Loading...
2c. 2 & 3. Approve Plans and Specs The Summit at Near Mtn 2nd Addition I 4e.0.143 1 i CITYOF ---- ,v CHANHASSEN 1 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 1 (612) 937 -1900 • FAX (612) 937 -5739 1 MEMORANDUM OFFICIAL ENONEERINQ COPY Received TO: Charles Folch, City Engineer Revision No. I FROM: Dave Hempel, Assistant City Engineer Approved . .. p 1, ty Engui 2 -3 Date ' 73 1 DATE: February 2, 1993 Approved by City Council SUBJ: Approve Construction Plans and Specifications and Dev I The Summit at Near Mountain 2nd Addition Project No. 93 -2 1 The attached development contract incorp t the conditions of approval for the final platting and construction plans and specifi : on .' proval p rocess. The construction costs I for the public improvements have been g,y culat . As a result, the required security to guarantee compliance with the terms o ' e de ve g r ' ment contract has been computed at I $272,400. In conjunction with the devel 40m.ent con t ct, the appropriate administration fee totals $8,279. I On April 23, 1992 the City Co „I approved the , i g al plat for The Summit at Near Mountain, Phase I. All site gr • ' and tree removal fo -;; o e street and utility improvements for both phases were Con' .3 d with Phase I of the ; velopment. The applicant has 1 submitted detailed cons p ,� n plans for The Summit a E, ear Mountain 2nd Addition for staffs review and 4w, - . uncil's approval. Staff has re 40',, wed the plans and finds them acceptable. How It S',. . dirojetripaittationner f .. e . City's 1992 edition of Standard 1 Specifications € ., - . g-: s." f _,( . , g g w ';i4`'. " ' t . . . . ',F , . ' „I., .. I City's 1992 Standard Spe ■ .: , ' & Detail Plates for 1993. construction. • refore, it is recommended • • cifications for�construction. .; tl the �updafed (1993) oval change from standard the 1 P -�, final plat or construction plans and specifi. ti Ols approval process, the conditions should be amended in the development contract ....:, � • u y. I It is therefore recommended that the construction lans dated March 2, 1 revised P � � February 1, 1993, prepared by Sathre- Eergquist, Inc. and the development contract dated 1 February 8, 1993 be approved conditioned upon the following conditions: 1 � 1 41 PRINTED ON RECYCLED PAPER 1 Charles Folch, City Engineer February 2, 1993 1 Page 2 ' 1. The applicant shall enter into the development contract and supply the City with a cash escrow or letter of credit in the amount of $272,400 and pay an administration fee of $8,279. ' 2. The project specifications shall adhere to the City's 1993 standard specifications and detail plates. 1 ktm 1 Attachments: 1. Construction plan (specifications available for review in the Engineering Department). 2. Development Contract. c: Mike Pflau Lundgren Bros. Construction, Inc. � � � Anion by City Administrator ' Endorsed ✓ t4 � Modified . 1 Date Submitted to Commission Dste Sc3 -'i,d tc Council 1 1 • 1 1 1 1 1 1 1 CITY OF CHANHASSEN DEVELOPMENT CONTRACT (Developer Installed Improvements) THE SUMMIT AT NEAR MOUNTAIN 2ND ADDITION SPECIAL PROVISIONS AGREEMENT dated February 8 , 1993, by and between the CITY OF CHANHASSEN, a Minnesota municipal corporation (the "City "), and LUNDGREN BROS. CONSTRUCTION, INC. (the "Developer "). 1. Request for Plat Approval. The Developer has asked the City to approve a plat for THE SUMMIT AT NEAR MOUNTAIN 2ND ADDITION (referred to in this Contract as the "plat "). The land is legally described as Outlots E, F, G and H, THE SUMMIT AT NEAR MOUNTAIN. 2. Conditions of Plat Approval. The City hereby approves the plat on condition that the Developer enter into this Contract and furnish the security required by it. 3. Development Plans. The plat shall be developed in accordance with the following plans. The plans shall not be attached to this Contract. With the exception of Plan A, the plans may be prepared, subject to City approval, after entering the Contract, but before commencement of any work in the plat. If the plans vary from the written terms of this Contract, the written terms shall control. The plans are: Plan A- -Final Plat prepared by Sathre - Bergquist, Inc. approved by the Chanhassen City Council on February 8, 1993. 