminary design, environmental scoping study was completed in 2007. A study to complete the environmental assessment review and
preliminary design from Pioneer Trail to Flying Cloud Drive is proposed for 2015 if other funding sources become available. No construction
funding for improvements have been identified at this time.
Justification
I To improve safety and mobility along the corridor and plan for future growth.
Prior Expenditures
180,000 Planning /Design
Total
300,000 300,000
Total 300,000 300,000
Prior
Funding Sources 2013
2014 2015 2016
2017 Total
180,000
Other Agency Contribution
225,000
225,000
Total
Street Pavement Management
75,000
75,000
Total
300,000
300,000
201 2014 2015 2016 2017 Total
Impact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # ST -018
Project Name P avement Management
Department
Street Improvements
Contact
Paul Oehme
Type
Maintenance
Useful Life
7 -10 years
Category
Streets/Highways
Account #1 420 - 0000 -4751 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $2,765,000
This project will provide maintenance such as crack sealing, seal- coating and pothole patching for City streets. Seal -coat projects will be
determined annually based on the pavement condition index as generated by the pavement management program. The street department uses this
funding source to pay for bituminous material for annual street patching.
Justification
Phis will provide a centralized funding mechanism that will help reduce the effect on General Fund operating expenditures.
Prior Expenditures
1,265,000 Maintenance
Total
Total 300,000 300,000 300,000 300,000 300,000 1,500,000
Prior Funding Sources
1,265,000 Street Pavement Management
Total Tax Levy
2013 2014 2015 2016 2017 Total
300,000 300,000 300,000 300,000 300,000 1,500,000
2013 2014 2015 2016 2017 Total
100,000 100,000 100,000 100,000 100,000 500,000
200,000 200,000 200,000 200,000 200,000 1,000,000
Total 300,000 300,000 300,000 300,000 300,000 1,500,000
Budget Impact/Other
Phese improvements will cost effectively prolong the life of the street so major improvements such as reconstruction projects can be delayed.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # ST -027
Project Name TH 101/Pleasant View Rd Intersection & Trail Imp
Account #1 420 - 4007 -xxxx
Account #2
Account #3
Account #4
Department Street Improvements
Contact Paul Oehme
Type Improvement
Useful Life
Category Streets/Highways
Priority n/a
Description I Total Project Cost: $1,258,000
The City has applied for state funds to make improvements to the intersection of TH 101 and Pleasant View Road. These improvements include
turn lanes, shoulder, drainage and trail improvements. The project would widen the intersection so left turn lanes can be constructed and curb and
gutter on TH 101 would be constructed where necessary. A 10' wide bituminous trail would be constructed on the west side of TH 101 from
Pleasant View Road to Town Line Drive. A trail would also be constructed on the north side of Pleasant View Road to connect to an existing trail
crossing. Pedestrian signage enhancement improvements are also planned for the intersection to improve safety crossing TH 101. A traffic signal
is not warranted at this intersection based on a MnDOT analvsis.
Justification
To improve safety, access and mobility in the project area.
Expenditures
2013 2014
2015 2016 2017 Total
Construction
1,258,000
1,258,000
Total
1,258,000
1, 258,000
Funding Sources
2013 2014
2015 2016 2017 Total
MSA
285,000
285,000
Other Agency Contribution
738,000
738,000
Park Dedication Fund
95,000
95,000
Street Pavement Management
90,000
90,000
Surface Water Utility Fund
50,000
50,000
Total
1,258,000
1,258,000
Budget Impact/Other
, uture maintenance of trail.
Capital Improvement Program 2013 thru 2017
Ci ty of Ch M
Project # ST -028
Project Name TH 101 Improvements -Lyman Blvd to Pioneer Trail
Account #1
Account #2
Account #3
Account #4
Department
Street Improvements
Contact
Paul Oehme
Type
Improvement
Useful Life
11,900,000
Category
Streets/Highways
Priority
n/a
Description I Total Project Cost: $11,900,000
This project is proposed to make improvements on TH 101 from Lyman Blvd to Pioneer Trail. The improvements are proposed to improve safety,
mobility and to plan for future growth in the region. The project is consistent with the 2007 101 corridor scoping study. Federal and state funds
are proposed to be used to pay for most of the improvements. The City will need to pay for extension of watermain consistent with the 2030
comprehensive plan.
