2c. Public Utility Improvements at Target site II 0 ..:, CITYOF
r , 4
1
i CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
1
MEMORANDUM OFFICIAL ENGINEERING COPY
I TO: Charles Folch, City Engineer Received
Revision No.
FROM: Dave Hempel, Assistant City Engineer - I Approved h City Engineer
I Date OVIF /NV!
3
DATE: September 2, 1993
I Approved by City Council
SUBJ: Accept Public Utility Improvements at the Target Site Date
Project No. 92 -15
1
Staff has received a letter from the developer's engineer, Mr. Fran Hagen of RLK &
1 Associates indicating that the above - referenced project has been constructed in accordance
with the approved plans and specifications and therefore requests the City accept the
utilities for permanent ownership and maintenance. All of the utility improvements have
1 been tested and approved by City staff. Staff has performed a walk - through inspection of
the project and finds the project in satisfactory condition.
1 It is therefore recommended that the City Council accept the public utilities at the Target
site, Project No. 92 -15 for perpetual ownership and maintenance conditioned upon the
I developer and /or contractor supplying the City with an acceptable maintenance bond
guaranteeing the public utilities for a two -year period commencing from the date of
acceptance and supplying the City with one set of mylar as -built plans and two sets of
I blueline as -built plans.
Action by MY Administrator,
jms
1 Endorsed l t l. k
Attachment: Letter from Mr. Fran Hagen dated September 1, 1993 Modified
Rejected
Date 9 - 7 -�t
1 c: Fran Hagen, RLK Date Submitted to Commission
Date Submitted to Council
1 y -,3 -93
1
1
1
•
[RIK 922 Mainstreet
Hopkins, Mn.
55343
(612) 933 -0972
ASSOCIATES LTD. fax: (612) 933 -1153
REVISED
•
1
September 1, 1993
1
City of Chanhassen
690 Coultier Drive
P.O. Box 147
Chanhassen, MN 55317
Attention: Bill Bement
Engineering Department
Gentlemen: 1
Construction of site grading and the public and private sanitary sewer, water main, and storm
sewer and street improvements have been completed at the Target Store site. Work was done
in accordance with approved plans and specifications and City requirements. We respectfully
request that the completed public work be accepted by the City of Chanhassen for continued
maintenance subject to the two year guarantee. The required two year Maintenance Bond will
be forwarded for your records.
Sincerely, 1
RLK ASSOCIATES, LTD.
„1 .
Francis D. Hagen, ,., F.E.
Director of Engineering
•
FDH:Iat 1
•
cc: Rick Whiteaker, Ryan Construction CITY OF 6NaHNASSEN
SEP 0 1993
ENGINEERS DEPT.
1
• Civil Engineering • Transportation • Infrastructure Redevelopment
• Landscape Architecture • Construction Management
1