1 Plan B -- Grading, Drainage and Erosion Control Plan dated March 2, 1992, Revised January 20, 1993, prepared by Sathre - Bergquist, Inc. Plan C- -Plans and Specifications for Public Improvements dated January 22, 1993, Revised February 1, 1993, 1 prepared by Sathre - Bergquist, Inc. 1 1 1 1 SP -1 1 1 4. Improvements. The Developer shall install and pay for the following: ' A. Sanitary Sewer System B. Water System ' C. Storm Water Drainage System D. Streets E. Concrete Curb and Gutter F. Street Signs G. Street Lights H. Site Grading I. Underground Utilities (e.g. gas, electric, ' telephone, CATV) J. Setting of Lot and Block Monuments K. Surveying and Staking 5. Time of Performance. The Developer shall install all required improvements by November 15, 1994. The Developer may, however, request an extension of time from the City. If an extension is granted, it shall be conditioned upon updating the security posted by the Developer to reflect cost increases and the extended completion date. 6. Security. To guarantee compliance with the terms of this Contract, payment of special assessments, payment of the costs of all public improvements, and construction of all public ' improvements, the Developer shall furnish the City with a letter of credit from a bank, cash escrow, or equivalent ( "security ") for $ 272,400.00 . The amount of the security was calculated as 110% ' of the following: Sanitary sewer $ 46.500 Watermain $ 39,200 On -site storm sewer $ 42.500 Streets $ 89.400 3 Street lights and signs $ 800 ' Erosion control $ 2.000 Engineering, surveying, and inspection $ 22.440 Landscaping $ 4.000 ' Iron Monuments to delineate conservation easement $ 800 ' TOTAL COST OF PUBLIC IMPROVEMENTS . . . $ 247,640 This breakdown is for historical reference; it is not a restriction on the use of the security. The security shall be subject to the ' approval of the City. The security shall be for a term ending December 31, 1994. The City may draw down the security, without notice, for any violation of the terms of this Contract. If the ' required public improvements are not completed at least thirty (30) days prior to the expiration of the security, the City may also draw it down. If the security is drawn down, the draw shall be used to cure the default. With City approval, the security may be reduced from time to time as financial obligations are paid, but in no case shall the security be reduced to a point less than 10% of SP -2 I/ the original amount until all improvements are complete and accepted by the City. 7. Notice. Required notices to the Developer shall be in 1 writing, and shall be either hand delivered to the Developer, its employees or agents, or mailed to the Developer by registered mail at the following address: 1 Lundgren Bros. Construction, Inc. 935 East Wayzata Boulevard Wayzata, MN 55391 Telephone: (612) 473 -1231 Facsimile: (612) 473 -7401 Notices to the City shall be in writing and shall be either hand delivered to the City Manager, or mailed to the City by registered mail in care of the City Manager at the following address: 1 Chanhassen City Hall, 690 Coulter Drive, P.O. Box 147, Chanhassen, Minnesota 55317, Telephone (612) 937 -1900. 8. Other Special Conditions. (This section to include ' conditions of approval from the plat review and plan and specification review process). A. A tree removal plan approved by city staff will be required for each lot in the subdivision prior to the issuance of a building permit. There shall be no clearcutting permitted for any lot except for the placement of the house pad and utilities. Clearcutting is defined as removal of any vegetation with a 4" caliper or more at four feet in height. 1 B. A conservation easement shall be provided at the 945' contour along Lots 1 -4, Block 4. The area below the 945' contour, including the wetland and shoreland, will not be permitted to be altered. C. Lots 3 and 4, Block 4, which have lakeshore on Silver Lake, will not be permitted to have docks accessing Silver Lake without receiving a wetland alteration permit. D. The applicant must receive and comply with conditions of final construction plans and specification approval from the City Council. All street and utility improvements shall conform to the city's 1993 Standard Specifications and detail ' plates. E. Wood fiber blankets or equivalent shall be utilized to stabilize slopes greater than 3:1. F. Additional spot elevations and necessary grading plan contours shall be provided with the building permit application for proper surface drainage around proposed buildings and driveway grade. 11 SP -3 1 1 11 G. The applicant shall enter into a development contract with the city to provide the city with the necessary financial sureties to guarantee the proper installation of the improvements. H. The applicant shall notify property owners of their 1 maintenance responsibilities and ownership of the boulder retaining wall by means of covenants and verbiage in the chain of title and the secondary emergency access to Indian Hills Road (Iroquois). I. All lots shall conform with any future tree protection ordinances. ' J. The City and watershed district will require that individual lot grading plans be submitted for all lots proposed along the "outside" perimeter of Oxbow Bend. Upon review of the individual lot grading plan, including soils information, the district may require that roof runoff drainage systems be installed to minimize the potential of an erosion problem occurring along the steep slope areas. K. Upon completion of construction and restoration of all areas disturbed, the applicant is responsible for the removal of all erosion control measures installed throughout the site. 9. General Conditions. The general conditions of this I Contract, approved by the City Council on February 22, 1988, are attached as Exhibit "B" and incorporated herein. 