Justifi I
I To improve safety and mobility on TH 101. The project also plans for growth of the community south of Lyman Blvd.
Expenditures
2013 2014
2015 2016 2017 Total
Construction
11,900,000
11,900,000
Total
11,900,000
11,900,000
Funding Sources
2013 2014
2015 2016 2017 Total
Assessment/Revolving Assess
75,000
75,000
MSA
250,000
250,000
Other Agency Contribution
10,800,000
10,800,000
Sewer Utility Fund
75,000
75,000
Water Utility Fund
700,000
700,000
Total
11,900,000
11,900,000
Budget hnpact/Other
Capital Improvement Program 2013 thru 2017
Ci of Ch anh a s s en, M
Project # ST -029
Project Name Repaint TH 5 Signals
Department
Street Improvements
Contact
Paul Oehme
Type
Maintenance
Useful Life
110,000
2013 2014
Category
Streets/Highways
Account #1 420 - 0000 -4751 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $110,000
This project would repaint the signals along TH 5 which are severely rusted. The maintenance agreement the City has with MNDOT and Carver
County states the City is responsible for the minor maintenance of the signals, which includes painting. If these signals are left to rust much
further, replacement may be warranted which would cost the City more. Seven signals are planned to be repainted on TH 5 from Century Blvd to
Dakota Ave.
Justification
I To avoid total replacement due to lack of maintenance and for aesthetic appeal.
Expenditures
2013 2014
2015 2016 2017 Total
Maintenance
110,000
110,000
Total
Funding Sources
110,000
2013 2014
1
2015 2016 2017 Total
Street Pavement Management
110,000
110,000
Total
110,000
110,000
Budget Impact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
P roject # SWNW-014
Proj Property Acquisition
Account #1 720-7025-4701 Account #3
Account #2 Account #4
Description
Fhe City will acquire property in accordance with its Comprehens
Department
Surface Water Management
Contact
Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
SWMP
Priority
n/a
Total Project Cost: $650,000
and Surface Water Management Plans.
Justification I
Properties within the City must be acquired in order to achieve the goals set forth in the Comprehensive and Surface Water Management Plans.
Prior Expenditures
425,000 Land Acquisition
Total
Prior Funding Sources
425,000 Surface Water Utility Fund
Total Total 75,000 75,000 75,000 225,000
2013 2014 2015 2016 2017 Total
75,000 75,000
75,000
225,000
75,000
75,000
75,000
225,000
Total 75,000
75,000
75,000
225,000
2013
2014 2015
2016 2017
Total
Budget Impact/(
Citywide. No map.
Capital Improvement Program 2013 thru 2017
City of Chanhasse MN
Project # SWMP -019
Project Name Street Improvement Projects - Storm Water Mgmt
Department
Surface Water Management
Contact
Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
SWMP
Account #1 720 - 70254751 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $1,350,000
kn annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects
mdertaken by the engineering and public works departments.
Justification
Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with
federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects.
Prior Expenditures
850,000 Construction
Total
Total 50,000 200,000 50,000 200,000 500,000
Prior
Funding Sources
2013
2014
2015
2016 2017
Total
850,000
Surface Water Utility Fund
50,000
200,000
50,000
200,000
500,000
Total
Total
50,000
200,000
50,000
200,000
500,000
Total
2013 2014
50,000 200,000
2015 2016 2017
50,000 200
500,000
Budge Imp act/Other
nventory, inspection and maintenance of new infrastructure will be required. Citywide. No map
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # SWMP -024
Project Name Lower Bluff Creek Sediment Improvements
Account #1 720 - 7025 -4751
Account i12
Account #3
Account i14
Department Surface Water Management
Contact Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
SWMP
Priority
n/a
Total Project Cost: $1,105,000
The Bluff Creek Total Maximum Daily Load Plan identified the lower reach of Bluff Creek (that area south of Pioneer) as the primary source of
total suspended solids (TSS). TSS loads at Pioneer Trail were on average 9,900 lbs, while at the TH101 and Carver County 61 wye they were
41,280 lbs. Consistent with the Bluff Creek Natural Resources Management Plan, the numerous gullies and escarpments in the lower reach are
largely responsible for this loading. This project will decrease the sediment load to Bluff Creek, the Minnesota River and to the Metro Mississippi
Watershed; all of which Chanhassen will have a waste load allocation (WLA) for.
