Loading...
9. Fesibility Report on Lake Lucy Rd Street and Utiity Extension; Call Public Hearing I c i , i CITY OF 1 1 , 02ANHAssEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 I (612) 937 -1900 • FAX (612) 937 -5739 Act by City Administrator Ent'orsze I MEMORANDUM Mocii:cd Rejecter' TO: Don Ashworth, City Manager °st` I FROM: &1/ Date Submitted to Commis/110K Charles Folch, City Engineer Date Submitted to 001114I r DATE: January 20, 1993 8ry SUBJ: Receive Feasibility Report on Lake Lucy Road Street and Utility Extension; I can Public Hearing Project No. 92-12 I . At their regular =meeting on July 13, 1992, t Council authorized the preparation of a feasibility study for extension of street 1 u . h es for Lake Lucy Road between Trunk I Highway 41 and County Road 117 (Gale •:, oule d). I have attached a copy of the July 9, 1992 staff report which provides some • kgroun • n the impetus and some of the issues I involved in this improvement project w il • has bee • reviously identified as a future road element of the City's comprehensive 41 de plan am - • ed in May of 1991. It is not staffs' intent to recommend construction o a. entire roa • `, egment at this time; however, the I proposed development on the we i`nd of this gener -: area forces the City into at least defining an appropriate alignme n or the entire collect road and constructing the public improvements needed for the?! Tt elopment. In this ' r, the City is able to pro - actively I plan for this road impr .m ent prior to development. : This philosophy is also being implemented on o e .. °. •sects such as the Trunk Highw ,:-,, - 5 north boulevard access road t. and Trunk Highwa -N =. . ,, 5.. , _ : >�. . > : °fi The specific ele .■. - - • s proposed improvement project are 1 • ent • e • • , i e study along with estimated project 4 ;:, € e sociated special assessments t. • tting properties. I Staff and the project engineer hav `, ul • an ., , `i ood meeting to be held on Wednesday, February 17, 1993 at 7:00 P • z. a urtyard Conference Road to discuss this proposed project. { . At the formal public hearing for this project, the project engineer will provide a presentation of this feasibility report and its findings. The only action necessary for the Council tonight I would be to formally receive the feasibility study and call for a public hearing at their regular meeting on March 8, 1993. 1 � le PRINTED ON RECYCLED PAPER 1 Don Ashworth January 20, 1993 1 Page 2 I It is therefore recommended that the City Council formally receive the feasibility study for street and utility improvements for the extension of Lake Lucy Road and officially map the alignment between Trunk Highway 41 and County Road 117 (Galpin Boulevard) Project No. 1 92 -12, and call for a public hearing on March 8, 1993. jms I Attachment: 1. Feasibility study. 2. Staff report dated July 9, 1992. I c: Dave Hempel, Assistant City Engineer Al Larson, Engelhardt & Associates I Brian Pike, Westside Baptist Church David Gestach, Gestach & Paulson Construction I Brian Klingelhutz, Klingelhutz & Geis 1 1 1 1 1 1 1 1 1 . BIZ -1 Z�-°- • li 7 CITYOF 1 0:0 ‘ ''' CHANHASSEN 1 ( 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 i (612) 937 -1900 • FAX (612) 937 -5739 Action by Ctty Administrator Endorsed. ✓ b W 6 1 MEMORANDUM t>wod Rejected -- DeiL7 — 9 -. 92.0.— TO: Don Ashworth, City Manager oats Submitted to Comm FROM: Charles Folch, City Engineer C/(,. Date Submitted to Col DATE: July 9, 1992 SUBJ: Authorize Preparation of Feasibility Study for Extension of Lake Lucy Road 1 Between Galpin Boulevard (County Road 17) and Trunk Highway 41 Project No. 92 -12 r I Y :. The City has recently been contacted by F . o a djacent property owners located in the southeast quarter of Section 4 and southwest quarter of Section 3 concerning development I proposals. Both properties are located on' the east side of Trunk Highway 41 immediately south of the Minnetonka Middle School property. `The property immediately adjacent to I Trunk Highway 41 is approximately 10 acres in size and is the location for a new church site. The adjacent property to the east is approximately 26 acres in size and is tentatively proposed for residential single - family development. Road access is a key element for both ' developments. The church property has a pre - existing driveway access on Trunk Highway 41. The single - family development may also have a cross - access easement over the church property out to Trunk Highway 41. Both are believed to be inappropriate access facilities 1 to these sites given the proposed developments. The City's comprehensive guide plan amended in May, 1991 identified the extension of Lake 1 Lucy Road from Gaipin Boulevard (County Road 117) west to Trunk Highway 41 as a needed future collector street improvement. The topography and environmental features of this area make routing a roadway alignment very challenging, particularly on the west end I towards Trunk Highway 41. It is not staffs intent to recommend constructing this entire road segment at this time; however, the two developments on the west end which I lie within the general area of the Lake Lucy Road extension sort of force the City into, at a minimum, defining the most appropriate alignment for this collector road through these sites. In effect, the City needs to be in the position of proactively determining the I alignment. • 1 it t41r PRINTED ON RECYCLED PAPER 1 1 1 Don Ashworth July 9, 1992 1 Page 2 • I The length of the future Lake Lucy Road between Galpin Boulevard and Trunk Highway 41 is a little over a half -mile. At this time it would be appropriate to define and officially map the entire future collector road alignment and perform a feasibility study on only the I westerly quarter -mile of this road segment which will initially serve these two development sites. I have contacted Bill Engelhardt of William R. Engelhardt Sc Associates, who has - some familiarity from previous involvement associated with this road to provide a cost 1 estimate to perform this feasibility study and official mapping. Bill has estimated this work to cost approximately $ 10,000. Being that this future roadway will ultimately serve as more of a community -wide roadway system and is in the City's long -range comprehensive 1 transportation guide plan, the cost to perform this study will have to be up- fronted by the City; however, it will likely be recovered over a number of years as tracts of land abutting this roadway develop and the corresponding construction projects take place and pay their 1 share of the roadway improvement costs. It is therefore recommended that the official mapping of the extension of Lake Lucy Road I between Galpin Boulevard (County Road 117) and Trunk Highway 41 and the preparation of a feasibility study for the road improvement project of approximately the westerly I quarter -mile of this segment be authorized, Project No. 92 -12, and that the consulting engineering firm of William R. Engelhardt & Associates be assigned as the engineer on the project. 1 ktm 1 Attachment: Location Map c: Dave Hempel, Sr. Engineering Technician I Brian Pike, Westside Baptist Church Dave Gestach Brian Klingelhutz 1 Bill Engelhardt 1 1 1 1 1 . N 1 LOCATION MAP 'V\ I NO SCALE ■ R t4t4E .,./1 , • - in ■ate IT. -i. s� , ZVI IR : 4 I ,,,,,, E ,..,<: _, a EMU jia �� I ...,,, . ,,,, w) ,,„„, • . in iiim wifiatw At „, .=.1.m Er HERMAN F/ELD ii,,, PARK 1 •.�1■■■ �, • *41 Vir �'♦ A PF 44 4 1 711.. - ..,- . j F E 3 Q �. cY 1 a. At !,, 4 , ;, c .. ,. ..,__ , O 4., - - -1____ . ( - - - , I , I 1 11 _ _ LAKE HARR/ ON • a , Man ' k ...' . 1 MI 1 Al 4 1 g" 14.1 J ' O CO VI 1