1 1 ' SP -4 I/ CITY OF CHANHASSEN 11 BY: 1 Donald J. Chmiel, Mayor (SEAL) AND: Don Ashworth, City Manager DEVELOPER: LUNDGREN BROS. CONSTRUCTION, INC. BY: Its STATE OF MINNESOTA ) ( ss. COUNTY OF CARVER ) The foregoing instrument was acknowledged before me this 1 day of , 19 , by Donald J. Chmiel, Mayor, and by Don Ashworth, City Manager, of the City of Chanhassen, a Minnesota municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. NOTARY PUBLIC ' STATE OF MINNESOTA ) ( ss. COUNTY OF The foregoing instrument was acknowledged before me this , day of , 19 , by NOTARY PUBLIC 1 1 DRAFTED BY: Campbell, Knutson, Scott & Fuchs, P.A. 317 Eagandale Office Center 1380 Corporate Center Curve Eagan, Minnesota 55121 (612) 452 -5000 1 SP -4 1 1 CONSENT fee owners of all or part of the subject property, the development of which is governed by the foregoing Development Contract, affirm and consent to the provisions thereof and agree to be bound by the provisions as the same may apply to that portion of the subject property owned by them. Dated this day of , 19 1 1 1 STATE OF MINNESOTA ) ( ss. COUNTY OF 11 day The foregoing instrument was acknowledged before me this of , 19 , • NOTARY PUBLIC DRAFTED BY: Campbell, Knutson, Scott ' & Fuchs, P.A. 317 Eagandale Office Center 1380 Corporate Center Curve 1 Eagan, Minnesota 55121 (612) 452 -5000 1 1 1 1 1 SP -5 I/ CITY OF CHANHASSEN 1 DEVELOPMENT CONTRACT (Developer Installed Improvements) EXHIBIT "B" GENERAL CONDITIONS 1. Right to Proceed. Within the plat or land to be platted, the Developer may not grade or otherwise disturb the earth, remove trees, construct sewer lines, water lines, streets, utilities, public or private improvements, or any buildings until all the following conditions have been satisfied: 1) this agreement has been fully executed by both parties and filed with the City Clerk, 2) the necessary security and fees have been received by the City, 3) the plat has been recorded with the County Recorder's Office of , the County where the plat is located, and 4) the City Engineer has issued a letter that the foregoing conditions have been satisfied and then the Developer may proceed. ' 2. Phased Development. If the plat is a phase of a multi - phased preliminary plat, the City may refuse to approve final plats of subsequent phases if the Developer has breached this Contract and the breach has not been remedied. Development of subsequent phases may not proceed until Development Contracts for such phases are approved by the City. , 3. Effect of Subdivision Approval. For two (2) years from the date of this Contract, no amendments to the City's Comprehensive Plan, except an amendment placing the plat in the current urban service area, or official controls shall apply to or affect the use, development density, lot size, lot layout or dedications of the approved plat unless required by state or federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the contrary, to the full extent permitted by state law the City may require compliance with any amendments to the City's Comprehensive Plan, official controls, platting or dedication requirements enacted after the date of this Contract. 4. Improvements. The improvements specified in the Special Provisions of this Contract shall be installed in accordance with City standards, ordinances, and plans and specifications which have been prepared and signed by a competent registered professional engineer furnished to the City and approved by the City Engineer. The Developer shall obtain all necessary permits from the Metropolitan Waste Control Commission and other agencies before proceeding with construction. The City will, at the Developer's expense, have one or more construction inspectors and a soil engineer inspect the work on a full or part -time basis. The Developer shall instruct its engineer to respond to questions from the City Inspector(s) and to make periodic site visits to satisfy that the construction is being performed to an acceptable level of 1 quality in accordance with the engineer's design. The Developer or GC -1 1 II 11 his engineer shall schedule a preconstruction meeting at a mutually agreeable time at the City Council chambers with all parties II concerned, including the City staff, to review the program for the construction work. Within sixty (60) days after the completion of the improvements and before the security is released, the Developer I shall supply the City with the following: (1) a complete set of reproducible Mylar as -built plans, (2) two complete sets of blue line as built plans, (3) two complete sets of utility tie sheets, (4) location of buried fabric used for soil stabilization, (5) I location stationing and swing ties of all utility stubs, (6) bench mark network, and (7) a 200 scale and a 500 scale reproducible Mylar copy of the plat. 1 5. Iron Monuments. Before the security for the completion of utilities is released, all monuments must be correctly placed in the ground in accordance with Minn. Stat. § 505.02, Subd. 1. The II Developer's surveyor shall submit a written notice to the City certifying that the monuments have been installed. I 6. License. The Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the plat to perform all work and inspections deemed appropriate by the I City in conjunction with plat development. 