Justification
2013 - Ravine #2 Stabilization Project - $240,000
2014 - Source Volume Reduction and Rate Control - $70,000
2015 - Ravine #6 Stabilization Project - $200,000
2016 - Source Volume Reduction and Rate Control - $70,000
2017 - Culvert/Bank Stabilization - Hennepin County Regional Trail - $225,000
Prior Expenditures 2013 2014 2015 2016 2017 Total
300,000 Construction 240,000 70,000 200,000 70,000 225,000 805,000
Total Total 240,000 70,000 200,000 70,000 225,000 805,000
Prior
300,000
Total
Funding Sources 2013 2014 2015 2016 2017 Total
Other Agency Contribution 165,000 35,000 125,000 35,000 150,000 510,000
Surface Water Utility Fund 75,000 35,000 75,000 35,000 75,000 295,000
Total 240,000 70,000 200,000 70,000 225,000 805,000
Budget hnpact/Other
All stabilization areas will require maintenance for 2 to 4 years.
Capital Improvement Program 2013 thru 2017
C of Chan MN
Project # SWMP -032
Project Name Stormwater Pond Improvements
Account #1 720 - 70254751
Account #2
Account #3
Account #4
Department Surface Water Management
Contact Paul Oehme
Type Improvement
Useful Life
Category SWMP
Priority n/a
Description I Total Project Cost: $360,000
Phis project will provide inspection and cleaning if required of all City stormwater ponds on a rotating four (4) year schedule, to identify any
nanagement needs and perform needed repairs and improvements. This may include sediment removal, placement of blanket, rip -rap or other
;rosion control BMP's, vegetation management and assessment, repair and replacement of inlet and outlet structures.
Justification
There are over 170 stormwater ponds in the City of Chanhassen, all requiring regular maintenance to assure they function to National Urban
Runoff Program recommendations. This measure has also been identified in Chanhassen's National Pollution Discharge Elimination Municipal
Separate Storm Sewer System permit.
Prior
150,000
Total
Expenditures 2013 2014 2015 2016 2017 Total
Maintenance 50,000 20,000 60,000 20,000 60,000 210,000
Total 50,000 20,000 60,000 20,000 60,000 210,000
Prior
Funding Sources
2013
2014
2015
2016
2017
Total
150,000
Surface Water Utility Fund
50,000
20,000
60,000
20,000
60,000
210,000
Total
Total
50,000
20,000
60,000
20,000
60,000
210,000
Budget hnpact/Other
This will require an input of other public works staff hours.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # SWMP -035
Project Name LID Implementation Project
Account #1 720 - 7025 -4751
Account #2
Account #3
Account #4
Department Surface Water Management
Contact Paul Oehme
Type Improvement
Useful Life
Category SWMP
Priority n/a
Description I Total Project Cost: $118,750
This project will work with residents within the City of Chanhassen who are willing to construct alternative stormwater best management practices
on their property and assist them with the design and construction of these features.
Justification
Water Resources staff have been approached by several Chanhassen residents and neighborhood groups interested in incorporating these features
into their landscaping plans and looking for guidance and assistance with the design and construction. By identifying and assisting residents with
the design and implementation of alternative stormwater treatment features, the City will be able to address water quality and quantity issues in
fully developed areas where regional ponding is not a practical option. This project will also meet requirements of the City's NPDES permit and
nondegradation plan as well as meeting issues identified in the Second Generation Surface Water Management Plan.
Prior Expenditures
2013
2014
2015
2016
2017
Total
F --- 62 - , - 50 - o l construction
11,250
11,250
11,250
11,250
11,250
56,250
Total
Total 11,250
11,250
11,250
11,250
11,250
56,250
Prior
Funding Sources
2013
2014
2015
2016
2017
Total
62,500
Surface Water Utility Fund
11,250
11,250
11,250
11,250
11,250
56,250
Total
Total
11,250
11,250
11,250
11,250
11,250
56,250
[get I tpact/Other
require additional notices, mailings and web page communications.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # SWMP -039
Project Name Cranes Vineyard Creek
Account #1 720 - 70254751
Account #2
Account #3
Account #4
Department Surface Water Management
Contact Paul Oehme
Type Improvement
Useful Life
Category SWMP
Priority n/a
Description
Total Project Cost: $300,000
Fhis project will stabilize the remaining 750 feet of Cranes Vineyard Creek (aka Curry Farm Creek) and stabilize the delta that has formed at the
>utlet into Christmas Lake.
Justification
Previously a large portion of the Creek was stabilized with utility repair work. The final 750 feet was not addressed at that time due to conflicts
with area landowners. The utility issues still exist and sanitary sewer becomes exposed. City staff has been in dialogue with the landowners and it
appears a compromise may be attainable. This project is identified in the Second Generation Surface Water Management Plan and will meet the
mitigation requirements of the Nondegradation Plan.
Expenditures 2013 2014 2015 2016 2017 Total
Construction 300,000 300,000
Total 300,000 300,000
Funding Sources 2013 2014 2015 2016 2017 Total
Other Agency Contribution 225,000 225,000
Surface Water Utility Fund 75,000 75,000
Total 300,000 300,000
Budget Impa 1
kdditional funding will be required to address sanitary sewer repairs and/or realignment. Vegetative management will be needed for a minimum of
hree years after completion.
Capital Improvement Program 2013 thru 2017
C of Chanhassen, MN
Project # SWMP -045
Project Name Storm Water Infrastructure Maintenance/Replacement
Account #1 720 - 7025 -xxxx Account #3
Account #2 Account #4
Department Surface Water Management
Contact Paul Oehme
Type Improvement
Useful Life
Category SWMP
Priority n/a
Total Project Cost: $200,000
This project is an annual maintenance budget used to maintain or replace failing or deficient public storm water infrastructure and have a
construction cost less than $25,000. In some instances public works staff can complete the work and pay for materials out of this fund. Other
times a contractor may be needed to complete the work.
Justifi
,very year the City replaces culverts, storm water structures and pipe throughout the City that have failed. These replacements are unforeseen ar
gyre typically noticed only after they have failed. Often these failures result in public safety issues or pose a potential threat to private property or
)ther City infrastructure.
Prior Expenditures
75,000 Construction
Total
25,000 25,000 25,000 25,000 25,000 125,000
Total 25,000 25,000 25,000 25,000 25,000 125,000
Prior Funding Sources
2013
2014
2015
2016
2017
Total
75,000 Surface Water Utility Fund
25,000
25,000
25,000
25,000
25,000
125,000
Total Total
25,000
25,000
25,000
25,000
25,000
125,000
2013 2014 2015 2016 2 017 Total
;et Impact/Other
activities will likely involve the utilization of public works labor.
Capital Improvement Program 2013 thru 2017
Ci ty of Cha M N
Project # SWMP -046
Project Name W est Central Lotus Lake -Phase II
Account #1
Account #2
Expenditures 2013 2014 2015 2016 2017 Total
Mainte nance 400,000 5,000 405,000
Department Surface Water Management
Contact Paul Oehme
Type Improvement
Useful Life
Category SWMP
Priority n/a
Description I Total Project Cost: $405,000
Ibis project will stabilize approximately 1,600 feet of deeply incised channel tributary to Lotus Lake. Along with the stabilization, best
nanagement practices aimed at reducing nutrient loading to Lotus Lake will be implemented.
Jus
The watershed draining through this channel is 362 acres in size or over 36% of the entire watershed draining to Lotus Lake and a similar
percentage of the sediment load. A 2008 feasibility report recommended three phases of improvements. Phase I was completed in 2009
decreasing the rate of discharge into the channel. City staff has been contacted by several of the adjoining property owners inquiring as to the
status of this phase of the project.