7. Site Erosion Control. Before the site is rough graded, II and before any utility construction is commenced or building permits are issued, the erosion control plan, Plan B, shall be implemented, inspected, and approved by the City. The City may impose additional erosion control requirements if they would be ' beneficial. All areas disturbed by the excavation and backfilling operations shall be reseeded forthwith after the completion of the work in that area. Except as otherwise provided in the erosion II control plan, seed shall be certified seed to provide a temporary ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed retention. The parties recognize that time is of the essence in controlling erosion. If the Developer does not comply with the erosion control plan and schedule of supplementary instructions received from the City, the City may take such action as it deems I appropriate to control erosion at the Developer's expense. The City will endeavor to notify the Developer in advance of any proposed action, but failure of the City to do so will not affect I the Developer's and City's rights or obligations hereunder. No development will be allowed and no building permits will be issued unless the plat is in full compliance with the erosion control requirements. Erosion control needs to be maintained until I vegetative cover has been restored, even if construction has been completed and accepted. After the site has been stabilized to where, in the opinion of the City, there is no longer a need for II erosion control, the City will authorize the removal of the erosion control, i.e. hay bales and silt fence. The Developer shall remove and dispose of the erosion control measures. II 8. Clean up. The Developer shall maintain a neat and orderly work site and shall daily clean, on and off site, dirt and II GC -2 debris, including blowables, from streets and the surrounding area that has resulted from construction work by the Developer, its agents or assigns. , 9. Acceptance and Ownership of Improvements. Upon completion and acceptance by the City of the work and construction required by this Contract, the improvements lying within public easements shall become City property. After completion of the improvements, a representative of the contractor, and a representative of the Developer's engineer will make a final inspection of the work with the City Engineer. Before the City accepts the improvements, the City Engineer shall be satisfied that all work is satisfactorily completed in accordance with the approved plans and specifications and the Developer and his engineer shall submit a written statement attesting to same with appropriate contractor waivers. Final acceptance of the public improvements shall be by City Council resolution. 1 10. Claims. In the event that the City receives claims from laborers, materialmen, or others that work required by this Contract has been performed, the sums due them have not been paid, and the laborers, materialmen, or others are seeking payment out of the financial guarantees posted with the City, and if the claims are not resolved at least ninety (90) days before the security required by this Contract will expire, the Developer hereby authorizes the City to commence an Interpleader action pursuant to Rule 22, Minnesota Rules of Civil Procedure for the District Courts, to draw upon the letters of credit in an amount up to 125% of the claim(s) and deposit the funds in compliance with the Rule, and upon such deposit, the Developer shall release, discharge, and dismiss the City from any further proceedings as it pertains to the letters of credit deposited with the District Court, except that the Court shall retain jurisdiction to determine attorneys' fees. 11. Park and Trail Dedication. Prior to the issuance of building permits for residential construction within the plat, the Developer, its successors or assigns, shall pay to the City the park and trail dedication fees then in force pursuant to Chanhassen City Ordinances and City Council resolutions. 