Account #3
Account #4
Total 400,000 5,000 405,000
Funding Sources 2013 2014 2015 2016 2017 Total
Other Agency Contribution 325,000 325,000
Surface Water Utility Fund 75,000 5,000 80,000
Total 400,000 5,000 405,000
Budget Impact/Other
?stablishment of understory vegetation will require maintenance for 2 to 4 years. This project will help meet load reduction requirements to Lotus
,ake per the anti - degradation plan and MS4 permit.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # W -024
Project Name W atermain Replacement
2013 2014
175,000 700,000
Account #1 700 - 7025 -4751 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $3,275,000
Replacement of existing water main lines in coordination with the reconstruction of the City street projects or minor fixes of water distribution
system for street rehabilitation projects.
Justification I
The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by
consolidating these projects and also to avoid potential cuts in recently improved streets. If significant repairs are necessary to the existing water
main, replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement is an ongoing
project in the City.
Prior Expenditures
1,500,000 Construction
Total
Prior Funding Sources
1,500,000 Water Utility Fund
Total
2015 2016
125,000 700,
Department
Water System Improvements
Contact
Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
Utilities
2017 Total
75,000 1,775,000
Total 175,000
700,000
125,000
700,000
75,000
1,775,000
2013
2014
2015
2016
2017
Total
175,000
700,000
125,000
700,000
75,000
1,775,000
Total 175,000
700,000
125,000
700,000
75,000
1,775,000
Bu hnp
Chese projects will decrease maintenance costs.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # W -027
Project Name Pressure Reducing Station
2013 2014 2015 2016 2017 Total
Account #1 700 - 7025 -4751 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $205,000
Pwo pressure reducing stations are programmed for the 2010 MUSA area and TH 101 in 2014 and 2015 if the area is developed.
Justification
Identified in the 2010 Comprehensive Water Supply Plan. Needed to control watermain pressure due to elevation changes for future development
areas.
Prior Expenditures
65,000 Construction
Total
Prior Funding Sources
65,000 Water Utility Fund
Total
65,000 75,000
Department
Water System Improvements
Contact
Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
Utilities
140,000
Total 65,000 75,000 140,000
2013 2014 2015 2016 2017 Total
65,000 75,000 140,000
Total 65,000 75,000 140,000
B udget Impact/Other
Chis project will increase maintenance costs.
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # W -032
Project Name W ell Rehabilitation Program
Account #1 700 - 7025 -4530
Account #2
Account #3
Account #4
Department Water System Improvements
Contact Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
Utilities
Priority
n/a
Description I Total Project Cost: $380,000
This program annually inspects and performs regular maintenance of the City's wells. Well pumps are recommended to be serviced every 8 years.
It is recommended that the following pumps and motors be pulled and inspected for wear:
2014 - Well #10
2015 - Well #I1
2016 - Well #2 and #12
2017 - Well #3 and #7
Justification
(Performing regular maintenance will extend the life of well components, reduce emergency calls and have a more reliable water supply system.
Prior Expenditures
180,000 Maintenance
Total
Prior Funding Sources
180,000 Water Utility Fund
Total
2013 2014
2015
2016
2017
Total
40,000
40,000
60,000
60,000
200,000
Total 40,000
40,000
60,000
60,000
200,000
2013 2014 2015 2016 2017 Total
40,000 40,000 60,000 60,000 200,000
Total 40,000 40,000 60,000 60,000 200,000
Budget Impact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # W -041
Project Name Repaint Lake Lucy Water Stand Pipe
Account #1 700 - 7025 -4751 Account #3
Account #2 Account #4
Description
This project will repaint the interior and exterior surfaces of the Lake Lucy stand pipe.
Department
Water System Improvements
Contact
Paul Oehme
Type
Improvement
Useful Life
Category
Utilities
Priority
n/a
Total Project Cost: $550,000
Justification
Steel tanks require recoating to protect the metal to prevent more costly repairs. An inspection report will be drafted prior to construction
justifying the work. The tank was last painted in 2000. If this tank is not repainted soon, the cost will increase significantly.
Expenditures 2013 2014 2015 2016 2017 Total
Construction 550,000 550,000
Total 550,000 550,000
Funding Sources 2013 2014 2015 2016 2017 Total
Water Utility Fund 550,000 550,000
Total 550,000 550,000
Impact/Other
Capital Improvement Program 2013 thru 2017
C of C MN
Project # W -048
Project Name W ell #15 Improvements
Department
Water System Improvements
Contact
Paul Oehme
Type
Improvement
Useful Life
Category
Utilities
Account #1 700 - 7025 -4751 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $1,400,000
Ibis well is proposed to meet the water needs of the growing community. This project is needed dependent on growth, summer water usage and
iquifer levels.
I Justification
I To meet the growing water needs of the City planned for in the 2008 water comprehensive plan.
Expenditures 2013 2014 2015 2016 2017 Total
Construction 1,400,000 1,400,000
Total 1,400,000 1,400,000
Funding Sources 2013 2014 2015 2016 2017 Total
Water Utility Fund 1,400,000 1,400,000
Total 1,400,000 1,400,000
Budget Impact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # W -050
Project Name High Zone High Service Pump
Account #1 700 - 70254751
Account #2
Account #3
Account #4
Department Water System Improvements
Contact Paul Oehme
Type Improvement
Useful Life
Category Utilities
Priority n/a
Description I Total Project Cost: $120,000
This project would allow water in the low zone pressure area that has treated water (iron and manganese removed) to be pumped up to the high
zone water pressure area.
Justification
This project is proposed due to the development growth in the high zone water pressure area. The west water treatment plant will be designed to
allow water to be pumped to either the high or low zone area. However, construction of the west water treatment plant is not planned until 2018 at
the earliest. The high service pump will allow treated water into the high zone during the winter months, so potentially 100% of the City could
have treated water a portion of the year.
Expenditures
2013 2014
2015 2016 2017 Total
Construction
120,000
120,000
Total
Funding Sources
120,000
2013 2014
120,000
2015 2016 2017 Total
Water Utility Fund
120,000
120,000
Total
Impact/Other I
120,000
120,000
Capital Improvement Program 2013 thru 2017
City o Cha MN
Project # W -055
Project Name 78 th Street Watermain Loop Improvements
Account #1
Account #2
Account #3
Account #4
Department Water System Improvements
Contact Paul Oehme
Type Improvement
Useful Life
Category Utilities
Priority n/a
Description I Total Project Cost: $150,000
l his project will extend an 8" watermain on 78th Street from TH 41 west to the Arbor's development.
Justificati I
Che Arbor's development is fully built out and water for this area is served by a trunk watermain on Tanadoona Drive. This development has a
ong service area which is currently not looped. During high flow events such as hydrant flushing this area can experience water hammers that can
muse hot water heater valves to open. This can lead to damage in the properties. To eliminate the water hammer problem the best solution is to
oop the watermain to TH 41.
Expenditures 2013
2014 2015 2016
2017 Total
Construction
150,000
150,000
Total
Funding Sources 2013
150,000
2014 2015 2016
150,000
2017 Total
Water Utility Fund
150,000
150,000
Total
150,000
150,000
Impact/Other
Capital Improvement Program 2013 thru 2017
City of Chanhassen, MN
Project # W -056
Project Name NWSA Trunk Watermain Oversizing
Department
Water System Improvements
Contact
Paul Oehme
Type
Improvement
Useful Life
Category
Utilities
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $310,000
Phis project pays for the oversizing of lateral watermains for future developments. Payment for this project will be from the Trunk Water fund
vhich is funded by development hook -up charges.
Justificati I
This project is necessary to support growth in the City and to ensure proper water pressure and fire flows.
Expenditures 2013 2014 2015 2016 2017 Total
Construction 200,000 110,000 310,000
Total 200,000 110,000 310,000
Funding Sources 2013 2014 2015 2016 2017 Total
vvater unuty Fund 200,000 110,000 310,000
Total 200,000 110,000 310,000
Budget Impact/Other