12. Landscaping. Unless the lot already has one tree in the ' front yard of suitable species, the Developer or lot purchaser shall plant a tree in the front yard of every lot in the plat. Suitable trees include: Maples Ash Linden Basswood Green Ash Birch Honey Locust Ginko (male only) Hackberry Kentucky Coffee Tree Oak Other species of trees may be approved by the building inspector. Trees which can cause a public nuisance, such as cotton producing trees, or can be a public hazard, such as bug infestation or weak GC -3 11 1 bark, are prohibited. The minimum tree size shall be two and one -half (21/2) inches caliper, either bare root in season, or balled and burlapped. The trees may not be planted in the boulevard (area between curb and property line). In addition to any sod required as a part of the erosion control plan, Plan B, the Developer or lot purchaser shall sod the boulevard area and all drainage ways on each lot utilizing a minimum of four (4) inches of topsoil as a base. Seed or sod shall also be placed on all disturbed areas of the lot. If these improvements are not in place at the time a ' certificate of occupancy is requested, a financial guarantee in the form of cash or letter of credit shall be provided to the City. Improvements are to be completed during the first growing season after issuance of the certificate of occupancy. After satisfactory ' inspection, the financial guarantee shall be returned. The City has established the financial guarantee at $1,000.00; however, this may be increased annually based upon cost. These requirements supplement, but do not replace, specific landscaping conditions that may have been required by the City Council for project approval. 11 13. Warranty. The Developer warrants all work required to be performed by it against poor material and faulty workmanship for a period of two (2) years after its completion and acceptance by the City. All trees, grass, and sod shall be warranted to be alive, of good quality, and disease free at the time of planting. All trees shall be warranted for twelve (12) months from the time of planting. The Developer or his contractor(s) shall post a letter of credit or other security acceptable to the City to secure the warranties at the time of final acceptance. 14. Lot Plans. Prior to the issuance of building permits, an acceptable Grading, Drainage, Erosion Control, and Tree Removal Plan shall be submitted for each lot as required in the Special ' Provisions, for review and approval by the City Engineer. Each plan shall assure that drainage is maintained away from buildings and that tree removal is consistent with City Ordinance. ' 15. Existing Assessments. Any existing assessments against the plat will be re- spread against the plat in accordance with City standards. 16. Street Lighting. The Developer shall have installed and pay for street lights in accordance with City standards. A plan shall be submitted for the City Engineer's approval prior to the installation. Before the City signs the final plat, the Developer shall pay the City a fee of $200.00 for each street light installed 1 in the plat. The fee shall be used by the City for furnishing electricity for each light for twenty (20) months. 17. Street Signs. All street name and traffic signs required by the City as a part of the public improvements shall be furnished and installed by the City at the sole expense of the Developer. ' GC -4 I/ 1 18. House Pads. The Developer shall promptly furnish the City "as- built" plans indicating the amount, type and limits of , fill on any house pad location. • 19. Responsibility for Costs. A. The Developer shall pay an administrative fee in conjunction with the installation of the plat improvements. This fee is to cover the cost of City Staff time and overhead for items such as review of construction documents, preparation of the Development Contract, monitoring construction progress, processing pay requests, processing security reductions, and final acceptance of improvements. This fee does not cover the City's cost for resident construction inspections. The fee shall be shall be calculated as follows: i) if the cost of the construction of public improvements is less than $500,000, three percent (3 %) of construction costs; ' ii) if the cost of the construction of public improvements is between $500,000 and $1,000,000, three percent (3 %) of construction costs for the first $500,000 and two percent (2 %) of construction costs over $500,000; iii) if the cost of the construction of public improvements is over $1,000,000, two and one -half percent (21/2%) of construction costs for the first $1,000,000 and one and one -half percent (11/2%) of construction costs over $1,000,000. Before the City signs the final plat, the Developer shall deposit with the City a fee based upon construction estimates. After construction is completed, the final fee shall be determined based upon actual construction costs. The cost of public improvements is defined in paragraph 6 of the Special Provisions. B. In addition to the administrative fee, the Developer , shall reimburse the City for all out -of- pocket costs incurred by the City for providing resident construction inspections. This cost will be periodically billed directly to the Developer based on the actual progress of the construction. Payment shall be due in accordance with Article 17E of this Agreement. C. The Developer shall hold the City and its officers ' and employees harmless from claims made by itself and third parties for damages sustained or costs incurred resulting from plat approval and development. The Developer shall indemnify the City and its officers and employees for all costs, damages, or expenses which the City may pay or incur in consequence of such claims, including attorneys' fees. , GC -5 , 1 D. In addition to the administrative fee, the Developer er P shall reimburse the City for costs incurred in the enforcement of this Contract, including . engineering and attorneys' fees. E. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under this Contract within thirty (30) days after receipt. If the bills are not paid on time, the City may halt all plat development work and construction, including but not limited to the issuance of building permits for lots which the Developer may or may not have sold, until the bills are paid in full. Bills not paid within thirty (30) days shall accrue interest at the rate of 8% per year. F. In addition to the charges and special assessments referred to herein, other charges and special assessments may be imposed such as, but not limited to, sewer availability charges ( "SAC "), City water connection charges, City sewer connection charges, and building permit fees. ' 20. Developer's Default. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly reimburse the City for any expense incurred by the City, provided the Developer is first given notice of the work in d€'fault, not less than four (4) days in advance. This Contract is ' Ycense for the City to act, and it shall not be necessary for 1, City to seek a Court order for permission to enter the land. W:n.tn the City does any such work, the City may, in addition to its other remedies, assess the cost in whole or in part. 21. Miscellaneous. ' A. Construction Trailers. Placement of on -site construction trailers and temporary job site offices shall be approved by the City Engineer as a part of the pre - construction meeting for installation of public improvements. Trailers shall be ' removed from the subject property within thirty (30) days following the acceptance of the public improvements unless otherwise approved by the City Engineer. B. Postal Service. The Developer shall provide for the maintenance of postal service in accordance with the local ' Postmaster's request. C. Third Parties. Third parties shall have no recourse against the City under this Contract. D. Breach of Contract. Breach of the terms of this Contract by the Developer shall be grounds for denial of building permits, including lots sold to third parties. E. Severability. If any portion, section, subsection, ' sentence, clause, paragraph, or phrase of this Contract is for any reason held invalid, such decision shall- not affect the validity of the remaining portion of this Contract. GC -6 1 F. Building Permits. Building permits will not be I/ issued for constructing homes in the plat until sanitary sewer, watermain, and storm sewer have been installed, tested, and accepted by the City, and the streets needed for access have been paved with a bituminous surface. G. Waivers /Amendments. The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Contract. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution of the City Council. The City's failure to promptly take legal action to enforce this Contract shall not be a waiver or release. H. Release. This Contract shall run with the land and may be recorded against the title to the property . After the Developer has completed the work required of it under this Contract, at the Developer's request the City Manager will issue a Certificate of Compliance. Prior to the issuance of such a certificate, individual lot owners may make as written request for a certificate applicable to an individual lot allowing a minimum of 111 ten (10) days for processing. I. Insurance. Developer shall take out and maintain until six (6) months after the City has accepted the public improvements, public liability and property damage insurance covering personal injury, including death, and claims for property damage which may arise out of Developer's work or the work of its subcontractors or by one directly or indirectly employed by any of them. Limits for bodily injury and death shall be not less than $500,000 for one person and $1,000,000 for each occurrence; limits for property damage shall be not less than $200,000 for each occurrence; or a combination single limit policy of $1,000,000 or more. The City shall be named as an additional insured on the policy, and the Developer shall file with the City a certificate evidencing coverage prior to the City signing the plat. The certificate shall provide that the City must be given ten (10) days advance written notice of the cancellation of the insurance. The certificate may not contain any disclaimer for failure to give the required notice. J. Remedies. Each right, power or remedy herein ' conferred upon the City is cumulative 'and in addition to every other right, power or remedy, expressed or implied, now or hereafter arising, available to City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. K. Assignability. The Developer may not assign this Contract without the written permission of the City Council. The Developer's obligation hereunder shall continue in full force and effect even if the Developer sells one or more lots, the entire plat, or any part of it. GC -7 1 II II L. Construction Hours. Construction equipment may only be operated in the plat between 7:00 a.m. and 6:00 p.m., Monday II through Saturday. Operation of construction equipment is also prohibited on the following holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day, Christmas Eve Day, and II Christmas Day. 11 M. Access. All access to the plat prior to the City II accepting the roadway improvements shall be the responsibility of the Developer regardless if the City has issued building permits or occupancy permits for lots within the plat. II N. Street Maintenance. The Developer shall be responsible for all street maintenance until streets within the subdivision are accepted by the City. Warning signs shall be l placed by the Developer when hazards develop in streets to prevent the public from traveling on same and directing attention to detours. If streets become impassable, the City may order that such streets shall be barricaded and closed. The Developer shall I maintain a smooth roadway surface and provide proper surface drainage. The Developer may request, in writing, that the City plow snow on the streets prior to final acceptance of the streets. II The City shall have complete discretion to approve or reject the request. The City shall not be responsible for reshaping or damage to the street base or utilities because of snowplowing operations. II The provision of City snow plowing service does not constitute final acceptance of the streets by the City. O. Soil Treatment Systems. If soil treatment systems I are required, the Developer shall clearly identify in the field and protect from alteration, unless suitable alternative sites are first provided, the two soil treatment sites identified during the I platting process for each lot. This shall be done prior to the issuance of a Grading Permit. Any violation /disturbance of these sites shall render them as unacceptable and replacement sites will 1 need to be located for each violated site in order to obtain a building permit. P. Variances. By approving the plat, the Developer I represents that all lots in the plat are buildable without the need for variances from the City's ordinances. I Q. Compliance with Laws. Ordinances. and Regulations. In the development of the plat the Developer shall comply with all laws, ordinances, and regulations of the following authorities: 1 1. City of Chanhassen; 2. State of Minnesota, its agencies, departments and commissions; 1 3. United States Army Corps of Engineers; 4. Watershed District(s); 5. Metropolitan Government, its agencies, II departments and commissions. II GC -8 I/ R. Proof of Title. Upon request, the Developer shall I/ furnish the City with evidence satisfactory to the City that it has the authority of the fee owners and contract for deed purchasers too enter into this Development Contract. S. Soil Conditions. The Developer acknowledges that the City makes no representations or warranties as to the condition of the soils on the property or its fitness for construction of the improvements or any other purpose for which the Developer may make use of such property. The Developer further agrees that it will indemnify, defend, and hold harmless the City, its governing body members, officers, and employees from any claims or actions arising out of the presence, if any, of hazardous wastes or pollutants on the property, unless hazardous wastes or pollutants were caused to be there by the City. T. Soil Correction. The Developer shall be responsible for soil correction work on the property. The City makes no representation to the Developer concerning the nature of suitability of soils nor the cost of correcting any unsuitable soil conditions which may exist. 1 1 1 1 1 1 1 1 1 1 GC -9 1 1 I CITY OF CHANHASSEN THE SUMMIT AT NEAR MOUNTAIN 2ND ADDITION PROJECT NO. 93 -2 1 BREAKDOWN OF ADMINISTRATION FEES - 2/1/93 1 I Estimated Total Cost of Public Improvements $247,640.00 - 3% of Public Improvement Costs (Under $500,000) $ 7,429.00 1 - Street Lighting Charge (for electricty) 3 @ $200 $ 600.00 1 - Final Plat Process (Attomey Fee for Review and Recording of Plat and Development Contract) $ 200.00 I - Recording Fees a. Development Contract $ 20.00 1 b. Plat Filing $ 30.00 1 TOTAL ADMINISTRATION FEES - -- —_— __- $ 8279.00 1 1 1 1 1 1 1 1 1